Westminster School Playing Field Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Me n a
Ri v e rT h a me s
Hi h g W ae tr
Me a H n
ih g W
ae tr
Po n d
Paddling
Pool
City of Westminster
Main tunnel
V a u x h a l l B r i d g e
Pimlico
Al e t b r Em b n m e a k n t
ea n
Hi gh
R o a d
ML W
Ri v er Th am
Paddling Pool
Me a n Hi g hW
ae tr
Lacks Dock
(disused)
Gr o v se n r o R o d a
od Pn
V a u x h a l l B r i d g e
Pond
MLW SL
SL
O u t f a l l
ea n
i gh
at er
O u t f a l l
i v e r T h a m
e s
Pond
Vauxhall
m a h T r e v i R s e
Shingle
e tr hWa g i nH a Me
n a e
h g i H
r e t a
SL
SL
Mud
SL
Mud
s e m a h T r e v i R
MP 0.5
Shingle
e tr Wa g ih nH a Me
London Borough
Mud
of Wandsworth
MH & MLW
Mud
0 19
4.5m
e s u o nH o l ut o D
0 o2 1t
DW
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Key:
Local authority boundary
Order limits
Tunnel
Shaft
Po d n
FOR INFORMATION
Location
Section 48 publicity
The Oval
g a M e n Hi h W
tr ae
l e n n a h c d e s i r o h t u A
n a i r t o t n c i e V m k d n e t a s b i L f Em o r d et n b l E A
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Tintagel House
Key:
Limits of land to be acquired or used (LLAU) Authorised channel + 105.40m Existing levels (shown in metres above tunnel datum) Listed buildings/structures Approximate position of CSO outlet Existing trees within surveyed area
West elev.
North elev.
+ 105.02m
Notes :
r e t a w
e n t
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on Camelford House over hangs the Thames path below Ground reinforcement to slipway the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.
Vauxhall Bridge
Camelford House
Ramp down to carpark below Cycle parking + 105.27m + 105.05m Brixton storm relief CSO
+ 104.54m + 103.80m Cobbled scour protection apron Clapham storm relief CSO Low level vegetation Duck tours vehicle entry security kiosk to Lacks dock with vehicle barrier Vauxhall Cross Line of Thames path subway below bridge Stairs up to bridge level Route of sewers to outfall shown dotted + 108.47m + 105.47m Location Secure boundary wall to Vauxhall Cross
N e w Ga S p r r ig d n e n sW s ak l
Al b e r t Em
b a n k m
d e s i r o h t u A
l e n n a h c
n a e
w o l
10m
40m
+ 104.85m
Exposed timber and concrete dolphin/outfall structure with double cast iron flap valves (upper in river wall, lower in foreshore at end of structure).Timber piles to perimeter Ramp down to bridge subway
FOR INFORMATION
a i or t c Vi ne i l ow l be
a i or t c Vi ne i l ow l be
Ramp up to road
t oo ef dg i Br
July 2012
Mud
4 5
Ea t sb r u y Ho u e s
Al e b r Em t b n a k me t n Ga d re s n
Mud
Stone
DW
El Su b
TN IW O T R H SR T E E T
St a
El Sub Sta
TCB
e n o t S
V a u x h a l l M C eh h to u r ds c h it
TN IW O T R H SR T E E T
ES lu b t Sa
e tn So
Thames Path
wa t er
8 4 o t 7 5
9 8
wa t er
Vauxhall Gardens
1 0 0
Community Centre
AL K
1t o
Mo r p eh t ( P A H r ) ms
P L A C E
Monument
ea n
FB
WO RG
Authorised channel
Pe i s nn ua l He g ih s t
Ar 87 n H e o u e s
9 3
P ON S ON B Y
9 t 2 o
Shingle
FB
AN ST REE T
l ow
2 0
at er
AL LW
0 6
i gh
lw o
ea n
VAU XH
D W
Play Area
Ti t g n a e Ho l u e s
ea n
LW
(site of)
o s u e
Gunhouse Stairs
1t 2 o 5
Works
9 2
Ke n n e y d Ho u e s
1 0 1
2 4
Depot
1 0
t o
House
5 J m a e s n o H
Shaftesbury
Co t a p H l l
5
(i o st f e )
1 0
1 t o
Cromwell House
1 2 1
1t o
Mud
G A LS S O H U S W E A L K
9 1
PH
Shingle
es
R i H v e r o w u a s l e k
n e h g Si l
LB
G A LS S O H U S W E A L K
Ri v er G L Th As l y Co am n
Alternative
Bd y LB
Ac
AL BERT EM BANKM EN
T
Playground
SM
TYE RS ST REET
s t&
Shingle
o u s e
Ca me l fr od H
ae tr
8 7t o9 0
ih g W
PH
LU S A D T R E E T
Me a nH
El Sub Sta
C R
a r d B d y
D ry al H e os ue
2 1 7
1o 6 t3
Bol
Lacks Dock
(disused)
TCB
e l g n i h S
N W S RN E P IG G R E SWA K A D N L
k l d epl L o o Wa
Vauxhall Bridge
C R
Walk
Ac/Ap
Sh l r et e
Games Court
MLW SL SL
Spring Gardens
Vauxhall Cross
6 1 5
Dolphin MP MP
O u t f a l l
85
S Gantry
S Gantry
Va x a l u h lSt t a in o
Dolphin
LW
MPs
S T R
E E T
a r d B d y
B R I D G E F O O T
VAUXHALL
A U
K LA N
O u t f a l l
TCB
S T R E E T
LY N
n e h g Si l
372
PH
Fo t o Br g i e d
Ps
19
CR
18
PC
K N IG O E NN T N LN A E
U n d
Aquarius House
14 t 7 o 18 0
16
H o u s e
1 3 c
3 3 7
Galleon
43 3
Hse
Hanover
742 to 771 773 to 886
2
Hostel
E L R V L G O A X A V U H
1 7
Jellicoe House
3
Kestrel House
dy B
569 to 658
Rowton House
SL
659 to 741
Hobart
887 to 927
3 1 to 8 1
5o 0 2 t3
House
18
t6 1o
8 1
Kingfisher House
e d os o Hu oe o R sw E L R V L G O A X A V U H
60 a
9 5
3 1 to
6 2
6 0
House
t6 1o
471 to 568
t1 7o 2
n a e
SL
Hamilton House
Square
r ut p i n o Pp i C
8 5 5 5
1
7
4 8
h g i H
10
5 b
r e t a
TCB DW
SG a t nr y
e l g n i h S
t o 47 0
Phoenix House
Cobalt
4 0 t o 4 6
1 1
4 F 3 l a 2 g s t a f f H o u s e
t o
t5 1o
1 0 a
1 0
9 b
9 a
m a h T r e v i R
Vauxhall Station
12
DW
Aquarius House
Va u h x a lSt l a t n i o
29 9 t o 33 6
Fn
s e
Ensign Hse
St George Wharf
17
TCB
1 3 b
F o u n t a i n
RO
14
1 4 a
H o u s e
St George Wharf
7 1
SO UT H L AM BE TH AD
1 3 a
VAUXHALL CROSS
Cobalt Square
H A R L E Y F O R D
R O A D
1 5
2 5
Cobalt Square
3 3
El Sub Sta
5 37
D r a k e
2 9 8
8 33 8 31
t o
7 37 7 39
Thames Path
1 8 1
6 39
35 o 7 7 t 31
n U d
5 39
Ud n
372
5 30
FB
4 39
t o B 1 r i 4 d 6 g e H o u s e
4 30
4 38
PH
5 35
8t o9
K N A B L L I M
6 33
1 6
1 1
Works
Allotment Gardens
3 32
LB
3 t 0 o3 4
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
7 9
4o t1 4
3 5 3 3 6 7
PH
8 3t o9 7
Keyplan:
This drawing
2 a
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Limits of land to be acquired or used (LLAU) Existing public right of way Route of temporary diversion of right of way Existing right of way temporarily stopped up Existing right of way permanently stopped up Provision of permanent permissive right of way
1 1 1
15 7 t o 16 1
U nd
Ap
1 9 1 1 5 1 2 1 1 1 3 2
1 9 3
Ac Notes:
1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown
Vauxhall City Farm
NG STREET GODI
6 t 2 o
6 ( 5 b eo l w)
3 9
2 32
10m
100m
PH
FOR APPROVAL
s y e b Pr
es n An St rh uc Ch RC
Location
U SO E A L C HP BET A L M TH
Section 48 publicity
S A n R t ne s C
Primary Sch
Access plan
es A n St n H l t al l t m n te e c l Se t oi Ca h
3t o9
o or B C t& s on LB
1 1
1 6
99 . 90
10 5. 04
98 . 89
9 . 92 0
10 5. 40
10 5. 01
es
10 5. 01
Pi l l ar s
Be nc h
1. 4m
i v er Th am
99 . 57
St on e
9 85 .5
et al
99.29
99 10 . 5 8 6. 11
10 6. 01
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Matchline: Sheet 2
SS SPS Bench x4
Keyplan:
9 89 .1
10 5. 02
This drawing
1 5 0 . 4 5
10 5. 39
99 . 83
Be nc h
1. 4m
10 5. 05
Pi l l ar s
9 95 .5
1 0 4 . 9 9
10 5. 05
Authorised channel
9 85 .4
S c a r
Tarmac
99.21
10 6. 12
St on e
99 . 79
10 5. 39
Be nc h Pi l l ar s 1. 4m
10 5. 01
M / w RF i t 0 h 8 St . m on h 99 on e . 72 W al St o 10 l 1. ne 5. 4m 10 R 39 e 5. h a 01 be t i ni t n w ee g W n LP al l s 10 6. 11 10 5. 00
h 12.0
et al
10 M / 5. on RF 06 SW 1. 0m 1. h 0m h
Maple g 0.9
9 94 .8
St on e
10 5. 05
S c a r
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
MG
M / on RF SW 1. 0m 1. h 0m h
9 88 .1
Key:
Limits of land to be acquired or used (LLAU) Above ground structures to be removed
99.17
9 . 85 5
9 89 .4
Be nc h Pi l l ar s 1. 4m
10 6. 11
1 0 4 . 9 7
1 0 6 . 0 0
St on e
9 . 93 8
99 . 20
et al
SPS
SS
98 . 53
99.16 99.12
10 5. 39
Bench x4
Be nc h Pi l l ar s 1. 4m
10 5. 44
99 . 84
10 5. 01
SPS
99 . 13
Notes:
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown.
99.36
10 5. 06
10 5 10 . 1 0 5. 01
9 . 85 1
St on e
99 . 86
10 6. 11
99 . 17
Maple g 0.8
1. 0m
et al
1 0 6 . 0 1
10 4. 89
9 8 . 6 1
99.19 98.99
h 12.0
removal of hardstanding and foundations, stripping of topsoil and clearance of minor Vauxhall Cross vegetation not shown.
10 5. 39
10 4. 57
98.85
O u W t f a l i l I t L hS 9 8 tr . om 9 2
Base 99.51
R i v e W i rE h A t fa r S fr I c o L hH tr O ut 10 e m a 0. ad Fl f l 74 10 ap l 3. 23 22 40 x 20 60
99.09
Concrete
10 5. 40
1 0 4 . 5 4
99.30 Dolphin
C R W
10 4 6 10 . 1 4. 71
V A U X H A O L v e L r h e a B d R I D G E
9 8 . 5 3
99 . 94
10 6. 12
99.01
99.07
h m h 2 . 2 .m 3 F 2 R / W M S n o
10 4. 86 10 4. 90
O v e r h e a d 1 0 5 . 5 6
99.46
/ R
97.81
10 4. 62
B e a m
1. 0m
9 8 . 8 4
9 8 . 9 9
Tarmac
on
SW
9. 85 2
99 . 55
9. 85 1
98.96
B e o/ am h
99 . 12
9 8 . 7 2
9 9 . 8 5 WF 1 S 0 h 1 . P e 0 i e 5 l t i n g
10 4. 29
9 99.28 9 . 0 F 7 l a p 9 9 2 . 3 2 9 5 0 x 1 4 4 0
9 9 . 8 9 9
9 9 . 5 2
1 0 4 . 5 7
98 . 52
MH(U) CL 104.60
Parapet on one bay of river wall and widen opening between lamp posts
7 5 0 . 1 4
1 0 4 . 2 9
7 9 . 9 9
Bridge Pier
9 8 . 9 6
Concrete
21 . 99
10 4. 26
d0 . 7
0 9 1 9.
99.05
9 9 . 2 9
9 9 . 1 0
97.99
St R one e a W ti al ni l ng 10 0. 04
9 9 . 5 4
10 4. 25
1 0 0 . 8 9 WF 99 0 . 0
10 0. 11
99.18
10 3. Li 90 f eb el t
99 . 75
O u t e r E d g e o f B r i B d e g a e m O O v e v r e h r e h a e d a d 1 0 7 . 7 6
10 5. 39
1 0 4 . 2 6
SPS
Tarmac
10 4. 57
9 9 . 8 0 9 9 . 3 9
1 0 1 . 0 9 Concrete Platform 1 0 0 . WF 8 0 9 9 . 6 2
2007
C o n WF ce r t e 1 0 0 . 7 9
1 0 4 . 2 6
7 5 0 . 1 4
Tarmac
99 . 94
Sh ee tP in l i g
Co nc r et e
O v e r h e a d 1 0 5 . 5 7
9 7 . 8 5
L a d d e r
10 4. 24
B e a m
97.61
99.40
1 0 3 . 8 2
10 3. 99
MG
99 . 83
99 . 63
99 . 99
10 4. 58
99 . 93
97.85
98 . 52
9 7 . 9 3
104.43
10 5. 16
99.25
Up s t an d
.1 85 9
104.48
1 0 4 . 5 7
Brixton storm overflow structure, S SPS timber dolphin and timber post
IC(U) CL 104.67
S P
M / R F
2 . 2 m h o n S W 1 1 0 . 4 0 . m 6 5 h
51 . 98
Mud/Shingle
Sheet layout
M / R F
1 . 8 m h
1 0 4 . 2 8
Fence
104.65
1 0 3 . 8 0
S f 17 9 oi 0. f t 8 9 6 . 4 0 1
SS
M / RF 2 . 2 m h So e t n Src r t te u u
Sheet 2
Sign MG
BP 10 4. 10 72 4. 83 M / R o n F2 SW . 2 m h 1 . 0 m h
1 0 4 . 5 3
9 8 9 9.
99.43
C 99 on . r 97 c et e
97.83
Sh ee tP in l i g
98.05
Sheet 1
Ladder
S o f f i t
97.84 98.09
8 4 . 8 9
9 .9 84
97.99
S h e e t P i l i n g
9 9 . 9 1
1 0 4 . 6 5
r an i t e
97.89
1 0 4 . 6 1
M / on RF SW 2. 2m 1. h 0m h
O v e r h e a d 1 0 7 . 8 0
99.49
9 9 . 9 4
WF
1 0 6 . 8 3
Pi l l ar 2. 6m h 10 4. 67
B e a m
99 . 85
1 0 4 . 5 5
15 . 99
MG
1 0 4 . 7 2
99.34
9 8 . 8 3
99 . 21
9 9 . 9 0 9 9 . 7 6
G r a n i t e S t e p s
10m
10m
92 9 .9
98 . 48
O u W t f a l i l I t L hS 9 8 tr . om 9 1
Concrete Base
99 . 91 B e a O m u O t e v r e E r d h g e e a d o f 1 B 0 4 r i . d 9 g 3 e O 1 v 0 e r 0 h . e 0 a 2 1 d 0 0 . 6 9 1 0 0 8 . 1 W 3 o o d e n F e n d e r s 8 W o 1 o 1 0 d 0 0 e 0 . n . 2 0 7 F 5 e n d e r s 1 1 0 0 0 0 . . 6 4 8 2
9 8 . 2 7
B e o/ am h
et ai ni ng
9 9 . 2 1
C W
al l
9 9 . 1 5
F l a C W 9 p R 9 1 . 1 7 1 2 0 x 1 5 3 0 9 9 . 1 0
99.68
9 9 . 4 3
1 0 1 . 0 3
9 9 . 6 2 9 9 . 7 8
Dolphin
9 9 . 5 5
2006
S t on e
9 9 . 0 4
1 0 1 . 0 3 9 9 . 2 6
C o P n l ce r a t f e o t r m
S ub w
FOR APPROVAL
For continuation of detail at bridge deck level see detail file 100-DV-SUR-CS20X-960801
1 1 0 0 0 0 . 0 . 6 4 7
ay
Location
9 84 .8
98.79
10 P 4. i l l ar 78 s
1 0 0 . 6 7
Wooden Post on Wooden Post on Concrete Base 100.68 Concrete
10 0. 39
1 0 1 . 0 7
S o f 1 ft 0 i 6 . 8 7
Document Information
1 0 0 . 6 5
Section 48 publicity
IR / on F C 0. W 9m 0. h 3m h
10 8. 87 10 8. 47
Clapham storm overflow structure plus 2 No. timber dolphins and 4 No. timber posts
98 . 48
98.78
1 0 4 . 6 6
Base 100.48
S t on e
99.74
S o f f i t
Ladder
1 0 7 . 9 5
2 2 0 . 1 0
MG
SPS
1 0 0 . 0 9
1 0 0 . 3 2
1 0 8 . 7 7
Mud/Shingle
10 1. B rc 40 i k
1 0 8 . 4 4
SPS
10 8. 78
July 2012
99.71
BP
10 7. 99
C w
98 . 45
99.19
IR / on F C 0. W 7m
1 10 07. 7. 86 60
10 7. 62
5 0 . 0 0 1
BP
0 . 7 m
o n
99 . 85
10 10 6. 6. 72 29
10 7. 48
10 8. 14
0. 5m
on
99.91
10 8. 45
8 9 . 9 9
I / R F
1 0 7 . 9 8
10 1. 24
10 6. 30
SPS
IR /
SPS
10 7. 23
8 97 9 .
a r d B d
100.53
WF
Co c n r eeW t al l
99.67
7 8 . 0 0 1
101.34
98 . 55
1 20 0 .2
1 19 0 .3
1 5 0 . 8 7 1 4 0 . 9 5
1 4 0 . 9 0 1 5 0 . 5 5
9 9 . 0 0 1
1 17 0 .9
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
100.43
1 0 0 . 8 6
79 0. 10
Keyplan:
10 0. 71
1 0 0 . 4 6
WF
1 1 0 . 9 9
Lifebelt
1 5 0 . 8 7 1 4 0 . 9 8
101.58
WF
This drawing
1 5 0 . 0 2 1 5 0 . 5 6
98 . 58
99.60
WF WF
1 0 0 . 7 7
WF WF
100.30
10 0. 23
1 2 0 . 1 6
10 0. 56
1 0 50 .4 1 0 60 .2
WF
1 5 0 . 0 7 1 6 0 . 0 0
101.43
99.55
PIG 200
1 2 0 . 1 6
o BW n
100.24
10 0. 46
10 0. 16
10 0. 72
1 5 0 . 8 7 1 5 0 . 0 6
1 5 0 . 1 3
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
9 . 85 6
Mud WF
09 .m h
Key:
Limits of land to be acquired or used (LLAU) Trees to be pruned
98 . 53
WF
99.45
101.33 WF WF
1 5 0 . 8 8 1 5 0 . 2 2
10 0. 65
WF 102.16
1 0 2 . 3 3
1 5 0 . 2 8
M/ RF
9 9 . 4 2
100.05
1 0 04 .7
1 0 0 . 0 8
WF
98 . 54
WF
9 92 .5
WF 101.29 WF
Ta r a m c
Notes:
1 6 0 . 0 3
1 5 0 . 3 7 1 5 0 . 6 2
1 0 03 .1
1 0 02 .7
99 . 24
10 0. 70
99 . 51
102.22
WF
10 2. 48
99.82
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. General activities of site clearance such as removal of hardstanding and foundations,
100.36
WF
1 0 5 . 8 1 0 52 7 .4
Concrete
98 . 54
2011
99 . 47
9 9 . 2 4
3 85 9.
