JINDAL SAW LTD.

AC & CWC UNIT MUNDRA,INDIA

Report No. :001

APPLICATION REPORT (3LPE)


CUSTOMER PIPE SIZE

: CUST-TESTED BY TULARAM ON
DATED 02.03.2011 : 30.000" OD X 22.000 mm WT

PROJECT P.O. NO.

: PROJECT-TESTED BY TULARAM ON
DATED 02.03.2011 : PONO-TESTED BY TULARAM ON DATED 02.03.2011 : 03.12.2010 / A

COATING SPEC : SPEC-TESTED BY TULARAM ON DATED DATE/SHIFT 02.03.2011 PIPE LINE SPEED : 2.4 Mtr/Minute TIME IN SECOND FROM LAST FBE GUN TO ADHESIVE ( INTERCOAT TIME ) : 21 SECOND TIME IN SECOND FROM LAST FBE GUN TO COOLING : 33 SECOND FREQUENCY : EACH PIPE EVERY HRS Pipe Temp. (C)
Sr. No. Time Pipe No. ME MIDDLE UME Adhesive PE/PP Film Dew Point Film Temp. (C) No of

Epoxy Gun

Remarks

Temp (C) Temp.(C) Gun (FBE) Pressure (Bar)

PROD. STOP DUE TO IND.PROB.AT 2.30 PM AND STARTED ON 4.00PM 001 2.10 0000001267 200 200 PROD. STOP DUE TO IND.PROB.AT 2.30 PM AND STARTED ON 4.00PM 002 2.3 0000001268 200 200 PROD. STOP DUE TO IND.PROB.AT 2.30 PM AND STARTED ON 4.00PM 003 2.3 0000001269 200 200 PROD. STOP DUE TO IND.PROB.AT 2.30 PM AND STARTED ON 4.00PM 004 10.2 0000001270 200 200 005 10 0000001271 200 200 006 10 6 200 200

-50 -50 -50 -50 -50 -50

8 8 8 8 8 8

BATCH NO -->

EPOXY POWER :3333

ADHESIVE :

PE/PP : 3344

INSPECTOR (QC) Format No.

ENGINEER (QC)

INSPECTION AUTHORITY