10 0. 4 4
1 6 0. 10
101.32
WF
1 0 58 .6 1 0 52 .9
100.40
10 2. 60
102.23
v er Th am
es
WF
Brick Pillar
9 . 85 1
WF
WF
9 . 96 9
Brick Pillar
99.59
101.27
9 94 .0
Bu i l d n So i g fi O v f t1 e 12 r e h . 52 ad
1 0 27 .6
102.27
WF
Brick Pillar
S Soofi f fi t 1 f t 0 10 9. 9. 33 10
99.87
105.35
99.38
9 9 . 0 5
9 . 99 0
WF
99.16
9 9 . 3 7
Shingle 100.51
102.33
al l
9 9 . 4 5
10 5. 34
9 9 . 8 7
Re t an ii n g
1 0 5 . 2 8
1 0 3 . 0 2
1 0 58 .8 1 0 53 .2
9 8 . 9 7
WF
1 0 29 .6
99.58
10 5. 37
/ R
0. 9m
100.49
on
WF
BW
105.35
10 5. 62
99.72
o n
100.03 101.27
9 9 . 8 8
C o n c r e t e B lc o kS l iw p a y
Co n c r e t e
CW
Sheet layout
0 . 9 m
99.83
10 2. 95
So fi f t
/ RF
10 9. 08
1 0 5 . 1 7
102.30
100.56
1 0 0 . 6 7
WF
10 5. 26
1 0 0 . 4 5
1 0 0 . 4 0
9 9 . 7 2
100.77
WF
2012
Shingle
2 6 . 9 9
WF
1 0 5 . 3 4 C o n c r e e B tP 1 S 0 W i 5 l f . of 1 lr 4 i S . a t 1 2 1 m m 0 7 oi h . kn 8 1 C 0 8 g W 4 A . 4 r 9 e a 1 M 0 e 5 . t 6 a 9 l G r i l l e
1 10 05. 5. 41 31
1 0 1 . 3 1
B i k e R a c k
1 0 5 . 4 8
S e a l e d s m o k e o u t l e 1 t 0 f 5 r o . 2 m 9 g B a W r a 1 g 0 e 6 . 4 9
7 2 . 5 0 1
99.76
1 0 1 . 0 5
101.29 102.11
B i k e
WF 1 0
. 1 5 3
R a c k
105.29
Bi k e
10 0. 33
Lifebelt
Bi k e
Ra c k
1 0 50 .9
10 5. 10
10 0. 10 10 5. 40
10 5. 10 3 5. 9 10 43 4. 49
105.27
1 0 61 .4
1 0 5 . 1 2 1 0 2 . 4 5
1 0 2 . 7 7
1 0 2 . 9 9
103.29
103.93
1 0 4 . 2 3
14 0. 4 1
10 5. 94 BR W
H R
1 0 5 . 4 5
1 . 1 m h
C o n c r e t e P Tarmac i l l a r
10 5. 36
14 0. 4 5
1 0 5 . 3 8
B i k e
M/ R F w i t .m hS 08 tn ho o eW nS o al tn l 14 eR .m ea hb ti ig ew nn t W e e nL al l P 1 s 0 1 . 3 1 6 0 51 .1
B i k e
99 . 62
1 0 1 . 5 7
102.37
1 0 5 . 3 2
Ra c k
1 0 2 . 5 6
a c k
6 0. 10 0
1 0 0 . 8 8
Tarmac
S e a l e d s m o k e o u t l e t f r o m 1 0 g 5 a . Tarmac 3 r 5 a g C e B o W C n c o 1 r n . e 2 c t m r e e 105.32 h P t e i l l P a i r l 1 l a 0 r 5 . 2 9
1 . 2 m h
1 0 5 . 3 2 B W
C o n c r e t e P i l l a r
03 3. 10
5 2 . 5 0 1
M R / F
m 9 . 0
99 . 55
Bi k eR
a c k
10m
CAMELFORD HOUSE
10m
M R / F
k c i r B g n i n i a t e R
n o
m 9 . 0 h n o C
l l a
3 3 . 5 0 1
W B
W
8 6 . 4 0 1
s e h s u B
1 0 36 .2
1 0 5 . 4 3
a c k
Planting
m 0 . 3 0 . 1
B ie k Ra c k
7 3 . 4 0 1
0 1 0 . 1 5
10 5. 01
C S
10 6. 12
1 0 54 Co .7 n ce r t e
.1 59 0 1
0.7mh
B W
10 10 5. 63 10 5. 9 5. 6 44
Stone Blocks
1 0 5 . 1 3
Scrub
C o n c r e t e P i l l a r
b a s e m e n t
S h P m S 5 . 0 W C
FOR APPROVAL
S e a l e d s m o k e o u t l e t f r o m b a s e m e n t C o n c r e t e P i l l a r
30 5. 10
Mud/Shingle
1 0 61 .4
10 10 0. 5. 07 05
Sculpture
1 0 54 .7
15 0. 0 9 SPS
1 0 5 . 1 2 1 0 5 . 1 0
1 0 3 . 9 0
1 0 42 .4
1 0 54 .1
105.72 B P 1 1 0 0 5 5 . . 4 5 6 5
g 0.2
1 0 5 . 4 1
105.38
Protruding
1 0 3 . 8 6 1 0 5 . 1 0
10 5. 01
15 3 0. 0
1 0 4 . 2 5
1 0 5 . 2 7
1 0 5 . 2 8
1 0 5 . 3 6
Sap
99.47
1 0 50 .7
6 0 . 5 0 1
Sign
m 2 . h /F2 MR 8 . h 1 m n W o S
1 0 50 .8
1 0 51 .0
15 0. 0 5
1 0 4 . 5 5 1 0 46 .3
1 0 4 . 5 1
1 0 4 . 5 7
BR 1 W 0 56 .3 1 M/ 0 59 RF .4 09 .m h
1 0 4 . 4 2 1 0 4 . 4 9 1 0 5 . 3 7 1 0 5 . 2 8 1 0 5 . 3 0 1 0 5 . 3 9 10 5. 37
1 0 5 . 2 7
Tarmac
1 0 5 . 4 2 1 0 1 55 0 .5 5 . 3 7
g 0.1 h 5.0 Silver Birch BP
1 0 5 . 3 0
1 0 5 . 1 0 4 5 0 . 4 6
105.36
C o n c r e t e P i l l a r
Location
2002
10 5. 05
1 0 50 .1
10 6. 13
1 0 5 . 1 1
1 0 50 .1 1 0 50 .6
Scrub
1 0 5 . 2 1
1 0 55 .3 1 0 5 . 4 2
105.64
1 0 5 . 2 7 1 0 5 . 3 0 1 0 5 . 2 0
C 0 m W . h 5
1 0 5 . 2 0
1 0 1 5 0 . 1 5 8 . 2 8
105.39
15 1 0. 1
B
105.20
Scrub 105.69
1 0 5 . 2 3 1 0 5 . 1 2 1 0 5 . 1 1
1 0 5 . 2 6
B P
C W
1 0 5 . 3 6
S e a l e d s m o k e C o o u n t c l e r t e f t r e o m P i l b l a a r s e m e n t
27 5. 10
10 10 0. 5. 00 40
10 5. 18
10 5. 06
Raised planters
Tarmac
M/ R F3 .m 0 ho nS W
1 0 50 .7
Tarmac
1 0 5 . 1 7
Tarmac
0 . 4 m h
1 0 5 . 1 1 0 3 0 5 9 55 .8 . 4 6
105.37 B
1 0 5 . 3 0
S o f f i t 1 0 9 . 1 3
10 .m h
1 0 50 .6
1 0 50 .3
1 0 50 .4
Rough Grass
1 0 52 .1 1 0 51 .2 SPS 1 0 51 .9
1. 0m
D U C K
BP
1 0 5 . 3 1 1 0 5 . 2 3 1 0 5 . 1 2
1 0 5 . 0 9
1 0 5 . 5 2
1 0 5 . 3 3
SW
1. 4m
Maple h 12.0
et al
Be nc h
on
T OU R S
10 4. 99
Pi l l ar s
10 5. 10
1. 0m
g 1.0
99 . 90 10 6. 12
St on e
1 0 5 . 1 0 1 0 5 . 1 9
A C C E S S
1 0 5 . 3 7 1 0 5 . 4 3 W
Sheet 2 of 2
b a s e m e n t
Tarmac
10 5. 04
Matchline: Sheet 1
10 5. 01
1 0 5 . 0 8
BP
Sign
10 6. 01
10 5. 06
15 7 0. 0
15 0. 1 3
Be nc h Pi l l ar s 1. 4m
1 0 5 . 1 3
10 5. 01
Concrete wall
Boundary wall
1 0 5 . 0 2
99 10 . 5 8 6. 11
1 0 5 . 1 1
Hut
1 0 49 .9 1 0 1 5 0 . 50 0 .9 9
St on e
et al
a 1 r m 0 5 a . c 1 0 6 W 4 1 . 9 al 8 l m o u n t e d c a be l B Sign
1 58 0 .6 Gr v l a e
0 0. 15 7
1 0 5 . 2 6 1 0 5 . 1 6 1 0 5 . 0 9
1 0 5 . 1 2 1 0 5 . 0 1
1 0 4 . 8 7
1 0 4 . 9 9
BERT EM BANK M
9 0. 14 6
1 0. 15 0
10 5. 40
1 0 5 . 0 4 1 0 5 . 1 5
BW 10 5. 99
B u s h e s1 . 0 3 Tarmac . 0 m h
1 0 5 . 0 9 1 0 5 . 1 2
ENT
10 5. 04
Concrete wall
1 0 M/ 51 .6 R F w 26 i t hS .m BP tn ho o eP nS 1 0 51 i l .2 lr W 1 a s2 . 4 .m mh 4 h
1 0 5 . 2 6 1 0 5 . 2 2 1 0 5 . 1 2
1 0 5 . 2 8
/ R F 0 . 9 m h o n B W
/ R
1 0 5 . 4 2
1 0 5 . 2 5
1 0 5 . 3 6 1 0 5 . 4 0
July 2012
Vauxhall Cross
Table 1
Above ground permanent structure
Ti nt ag el Ho us e
Ventilation column(s) serving the Clapham SR CSO interception chamber and Brixton SR CSO interception culvert Ventilation column(s) serving the shaft
m a h T Maximum height above finished ground level r e (Minimum heights are in brackets where applicable) v i 6.0m R
8.0m (4.0m)
s e
DW
Pe ni ns ul a
ei g
N
w n a e w o l
r e t a
G u n h (i o s se u e t Sa o) ti f r s
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
2.5m (1.5m) Zone within which Work No. 15a would be located
Co p t Ha l l of
92
( st i e
S h i n g l e
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
91
Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1)
o u s e
n a e
EM BA NK ME NT
e l f o r d
9 0
a m
8 7
t o
AL BE RT
Zone within which ventilation column(s) serving the Brixton SR CSO interception culvert may be located
Sh et l e r
S h i n g l e
9 1
8 1
Typical Section A
(Not to scale)
Va u x h al lS tt ai o n
C R
Zone within which ventilation column(s) serving the shaft may be located
r e t a h g i W
Zone within which required landscaping would be located Limits of permanent access Maximum extent of top of river/ parapet wall or terracing
ge i rd B l l ha x au V
ML W D o l p h i n MP MP
s (i D d o s u c s k e d )
L a c k
B o l
Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
T C B
N E W G S P A R R I D N E G N SW A L K
O l al f ut
D o l p h i n
MP s
O l al f ut
10m
40m
Maximum extent of top of river/parapet wall Top of river/parapet wall 105.65m maximum 105.41m minimum Top of river/parapet wall 106.00m maximum 105.41m minimum
FOR APPROVAL
Maximum extent of terracing Location
R B D I G FO E
Section 48 publicity
River foreshore (varies)
dy B
e dg i Br H
1 o t 6 14
O T
River foreshore (varies) Foreshore structure
T C B
e s ou
Foreshore structure
1 18
a 13
o t
e ak Dr e us Ho
8 29
Typical Section B
(Not to scale)
c Thames Water Utilities Ltd 2008
7 4 1o t 0 8 1
A q u ai r u s H
Mu d
Mu d
en t
en t
ba nk m
ba nk m
N
Mu d
Al be r tE m
Al be r tE m
Mu d
W
Mu d
W
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
He i gh t s
He i gh t s
He i gh t s
93
93
Pe ni ns ul a
Pe ni ns ul a
Ti nt ag el Ho us e
Ti nt ag el Ho us e
Ti nt ag el Ho us e
m a h dy T B B r L e v nst& i R sl Co y
s e
G u n h (i o s se u e t Sa o) ti f r s
DW
m a h dy T B B r L e v nst& i R sl Co y
s e
G u n h (i o s se u e t Sa o) ti f r s
DW
m a h dy T B B r L e v nst& i R sl Co y
s e
G u n h (i o s se u e t Sa o) ti f r s
DW
Pe ni ns ul a
93
92
92
Co p t Ha l l of
Co p t Ha l l of
( st i e
( st i e
( st i e
S h i n g l e
S h i n g l e
S h i n g l e
Co p t Ha l l of
91
91
91
92
EM BA NK ME NT
EM BA NK ME NT
o u s e
o u s e
e l f o r d
e l f o r d
e l f o r d
9 0
9 0
t o
t o
8 7
8 7
a m
a m
a m
8 7
t o
9 0
o u s e
n a e
n a e
n a e
AL BE RT
AL BE RT
s (i D d o s u c s k e d )
L a c k
B o l
s (i D d o s u c s k e d )
L a c k
B o l
s (i D d o s u c s k e d )
L a c k
B o l
AL BE RT
EM BA NK ME NT
Sh et l e r
Sh et l e r
Sh et l e r
en t
en t
ba nk m
ba nk m
Al be r tE m
Al be r tE m
He i gh t s
He i gh t s
93
93
Pe ni ns ul a
Pe ni ns ul a
Ti nt ag el Ho us e
Ti nt ag el Ho us e
Ti nt ag el Ho us e
m a h dy T B B r L e v nst& i R sl Co y
G L A
s e
G u n h (i o s se u e t Sa o) ti f r s
DW
m a h dy T B B r L e v nst& i R sl Co y
G L A
s e
G u n h (i o s se u e t Sa o) ti f r s
DW
s e m a h dy T B B r L e v nst& i R sl Co y
G L A
Pe ni ns ul a
93
S h i n g l e
S h i n g l e
S h i n g l e
He i gh t s
92
92
Co p t Ha ( st i e l l of
Co p t Ha ( st i e l l of
S h i n g l e
S h i n g l e
S h i n g l e
Co p t Ha ( st i e l l of
91
91
EM BA NK ME NT
EM BA NK ME NT
o u s e
o u s e
n a e
n a e
e l f o r d
e l f o r d
e l f o r d
9 0
9 0
t o
t o
8 7
8 7
a m
a m
a m
8 7
t o
9 0
o u s e
n a e
AL BE RT
AL BE RT
s (i D d o s u c s k e d )
L a c k
B o l
s (i D d o s u c s k e d )
L a c k
B o l
s (i D d o s u c s k e d )
L a c k
B o l
ML W
ML W
ML W
T C B
T C B
T C B
D o l p h i n
N E W G S P A R R I D N E G N SW A L K
D o l p h i n
N E W G S P A R R I D N E G N SW A L K
D o l p h i n
N E W G S P A R R I D N E G N SW A L K
MP
MP
MP
MP
MP
MP
EM BA NK ME NT
Sh et l e r
Sh et l e r
Sh et l e r
D o l p h i n
D o l p h i n
D o l p h i n
o u s e
MP s
MP s
MP s
Zone within which the ventilation column(s) serving the Clapham SR CSO interception chamber may be located
5 8
S L
AL BE RT
EM BA NK ME NT
V a u x h a l l Bi r d g e
r e t a h g i W
V a u x h a l l Bi r d g e
r e t a h g i W
V a u x h a l l Bi r d g e
r e t a h g i W
91
92
e l f o r d
t o
9 0
8 7
a m
s (i D d o s u c s k e d )
L a c k
B o l
ML W
AL BE RT
MP s
c Thames Water Utilities Ltd 2008
Sh et l e r
w er v i
w er v i
w er v i
k al
W L C C
W d ar dy B
k al
k al
W d ar
dy B
S h i n g l e
S h i n g l e
W L C C
S h i n g l e
W L C C
S h i n g l e
Keyplan:
This drawing
W d ar dy B
V a u x h a l l Bi r d g e
r e t a h g i W
V a u x h a l l Bi r d g e
r e t a
h g i
V a u x h a l l Bi r d g e
r e t a h g i W
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
S h i n g l e
R
ML W D o l p h i n MP MP
Key:
Limits of land to be acquired or used (LLAU)
T C B
ML W
ML W
T C B
T C B
D o l p h i n
N E W G S P A R R I D N E G N SW A L K
N E W G S P A R R I D N E G N SW A L K
D o l p h i n
N E W G S P A R R I D N E G N SW A L K
MP
MP
MP
MP
Zone within which all permanent site structures would be located Zone within which the shaft would be located
GO
O l al f ut
D o l p h i n
l al f ut
l al f ut
D o l p h i n
D o l p h i n
MP s
O
l al f ut
5 8
l al f ut
l al f ut
GO
G OD IG N
MP s
MP s
S L
5 8
S L
5 8
S L
S L
S L
S L
Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located
DI N
DI NG ST RE ET
G S TR
ST RE ET
S h i n g l e
EE T
S h i n g l e
R B
R B
R B D I G
Mu d
W d ar
D I
D I G FO E
Mu d
d ar
d ar
G FO E
Mu d
FO E O T
dy B
dy B
dy B
O T
Mu d
Mu d
Mu d
Limits of permanent access Maximum extent of top of river/ parapet wall or terracing
w er v i
w er v i
w er v i
k al
S h i n g l e
k al
k al
W L C C
Zone within which ventilation column(s) serving the shaft may be located
S h i n g l e
W L C C
S h i n g l e
W L C C
DW
Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
G u n h (i o s se u e t Sa o) ti f r s
W d ar dy B
d ar
d ar
dy B
dy B
Zone within which ventilation column(s) serving the Brixton SR CSO interception culvert may be located
S h i n g l e
C R
O l al f ut O l al f ut
5 8
R
O l al f ut O l al f ut
O l al f ut
O l al f ut
GO
GO
G OD IG N
DI N
DI NG ST RE ET
G ST RE ET
ST REE T
S L
5 8
S L
S L
S L
S L
S h i n g l e
S h i n g l e
R B
R B
R B D I G FO E O T
dy B
W d ar
D I
D I G FO E O T
d ar
d ar
G FO E
dy B
dy B
O T
FOR INFORMATION
Location
D o l p h i n
MP
MP
O l al f ut
Outfall apron
Work No. 1c. 7.2m internal dia main tunnel to Chambers Wharf
Maple g 0.8 h 12.0
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Matchline: Sheet 2
Keyplan:
This drawing
Connection culvert
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
2 No. 0.2m x 0.2m vents with grilles built into flood defence parapet wall
Maple g 0.8 h 12.0
Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located
Authorised channel
V a u x h a l l B r i d g e
Maple g 0.8 h 12.0
Zone within which the shaft would be located Vauxhall Cross Zone within which ventilation column(s) and local control pillar(s) may be located 2 No. 0.225m internal dia ventilation columns, 6m high Proposed gated maintenance access (not publicly accessible) Zone within which permanent above ground structures would be located Limits of permanent access
104.50
Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.
Terracing
102.20
O u t f a l l
Sheet layout
Sheet 2 101.51 Zone within which electrical and control kiosk(s) may be located Sheet 1
101.20 Mean low water Electrical and control kiosk 7m x 2m x 2.5m high
101.41
Bridge abutment
Connection culvert
ILLUSTRATIVE
Location 0.225m internal dia ventilation column, 6m high Existing Clapham Storm Relief Sewer
Scour protection
N Authorised channel
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Scour protection Work No. 15b. 3.2m internal dia connection tunnel River wall with railing
Work No. 1c. 7.2m internal dia main tunnel to Chambers Wharf Zone within which Work No. 15a would be located
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Ramp up to approximately 0.5m above original ground level 104.50 Limits of land to be acquired or used (LLAU) Proposed access cover Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located
at 16 . 10
at er Li ne
Zone within which permanent above ground structures would be located Limits of permanent access
Lo w
on
10 / 03 / 10
Notes:
Zone within which electrical and control kiosk may be located 105.40 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.
Ventilation duct
Sheet layout
Electrical and control kiosk 5m x 2m x 2m high Work No. 1c. 7.2m internal dia main tunnel to Kirtling Street Zone within which ventilation columns may be located Passive filter chamber
Sheet 2
105.40
Sheet 1
106.00
10m
10m
ILLUSTRATIVE
Location
Matchline: Sheet 1
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
e a r ww t e no M a l
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Vauxhall Bridge pier Outfall apron to prevent local scour of riverbed
Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located
Combined CSO Vauxhall Bridge above Terraces cut back around CSO outlet Steel monopile dolphins for impact protection + 99.48m 2 No. ventilation columns 6m high + 105.40m
Zone within which required landscape would be located Authorised channel Thames Path Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Thames Water land
105.40
Rubble / riprap protects connection culvert in terraces under bridge where over shadowed
104.50 AA
Landscape key:
Vegetated inter-tidal terrace + 99.98m Area under bridge not accessible to public
Floodable vegetated inter-tidal terraces over connection culvert semi-buried in foreshore. Refer to the permanent works layout for details
Rock pool
New fence and gate to void under bridge to match consented scheme Lockable gate on to foreshore structure (not publicly accessible)
Sheet Layout:
Sheet 1 Sheet 2
Electrical and control kiosk 2m high located in fenced off area under bridge
10m
10m
Remove parapet on one bay of river wall for Thames Water access to structure and widen opening between lamp posts: allow for local leveling onto new structure
INDICATIVE
Save for the layout of above ground structures which is illustrative
Vauxhall Cross
Location
Section 48 publicity
Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing. 3. Access covers not shown on this drawing. Refer to the Permanent works layout for an indication of the extent of access covers required.
+ 105.87m
r e t a w n a e w o l
AA
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
0 00 R8
Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Zone within which required landscape would be located Authorised channel Thames Path + 105.40m Camelford House 105.40 Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Thames Water land
Top of wall: 106.00m Top of handrail: 106.6m Semi mature London planes
105.40 Timber fenders fixed to the new concrete river wall New vertical steel fin fence
Listed buildings/structures Approximate position of CSO outlet Existing trees within surveyed area
Electrical and control kiosk 1.5m high 2 No.ventilation columns of 4m minimum to 8m maximum height + 105.28m Land returned to landowner Wall to be reinstated post-construction Drop down bollards Planting to be agreed with LPA Ground reinforcement to slipway Replacement security hut erected after construction
Proposed trees
Sheet Layout:
Sheet 1 Sheet 2
Landscape key:
Multi-stem birch 1.5m wide, 5.0m high Ground cover Two tone natural stone paving with steel edging between types Reinstated paving Concrete block surface treatment
INDICATIVE
Save for the layout of above ground structures which is illustrative
Location
Section 48 publicity Proposed landscape plan Shaft structure Book of plans - section 15
S48-PP-15X-ALBEF-000181 July 2012
Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing. 3. Access covers not shown on this drawing. Refer to the Permanent works layout for an indication of the extent of access covers required.
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Camelford House New steel fin fence to private land Access to foreshore via Lacks Dock maintained
Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be
Fo c n i u t n s e d a n s e t r o t ai n o e r wi g h e 2
provided.
Vertical fenders
Sheet Layout:
Sheet 1
Sheet 2
10m
10m
ILLUSTRATIVE
A
Location
Section AA sheet 1 of 2
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the 2 No. ventilation columns 6m high Floodable vegetated inter-tidal terraces over connection culvert semi-buried in foreshore. Refer to the permanent works layout for details Ventilation column 6m high scale of the below ground infrastructure to be provided.
Fo c n i u t n s e d a n s e t r o t ai n o e r wi g h e 1
Vauxhall Bridge
Sheet Layout:
Valve and interception chamber Sheet 1 Sheet 2
10m
10m
ILLUSTRATIVE
A
Location
Section AA sheet 2 of 2
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Brixton storm relief CSO Clapham storm relief CSO
Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
1. All dimensions and levels are approximate.
Vauxhall Bridge
2020 flood defence level 105.41m ATD Mean high water springs 103.81m ATD
Lacks Dock
Vauxhall Cross
Lamp posts moved to Ventilation widen opening onto column structure 6m high
Floodable vegetated inter-tidal terraces over connection culvert semi-buried in foreshore. Refer to the permanent works layout for details
Vauxhall Bridge
2020 flood defence level 105.41m ATD Mean high water springs 103.81m ATD
10m
40m
ILLUSTRATIVE
es t( rv i er )e l ev at i on
Location
Section 48 publicity As existing and proposed West (river) elevation Book of plans - section 15
S48-PP-15X-ALBEF-000184 July 2012
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Thames Path passes under Camelford House Concrete wall of Vauxhall Cross beyond
Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
1. All dimensions and levels are approximate. Vauxhall Bridge
2020 flood defence level 105.41m ATD Mean high water springs 103.81m ATD
Vauxhall Cross
Electrical and control kiosk 1.5m high Semi mature London Planes 2 No. ventilation columns of 4m minimum to 8m maximum height
Vauxhall Bridge
2020 flood defence level 105.41m ATD Mean high water springs 103.81m ATD
10m
40m
Shaft structure
Interception structure
ILLUSTRATIVE
N ot r he lv e ai t o n
Location
Section 48 publicity As existing and proposed North elevation Book of plans - section 15
S48-PP-15X-ALBEF-000185 July 2012
1 44 0 .6
1 48 0 .8 1 47 0 .3
h 5.0
Co c n rt ee
104.45 104.53
1 41 0 .6 1 42 0 .6
1 0 46 .4 1 0 46 .9
CPS
1 46 0 .1
104.95
104.47
DK
1 4 0 . 4 4
98 . 56
9 88 .6
1 0 56 .6 1 0 46 .4
TPS
DK
1 48 0 .0
h 8.0
104.49
1 47 0 .1
104.77
Co c n rt ee
1 42 0 .9
g 0.5
104.40
1 41 0 .5
Plane
TPS
Pd ee si t n r a Co rsi sg n
1 43 0 .0
1 42 0 .8
Plane g 0.6
No.36
1 45 0 .6
104.43
1 43 0 .1
FL 104.31
98. 56
1 0 46 .1 1 0 46 .9
104.99
9 90 .3
CPS
FL
1 0 56 .4 1 0 46 .4
SK
104.29
1 44 0 .2
1 43 0 .8
ea ti nn ig
1 41 0 .2
1 42 0 .3
104.74
1 0 46 .7 10 4. 70
1 48 0 .2 1 46 0 .8
h 8.0
98. 57
St o n eR
Grass
9 93 .4
Sign
1 0 56 .5 1 0 46 .3
CPS
Sap RS
98 . 57
1 0 46 .5
1 44 0 .9
178400N
1 46 0 .4
1 4 0 . 3 5
1 45 0 .4
1 43 0 .0
Plane g 0.8
No.37
N
98 . 58
Ti t g na e H l o s u e
1 0 49 .8 Be n c h Ma rl be Ba s e
1 4 0 . 6 1
AL BERT
EM BANKM
0 .0 1 46 0 .0 1 46
ENT
1 42 0 .3
N
5 0. 14 6
1 42 0 .8
SPS
14 0. 7 7 14 0. 7 3
B B
9 95 .6
Ma rl b eW a l l 10 .m h
14 0. 7 4
SK B
MH(U)
98 . 58
CL 104.65
al l
14 0. 7 9
h
BP
1 45 0 .5
104.76
BB
1 41 0 .9 1 42 0 .6
CPS
1 44 0 .1
B ul i dn ig S of Ov ft i1 eh 1 r 0 47 0 .0 93 e d .0 a
1 43 0 .6
14 0. 7 5 14 0. 7 0
104.76
DK
So f ft i 1 68 1 .3 1 46 0 .9
1 0 46 .9
St o n eW
M rl ab 1 e . 0 h m
Peninsula Heights
1 46 0 .6
99.13 99.42
IC(U) CL 104.33
ES
THAM
99.34
10 .m h
1 46 0 .6
1 45 0 .1 1 43 0 .8
1 0 00 .0
98 . 5 6
St o n eR
1 0 46 .9
I V ER
St n o eD K
1 46 0 .2
BP
MH(U) CL 104.67
SK
99.78
1 0 46 .6
1 45 0 .1 1 43 0 .7
1 42 0 .6
99.56 Concrete
100.07
1 0 47 .0
1 44 0 .6
1 46 0 .0
DK
1 42 0 .2
98. 56
1 0 02 .1
99.68 100.13
104.60
1 45 0 .9 St n o e DK
at er Li ne
1 44 0 .8
1 44 0 .9
100.30
99.27
So f ft 0 i1 9 .1 3 St n o eD
Low
100.22
98. 59
105.40
1 0 4 . 7 1
10 0. 43
1 58 0 .6
104.70
1 44 0 .1
1 0 0 . 6 0
Sign
1 4 0 . 7 1
1 43 0 .0
99.35 Concrete
.9 05 0 1
1 47 0 .4
1 44 0 .4
Buttress
1 43 0 .1
178360N
1 44 0 .2
Concrete
1 45 0 .1
SK
1 44 0 .2
1 4 0 . 6 6 Co c n r eeW t a l1 4 7 l 0 .0
1 58 0 .6
1 46 0 .2
2010
99.84
1 45 0 .3
98. 57
1 46 0 .0
CPS
CPS
1 45 0 .5
10 0. 5 3
9 2
1 0 46 .6
al l0 .m 8
1 42 0 .6
10 / 03/ 10
on
1 0 46 .8
St o n eW
1 0 46 .9
DK
1 45 0 .8
1 0 47 .2
1 43 0 .1
1 44 0 .0
1 43 0 .9
at 16 . 10
1 44 0 .8
1 0 4 . 4 7
1 44 0 .4
DK
CPS
1 0 4 . 3 5
SK
Texaco Garage
1 43 0 .2
98. 55
9 97 .8
1 0 46 .6
1 44 0 .3
98. 58
1 41 0 .5
1 41 0 .9 1 42 0 .7
1 43 0 .8 1 42 0 .9
1 0 46 .8
1 0 47 .0
BW 08 h .m
2009
1 45 0 .2
1 11 0 .0
1 43 0 .9
1 42 0 .8
104.71
1 43 0 .6
99.51
1 0 08 .1
1 46 0 .4
DK
1 44 0 .8
1 42 0 .6
98 . 58
1 46 0 .1
F0 .m 9 h
2008
1 58 0 .5
DK
104.43
1 46 0 .0
1 09 0 .9
BP
Concrete Buttress
Tintagel House
St n DK o e
M DC
BP
1 45 0 .3
M/ R
BP
100.70 99.57
104.70 B
1 11 0 .0
1 10 0 .3
1 46 0 .2
1 44 0 .2
1 46 0 .4
Ta m r a c
DK
CPS 1 43 0 .8 1 42 0 .9 SK 1 42 0 .7
1 45 0 .4
98 . 58
BW 0 8 .mh
Concrete Buttress
DK
1 04 . 4 8
1 0 4. 5 2
SK 104.56
1 0 4. 48
St o n e Re ti an ig n W
Gunhouse Stairs
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Be n c h Ma rl be Ba s e
1 0 4 . 9 8
al l
1 41 0 .5 1 42 0 .5
1 0 46 .5
al l0 .m 8
1 44 0 .5
1 43 0 .4
1 44 0 .4
70 65 . 104. 4 10
0 .5 1 46
0 .2 1 44
0 .4 1 44
0 .5 1 45
0 .6 1 45
1 45 0 .0
1 58 0 .5
1 47 0 .6
99.59
SK
1 45 0 . 9 BW 08 h .m
1 0 04 .8
1 12 0 .9
1 4 0 . 8 2
1 44 0 .2
1 43 0 .2
98. 55
1 45 0 .6
1 13 0 .3
1 4 0 . 8 7
M/ R
F0 .m 9 h
CPS
1 0 . 0 0 1
1 58 0 .5
100.32
100.84
101.33
1 0 06 .1
1 4 0 . 9 4 1 0 55 .6
1 49 0 .3
9 85 .6
99.88 100.05
1 0 07 .4
178320N
100.67
99.58
100.85
1 16 0 .3
1 15 0 .4
CW
101.21
1 58 0 .6
WF
9 85 .6
100.95
100.70
WF
1 49 0 .9
1 55 0 .7
101.11
1 49 0 .9
Ta r c m a
1 17 0 .1
100.01 100.15
WF
100.84 99.49
101.20 WF
9 85 .7
99.89
100.15
101.24
WF 101.20
100.63
1 58 0 .6 1 48 0 .5
100.02
1 0 08 .3
98. 57
100.17
100.53 WF
Co c n r eeW t al l
1 4 0 . 9 0 1 5 0 . 5 5
9 9 . 0 0 1
1 17 0 .9
1 17 0 .4
1 49 0 .1 1 55 0 .7
99.55
100.19
101.49
Co t a p H l l
1 0 08 .0
1 58 0 .6
1 49 0 .5
Br k i W c al l
9 85 .6
1 08 0 .7
1 17 0 .0
1 49 0 .4 1 55 0 .6
5 0 2 E 3 3 0
5 0 6 E 3 3 0
1 11 0 .6
Concrete Buttress
1 00 . 42
1 47 0 .2
0 .7 1 46
CPS
0 .2 1 44
0 .5 1 45
4 3 . 0 0 1
G A LS S O H U S WA E L K
CPS
0 .0 1 46
Keyplan:
0 .6 1 45
0 .4 1 44
99.67
7 8 . 0 0 1
101.34
100.43
100.
46
WF
1 1 0 . 9 9
Lifebelt
1 5 0 . 8 7 1 4 0 . 9 8
101.58
WF
This drawing
98 . 55
1 20 0 .2
1 19 0 .3
1 5 0 . 8 7 1 4 0 . 9 5
98 . 58
10 0. 71
1 0 0 . 8 6
99.60
WF WF
1 0 0 . 7 7
WF WF
100.30
100. 23
1 0 50 .4 1 0 60 .2
1 5 0 . 0 2 1 5 0 . 5 6
178280N
99.55
9 . 85 6
WF
101.43
PIG 200
1 2 0 . 1 6
o B n W
Mud WF
99.45
101.33 WF
E S
A M
10 0. 65
WF 102.16
100.05
I VER
98 . 54
1 0 04 .7
WF
WF
at 16. 10
9 92 .5
WF 101.29 WF
9 85 .6
WF
1 5 0 . 8 8 1 5 0 . 2 2
TH
9 9 . 4 2
1 0 0 . 0 8
1 0 2 . 3 3
1 5 0 . 2 8
M/ R
WF
AL BERT EM BANKM
100.24
10 0. 46
100 . 16
98 . 53
F0 .m 9 h
ENT
1 2 0 . 1 6
79 0. 10
10 0. 56
100 . 72
1 5 0 . 8 7 1 5 0 . 0 6
1 5 0 . 1 3
1 5 0 . 0 7 1 6 0 . 0 0
102.22
WF
99.82
100.36
WF
Concrete
2011
3 85 9.
100.44
101.32
10 2. 60
WF
102.23
WF
1 5 0 . 3 9
100.40
1 6 0. 10
Brick Pillar
WF
10 5. 62
99.72
WF
Brick Pillar
9 . 96 9
99.59
101.27
BW
105.35
Bu i l di ng Sof f Ov i t1 er 12. he 52 ad
WF
109 109.. 33 10
Brick Pillar
99.38
9 . 99 0
WF
178240N
9 8 . 9 7
9 9 . 0 5
101.25 WF 99.16
9 9 . 3 7
1 0 29 .6
99.58
Shingle 100.51
102.33
9 .6 85
al l
9 9 . 4 5
o n
100.03 101.27
9 9 . 8 8
Co nc r e t e
CW
99.83
1 0 5 . 1 7
102.30
1 0 0 . 6 7
99.31
100.56
WF
105. 26
1 0 0 . 4 5
98 . 58
1 0 0 . 4 0
99 . 72
100.77
WF
1 0 4 . 4 9
2012
Shingle
62 . 9 9
WF
1 0 5 . 3 4 Co n c r e e B tP 1 S 0 W i 5 l f . of 1 lr 4 i S . a t 1 2 1 m mh 0 7 o k 8 CW .8 ig n A r e a 1 Me 0 5 t . 6 a 9 l Gr i l l e
9 85 .7
10 2. 95
C o n c r e t e B lc o kS l i p w a y
0 . 9 m
So fi f t
/ RF
10 9. 08
105. 34
9 9 . 8 7
Ret an ii ng
1 0 5 . 2 8
1 0 3. 0 2
1 0 58 .8 1 0 53 .2
So So fi f fi t f t
9 8 . 5 2
99.87
105.35
Brick Pillar
10 5. 37
/ R
9 8 . 5 4
1 0 27 .6
102.27
0. 9m
100.49
on
WF
Barges on campshed
9 . 85 1
9 1
10/ 03 / 10
on
at er Li ne
10 0. 70
99 . 51
102. 48
Ta r a m c
1 0 03 .1
Lo w
1 0 02 .7
99. 47
9 9 . 2 4
1 0 58 .6 1 0 52 .9
10 5 . 8 1 0 52 7 .4
98 . 54
1 5 0 . 3 7 1 5 0 . 6 2
1 6 0 . 0 3
99. 24
1 0 1 . 3 1
99.76
1 0 1 . 0 5
101.29 102.11
10 10 5. 5. 41 31
B i k e Ra c k
1 0 5 . 4 8
S e a l e d s mo k e o u t l e 1 t 0 f 5 r o . 2 m 9 g BW a r a 1 g 0 e 6 . 4 9
Bi k e
WF 1 03
R a c k
a c k
99 . 55
5
1
105.29
99.46
100.60
Bi k e
10 0. 33
Lifebelt
Bi k e
Ra c k
1 0 50 .9
10 5. 10
10 0. 10 10 5. 40
10 5. 10 3 5. 9 104 43 . 49
105.27
1 0 61 .4
1 0 2 . 7 7
1 0 2 . 9 9
103.29
99.60 MH(U)
99 . 33
CL 105.06
1 0 5 . 1 2
1 0 2 . 4 5
103.93
1 0 4 . 2 3
14 0. 4 1 105. 94 BRW
HR
1 0 5 . 4 5
1 . 1 mh
105. 10 6 3 10 5. 9 5. 6 44
10 5. 36
14 0. 4 5
1 0 5 . 3 8
Bi k e
M/ R F w i t .m hS 08 tn ho o eWa nS t o l l 14 n R .m e e a hb ti ig ew nn t Wa e e nL l l P 1 s 0 1 . 3 1 6 0 51 .1
98 . 59
B i k e
99 . 62
1 0 1 . 5 7
102.37
1 0 5 . 3 2
Ra c k
1 0 2 . 5 6
Ra c k
1 0 0 . 8 8
Tarmac
on
Co n c r e t e P i l l a r 1 0 5 . 3 S 2 e B a W l e d 1 s . 2 mo m h k e o u t l e t f r o m 1 0 g 5 a . Tarmac 3 r 5 a g Co e B W Co n c 1 r n . e 2 c t mh r e e 105.32 P t e i l l P a i r l 1 l a 0 r 5 . 2 9
CAMELFORD HOUSE
1 0 36 .2
1 0 5 . 4 3
B ie k Ra c k
1 0 5 . 3 1 4 0 5 . 4 5
S e a l e d s mo k e o u t l e t f r o m
99.46
99. 90
105. 01
CS
Stone Blocks
10 6. 12
1 0 54 Co .7 n ce r t e
98. 58
.1 59 0 1
0.7mh
1 0 5 . 1 3
Scrub
B W
g 0.2
t e P Tarmac i l l a r
1 0 5 . 4 1
Co n c r e
Co n c r e t e P i l l a r
b a s e me n t
1 0 5 . 3 6
Mud/Shingle
1 0 61 .4
1 0 5 . 1 2
1 0 3 . 9 0
1 0 42 .4
105.09
10 10 0. 5. 07 05
9 .1 92
Sculpture
1 0 54 .7
SPS
1 0 54 .1
105.72 BP 1 1 0 0 5 5 . . 4 5 6 5
105.38
Protruding
1 0 5 . 1 0
Mud/Shingle
1 0 3 . 8 6
1 0 5 . 1 0
10 5. 01
105.03
1 0 4 . 2 5
1 0 5 . 2 7
1 0 5 . 3 0
B
1 0 5 . 2 8
1 0 5 . 3 6
1 0 5 . 4 2 1 0 1 55 0 .5 5 . 3 7
S e a l e d s mo k e o u t l e t f r o m
Sap
99.47
1 0 50 .7
6 0 .
m 2 . h /F2 MR 8 . h 1 m n W o S
BR 1 W 0 56 .3 1 M/ 0 59 RF .4 09 .m h
1 0 4 . 4 2
1 0 4 . 4 9
Tarmac
1 0 50 .8
99 . 13
105
Sign
1 0 51 .0
15 0. 0 5
1 0 4 . 5 5 1 0 46 .3
1 0 5 . 3 7 1 0 5 . 2 8
1 0 5 . 1 0 4 5 0 . 4 6
105.36
b a s e m e n t Co n c r e t e P i l l a r
Co n c r e t e P i l l a r
S e a l e d s mo k e Co o u n t c l e r t e f t r e o m P i l b l a a r s e me n t
N W S RN E P IG G R E SWA K A D N L
2002
105 . 05
1 0 50 .1
1 0 5 . 1 1
B Scrub
1 05 . 2 1
105.64
1 0 5 . 3 0 1 0 5 . 3 9
10 5. 37
1 0 5 . 2 7
99.41
99 . 81
1 0 5 . 2 7 1 0 5 . 3 0 1 0 5 . 2 0
1 0 5 . 2 0
106 . 13
98. 58
CW 0.5mh
1 0 50 .1
105.11
1 0 50 .6
105.20
Scrub 105.69
1 0 1 5 0 . 1 5 8 . 2 8
1 0 5 . 2 3 1 0 5 . 1 2
1 0 5 . 1 1
1 0 5 . 3 0
B u s h e s1 . 1 0 03 5 . 0 . mh 4 8
105.39
178200N
1 0 5 . 2 6
1 0 5 . 3 6
Tarmac
C W 0 . 4 m h
10 10 0. 5. 00 40
10 5. 06
1 0 50 .7 M/ R F3 .mh 0 o nS W
Tarmac
1 0 5 . 1 7
1 0 5 . 1 1 0 3 0 5 9 55 .8 . 4 6
105.37 B
10 5. 18
BP
10 .mh
1 0 50 .6
1 0 50 .3
1 0 50 .4
Tarmac
Rough Grass
1. 0m
99. 02
D U C K
BP
1 0 5 . 3 0
S o f f i t 1 0 9 . 1 3
SW
Be nc h Pi l l ar s 1. 4m
Maple h 12.0
1. 0m
10 4. 99
g 1.0
99.35
9 85 .6
105 . 10
9 . 92 0
99 . 74
1 0 52 .1 1 0 51 .2 SPS 1 0 51 .9
on
T OU R S
et al
99 . 90 106 . 12
St one
1 0 5 . 1 0 1 0 5 . 1 9
A C C E S S
0 5 . 3 1 1 0 5 . 2 3 1 0 5 . 1 2
1 0 5 . 0 9
1 0 5 . 5 2
1 0 5 . 3 3
1 0 5 . 3 7 1 0 5 . 4 3 W
S e a l e d s m o k e o u t l e t f r o m
/ R F 0 . 9 mh o n B W
Tarmac
b a s e m e n t
/ RF
Alternative access only: Modify kerb line & remove 2 parking bays
9 94 .0
7 2 . 5 0 1
Bi k eR
a c k
03 3. 10
5 2 5. 0 1
R /
F
m 9 . 0
M RF /
k c i Br
n o
m 9 . 0 h CW
3 3 5. 10
W B
g n i n ai t Re
W
l l a
68 04. 1
s e h s u B
m 0 . 3 0 . 1
7 3 . 4 0 1
0 1 0 . 1 5
S h P m S 5 . 0
30 . 105
10 5. 01
1 0 5 . 0 8
105.10
BP
9 . 92 0
104.96
105.07
10 5. 40
Sign
10 6. 01
10 5. 06
Be nc h Pi l l ar s 1. 4m
10 5. 01
MI6
SPS Maple g 1.0 h 12
1 0 5 . 1 3
1 0 5 . 0 2
98. 57
St one
et al
99.29
99 10 . 85 6. 1
1 0 5 . 1 1
Hut
9 85 .5
Ba ri r e r
10 5. 02
1 0 50 .6
SS SPS Bench x4
1 0 4 . 9 9 1 0 5 . 0 5 1 0 50 .6
es
1 0 49 .9 1 0 1 5 0 . 50 0 .9 9
a 1 r m 0 5 a . c 1 0 6 Wa 4 1 . 9 8 l l m o u n t e d c a be l B Sign
AL BERT EM BAN
105.07
105.13
1 58 0 .6 Gr v l a e
1 0 5 . 0 4 1 0 5 . 1 5
1 0 5 . 2 6 1 0 5 . 1 6 1 0 5 . 0 9
10 5. 99
98 . 89
BW
Tarmac
B u s h e s1 . 0 3 . 0 m h
1 0 5 . 0 9 1 0 5 . 1 2
KM ENT
1 0 M/ 51 .6 R F w 26 i t hS .mh BP tn o n eP o S 1 0 51 i l .2 lr W 1 a s2 . 4 .m mh 4 h
10 5. 04
10 5. 04
1 0 5 . 2 6 1 0 5 . 2 2 1 0 5 . 1 2
1 0 5 . 2 8
1 0 5 . 4 2
1 0 5 . 2 5
1 0 5 . 3 6 1 0 5 . 4 0
1 0 5 . 1 2 1 0 5 . 0 1
1 0 4 . 8 7
9 89 .1
BP
99 . 83
1 0 48 .3
10 5. 05
1 0 5 . 0 1
9 95 .5
1 0 4 . 9 9
1 0 4 1 .5 0 8 1 4 0 . 9 4 5 . 9 8
9 85 .4
10 5. 05
S c a r
Tarmac
99.21
106 . 12
et al
99 . 79
10 5. 39
S c a r
h
10 5. 01
M / wi RF t 0. h St 8m on h 99 on e . 72 W al St on l 1. 4m e R e h a be t i ni t n w ee g W n LPsal l
h 12.0
10 M / 5. on RF 06 SW 1. 0m 1. h 0m h
Maple g 0.9
MG
99.17
10 5. 10 39 5. 01
Ben c h Pi l l ar s 1. 4m
10 6. 11
1 0 4 . 9 7
1 0 6 . 0 0
9 89 .4
10 5. 00
9 . 85 5
9 9 . 0 0 1
St one
99 . 20
178160N
98 . 53
SPS
SS
99.16 99.12
7 8 . 0 0 1
10 5. 39
Bench x4
99 . 13
99.36
Ben c h Pi l l ar s 1. 4m
10 5. 06
10 5 10 . 1 0 5. 01
9 . 85 1
St on e
99 . 86
106 . 11
99 . 17
Maple g 0.8
1. 0m
et al
1 0 6 . 0 1
105. 44
SPS
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
27 5. 10
99. 57
10 5. 39
Be nc h Pi l l ar s 1. 4m
1 5 0 . 4 5
.1 92 9
NG STREET GODI
10 6. 11
St on e
Be nc h Pi l l ar s 1. 4m
9 94 .8
9 . 93 8
99 . 84
10 5. 01
et al
et al
10 5. 05 M / on RF SW 1. 0m 1. h 0m h
9 88 .1
10 4. 89
9 8 . 6 1
98.99
99.19
10 5. 07
10 5. 39
10 4. 57
99.09 98.85
9. 85 2
O u W t f a l i l I t L hSt 9 8 . om 9 r 2
99.30 Dolphin
CRW
9 9 . 5 2
10 5. 40
1 0 4 . 5 4
10 4 6 10 . 1 4. 71
V A UX HA O L v e L r h e a B d R I D G E
9 8. 5 3
99.01
99.07
99 . 94
10 6. 12
2mh . 2 . 3mh F 2 R W M/ S n o
10 4. 86 104. 90
Ov e r h e a d 1 0 5 . 5 6
99.46
/ R
97.81
10 4. 62
B e a m
1. 0m
9 8 . 8 4
9 8 . 9 9
Tarmac
on
SW
h 12.0
B ea o/ m h
99. 12
9 8 . 7 2
9 9 . 8 5 WF 1 S 0 h 1 . P e 0 i e 5 l t i n g
1 0 4 . 2 9
Bridge Pier
9 8 . 9 6
99.01
Concrete
99.05
97.99
10 0. 11
99.18
a W n al i i l ng 100 . 04
10 4. 25
B e a m
10 3. Li 90 f eb el t
99 . 75
9 9 1 . 2 0 9 1 . 0 9 9 Concrete 9 . 8 0 9 9 Platform 9 9 . . 3 1 1 Ou 9 0 0 0 t . e WF 8 r 0 E 9 d 9 g . e 6 1 2 0 o 0 f . Br 8 9 i WF 99 0 d . g 9 0 e 9 . Ov 5 Ov 4 e r e h r e h a e d a d 1 0 7 . 7 6
2007
10 4. 26
d0 . 7
1 0 0 . 7 9
C o n WF ce r t e
1 0 4 . 2 6
Tarmac
10 5. 39
1 0 4 . 2 6
SPS
Tarmac
10 4. 57
St o Ret ne
104.48
1 0 4 . 5 7
S P S
M / R F
Sh ee tP ing l i
Con c r et e
O v e r h e a d 1 0 5 . 5 7
9 7 . 8 5
CS
L a d d e r
10 4. 24
Be a m
97.61
99.40
1 0 3 . 8 2
MG
SPS
2 . 2 mh o n S W 1 1 0 . 4 0 . m 6 5 h
99 . 94
10 3. 99
IC(U) CL 104.67
1 0 0 . 4 6
99. 55
9. 85 1
98.96
104 . 29
CL 104.60
10 0. 71
9 99.28 9 . 0 F 7 l a p 9 9 2 . 3 2 9 5 0 x 1 4 4 0
1 0 4 . 5 7
MI6
MH(U)
Ri v er Th am
5 0 4 E 3 2 0
5 0 8 E 3 2 0
5 0 2 E 3 3 0
5 0 6 E 3 3 0
5 0 0 E 3 4 0
98 . 52
St one
99 98.
7 5 0 . 1 4
7 9 9. 9
21 . 99
7 5 0 . 1 4
10 4. 58
99. 83
99 . 63
99 . 99
99. 93
98 . 52
105.
97.85
9 7 . 9 3
16
Up s t and
99.25
Sign MG
1 0 4 . 5 3
Con 99 . r 97 c et e
97.83
Sh ee tPi l i ng
98.05
98.99
99.43
178120N
99. 85
97.84 98.09
8 4 . 8 9
r ani t e
97.89
9 .9 84
97.99
S h e e t P i l i n g
1 0 4 . 6 1
M / on RF SW 2. 2m 1. h 0m h
Ov e r h e a d 1 0 7 . 8 0
99.49
9 9 . 9 4
S o f f i t
WF
1 0 6 . 8 3
Pi l l ar 2. 6m h 10 4. 67
1 0 4 . 5 5
MG
1 0 4 . 6 5
9 9 . 9 1
1 0 4 . 7 2
99.34
9 9 . 9 0 9 9 . 7 6
Gr a n i t e S t e p s
9 8 . 8 3
9 8 . 2 7
O u W t f a l i l I t L hSt 9 8 . om 9 r 1
Concrete Base
99 . 91
Be o/ am h
9 9 . 1 5
F l a 9 p 9 1 . 1 7 1 2 0 x 1 5 3 0 9 9 . 1 0
CW
CRW
99.68
9 9 . 4 3
et ai ni ng
9 9 . 2 1
E S
98 . 50
A M
TH
9 9 . 5 5
2006
1 0 0 . 6 9
1 0 0 . 0 2
St one
9 9 . 0 4
9 9 . 2 6
Co P n l ce r a t f e o t r m
S ub w
98.93
1 0 1 . 0 3
ay
9 9 . 7 8
B e a Ou m O t e v r e Ed r h g e e a d o f 1 Br 0 4 i . d 9 g 3 e Ov e r h e a d
al l
1 0 1 . 0 3
9 9 . 6 2
I V E R
8
1 1 0 0 0 0 . 0 . 6 4 7
9 84 .8
o o d e n
1 0 0 . 1 3
9 84 .8
98.79
8 W o 1 o 0 d 0 e . n 2 7 F e n d e r s 1 0 0 . 4 2
F e n d e r s
1 0 0 . 0 5
1 0 0 . 6 8
1 0 0 . 6 4
1 0 1 . 0 7
10 5. 105 60 101 . 72 . 38
10 P 4. i l l ar 78 s
1 0 0 . 6 7
100 . 23
Post on Concrete
100. 39
104.
100.68
104 . 91
98. 48
98.78
10 10 1 5. 41 . 48
10 8. 87 108 . 47
Ladder
101. 10 S t 5. on 40 67 10 et e ai 5. ni 82 ng W al l
S o f f i t
1 0 7 . 9 5
MG
105.
SPS
IR / on F CW 0. 7m
al l
53
at 14 . 39
10 0. 3 2
et ai ni ng
10 0 . 0 9
10 5. 47
09 / 03 / 10
10 10 6. 5. 80 59
Mud/Shingle
1 0 10 8. 7. 11 77
B rc i k
101.
10 10 6. 5. 04 68
at er Li ne
10 5. 6 10 3 8. 85
10 7. 99
Lo 98. w 45 W
99.19
IRF / on CW 0. 7m
10 10 7. 7. 86 60
10 7. 62
5 0 0. 10
BP
h
0 . 7 m
o n
Cw
CW
108 . 45
8 9 . 9 9
I / RF
1 0 7 . 9 8
CW
10 8. 78
on
40
99.71
BP
SPS
IRF / on C 0. W 9m 0. h 3m h
100.48
66
Base
St one
99.74
101 . 31
1 0 0 . 6 5
1 0 8 . 7 7
1 0 8 . 4 4
10 6. 106. 7 2 29
on
99.91
107 . 48
108 . 14
99.95
10 1. 24
107 . 37
10 6. 30
SPS
IR /
SPS
107 . 23
0. 5m
178080N
10 0. 12
1 0 6 . 9 0
9 98 .7
IR / on F C 0. W 7m
99.64
101. 02
99.94
BP
100.18
106. 96
107.
10 6. 95 Bui l d S i ng of f O i t112. v er he 41 a d
Column
SPS
35
10 10 6. 8. 97 14
Concrete
B R I D G E F O O T
10 0. 56
Wooden
S t on e
.4 01 0 1
.9 97 9
SPS
1 10 06. 8. 97 14
Sign
10 7. 34
BP
99.90
1 0 69 .5
11 .m h
106. 96
10 6. 96
1 0 6 . 9 5
Br 1 i t d o g e 1 4 H 6 o u s e
10 0. 96
SPS
BP
10 1. 02
1 0 6 . 9 6
SPS
BP
178040N
K N IG O E NN T N LN A E
Loading bay
9 9 . 4 2
98 . 54
Alternative access only: Remove central divide on ramp and install signals top and bottom
S o f 1 ft 0 i 6 . 8 7
98 . 48
99. 21
98 . 58
BP 104 . 10 72 4. 83 M/ R o n F2 SW . 2 m h 1 . 0 m h
99 . 85
.1 85 9
51 98.
Mud/Shingle
M/ RF
1 . 8 mh
1 0 4 . 2 8
Soffit 107.89
104.65
1 0 3 . 8 0
104.43
9 6
104. SS
M / RF
2 . 2 mh
Stone Structure
Key:
Alternative access only: Construction access left turn in, left turn out Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route Existing sewers Sheet piles Offices / welfare building Extent of temporary working area over the foreshore
15 . 99
92 9 .9
2 2 0 . 1 0
107. 10 6. 31 87
al l
10 6. 95
1 0 8 . 1 3
106 . 95
98 . 53
10 0. 16
10 6. 94
1 0 6 . 9 5
104.
15
BW
10 / 03 / 10
Ca me l fr od H
at er Li ne
on
3 85 9.
9 . 85 1
9 . 96 9
9 .6 85
9 . 99 0
9 94 .0
9 9 . 2 4
8 7t o9 0
99 . 51
1 0 03 .1
98 . 54
Lo w
99. 47
1 0 02 .7
99. 24
o u s e
SO UT H L AM BE TH RO AD
at 16 . 10
9 92 .5
1 0 04 .7
1 0 0 . 0 8
8 97 9 .
99 . 72
99 . 55
98 . 59
99 . 62
99 . 33
99. 90
98 . 58
9 .1 92
99 . 13
98 . 58
99. 81
99 . 02
9 85 .6
9 . 92 0
99 . 74
9 . 92 0
104.96
105.07
1 0 5 . 0 4 1 0 5 . 1 5
10 5. 99
98 . 89
99 . 57
9 85 .5
ac c es s
Piling rig
9 95 .5
9 85 .4
9 89 .1
am
Sh l r et e
9 88 .1
9 94 .8
9 . 85 5
9 89 .4
9 . 93 8
99 . 20
98 . 53
9 . 85 1
99 . 13
99 . 17
9. 85 1
98 . 52
85
98 . 52
9 .9 84
98 . 48
Va x a l u h lSt t a in o
98 . 50
9 84 .8
9 84 .8
10 0. 39
98 . 48
at 14 . 39
10 0 . 3 2
10 0 . 0 9
London underground Victoria Line tunnels Bridge omitted for clarity Rounded edge to temporary cofferdam in river to reduce scour impact
at er Li ne
on
09/ 03 / 10
Lo 98. w 45 W
10 0. 12
.4 01 0 1
.9 97 9
9 98 .7
99 . 85
5 0 6 E 3 1 0
Bridge piers
5 0 0 E 3 2 0
5 0 4 E 3 2 0
5 0 8 E 3 2 0
5 0 2 E 3 3 0
SOU TH
ACE H PL BET A L M
Notes :
2 6 9. 9
Bol
Permanent cofferdam
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors
1 0 4 . 2 3
TCB
1 1 0 0 5 5 . . 4 5 6 5
1 0 42 .4
construction depending on their preferred construction methods subject to any controls on layout imposed through the planning
1 0 4 . 4 2 1 0 4 . 4 9
1 0 5 . 2 8
0 5 . 3 0 1 0 5 . 3 9
1 0 5 . 2 0
1 0 1 5 0 . 1 5 8 . 2 8
1 0 5 . 1 2
.1 92 9
Vauxhall Bridge
1 0 5 . 1 0 1 0 5 . 1 9
2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where
1 0 5 . 0 9
appropriate, outline traffic management arrangements are shown. Construction access, left turn in, left turn out
1 0 4 1 .5 0 8 4 . 9 5
1 0 49 .9 1 0 5 . 0 9
1 0 5 . 1 2 1 0 5 . 0 1
1 0 5 . 0 5
3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
barriers may be required but is not shown on this drawing. 5. Flood defence levels to be maintained at all times
MLW
SL SL
10m
40m
.1 85 9
ILLUSTRATIVE
51 . 98
Location
8 4 . 8 9
Document Information
6 t 2 o 6 ( 5 b eo l w)
Section 48 publicity Construction phases - phase 1 Site set-up Book of plans - section 15
S48-PP-15X-ALBEF-000186 July 2012
2 2 0 . 1 0
8 9 . 9 9
5 0 0. 0 1
B R I D G E F O O T
VAUXHALL
8 97 9 .
Ti t g na e H l o s u e
08 x W 2 3 Dd .
F0 .m 9 h
1 87) 7 ("
10 W 8 Dd .
1 46 0 .0
M/ R
1 09 0 .9
BP
W o lc r o d m F ir Op be t i c
BP
9 4 3 "CI 1 (6)
Concrete Buttress
Tintagel House
St n DK o e
M DC
BP
104.70
1 44 0 .2
1 11 0 .0
N
1 10 0 .3
Concrete Buttress
N
05 d .
SK 5 0. 14 6
0 .7 1 46
Ta m r a c
DK
CPS 1 43 0 .8 1 42 0 .9 SK 1 42 0 .7
BW 0 8 .mh
MH(F)4302
Shingle
1 11 0 .6
Concrete Buttress
1 00 . 42
CL 104.45
1 47 0 .2
1 0 4. 48
DK
W CL 104.62 WV
1 45 0 . 9 BW 08 h .m
9 2
Fi r O p be t i c
1 12 0 .9
1 4 0 . 8 2
W o lc r o d m F ir Op be t i c
d . 33
Concrete Buttress
Co t b l Fi r O e pi t c
1 47 0 .6
1 87) 7 ("
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
0 9 PE 13 d .
FO
1 46 0 .4
1 46 0 .2
CPS
0 .2 1 44
0 .5 1 45
CPS
03 W 1 Dd .
1 1 KV
SK
FO
5 Dd W 10 .
1 44 0 .2
1 43 0 .2
Me c r ru y
0 .0 1 46
1 13 0 .3
CPS
4 3 . 0 10
4 . 0 d
BT
CL 104.60
0 .6 1 45
0 .4 1 44
1K 1V
Gunhouse Stairs
Concrete
1 4 0 . 8 7
M/ RF
Shotcrete production
1 0 06 .1
1 0 . 0 0 1
09 .m h
C A
WV
d1.0
Shingle
Buttress
ENT
2 WDd . 0 2
1W
BT CL 104.51
4 Dd . W 11
N
03 W 1 Dd .
2 Dd . W 05
FH CL 104.54
Keyplan:
Concrete
(i o st f e )
1 49 0 .3
MP 99.48
G A LS S O H U S WA E L K
AL ERT EM BAN B KM
3 . d0
Co t a p H l l
1 4 0 . 9 4
Ri v er Th am
Concrete
Buttress
99.88
Co t a p H l l
es
1 15 0 .4
Ta r c m a
1 0 07 .4
AL BERT EM BANKM
WF
WF
1 49 0 .9
(i o st f e )
1 16 0 .3
This drawing
CW
ENT
1 49 0 .9
100.01
WF
1 49 0 .5
9 1
1 0 08 .0
1 17 0 .1
WF
1 17 0 .0
99.89
Bol
WF
TCB
N W S RN E P IG G R E SWA K A D N L
1 08 0 .7
Br k i W c al l
1 49 0 .4
Vauxhall
es
100.17
WF
Games Court
1 0 08 .3
Barges on campshed
1 17 0 .9
1 17 0 .4
Vauxhall Bridge
Walk
100.02
Co c n r eeW t al l
MLW
SL
SL
Ri v er Th am
1 20 0 .2
1 19 0 .3
Alternative access
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
1 48 0 .5
S Gantry
1 5 0 . 8 7 1 4 0 . 9 8
S Gantry
1 0 0 . 7 7
1 0 0 . 8 6
1 4 0 . 9 5
WF
1 1 0 . 9 9
Lifebelt
1 4 0 . 9 0
Overhanging Tree
7.0mh
1 49 0 .1
WF
1 5 0 . 0 2
1 0 50 .4 1 0 60 .2
NG STREET GODI
79 . 100
WF
Key:
AL BERT EM BANKM ENT
Alternative access only: Construction access left turn in, left turn out Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route Existing sewers Sheet piles Extent of temporary working area over the foreshore
TCB
WF
1 2 0 . 1 6
10 0. 72
Loading bay
Mud
WF
1 5 0 . 8 7 1 5 0 . 0 6
F0 .m 9 h
Shingle
o B n W
1 5 0 . 1 3
B R I D G E F O O T
VAUXHALL
PIG
1 5 0 . 0 7 1 6 0 . 0 0
1 2 0 . 1 6
Ps
Fo t o Br g i e d
E S
K N IG O E NN T N LN A E
A M
1 5 0 . 2 8
M/ R
SO UT H L AM BE TH RO AD
I V E R
VAUXHALL CROSS
WF
LB
10 / 03 / 10
Ta r a m c
WF
1 5 0 . 3 7 1 5 0 . 6 2
DW
WF
Concrete
2011
10 0. 4 4
102 . 60
WF
1 6 0. 10
WF
S Ga nr ty
WF
SL
WF
Brick Pillar
Bu i l d ng So i fi Ov f t11 er 2. head 52
SL
WF
Brick Pillar
Co nc r e t e
So fi f t
/ RF
9 9 . 8 8
1 0 5 . 1 7
10 5. 26
1 0 0 . 4 5
102 . 95
C o n c r e t e B lc o kS l iw p a y
0 . 9 m
10 9. 08
Scale 1:2500
1 0 0 . 6 7
o n
CW
10 5. 34
9 9 . 8 7
Re t an ii ng
1 0 5 . 2 8
9 8 . 5 2
WF
9 9 . 0 5
Brick Pillar
9 8 . 9 7
9 9 . 3 7
WF
Shingle
al l
9 9 . 4 5
1 0 29 .6
10 5. 37
/ RF
9 8 . 5 4
1 0 27 .6
0. 9m
on
WF
BW
10 5. 62
1 5 0 . 3 9
8 7t o9 0
10 0. 70
TCB
Ca me l fr od H
on
at er Li ne
102 . 48
Lo w
1 6 0 . 0 3
o u s e
TH
at 16 . 10
10 0. 65
a c k
Bi k eR
a c k
B i k e
Ra c k
Bi k e
10 0. 33
Lifebelt
Ra c k
Bi k e
ac k
10 5. 10
10 0. 10
1 0 2 . 7 7
1 0 2 . 9 9
B i k e
10 5. 94 BR W
10 5. 01
1 0 54 Co .7 n ce r t e
1 0 54 .7
10 10 0. 5. 07 05
1 0 5 . 1 0
10 5. 01
1 0 50 .7
6 0 . 5 0 1
Sign
MH(F) CL 105.04
m 2 . h /F2 MR 8 . h 1 m n W o S
1 0 50 .8
1 0 51 .0
15 0. 0 5
1 0 4 . 5 5 1 0 46 .3
1 0 4 . 5 7 1 0 4 . 5 1
1 0 55 .3 1 0 5 . 4 2
BRW 1 0 56 .3 1 M/ 0 59 RF .4 09 .m h
105 . 37
1 0 5 . 1 1
1 0 50 .1
1 0 50 .6
Scrub
1 0 5 . 2 1
10 0. 00
10 5. 18
10 5. 06
Tarmac
1. 0m
SW
1. 4m
Maple
1. 0m
on
Be nc h
10 4. 99
10 5. 10
Pi l l ar s
g 1.0 h 12.0
et al
/ RF
ac c es s
St on e
99. 90
105 . 04
10 5. 01
1 0 5 . 0 8
1 0. 15 0
BP
Sign
Be nc h Pi l l ar s 1. 4m
105 . 01
MI6
SPS
1 0 5 . 1 3
1 0 5 . 0 9
105 . 06
15 7 0. 0
15 0. 1 3
1 0 5 . 0 2
1 0 5 . 1 1
1 0 4 . 9 8
Hut
St on e
et al
Maple
g 1.0 h 12
am
1 0 49 .9 1 0 1 5 0 . 50 0 .9 9
99 . 85
T a r ma c Wa l l mo u n t e d c a be l B Sign
Gr v l a e
105.07
1 0 5 . 2 6
AL BERT EM BANKM
104.96
1 0 5 . 0 4 1 0 5 . 1 5
10 5. 99
BW
Tarmac
B u s h e s1 . 0 3 . 0 m h
ENT
Ba ri r e r
10 5. 02
BP
SPS
Bench x4
4 D W d . 03 D NV
et al
1 5 0 . 4 5
99 . 83
1 0 48 .3
1 0 5 . 0 1
4 D W 03 5 D d . W d . 07
1. 4m
Be nc h
10 5. 05
Pi l l ar s
St on e
d . 09
10 5. 05
S c a r
Tarmac
S c a r
10 5. 01
M / w RF i t 0. h St 8m one h 99 on . 72 W al St o l 1. ne 4m Re h a bett i ni n w ee g W n LP al l s
10 M / 5. on RF 06 SW 1. 0m 1. h 0m h
Crane
St on e
Be
MG
Sh l r et e
99 . 79
nc h Pi l l ar s 1. 4m
105 . 05 M / on RF SW 1. 0m 1. h 0m h
10 5. 00
10 5. 01
et al
St one
MLW
10 5. 01 99 . 84
Be nc h Pi l l ar s 1. 4m
Bench x4
nc h Pi l l ar s 1. 4m
h
10 5. 44
10 5. 06
St one
et al
10 5 105 . 1 0 . 01
Be
99 . 86
10 4. 89
10 5. 07
10 4. 57
10
Concrete Base
1 0 4 . 5 4
4. 61 10 4. 71
V A U X H A O L v e L r h e a B d R I D G E
10 4. 86 10 4. 90
Ov e r h e a d 1 0 5 . 5 6
10 4. 62
/ R
Be a m
9 8 . 9 9
1. 0m
Tarmac
on
SW
1. 0m
99. 94
10 4. 29
10 4. 26
d0 . 7
ai W t al ni l ng 10 0. 04
85
St Re one
9 9 . 5 4
10 4. 25
Be a m
10 3. Li 90 f eb el t
O u t e r E d g e o f B r i d g e Ov O e v r e h r e h a e d a d 1 0 7 . 7 6
1 0 4 . 2 6
SPS
10 0. 11
Tarmac
10 4. 57
Sh ee tPi l i ng
Co nc r et e
O v e r h e a d 1 0 5 . 5 7
9 7 . 8 5
MG
M / R F
CS
L a d d e r
104 . 24
Bridge piers
99 . 94
10 3. 99
99 . 63
99. 99
104 . 58
99 . 93
9 7 . 9 3
10 5. 16
Up s t an d
Co 99 nc . 97 r et e
97.83
Sh ee tPi l i ng
BP 104 . 10 72 4. 83 M/ RF o n . SW 22 mh 1 . 0 mh
99 . 85
97.84
99.49 WF 97.89
S o f f i t
M / on RF SW 2. 2m 1. h 0m h
1 0 6 . 8 3
Pi l l ar 2. 6m h 10 4. 67
97.81 98.02
S h e e t P i l i n g
97.99
1 0 4 . 6 5
9 9 . 9 1
r an i t e
Va x a l u h lSt t a in o
TH
Be a Ou m O t e v r e E r d h g e e a d o f 1 B 0 4 r i . d 9 g 3 e O v e r h e a d
al l
99 . 91
et ai ni ng
E S
A M
S t on e
Su bw
ay
I V E R
101 . 38
10 P 4. i l l ar 78 s
10 1. 31
10 4. 91
10 1. 40
So f f i t
10 8. 47
1 0 7 . 9 5
IR / on F C 0. W 9m 0. h 3m h
100.48
1 0 4. 6 6
Base
S t on e
10 1. 48
S t Re one t ai ni ng
al l
IR / on F C 0. W 7m
al l
at 14 . 39
Re t ai ni ng
10 5. 47
09/ 03 / 10
10 1. Br 40 i c k
10 5. 59
Mud/Shingle
10 7. 77
on
10 5. 68
10 6. 29
at er Li ne
10 5. 63
Lo w
BP
0 . 7 m
10 7. 99
IR / on F C 0. W 7m
107 . 62
10 7. 60
10 6. 87
10 1. 24
1 0 6 . 9 0
10 1. 02
SPS
S t one
Sign
i c k Re nd t er ai B gr ni rc i ng ou k W nd W al al C l l IR ar / Pa F on 0. r k 7 C m 10 h W 5. 12 104 10 6. . 13 95
BP
Br
1 0 69 .5
10 0. 96
SPS
BW
11 .m h
10 6. 96
10 6. 96
1 0 6 . 9 5
106 . 97
106 . 96
B P
10 7. 35
B ui l di So n g fi O f t1 v er 12. he 41 a d
IR / on F C 0. W 7m
Column
10 6. 95
10 10 6. 8. 97 14
Concrete
10 6. 30
SPS
SPS
B 1 r i t d o g e 1 4 H 6 o u s e
al l
IR /
SPS
10 7. 23
0. 5m
on
SOU TH
ACE H PL BET A L M
WF
Authorised channel
Shingle
1 0 0 . 4 0
WF
2012
WF
C o n c r e e B tP 1 S 0 W i 5 l f . of 1 lr 4 i S . a t 1 2 1 m m 0 7 o h k 8 CW .8 ig n A r e a 1 M 0 e 5 . t 6 a 9 l G r i l l e
1 0 5 . 4 8
1 0 1 . 3 1
B i k e R a c k
S e a l e d s m o k e o u t l e t f r o m g B a W r a g e
Notes :
1. These construction phasing plans have been
7 2 . 05 1
03 3. 10
1 0 1 . 0 5
Bol
M
R / F
B i k e
9m . 0
WF
R a c k
B W
1 . 2 m h
6 0. 10 0
1 0 0 . 8 8
Tarmac
h n o
1 0 50 .9
S e a l e d s m o k e o u t l e t f r o m
51 3. 10
R /
F
W B n o 3 h 3 5. 0 1
1 0 2 . 5 6
1 0 1 . 5 7
Tarmac
C o n c r e t e P i l l a r B W
1 . 2 m h
g a r a g C e o n c r e t e P i l l a r
CAMELFORD HOUSE
prepared to illustrate possible site layouts for the principle construction phases. Contractors
k c i r B ng ni ai et R
9m . 0
C
W l al
68 . 04 1
s he us B
1 03 .2 6
1 0 5 . 4 3
14 0. 4 5
MH(U) CL 105.06
B ie k Ra c k
1 0 5 . 1 2
1 0 2 . 4 5
14 0. 4 1
S e a l e d s m o k e o u t l e t f r o m
0m . 3 01.
7 3 . 4 0 1
1 0 5 . 1 3
R A
HR
C S
B W
1 . 1 mh
C o n c r e t e P Tarmac i l l a r
Co n c r e t e P i l l a r
b a s e m e n t
TCB
S e a l e d s m o k e o u t l e t f r o m
0 1 0 . 1 5
30 5. 10
Mud/Shingle
15 0. 0 9 SPS
Mud/Shingle
R A
1 0 5 . 1 2
1 0 3 . 9 0
g 0.2
1 0 5 . 4 6
1 0 5 . 3 0
construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process.
1 0 3 . 8 6
1 0 5 . 1 0
Protruding Sculpture
15 3 0. 0
1 0 4 . 2 5
1 0 5 . 2 7
1 0 5 . 2 8
1 0 5 . 3 6
Sap
1 0 4 . 4 2 1 0 4 . 4 9
Tarmac
1 0 5 . 2 8
0 5 . 3 0 1 0 5 . 3 9
1 0 5 . 3 7
1 0 5 . 2 7 1 0 5 . 2 0
1 0 5 . 2 0
b a s e m e n t Co n c r e t e P i l l a r
C o n c r e t e P i l l a r
G R E SWA K A D N L
2002
1 0 50 .1
1 0 5 . 2 7
Tarmac
B u s h e s1 . 0 3 . 0 mh
CW 0.5mh
1 0 5 . 3 0
1 0 5 . 1 2
1 0 5 . 1 1
105.11
B
105.20
Scrub
1 0 1 5 0 . 1 5 8 . 2 8
1 0 5 . 2 6
C W
1 0 5 . 3 6
Tarmac
S e a l e d s mo k e C o o u n t c l e r t e f t r e o m P i l b l a a r s e me n t
27 . 105
1 0 50 .7 M/ R F3 .mh 0 o nS W
Tarmac
1 0 5 . 1 7
0 . 4 mh
B
1 0 5 . 3 0
1 0 5 . 3 1
1 0 5 . 3 3
10 .m h
1 0 50 .6
1 0 50 .3
1 0 50 .4
S o f f i t 1 0 9 . 1 3
Rough Grass
1 0 52 .1 1 0 51 .2 SPS 1 0 51 .9
D U C K
BP
Vauxhall Bridge
Rotating Gate
MG
CL 105.09
T OU R S
1 0 5 . 1 0 1 0 5 . 1 9
A C C E S S
1 0 5 . 1 2
1 0 5 . 0 9
S e a l e d s mo k e o u t l e t f r o m
/ R F 0 . 9 m h o n B W
Tarmac
1 0 5 . 2 6
1 0 M/ 51 .6 R F w 26 i t hS .mh BP tn o n eP o S 1 0 51 i l .2 lr W 1 a s2 . 4 .m mh 4 h
1 0 5 . 2 8
1 0 5 . 1 2
1 0 5 . 2 5
phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown.
1 0 5 . 0 1
1 0 50 .6
1 0 4 . 8 7
1 0 4 . 9 9 1 0 5 . 0 5 1 0 50 .6
SS
3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing. 5. Flood defence levels to be maintained at all times
1 0 4 . 9 9
1 0 4 1 .5 0 8 1 4 0 . 9 4 5 . 9 8
CT CL 104.76
1 0 4 . 9 7
SS SPS
SS
SPS
SL SL
Maple
g 0.8 h 12.0
10m
40m
h 2m h 2. . 3m F 2 R / W M S on
1 0 4 . 5 7
MH(U) CL 104.60
9 8 . 7 2
Bridge Pier
1 0 4 . 2 9
7 5 0 . 1 4
1 0 4 . 2 6
Tarmac
7 5 0 . 1 4
1 0 4 . 5 7
M / R F
S P S
Be a m
1 0 3 . 8 2
SPS
2 . 2 m h o n S W 1 1 0 . 4 0 . m 6 5 h
ILLUSTRATIVE
IC(U) CL 104.67
Mud/Shingle
1 . 8 m h
1 0 4 . 2 8
S f 17 9 oi 0. f t 8
1 0 3 . 8 0
SS
M/ RF
Stone Structure
2 . 2 m h
Sign MG
9 8 9 9.
1 0 4 . 5 3
98.00
1 0 4 . 5 5
Location
MG
1 0 4 . 7 2
97.97
Gr a n i t e S t e p s
9 9 . 7 6
Concrete
9 8 . 2 7
Document Information
6 t 2 o
Section 48 publicity Construction phases - phase 2 Shaft construction and tunnelling Book of plans - section 15
S48-PP-15X-ALBEF-000187 July 2012
1 0 0 . 0 5
6 ( 5 b eo l w)
1 0 0 . 6 4
1 0 1 . 0 7
Wooden
So f 1 ft 0 i 6 . 8 7
Post on Concrete
MG
MH(F)
SPS
CL 108.32
1 0 8 . 4 4
BP
SPS
I / R F
1 0 7 . 9 8
MH(F)2002
o n
CL 108.21
C w
21 55 x6 17 6
B R I D G E F O O T
VAUXHALL
1 48 0 .8 1 47 0 .3
Co c n rt ee
104.45 104.53
1 41 0 .6 1 42 0 .6
g 0.6 h 5.0
1 0 46 .4 1 0 46 .9
CPS
1 46 0 .1
104.95
104.47
DK
1 4 0 . 4 4
9 88 .6
1 0 56 .6 1 0 46 .4
TPS
DK
104.40
1 48 0 .0
h 8.0
104.49
1 47 0 .1
104.77
Co c n rt ee
1 42 0 .9
g 0.5
1 41 0 .5
Plane
TPS
Pd ee si t n r a Co rsi sg n
No.36
1 45 0 .6
104.43
1 43 0 .1
FL 104.31
98. 56
1 0 46 .1 1 0 46 .9
104.99
CPS
FL
SK
104.29
St o n e Re ti an ig n W
1 44 0 .2
1 43 0 .8
1 41 0 .2
1 42 0 .3
104.74
1 0 46 .7 10 4. 70
1 48 0 .2 1 46 0 .8
h 8.0
98 . 57
Grass
9 93 .4
Sign
1 0 56 .5 1 0 46 .3
CPS
Sap RS
1 0 46 .5
1 46 0 .4
98 . 57
1 44 0 .9
1 4 0 . 3 5
1 45 0 .4
1 43 0 .0
Plane g 0.8
No.37
N Gunhouse Stairs
Ti t g na e H l o s u e
1 0 49 .8 Be n c h Ma rl be Ba s e
1 4 0 . 6 1
1 44 0 .6
AL BERT
EM BANKM
ENT
98 . 56
1 42 0 .3
1 43 0 .0
1 42 0 .8
0 .0 1 46
104.70
N
5 0. 14 6
9 90 .3
1 0 56 .4 1 0 46 .4
1 42 0 .8
SPS
14 0. 7 7 14 0. 7 3
B B
9 95 .6
Ma rl b eW a l l 10 .mh
SK B
MH(U)
98. 58
14 0. 7 4
CL 104.65
al l
14 0. 7 9
h
BP
1 45 0 .5
104.76
104.76
DK
So f ft i 1 68 1 .3 1 46 0 .9
1 0 46 .9
St o n eW
M rl ab 1 e . 0 h m
9 97 .8
1 0 46 .6
Peninsula Heights
1 46 0 .6
1 44 0 .3
98 . 58
1 41 0 .5
1 41 0 .9 1 42 0 .7
1 43 0 .8 1 42 0 .9
99.13 99.42
1 0 46 .8
1 0 47 .0
IC(U) CL 104.33
E S
A M
99.34
10 .m h
1 46 0 .6
1 45 0 .1 1 43 0 .8
TH
1 0 00 .0
98 . 56
St o n eR
1 0 46 .9
I V E R
St n o e DK
1 46 0 .2
BP
MH(U) CL 104.67
SK
99.78
1 0 46 .6
1 45 0 .1 1 43 0 .7
1 42 0 .6
99.56 Concrete
100.07
1 0 47 .0
1 44 0 .6
1 46 0 .0
DK
1 42 0 .2
98. 56
1 0 02 .1
1 44 0 .8
1 0 4 . 4 7
1 44 0 .4
DK
CPS
1 0 4 . 3 5
99.68 100.13
104.60
1 45 0 .9 St n o e DK
at er Li ne
1 44 0 .8
1 44 0 .9
100.30
99.27
So f ft 0 i1 9 .1 3 St n o e DK
Lo w
100.22
98. 59
105.40
1 0 4 . 7 1
10 0. 43
1 58 0 .6
104.70
1 44 0 .1
1 0 0 . 6 0
Sign
1 4 0 . 7 1
1 43 0 .0
1 44 0 .2
1 45 0 .1
1 43 0 .1
1 47 0 .4
1 44 0 .4
SK
1 46 0 .2
99.84
Texaco Garage
1 43 0 .2
SK
1 44 0 .2
2010
1 4 0 . 6 6 Co c n r eeW t a l1 4 7 l 0 .0
1 58 0 .6
1 45 0 .3
98. 57
1 46 0 .0
CPS
CPS
1 45 0 .5
10 0. 5 3
1 4 0 . 8 2
9 2
1 0 46 .6
al l0 .m 8
1 42 0 .6
10 / 03 / 10
on
1 0 46 .8
St o n eW
100 . 45
1 0 46 .9
DK
1 45 0 .8
1 0 47 .2
1 43 0 .1
1 44 0 .0
1 43 0 .9
at 16 . 10
BW 08 h .m
2009
1 45 0 .2
1 11 0 .0
1 43 0 .9
99.51
1 46 0 .4
1 42 0 .8
104.71
1 43 0 .6
1 0 08 .1
DK
1 44 0 .8
1 42 0 .6
98. 58
1 46 0 .1
F0 .m 9 h
2008
1 58 0 .5
DK
104.43
1 46 0 .0
1 09 0 .9
BP
Concrete Buttress
Tintagel House
St n DK o e
M DC
BP
1 45 0 .3
M/ R
BP
100.70 99.57
104.70 B
1 11 0 .0
1 10 0 .3
1 46 0 .2
1 44 0 .2
1 46 0 .4
Ta m r a c
DK
CPS 1 43 0 .8 1 42 0 .9 SK 1 42 0 .7
1 45 0 .4
98 . 58
BW 0 8 .mh
Concrete Buttress
DK
1 0 4 . 48
1 04. 52
SK 104.56
1 0 4. 48
St o n e Re ti an ig n W
BB
1 41 0 .9 1 42 0 .6
CPS
1 0 46 .5
al l0 .m 8
1 44 0 .5
1 43 0 .4
1 44 0 .4
1 44 0 .1
B ul i dn ig S of Ov ft i1 eh 1 r 0 47 0 .0 93 e d .0 a
1 43 0 .6
14 0. 7 5 14 0. 7 0
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
0 .0 1 46
Be n c h Ma rl be Ba s e
1 0 4 . 9 8
al l
1 41 0 .5 1 42 0 .5
70 4. 65 4. 10 10
0 .5 1 46
0 .2 1 44
0 .5 1 45
.9 05 0 1
0 .6 1 45
0 .4 1 44
1 45 0 .0
1 11 0 .6
Concrete Buttress
1 47 0 .2
10 0 . 42
0 .7 1 46
CPS
0 .2 1 44
0 .5 1 45
CPS
1 58 0 .5
1 47 0 .6
99.59
SK
1 45 0 . 9 BW 08 h .m
1 0 04 .8
1 12 0 .9
1 13 0 .3
Concrete Shingle
1 0 06 .1
Buttress
1 4 0 . 8 7
M/ R
F0 .m 9 h
CPS
4 3 . 0 0 1
1 0 . 0 0 1
1 58 0 .5
100.32
100.84
101.33
1 4 0 . 8 2
1 44 0 .2
1 43 0 .2
98 . 55
1 45 0 .6
0 .0 1 46
0 .6 1 45
0 .4 1 44
1 4 0 . 9 4 1 0 55 .6
1 49 0 .3
9 85 .6
99.88 100.05
1 15 0 .4
Ta r c m a
100.85
100.67
99.58
101.21
1 58 0 .6
WF
9 85 .6
100.95
100.70
WF
1 49 0 .9
1 55 0 . 7
101.11
100.01 100.15
WF
100.84 99.49
101.20 WF
9 85 .7
99.89
100.15
101.24
WF 101.20
100.63
100.02
1 0 08 .3
98. 57
100.17
100.53 WF
Co c n r eeW t al l
1 4 0 . 9 0 1 5 0 . 5 5
9 9 . 0 0 1
1 17 0 .9
1 17 0 .4
1 49 0 .1 1 55 0 .7
99.55
100.19
101.49
Co t a p H l l
1 49 0 .5
1 08 0 .7
1 17 0 .0
1 58 0 .6 1 48 0 .5
Br k i W c al l
1 49 0 .4 1 55 0 .6
G A LS S O H U S WA E L K
1 0 08 .0
1 17 0 .1
1 58 0 .6
1 4 0 . 9 4
1 0 07 .4
1 16 0 .3
CW
1 49 0 .9
99.67
7 8 . 0 0 1
101.34
100.43
100
. 46
WF
1 1 0 . 9 9
Lifebelt
1 5 0 . 8 7 1 4 0 . 9 8
101.58
WF
99.60
WF WF
1 0 0 . 7 7
WF WF
100.30
WF
101.43
99.55
9 . 85 6
PIG 200
1 2 0 . 1 6
10 0. 46
Mud WF
98 . 53
99.45
101.33 WF
E S
WF
1 5 0 . 8 8 1 5 0 . 2 2
A M
10 0. 65
WF 102.16
TH
9 9 . 4 2
100.05
1 0 04 .7
1 0 0. 0 8
WF
I V E R
98 . 54
WF
at 16. 10
9 92 .5
WF 101.29 WF
102 . 48
1 0 2 . 3 3
1 5 0 . 2 8
M/ R
WF
F0 .m 9 h
o BW n
100.24
(i o st f e )
This drawing
98 . 55
1 20 0 .2
1 19 0 .3
98 . 58
10 0 . 71
1 0 0 . 8 6
1 5 0 . 8 7 1 4 0 . 9 5
100. 23
1 2 0 . 1 6
10 0. 56
10 0. 16
100. 72
1 5 0 . 8 7 1 5 0 . 0 6
1 5 0 . 1 3
1 5 0 . 0 7 1 6 0 . 0 0
1 0 50 .4 1 0 60 .2
1 5 0 . 0 2 1 5 0 . 5 6
102.22
WF
99.82
100.36
WF
Concrete
2011
3 85 9.
100.44
101.32
102 . 60
WF
102.23
WF
Brick Pillar
9 . 85 1
WF
10 5. 62
99.72
1 5 0 . 3 9
100.40
1 6 0. 10
9 1
79 0. 10
10/ 03 / 10
at er Li ne
on
10 0. 70
99. 51
Ta r a m c
1 0 03 .1
Lo w
1 0 02 .7
99 . 47
9 9 . 2 4
1 0 58 .6 1 0 52 .9
1 05 . 8 1 0 52 7 .4
98 . 54
1 5 0 . 3 7 1 5 0 . 6 2
1 6 0 . 0 3
99. 24
WF
Brick Pillar
9 . 96 9
99.59
101.27
BW
105.35
Bui l d ng So i fi O v f t1 e 12.r e h 52 ad
WF
Brick Pillar
109 109 . 33 . 10
99.38
9 9 . 0 5
9 . 99 0
WF
101.25
99.16
9 9 . 3 7
Shingle 100.51
102.33
1 0 3 . 0 2
1 0 58 .8 1 0 53 .2
9 8 . 9 7
WF
1 0 29 .6
99.58
So So fi f fi t f t
9 8 . 5 2
99.87
105.35
Brick Pillar
10 5. 37
/ RF
9 8 . 5 4
1 0 27 .6
102.27
0. 9m
100.49
on
WF
9 .6 85
al l
9 9 . 4 5
o n
100.03 101.27
Co nc r e t e
CW
99.83
1 0 5 . 1 7
102.30
1 0 0 . 6 7
99.31
100.56
WF
10 5. 26
1 0 0 . 4 5
10 2. 95
So fi f t
/ RF
9 9 . 8 8
C o n c r e t e B l o c k S l i p w a y
0 . 9 m
109. 08
98 . 58
1 0 0 . 4 0
99 . 72
100.77
WF
1 0 4 . 4 9
2012
Shingle WF
1 0 5 . 3 4 Co n c r e e B tP 1 S 0 W i 5 l f . of 1 lr 4 i S . a t 1 2 1 m m 0 7 o h k 8 CW .8 ig n A r e a 1 M 0 e 5 t . 6 a 9 l Gr i l l e
105. 34
9 9 . 8 7
1 0 1 . 3 1
10 10 5. 5. 41 31
62 99.
B i k e R a c k
1 0 5 . 4 8
S e a l e d s mo k e o u t l e 1 t 0 f 5 r o . 2 m 9 g BW a r a 1 g 0 e 6 . 4 9
99.76
1 0 1 . 0 5
101.29 102.11
Bi k e
WF 1
Ra c k
1 0 5 . 3 2 B W
105.29
Co n c r e t e P i l l a r
1 . 2 mh
Rac
99.46
100.60
1 0 0 . 8 8
Bi k e
10 0. 33
Lifebelt
Bi k e
Ra c k
1 0 50 .9
10 5. 10
10 0. 10 10 5. 40
10 5. 10 39 5. 104 43 . 49
105.27
1 0 61 .4
1 0 2 . 7 7
1 0 2 . 9 9
103.29
99.60 MH(U)
99. 33
CL 105.06
1 0 5 . 1 2
1 0 2 . 4 5
103.93
1 0 4 . 2 3
14 0. 4 1
10 5. 94 BR W
HR
1 0 5 . 4 5
10 5. 36
14 0. 4 5
1 0 5 . 3 8
B i k e
M/ R F w i t .m hS 08 tn ho o eWa nS t o l l 14 n R .m e e a hb ti ig ew nn t Wa e e nL l l P 1 s 0 1 . 3 1 6 0 51 .1
Tarmac
h on
B i k e
98 . 59
99 . 62
1 0 1 . 5 7
102.37
1 0 5 . 3 2
Rac k
1 0 2 . 5 6
Tarmac
Co n c r e 105.32 t e P i l l a r
S e a l e d s mo k e o u t l e t f r o m 1 0 g 5 a . 3 r 5 a g Co e B W n c 1 r . e 2 t mh e P i l l a r 1 0 5 . 2 9
CAMELFORD HOUSE
1 0 36 .2
1 0 5 . 4 3
B ie k Ra c k
a c k
9 94 .0
Re t a ni i ng
1 0 5. 2 8
7 2 5. 10
03 3. 10
5 2 . 05 1
R /
1 5 03.
9m . 0
99. 55
Bi k e Ra c k
M RF /
k c i r B
n o
9m 0. CW
3 3 05. 1
W B
g n i n i a t Re
W
l l a
8 6 4. 0 1
37 4. 0 1
s e h s u B
m 0 3. 0 1.
1 0 5 . 3 1 4 0 5 . 4 5
S e a l e d s mo k e o u t l e t f r o m
0 1 0 . 1 5
99.46
99 . 90
10 5. 01
CS
10 6. 12
1 0 54 Co .7 n ce r t e
98. 58
.1 59 0 1
0.7mh
1 05 . 3 6
Mud/Shingle
1 0 61 .4
1 0 5 . 1 2
1 0 3 . 9 0
1 0 54 .1
1 0 42 .4
105.09
SPS
105.72 BP 1 1 0 0 5 5 . . 4 5 6 5
1 0 5 . 3 4
B W
g 0.2
105 10 . 63 10 5. 9 5. 6 44
Stone Blocks
1 0 5 . 1 3
1 . 1 mh
Scrub
t e P Tarmac i l l a r
1 0 5 . 4 1
Co n c r e
Co n c r e t e P i l l a r
b a s e m e n t
S h P m S 5 . 0
C
W
105.38
Protruding Sculpture
1 0 54 .7
10 10 0. 5. 07 05
9 .1 92
1 0 5 . 1 0
Mud/Shingle
1 0 3 . 8 6 1 0 5 . 1 0
10 5. 01
105.03
1 0 4 . 2 5
1 0 5 . 2 7
1 0 5 . 3 0
B
1 0 5 . 2 8
1 0 5 . 3 6
1 0 5 . 4 2 1 0 1 55 0 .5 5 . 3 7
S e a l e d s mo k e o u t l e t f r o m
Sap
99.47
1 0 50 .7
6 0
BR 1 W 0 56 .3 1 M/ 0 59 RF .4 09 .m h
1 0 4 . 4 2
1 0 4 . 4 9
Tarmac
99 . 13
105.
Sign
105 . 05
m 2 . h /F2 MR 8 . h 1 m n W o S
1 0 50 .8
1 0 51 .0
15 0. 0 5
1 0 4 . 5 5 1 0 46 .3
1 0 5 . 3 7 1 0 5 . 2 8
1 0 5 . 3 0 1 0 5 . 3 9
1 0 5 . 1 0 4 5 0 . 4 6
105.36
Co n c r e t e P i l l a r
S e a l e d s m o k e C o o u n t c l e r t e f t r e o m P i l b l a a r s e me n t
N W S RN E P IG G R E SWA K A D N L
2002
1 0 50 .1
1 0 5 . 1 1
1 0 5 . 2 7
B Scrub
105.64
99.41
99. 81
10 5. 2 1
1 0 5 . 2 7 1 0 5 . 3 0 1 0 5 . 2 0
1 0 5 . 2 0
105. 37
106 . 13
98. 58
CW 0.5mh
1 0 50 .1
105.11
1 0 50 .6
105.20
Scrub 105.69
1 0 1 5 0 . 1 5 8 . 2 8
1 0 5 . 2 3 1 0 5 . 1 2
1 0 5 . 1 1
1 0 5 . 3 0
B u s h e s1 . 1 0 03 5 . 0 . mh 4 8
1 0 5 . 3 6
105.39
1 0 5 . 2 6
BP
10 105 0. . 00 40
10 5. 06
1 0 50 .7 M/ R F3 .mh 0 o nS W
Tarmac
Tarmac
1 0 5 . 1 7
Tarmac
C W
1 0 5 . 1 1 0 3 0 5 9 55 .8 . 4 6
105.37 B
S o f f i t 1 0 9 . 1 3
0 . 4 m h
10 .m h
1 0 50 .6
1 0 50 .4
1 0 50 .3
Rough Grass
1 0 52 .1 1 0 51 .2 SPS 1 0 51 .9
1. 0m
99 . 02
D U C K
BP
1 0 5 . 3 0
SW
Ben c h Pi l l ar s 1. 4m
Maple h 12.0
1. 0m
on
T OU R S
10 4. 99
g 1.0
99.35
et al
99 . 90 10 6. 12
9 85 .6
St on e
1 0 5 . 1 0 1 0 5 . 1 9
1 0 M/ 51 .6 R F w 26 i t hS .m BP tn ho o eP nS 1 0 51 i l .2 lr W 1 a s2 .mh 4 .mh 4
105. 10
9 . 92 0
99. 74
A C C E S S
0 5 . 3 1 1 0 5 . 2 3 1 0 5 . 1 2
1 0 5 . 0 9
1 0 5 . 5 2
1 0 5 . 3 3
1 0 5 . 3 7 1 0 5 . 4 3 W
S e a l e d s m o k e o u t l e t f r o m
/ R F 0 . 9 m h o n B W
Barges on campshed
NG STREET GODI
b a s e m e n t
Tarmac
10 5. 04
10 5. 01
1 0 5 . 0 8
BP
9 . 92 0
Sign
10 6. 01
10 5. 06
105.07
105.13
Be nc h Pi l l ar s 1. 4m
10 5. 01
MI6
SPS Maple g 1.0 h 12
1 0 5 . 1 3
1 0 5 . 1 1
1 0 5 . 0 2
Hut
St one
et al
99.29
99 106 . 85 . 11
9 85 .5
10 5. 02
SS SPS Bench x4
9 89 .1
1 0 5 . 0 5 1 0 50 .6
Ba ri r e r
1 0 50 .6
1 0 4 . 9 9
BP
99 . 83
1 0 48 .3
1 0 5 . 0 1
10 5. 05
9 95 .5
1 0 4 . 9 9
1 0 4 1 .5 0 8 1 4 0 . 9 4 5 . 9 8
9 85 .4
10 5. 05
S c a r
Tarmac
99.21
10 6. 12
et al
99 . 79
105. 39
S c a r
h
10 5. 01
Pi l l ar s
M / w RF i t 0 h 8m St . on h 99 on e . 72 W al St on l 1. 4m e R e h a be t i ni t ng w een W LP al l s 10 6. 11 10 5. 00
h 12.0
99.17
9 . 85 5
105 10 . 39 5. 01
9 89 .4
Ben c h Pi l l ar s 1. 4m
106. 11
1 0 4 . 9 7
1 0 6 . 0 0
et al
St on e
105. M / on RF 06 SW 1. 0m 1. h 0m h
Maple g 0.9
MG
es
10 5. 39
1 0 49 .9 1 0 1 5 0 . 50 0 .9 9
a 1 r ma 0 5 . c 1 0 6 Wa 4 1 . 9 8 l l mo u n t e d c a be l B Sign
99. 57
1 58 0 .6 Gr v l a e
105.07
1 0 5 . 2 6 1 0 5 . 1 6 1 0 5 . 0 9
1 0 5 . 1 2 1 0 5 . 0 1
1 0 4 . 8 7
St on e
Ben c h Pi l l ar s 1. 4m
St on e
Ben c h
1. 4m
9 94 .8
et al
10 5. 05 M / on RF SW 1. 0m 1. h 0m h
9 88 .1
1 5 0 . 4 5
AL BERT EM BANKM
104.96
105.10
10 5. 40
1 0 5 . 0 4 1 0 5 . 1 5
10 5. 99
98 . 89
BW
Tarmac
B u s h e s1 . 0 3 . 0 m h
1 0 5 . 0 9 1 0 5 . 1 2
ENT
10 5. 04
1 0 5 . 2 6 1 0 5 . 2 2 1 0 5 . 1 2
1 0 5 . 2 8
1 0 5 . 4 2
1 0 5 . 2 5
1 0 5 . 3 6 1 0 5 . 4 0
SPS
SS
99.16 99.12
10 5. 39
Bench x4
Be nc h Pi l l ar s 1. 4m
99. 13
99.36
10 5. 06
105 10 . 1 0 5. 01
9 . 85 1
St one
99 . 86
10 6. 11
99 . 17
Maple h 12.0
10 4. 89
99.19 98.99
10 5. 07
10 5. 39
10 4. 57
Spillway 97.99
9 84 .9
98.85
Base 99.51
Brick
99.09
Concrete
9. 85 2
O u W t f a l i l I t L hS 9 8 tr . om 9 2
99.30 Dolphin
CRW
10 5. 40
1 0 4 . 5 4
10 4 6 104 . 1 . 71
V A UX H A O L v e L r h e a B d R I DGE
98. 5 3
99 . 94
10 6. 12
99.01
99.07
h
2m . 2 3m F 2. R / W M S n o
10 4. 86 104. 90
Ov e r h e a d 1 0 5 . 5 6
97.81
99.46
10 4. 62
/ RF
B e a m
1. 0m
9 8 . 8 4
9 8 . 9 9
Tarmac
on
SW
1. 0m
9 8 . 6 1
99 . 55
9. 85 1
98.96
Be o/ am h
99 . 12
9 8 . 7 2
9 9 . 8 5 WF 1 S 0 h 1 . P e 0 i e 5 l t i n g
104 . 29
9 99.28 9 . 0 F 7 l a p 9 9 2 . 3 2 9 5 0 x 1 4 4 0
9 9 . 5 2
1 0 4 . 5 7
MI6
MH(U) CL 104.60
1 0 4 . 2 9
Bridge Pier
9 8 . 9 6
99.01
Concrete
99.05
97.99
10 0. 11
99.18
a W ni al i ng l 100 . 04
10 3. Li 90 f eb el t
99 . 75
9 9 1 . 2 0 9 1 . 0 9 9 Concrete 9 . 8 0 9 9 Platform 9 9 . . 3 1 1 Ou 9 0 0 0 t . e WF 8 r 0 Ed 9 9 g . e 6 1 2 0 o 0 f . Br 8 9 i B WF 99 0 d . e g 9 0 a e 9 m . Ov 5 Ov 4 e r e h r e h a e d a d 1 0 7 . 7 6
2007
WF
10 4. 26
d0 . 7
1 0 0 . 7 9
Co n c r e t e
1 0 4 . 2 6
Tarmac
105. 39
1 0 4 . 2 6
SPS
10 4. 25
Tarmac
St R one et
104.48
1 0 4 . 5 7
M/ R F
S P S
Sh ee tP in l i g
Con c r et e
Ov e r h e a d 1 0 5 . 5 7
9 7 . 8 5
MG
L a d d e r
10 4. 24
Be a m
97.61
99.40
1 0 3 . 8 2
SPS
2 . 2 mh o n S W 1 1 0 . 4 0 . mh 6 5
IC(U) CL 104.67
Ri v er Th am
g 0.8
h
98. 52
99 . 94
10 3. 99
10 4. 57
et al
1 0 6 . 0 1
105. 44
SPS
Alternative access
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
27 5. 10
9 . 93 8
99 . 20
98 . 53
99 . 84
10 5. 01
/ RF
10 5. 18
.1 92 9
9 9 . 8 9
7 5 0 . 1 4
7 9 . 9 9
21 99.
7 5 0 . 1 4
10 4. 58
99. 83
99 . 99
99 . 63
99. 93
97.85
98. 52
9 7 . 9 3
105. 16
99.25
Ups t and
.1 85 9
51 . 98
Mud/Shingle
M/ R F
1 . 8 m h
1 0 4 . 2 8
Soffit 107.89
104.65
1 0 3 . 8 0
104.43
69 . 4 0 1 SS
M/ RF
Stone Structure
2 . 2 m h
Sign MG
BP 104. 104. 72 83 M / R o n F2 SW . 2 m h 1 . 0 m h
1 0 4 . 5 3
98.99
99.43
C 99 on . r 97 c et e
97.83
Sh ee tPi l i ng
98.05
97.84 98.09
8 4 . 8 9
9 .9 84
97.99
S h e e t P i l i n g
No Access
9 9 . 9 1
1 0 4 . 6 5
r ani t e
97.89
1 0 4 . 6 1
1 0 4 . 7 2
99.34
9 9 . 9 0 9 9 . 7 6
Gr a n i t e S t e p s
98 . 48
9 8 . 8 3
9 8 . 2 7
O u W t f a l i l I t L hS 9 8 tr . om 9 1
99. 21
Concrete Base
99 . 91
B e o/ am h
9 9 . 1 5
F l a 9 p 9 1 . 1 7 1 2 0 x 1 5 3 0 9 9 . 1 0
CW
M / on RF SW 2. 2m 1. h 0m h
Ov e r h e a d 1 0 7 . 8 0
99.49
9 9 . 9 4
S o f f i t
WF
1 0 6 . 8 3
Pi l l ar 2. 6m h 10 4. 67
B e a m
99 . 85
1 0 4 . 5 5
MG
Crane Alternative access only: Construction access left turn in, left turn out
1 0 60 .2
Key:
AL BERT EM BANKM ENT
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route Existing sewers Sheet piles Extent of temporary working area over the foreshore
1 6 0 . 0 0
15 . 99
CRW
99.68
Re t ai ni ng
9 9 . 2 1
E S
98.93
98 . 50
9 9 . 0 4
Dolphin Concrete Base 99.47
A M
TH
9 9 . 5 5
2006
1 0 0 . 6 9
1 0 0 . 0 2
St one
9 9 . 2 6
C o P n l ce r a t f e o t r m
S ubwa
1 0 1 . 0 3
9 9 . 7 8
B e a Ou m Ov t e r e Ed r h g e e a d o f 1 Br 0 4 i . d 9 g 3 e O v e r h e a d
al l
1 0 1 . 0 3
92 9 .9
9 9 . 4 3
9 9 . 6 2
I V E R
9 84 .8
1 1 0 0 0 0 . 0 . 6 4 7
o o d e n
1 0 0 . 1 3
F e n d e r s
9 84 .8
98.79
8 W o 1 o 0 d 0 e . n 2 7 F e n d e r s 1 0 0 . 4 2
1 0 0 . 0 5
1 0 0 . 6 8
1 0 0 . 6 4
10 5. 60 10 10 5. 1. 72 38
100.68
10 4. 91
98. 48
98.78
1 10 5. 01. 41 48
108. 87 10 8. 47
Ladder
53 10 10 S 1. t 5. one 40 67 10 et ai 5. ni 82 ng W al l
S o f f i t
1 0 7 . 9 5
MG
105.
SPS
IR / on F CW 0. 7m
al l
at 14 . 39
10 0. 32
et ai ni ng
10 0. 0 9
10 5. 47
09/ 03 / 10
106 105. . 80 59
Mud/Shingle
101 B . rc 40 i k
108 10 . 7. 11 77
106. 10 0 5. 4 68
at er Li ne
10 5. 6 1 3 08.
10 7. 99
Lo 98 w . 45 W
99.19
IR / on F CW 0. 7m
1 10 07. 7 86 . 60
107 . 62
5 0 . 00 1
BP
h
0 . 7 mh
o n Cw
99 . 85
10 6. 106 7 . 2 29
107 . 48
108.
10 6. 30
99.95
101.
24
SPS
IR /
SPS
10 7. 23
0. 5m
14
on
99.91
CW
108 . 45
8 9 . 9 9
I / RF
1 0 7 . 9 8
10 8. 78
99.71
BP
SPS
on
8 5
IR / on F CW 0. 9m 0. h 3m h
1 0 8 . 7 7
104
100.48
. 66
Base
S t one
99.74
10 1. 31
1 0 0 . 6 5
10 P 4. i l l ar 78 s
1 0 0 . 6 7
1 0 1 . 0 7
S o f 1 ft 0 i 6 . 8 7
2 2 0 . 1 0
1 0 8 . 4 4
IRF / on CW 0. 7m
10 0. 12
1 0 6 . 9 0
9 98 .7
101 . 02
99.94
BP
107 . 35
10 6. 95
99.64
SPS
B ui l di S ng of f Ov i t112. er h 41 ead
Column
106 10 . 8. 97 14
Concrete
B R I D G E F O O T
107 10 . 6. 31 87
10 7. 37
100.18
10 6. 96
St one
.4 01 0 1
.9 97 9
al l
Sign
B rc i k Re nd t er ai B gr ni rc i ng ou k W nd W al al C l l IR ar / Pa F on 0. r k 7m 105. C 10 h W 5. 40 12 10 10 4. 6. 13 95
10 7. 34
BP
99.90
1 0 69 .5
10 0. 96
SPS
BP
106 . 94
10 1. 02
1 0 6 . 9 6
SPS
106.
106 . 95
BP
10 8 . 1 3
95
1 0 6 . 9 5
104.
15
BW
11 .m h
106. 96
10 6. 96
1 0 6 . 9 5
1 10 06 97 8. . 14
1 5 0 . 8 8
10 / 03 / 10
Ca me l fr od H
at er Li ne
on
Crane
10 5. 62
8 7t o9 0
Lo w
10 5. 87
1 5 0 . 6 2
1 6 0 . 0 3
o u s e
SO UT H L AM BE TH RO AD
at 16 . 10
10 5. 94
1 0 59 .4
10 5. 10
ac c es s
104.96
105.07
1 0 5 . 0 4 1 0 5 . 1 5
10 5. 99
am
Sh l r et e
85
Bridge piers
10 5. 16
Va x a l u h lSt t a in o
at 14 . 39
at er Li ne
on
09/ 03 / 10
Lo w
10 7. 35
10 8. 14
8 97 9 .
Loading bay
SPS
Br 1 i t d o g e 1 4 H 6 o u s e
Permanent cofferdam
K N IG O E NN T N LN A E
Notes :
Bol
1. These construction phasing plans have been prepared to illustrate possible site layouts for
Authorised channel
TCB
1 1 0 0 5 5 . . 4 5 6 5
the principle construction phases. Contractors may choose to lay sites out differently during
N W S RN E P IG G R E SWA K A D N L
1 0 5 . 3 7 1 0 5 . 2 8 0 5 . 3 0 1 0 5 . 3 9
construction depending on their preferred construction methods subject to any controls on layout imposed through the planning
1 0 4 . 4 2 1 0 4 . 4 9
1 0 5 . 3 0 1 0 5 . 2 0
1 0 1 5 0 . 1 5 8 . 2 8
1 0 5 . 2 3 1 0 5 . 1 2
Vauxhall Bridge
Site power structure Crane
1 0 5 . 1 0 1 0 5 . 1 9
1 0 5 . 2 2 1 0 5 . 1 2
2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown.
1 0 49 .9 1 0 5 . 0 9
1 0 5 . 1 2 1 0 5 . 0 1
1 0 5 . 0 5
1 0 4 1 .5 0 8 4 . 9 5
3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing. 5. Flood defence levels to be maintained at all times
MLW
SL SL
10m
40m
ILLUSTRATIVE
1 0 3 . 8 2
1 0 3 . 8 0
Location
Document Information
6 t 2 o 6 ( 5 b eo l w)
Section 48 publicity Construction phases - phase 3 Construction of other structures Book of plans - section 15
S48-PP-15X-ALBEF-000188 July 2012
B R I D G E F O O T
VAUXHALL
1 48 0 .8 1 47 0 .3
Co c n rt ee
104.45 104.53
1 41 0 .6 1 42 0 .6
g 0.6 h 5.0
1 0 46 .4 1 0 46 .9
CPS
1 46 0 .1
104.95
104.47
DK
1 4 0 . 4 4
9 88 .6
1 0 56 .6 1 0 46 .4
TPS
DK
104.40
1 48 0 .0
h 8.0
104.49
1 47 0 .1
104.77
Co c n rt ee
1 42 0 .9
g 0.5
1 41 0 .5
Plane
TPS
Pd ee si t n r a Co rsi sg n
No.36
1 45 0 .6
104.43
1 43 0 .1
FL 104.31
98. 56
1 0 46 .1 1 0 46 .9
104.99
CPS
FL
SK
104.29
St o n e Re ti an ig n W
1 44 0 .2
1 43 0 .8
1 41 0 .2
1 42 0 .3
104.74
1 0 46 .7 10 4. 70
1 48 0 .2 1 46 0 .8
h 8.0
98 . 57
Grass
9 93 .4
Sign
1 0 56 .5 1 0 46 .3
CPS
Sap RS
1 0 46 .5
1 46 0 .4
98 . 57
1 44 0 .9
1 4 0 . 3 5
1 45 0 .4
1 43 0 .0
Plane g 0.8
No.37
N Gunhouse Stairs
Ti t g na e H l o s u e
1 0 49 .8 Be n c h Ma rl be Ba s e
1 4 0 . 6 1
1 44 0 .6
AL BERT
EM BANKM
ENT
98 . 56
1 42 0 .3
1 43 0 .0
1 42 0 .8
0 .0 1 46
104.70
N
5 0. 14 6
9 90 .3
1 0 56 .4 1 0 46 .4
1 42 0 .8
SPS
14 0. 7 7 14 0. 7 3
B B
9 95 .6
Ma rl b eW a l l 10 .mh
SK B
MH(U)
98. 58
14 0. 7 4
CL 104.65
al l
14 0. 7 9
h
BP
1 45 0 .5
104.76
104.76
DK
So f ft i 1 68 1 .3 1 46 0 .9
1 0 46 .9
St o n eW
M rl ab 1 e . 0 h m
9 97 .8
1 0 46 .6
Peninsula Heights
1 46 0 .6
1 44 0 .3
98 . 58
1 41 0 .5
1 41 0 .9 1 42 0 .7
1 43 0 .8 1 42 0 .9
99.13 99.42
1 0 46 .8
1 0 47 .0
IC(U) CL 104.33
E S
A M
99.34
10 .m h
1 46 0 .6
1 45 0 .1 1 43 0 .8
TH
1 0 00 .0
98 . 56
St o n eR
1 0 46 .9
I V E R
St n o e DK
1 46 0 .2
BP
MH(U) CL 104.67
SK
99.78
1 0 46 .6
1 45 0 .1 1 43 0 .7
1 42 0 .6
99.56 Concrete
100.07
1 0 47 .0
1 44 0 .6
1 46 0 .0
DK
1 42 0 .2
98. 56
1 0 02 .1
1 44 0 .8
1 0 4 . 4 7
1 44 0 .4
DK
CPS
1 0 4 . 3 5
99.68 100.13
104.60
1 45 0 .9 St n o e DK
at er Li ne
1 44 0 .8
1 44 0 .9
100.30
99.27
So f ft 0 i1 9 .1 3 St n o e DK
Lo w
100.22
98. 59
105.40
1 0 4 . 7 1
10 0. 43
1 58 0 .6
104.70
1 44 0 .1
1 0 0 . 6 0
Sign
1 4 0 . 7 1
1 43 0 .0
1 44 0 .2
1 45 0 .1
1 43 0 .1
1 47 0 .4
1 44 0 .4
SK
1 46 0 .2
99.84
Texaco Garage
1 43 0 .2
SK
1 44 0 .2
2010
1 4 0 . 6 6 Co c n r eeW t a l1 4 7 l 0 .0
1 58 0 .6
1 45 0 .3
98. 57
1 46 0 .0
CPS
CPS
1 45 0 .5
10 0. 5 3
1 4 0 . 8 2
9 2
1 0 46 .6
al l0 .m 8
1 42 0 .6
10 / 03 / 10
on
1 0 46 .8
St o n eW
100 . 45
1 0 46 .9
DK
1 45 0 .8
1 0 47 .2
1 43 0 .1
1 44 0 .0
1 43 0 .9
at 16 . 10
BW 08 h .m
2009
1 45 0 .2
1 11 0 .0
1 43 0 .9
99.51
1 46 0 .4
1 42 0 .8
104.71
1 43 0 .6
1 0 08 .1
DK
1 44 0 .8
1 42 0 .6
98. 58
1 46 0 .1
F0 .m 9 h
2008
1 58 0 .5
DK
104.43
1 46 0 .0
1 09 0 .9
BP
Concrete Buttress
Tintagel House
St n DK o e
M DC
BP
1 45 0 .3
M/ R
BP
100.70 99.57
104.70 B
1 11 0 .0
1 10 0 .3
1 46 0 .2
1 44 0 .2
1 46 0 .4
Ta m r a c
DK
CPS 1 43 0 .8 1 42 0 .9 SK 1 42 0 .7
1 45 0 .4
98 . 58
BW 0 8 .mh
Concrete Buttress
DK
1 0 4 . 48
1 04. 52
SK 104.56
1 0 4. 48
St o n e Re ti an ig n W
BB
1 41 0 .9 1 42 0 .6
CPS
1 0 46 .5
al l0 .m 8
1 44 0 .5
1 43 0 .4
1 44 0 .4
1 44 0 .1
B ul i dn ig S of Ov ft i1 eh 1 r 0 47 0 .0 93 e d .0 a
1 43 0 .6
14 0. 7 5 14 0. 7 0
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
0 .0 1 46
Be n c h Ma rl be Ba s e
1 0 4 . 9 8
al l
1 41 0 .5 1 42 0 .5
70 4. 65 4. 10 10
0 .5 1 46
0 .2 1 44
0 .5 1 45
.9 05 0 1
0 .6 1 45
0 .4 1 44
1 45 0 .0
1 11 0 .6
Concrete Buttress
1 47 0 .2
10 0 . 42
0 .7 1 46
CPS
0 .2 1 44
0 .5 1 45
CPS
1 58 0 .5
1 47 0 .6
99.59
SK
1 45 0 . 9 BW 08 h .m
1 0 04 .8
1 12 0 .9
1 13 0 .3
Concrete Shingle
1 0 06 .1
Buttress
1 4 0 . 8 7
M/ R
F0 .m 9 h
CPS
4 3 . 0 0 1
1 0 . 0 0 1
1 58 0 .5
100.32
100.84
101.33
Keyplan:
1 4 0 . 8 2
1 44 0 .2
1 43 0 .2
98 . 55
1 45 0 .6
0 .0 1 46
0 .6 1 45
0 .4 1 44
1 4 0 . 9 4 1 0 55 .6
1 49 0 .3
9 85 .6
99.88 100.05
1 15 0 .4
Ta r c m a
100.85
100.67
99.58
101.21
1 58 0 .6
WF
9 85 .6
100.95
100.70
WF
1 49 0 .9
1 55 0 . 7
101.11
100.01 100.15
WF
100.84 99.49
101.20 WF
Co t a p H l l
1 49 0 .5
1 17 0 .0
1 49 0 .4 1 55 0 .6
G A LS S O H U S WA E L K
1 0 08 .0
1 17 0 .1
1 58 0 .6
1 4 0 . 9 4
1 0 07 .4
1 16 0 .3
CW
1 49 0 .9
9 85 .7
99.89
100.15
101.24
WF 101.20
100.63
100.02
1 0 08 .3
98. 57
100.17
100.53 WF
Co c n r eeW t al l
99.67
7 8 . 0 0 1
101.34
98 . 55
1 20 0 .2
1 19 0 .3
100.43
1 0 0 . 8 6
1 5 0 . 8 7 1 4 0 . 9 5
10 0 . 71
. 46
WF
1 1 0 . 9 9
100
1 4 0 . 9 0 1 5 0 . 5 5
9 9 . 0 0 1
1 17 0 .9
1 17 0 .4
1 49 0 .1 1 55 0 .7
99.55
100.19
101.49
Lifebelt
1 5 0 . 8 7 1 4 0 . 9 8
101.58
WF
99.60
WF WF
1 0 0 . 7 7
WF WF
100.30
WF
101.43
99.55
9 . 85 6
PIG 200
1 2 0 . 1 6
10 0. 46
Mud WF
98 . 53
99.45
101.33 WF
E S
WF
1 5 0 . 8 8 1 5 0 . 2 2
A M
10 0. 65
WF 102.16
TH
9 9 . 4 2
100.05
1 0 04 .7
1 0 0. 0 8
WF
I V E R
98 . 54
WF
at 16. 10
9 92 .5
WF 101.29 WF
102 . 48
1 0 2 . 3 3
1 5 0 . 2 8
M/ R
WF
F0 .m 9 h
o BW n
100.24
(i o st f e )
102.22
WF
99.82
100.36
WF
Concrete
2011
3 85 9.
100.44
101.32
102 . 60
WF
102.23
WF
Brick Pillar
9 . 85 1
WF
WF
Brick Pillar
9 . 96 9
99.59
101.27
BW
105.35
9 94 .0
Bui l d ng So i fi O v f t1 e 12.r e h 52 ad
WF
Brick Pillar
109 109 . 33 . 10
99.38
9 9 . 0 5
9 . 99 0
WF
1 0 29 .6
99.58 101.25
So So fi f fi t f t
9 8 . 5 2
99.87
105.35
Brick Pillar
10 5. 37
/ RF
9 8 . 5 4
1 0 27 .6
102.27
0. 9m
100.49
on
WF
10 5. 62
99.72
1 5 0 . 3 9
100.40
1 6 0. 10
99.16
9 9 . 3 7
Shingle 100.51
102.33
9 .6 85
al l
9 9 . 4 5
o n
100.03 101.27
Co nc r e t e
CW
0 . 9 m
109. 08
105. 34
9 9 . 8 7
Re t a ni i ng
1 0 5. 2 8
1 0 3 . 0 2
1 0 58 .8 1 0 53 .2
9 8 . 9 7
WF
99.83
1 0 5 . 1 7
102.30
1 0 0 . 6 7
99.31
100.56
WF
10 5. 26
1 0 0 . 4 5
10 2. 95
So fi f t
/ RF
9 9 . 8 8
C o n c r e t e B l o c k S l i p w a y
98 . 58
1 0 0 . 4 0
99 . 72
100.77
WF
1 0 4 . 4 9
2012
Shingle WF
1 0 5 . 3 4 Co n c r e e B tP 1 S 0 W i 5 l f . of 1 lr 4 i S . a t 1 2 1 m m 0 7 o h k 8 CW .8 ig n A r e a 1 M 0 e 5 t . 6 a 9 l Gr i l l e
1 0 1 . 3 1
10 10 5. 5. 41 31
62 99.
B i k e R a c k
1 0 5 . 4 8
S e a l e d s mo k e o u t l e 1 t 0 f 5 r o . 2 m 9 g BW a r a 1 g 0 e 6 . 4 9
99.76
1 0 1 . 0 5
101.29 102.11
Bi k e
WF 1
Ra c k
1 0 5 . 3 2 B W
105.29
Co n c r e t e P i l l a r
1 . 2 mh
Rac
99.46
100.60
1 0 0 . 8 8
Bi k e
10 0. 33
Lifebelt
Bi k e
Ra c k
1 0 50 .9
10 5. 10
10 0. 10 10 5. 40
10 5. 10 39 5. 104 43 . 49
105.27
1 0 61 .4
1 0 2 . 7 7
1 0 2 . 9 9
103.29
99.60 MH(U)
99. 33
CL 105.06
1 0 5 . 1 2
1 0 2 . 4 5
103.93
1 0 4 . 2 3
14 0. 4 1
10 5. 94 BR W
HR
1 0 5 . 4 5
10 5. 36
14 0. 4 5
1 0 5 . 3 8
B i k e
M/ R F w i t .m hS 08 tn ho o eWa nS t o l l 14 n R .m e e a hb ti ig ew nn t Wa e e nL l l P 1 s 0 1 . 3 1 6 0 51 .1
Tarmac
h on
B i k e
98 . 59
99 . 62
1 0 1 . 5 7
102.37
1 0 5 . 3 2
Rac k
1 0 2 . 5 6
Tarmac
Co n c r e 105.32 t e P i l l a r
S e a l e d s mo k e o u t l e t f r o m 1 0 g 5 a . 3 r 5 a g Co e B W n c 1 r . e 2 t mh e P i l l a r 1 0 5 . 2 9
Bi k e Ra c k
CAMELFORD HOUSE
9 1
Alternative access only: Access / haul route removed and site reinstated
1 08 0 .7
Br k i W c al l
This drawing
98 . 58
100. 23
1 2 0 . 1 6
10 0. 56
10/ 03 / 10
10 0. 16
100. 72
at er Li ne
on
10 0. 70
99. 51
Ta r a m c
1 0 03 .1
Lo w
1 0 02 .7
99 . 47
9 9 . 2 4
1 0 58 .6 1 0 52 .9
1 05 . 8 1 0 52 7 .4
98 . 54
1 5 0 . 3 7 1 5 0 . 6 2
1 6 0 . 0 3
99. 24
1 5 0 . 8 7 1 5 0 . 0 6
1 5 0 . 1 3
1 5 0 . 0 7 1 6 0 . 0 0
1 0 50 .4 1 0 60 .2
1 5 0 . 0 2 1 5 0 . 5 6
1 58 0 .6 1 48 0 .5
79 0. 10
1 0 36 .2
1 0 5 . 4 3
B ie k Ra c k
1 0 5 . 3 1 4 0 5 . 4 5
S e a l e d s mo k e o u t l e t f r o m
99.46
99 . 90
10 5. 01
CS
10 6. 12
1 0 54 Co .7 n ce r t e
98. 58
.1 59 0 1
0.7mh
1 05 . 3 6
Mud/Shingle
1 0 61 .4
1 0 5 . 1 2
1 0 3 . 9 0
1 0 54 .1
1 0 42 .4
105.09
SPS
105.72 BP 1 1 0 0 5 5 . . 4 5 6 5
1 0 5 . 3 4
B W
g 0.2
105 10 . 63 10 5. 9 5. 6 44
Stone Blocks
1 0 5 . 1 3
1 . 1 mh
Scrub
t e P Tarmac i l l a r
1 0 5 . 4 1
Co n c r e
Co n c r e t e P i l l a r
b a s e m e n t
105.38
Protruding Sculpture
1 0 54 .7
10 10 0. 5. 07 05
9 .1 92
1 0 5 . 1 0
Mud/Shingle
1 0 3 . 8 6 1 0 5 . 1 0
10 5. 01
105.03
1 0 4 . 2 5
1 0 5 . 2 7
1 0 5 . 3 0
B
1 0 5 . 2 8
1 0 5 . 3 6
1 0 5 . 4 2 1 0 1 55 0 .5 5 . 3 7
S e a l e d s mo k e o u t l e t f r o m
Sap
99.47
1 0 50 .7
6 0
BR 1 W 0 56 .3 1 M/ 0 59 RF .4 09 .m h
1 0 4 . 4 2
1 0 4 . 4 9
Tarmac
99 . 13
105.
Sign
105 . 05
m 2 . h /F2 MR 8 . h 1 m n W o S
1 0 50 .8
1 0 51 .0
15 0. 0 5
1 0 4 . 5 5 1 0 46 .3
1 0 5 . 3 7 1 0 5 . 2 8
1 0 5 . 3 0 1 0 5 . 3 9
1 0 5 . 1 0 4 5 0 . 4 6
105.36
Co n c r e t e P i l l a r
S e a l e d s m o k e C o o u n t c l e r t e f t r e o m P i l b l a a r s e me n t
N W S RN E P IG G R E SWA K A D N L
2002
1 0 50 .1
1 0 5 . 1 1
1 0 5 . 2 7
B Scrub
105.64
99.41
99. 81
10 5. 2 1
1 0 5 . 2 7 1 0 5 . 3 0 1 0 5 . 2 0
1 0 5 . 2 0
105. 37
106 . 13
98. 58
CW 0.5mh
1 0 50 .1
105.11
1 0 50 .6
105.20
Scrub 105.69
1 0 1 5 0 . 1 5 8 . 2 8
1 0 5 . 2 3 1 0 5 . 1 2
1 0 5 . 1 1
1 0 5 . 3 0
B u s h e s1 . 1 0 03 5 . 0 . mh 4 8
1 0 5 . 3 6
105.39
1 0 5 . 2 6
BP
10 105 0. . 00 40
10 5. 06
1 0 50 .7 M/ R F3 .mh 0 o nS W
Tarmac
Tarmac
1 0 5 . 1 7
Tarmac
C W
1 0 5 . 1 1 0 3 0 5 9 55 .8 . 4 6
105.37 B
S o f f i t 1 0 9 . 1 3
0 . 4 m h
10 .m h
1 0 50 .6
1 0 50 .4
1 0 50 .3
Rough Grass
1 0 52 .1 1 0 51 .2 SPS 1 0 51 .9
1. 0m
99 . 02
D U C K
BP
1 0 5 . 3 0
SW
Ben c h Pi l l ar s 1. 4m
Maple h 12.0
1. 0m
on
T OU R S
10 4. 99
g 1.0
99.35
et al
99 . 90 10 6. 12
9 85 .6
St on e
1 0 5 . 1 0 1 0 5 . 1 9
1 0 M/ 51 .6 R F w 26 i t hS .m BP tn ho o eP nS 1 0 51 i l .2 lr W 1 a s2 .mh 4 .mh 4
105. 10
9 . 92 0
99. 74
A C C E S S
0 5 . 3 1 1 0 5 . 2 3 1 0 5 . 1 2
1 0 5 . 0 9
1 0 5 . 5 2
1 0 5 . 3 3
1 0 5 . 3 7 1 0 5 . 4 3 W
S e a l e d s m o k e o u t l e t f r o m
/ R F 0 . 9 m h o n B W
Tarmac
b a s e m e n t
10 5. 04
10 5. 01
1 0 5 . 0 8
BP
9 . 92 0
Sign
10 6. 01
10 5. 06
105.07
105.13
Be nc h Pi l l ar s 1. 4m
10 5. 01
MI6
SPS Maple g 1.0 h 12
1 0 5 . 1 3
1 0 5 . 1 1
1 0 5 . 0 2
Hut
St one
et al
99.29
99 106 . 85 . 11
9 85 .5
10 5. 02
SS SPS Bench x4
9 89 .1
1 0 5 . 0 5 1 0 50 .6
Ba ri r e r
1 0 50 .6
1 0 4 . 9 9
BP
99 . 83
1 0 48 .3
1 0 5 . 0 1
10 5. 05
9 95 .5
1 0 4 . 9 9
1 0 4 1 .5 0 8 1 4 0 . 9 4 5 . 9 8
9 85 .4
10 5. 05
S c a r
Tarmac
99.21
10 6. 12
et al
99 . 79
105. 39
S c a r
h
10 5. 01
Pi l l ar s
M / w RF i t 0 h 8m St . on h 99 on e . 72 W al St on l 1. 4m e R e h a be t i ni t ng w een W LP al l s 10 6. 11 10 5. 00
h 12.0
99.17
9 . 85 5
105. M / on RF 06 SW 1. 0m 1. h 0m h
Maple g 0.9
MG
es
10 5. 39
1 0 49 .9 1 0 1 5 0 . 50 0 .9 9
a 1 r ma 0 5 . c 1 0 6 Wa 4 1 . 9 8 l l mo u n t e d c a be l B Sign
99. 57
1 58 0 .6 Gr v l a e
105.07
1 0 5 . 2 6 1 0 5 . 1 6 1 0 5 . 0 9
1 0 5 . 1 2 1 0 5 . 0 1
1 0 4 . 8 7
St on e
Ben c h Pi l l ar s 1. 4m
St on e
Ben c h
1. 4m
9 94 .8
et al
10 5. 05 M / on RF SW 1. 0m 1. h 0m h
9 88 .1
1 5 0 . 4 5
AL BERT EM BANKM
104.96
105.10
10 5. 40
1 0 5 . 0 4 1 0 5 . 1 5
10 5. 99
98 . 89
BW
Tarmac
B u s h e s1 . 0 3 . 0 m h
1 0 5 . 0 9 1 0 5 . 1 2
ENT
10 5. 04
1 0 5 . 2 6 1 0 5 . 2 2 1 0 5 . 1 2
1 0 5 . 2 8
1 0 5 . 4 2
1 0 5 . 2 5
1 0 5 . 3 6 1 0 5 . 4 0
7 2 5. 10
03 3. 10
5 2 . 05 1
R /
1 5 03.
9m . 0
99. 55
M RF /
a c k
k c i r B
n o
9m 0. CW
3 3 05. 1
W B
g n i n i a t Re
W
l l a
8 6 4. 0 1
37 4. 0 1
s e h s u B
m 0 3. 0 1.
0 1 0 . 1 5
S h P m S 5 . 0
C
W
106. 11
1 0 4 . 9 7
1 0 6 . 0 0
St on e
SPS
SS
99.16 99.12
10 5. 39
Bench x4
Be nc h Pi l l ar s 1. 4m
99. 13
99.36
10 5. 06
105 10 . 1 0 5. 01
9 . 85 1
St one
99 . 86
10 6. 11
99 . 17
Maple h 12.0
10 4. 89
99.19 98.99
10 5. 07
10 5. 39
10 4. 57
Spillway 97.99
9 84 .9
98.85
Base 99.51
Brick
99.09
Concrete
9. 85 2
O u W t f a l i l I t L hS 9 8 tr . om 9 2
99.30 Dolphin
CRW
10 5. 40
1 0 4 . 5 4
10 4 6 104 . 1 . 71
V A UX H A O L v e L r h e a B d R I DGE
98. 5 3
99 . 94
10 6. 12
99.01
99.07
h
2m . 2 3m F 2. R / W M S n o
10 4. 86 104. 90
Ov e r h e a d 1 0 5 . 5 6
97.81
99.46
10 4. 62
/ RF
B e a m
1. 0m
9 8 . 8 4
9 8 . 9 9
Tarmac
on
SW
1. 0m
9 8 . 6 1
99 . 55
9. 85 1
98.96
Be o/ am h
99 . 12
9 8 . 7 2
9 9 . 8 5 WF 1 S 0 h 1 . P e 0 i e 5 l t i n g
104 . 29
9 99.28 9 . 0 F 7 l a p 9 9 2 . 3 2 9 5 0 x 1 4 4 0
9 9 . 5 2
1 0 4 . 5 7
MI6
MH(U) CL 104.60
1 0 4 . 2 9
Bridge Pier
9 8 . 9 6
99.01
Concrete
99.05
97.99
10 0. 11
99.18
a W ni al i ng l 100 . 04
10 3. Li 90 f eb el t
99 . 75
9 9 1 . 2 0 9 1 . 0 9 9 Concrete 9 . 8 0 9 9 Platform 9 9 . . 3 1 1 Ou 9 0 0 0 t . e WF 8 r 0 Ed 9 9 g . e 6 1 2 0 o 0 f . Br 8 9 i B WF 99 0 d . e g 9 0 a e 9 m . Ov 5 Ov 4 e r e h r e h a e d a d 1 0 7 . 7 6
2007
WF
10 4. 26
d0 . 7
1 0 0 . 7 9
Co n c r e t e
1 0 4 . 2 6
Tarmac
105. 39
1 0 4 . 2 6
SPS
10 4. 25
Tarmac
St R one et
104.48
1 0 4 . 5 7
M/ R F
S P S
Sh ee tP in l i g
Con c r et e
Ov e r h e a d 1 0 5 . 5 7
9 7 . 8 5
MG
L a d d e r
10 4. 24
Be a m
97.61
99.40
1 0 3 . 8 2
SPS
2 . 2 mh o n S W 1 1 0 . 4 0 . mh 6 5
IC(U) CL 104.67
Ri v er Th am
g 0.8
h
98. 52
99 . 94
10 3. 99
10 4. 57
et al
1 0 6 . 0 1
105. 44
SPS
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
27 5. 10
10 5. 18
105 10 . 39 5. 01
9 89 .4
Ben c h Pi l l ar s 1. 4m
9 . 93 8
99 . 20
98 . 53
99 . 84
10 5. 01
et al
/ RF
.1 92 9
NG STREET GODI
9 9 . 8 9
7 5 0 . 1 4
7 9 . 9 9
21 99.
7 5 0 . 1 4
10 4. 58
99. 83
99 . 63
99 . 99
99. 93
97.85
98. 52
9 7 . 9 3
105. 16
99.25
Ups t and
.1 85 9
51 . 98
Mud/Shingle
M/ R F
1 . 8 m h
1 0 4 . 2 8
Soffit 107.89
104.65
1 0 3 . 8 0
104.43
69 . 4 0 1 SS
M/ RF
Stone Structure
2 . 2 m h
Sign MG
BP 104. 104. 72 83 M / R o n F2 SW . 2 m h 1 . 0 m h
1 0 4 . 5 3
98.99
99.43
C 99 on . r 97 c et e
97.83
Sh ee tPi l i ng
98.05
97.84 98.09
8 4 . 8 9
9 .9 84
97.99
S h e e t P i l i n g
No Access
9 9 . 9 1
1 0 4 . 6 5
r ani t e
97.89
1 0 4 . 6 1
1 0 4 . 7 2
99.34
9 9 . 9 0 9 9 . 7 6
Gr a n i t e S t e p s
98 . 48
9 8 . 8 3
9 8 . 2 7
O u W t f a l i l I t L hS 9 8 tr . om 9 1
99. 21
Concrete Base
99 . 91
B e o/ am h
9 9 . 1 5
F l a 9 p 9 1 . 1 7 1 2 0 x 1 5 3 0 9 9 . 1 0
CW
CRW
99.68
9 9 . 4 3
1 0 1 . 0 3
Re t ai ni ng
E S
98.93
98 . 50
9 9 . 0 4
Dolphin Concrete Base 99.47
A M
TH
9 9 . 5 5
2006
St one
9 9 . 2 6
C o P n l ce r a t f e o t r m
S ubwa
1 0 1 . 0 3
9 9 . 7 8
For continuation of detail at bridge deck level see detail file 100-DV-SUR-CS20X-960801
I V E R
9 84 .8
1 1 0 0 0 0 . 0 . 6 4 7
9 84 .8
98.79
10 5. 60 10 10 5. 1. 72 38
10 P 4. i l l ar 78 s
1 0 0 . 6 7
Wooden Post on Concrete
10 0. 39
1 0 0 . 6 4
100.68
10 4. 91
98. 48
98.78
1 10 5. 01. 41 48
108. 87 10 8. 47
Ladder
53 10 10 S 1. t 5. one 40 67 10 et ai 5. ni 82 ng W al l
S o f f i t
1 0 7 . 9 5
MG
105.
SPS
IR / on F CW 0. 7m
al l
at 14 . 39
10 0. 32
et ai ni ng
10 0. 0 9
10 5. 47
09/ 03 / 10
106 105. . 80 59
108 10 . 7. 11 77
IR / on F CW 0. 9m 0. h 3m h
104
100.48
. 66
Base
S t one
99.74
10 1. 31
1 0 0 . 6 5
1 0 8 . 7 7
Mud/Shingle
106. 10 0 5. 4 68
at er Li ne
10 5. 6 1 3 08.
10 7. 99
Lo 98 w . 45 W
99.19
IR / on F CW 0. 7m
1 10 07. 7 86 . 60
107 . 62
5 0 . 00 1
BP
h
0 . 7 mh
o n Cw
99 . 85
10 6. 106 7 . 2 29
107 . 48
108.
99.95
101.
107 10 . 6. 31 87
10 7. 37
IRF / on CW 0. 7m
10 0. 12
1 0 6 . 9 0
9 98 .7
101 . 02
99.94
BP
100.18
al l
10 6. 96
107 . 35
10 6. 95
99.64
SPS
B ui l di S ng of f Ov i t112. er h 41 ead
Column
106 10 . 8. 97 14
Concrete
10 6. 30
24
SPS
St one
.4 01 0 1
.9 97 9
SPS
1 10 06 97 8. . 14
Sign
B rc i k Re nd t er ai B gr ni rc i ng ou k W nd W al al C l l IR ar / Pa F on 0. r k 7m 105. C 10 h W 5. 40 12 10 10 4. 6. 13 95
10 7. 34
BP
99.90
1 0 69 .5
10 0. 96
SPS
BP
106 . 94
10 1. 02
1 0 6 . 9 6
SPS
106.
106 . 95
BP
10 8 . 1 3
95
1 0 6 . 9 5
104.
15
BW
11 .m h
106. 96
10 6. 96
1 0 6 . 9 5
Br 1 i t d o g e 1 4 H 6 o u s e
IR /
SPS
10 7. 23
0. 5m
14
on
99.91
CW
108 . 45
8 9 . 9 9
I / RF
1 0 7 . 9 8
10 8. 78
99.71
BP
SPS
B R I D G E F O O T
1 6 0 . 0 0
101 B . rc 40 i k
1 0 8 . 4 4
1 0 1 . 0 7
S o f 1 ft 0 i 6 . 8 7
on
8 5
1 0 60 .2
9 9 . 2 1
B e a Ou m Ov t e r e Ed r h g e e a d o f 1 Br 0 4 i . d 9 g 3 e O 1 v e 0 r 0 h . e 0 a 2 1 d 0 0 . 6 9 1 0 0 8 . 1 W 3 o o d e n F e n d e r s 8 W o 1 o 1 0 d 0 0 e 0 . n . 2 0 7 F 5 e n d e r s 1 1 0 0 0 0 . . 6 4 8 2
al l
9 9 . 6 2
M / on RF SW 2. 2m 1. h 0m h
Ov e r h e a d 1 0 7 . 8 0
99.49
9 9 . 9 4
S o f f i t
WF
1 0 6 . 8 3
Pi l l ar 2. 6m h 10 4. 67
B e a m
99 . 85
1 0 4 . 5 5
MG
Key:
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route Existing sewers
15 . 99
92 9 .9
2 2 0 . 1 0
1 5 0 . 8 8
Ca me l fr od H
Hoarding removed
10 5. 62
8 7t o9 0
Lo w
10 5. 87
1 5 0 . 6 2
1 6 0 . 0 3
at er Li ne
on
10 / 03 / 10
o u s e
SO UT H L AM BE TH RO AD
at 16 . 10
10 5. 94
1 0 59 .4
10 5. 10
104.96
105.07
1 0 5 . 0 4 1 0 5 . 1 5
1 0 5 . 1 6 1 0 5 . 0 9
1 0 49 .9 1 0 5 . 0 9
1 0 5 . 1 2 1 0 5 . 0 1
1 0 5 . 0 5
10 5. 99
MLW
Sh l r et e
85
Bridge piers
10 5. 16
Va x a l u h lSt t a in o
at 14 . 39
at er Li ne
on
09/ 03 / 10
Lo w
10 7. 35
10 8. 14
8 97 9 .
K N IG O E NN T N LN A E
Bol
Authorised channel
1 0 4 . 4 2 1 0 4 . 4 9 1 0 5 . 3 7
N W S RN E P IG G R E SWA K A D N L
1 0 5 . 3 0
1 0 5 . 1 8
1 0 5 . 2 3 1 0 5 . 1 2
Vauxhall Bridge
1 0 5 . 2 3 1 0 5 . 1 2
1 0 5 . 1 0 1 0 5 . 1 9
1 0 5 . 2 2 1 0 5 . 1 2
1 0 4 1 .5 0 8 4 . 9 5
40m
ILLUSTRATIVE
1 0 3 . 8 2
1 0 3 . 8 0
Location
Document Information
6 t 2 o 6 ( 5 b eo l w)
Section 48 publicity Construction phases - phase 4 Site demobilisation Book of plans - section 15
S48-PP-15X-ALBEF-000189 July 2012
B R I D G E F O O T
VAUXHALL