ITEM -2:- HEAD WORKS AND INTAKE STRUCTURE(AS PER ASSESSMENT OF BIDDER)

(100 marks & must score minimum 65 marks to technically qualify)


Description Details to be filled by Bidder for each
Sl. water supply project (attach PDR sheets
No. to explain)
1. Intake Well / Intake Channel and Raw water pump house
1.1 Number of intakes / intake capacity 1/30 MLD
1.2 Total Design capacity (MLD) 29.62MLD
1.3 Location of intake well / intake channel Village – Patraput, G.P. – Andrahal.
1.4 Distance from reservoir/river bank (m) 300 M
2 Dimensional details 10 m Dia2Depth from lowest water level
Invert level of lowest inlet grating in intake 462.686
2.1 well / invert level of inlet channel (m / ft)
Diameter of intake well / width of intake 10
2.2 channel (m)
Depth of intake well / depth of intake 2
2.3 channel (m)
3 Design details
Design flow for inlet gratings / connecting 34.3
pipes / inlet channel (MLD)
3.1
Number (Nos.) and diameter of connecting Provide 2 layer, each layer of 600 mm
3.2 pipes (mm) dia opening
Pipe material and class of pipe for 600
connecting pipes (mm)
3.3
Invert level of connecting pipes at intake as per site
3.4 well (m )
Top level of intake well / inlet channel (m / as per site
3.5 ft)
3.6 Top level of intake well 463.43
4. Raw water pumps
4.1 Type of raw water pumps VT
4.2 Design flow for pumps LPM 7860
4.3 Number of raw water pumps W + S (Nos.) 2 working+1Stand by
4.4 Hours operation of pumps (m3 / hour) 20
4.5 Design head for each raw water pump (m) 45.00
4.6 Material for piping and fittings DI
5. Number and size of valves 4 no size as per detailed design
a) Non return valves (Nos. / mm) 4
b) Actuator operated butterfly valves (Nos. / 4
mm)
c) Automatic air valves (Nos. / mm) 3
d) Expansion joint / bellow (Nos. / mm) 8
6 Capacity of EOT crane (Ton) 5
7 Power Supply Electrical
7.1 Source and distance of electricity supply 1.5 KM
7.2 Transformer capacity (KVA) 325.00
8. Details of surge protection system Thrust Block and Surge vessel provided
9. Size of below rooms
LT room (m x m x m) 15 x 10 x 4
Battery / UPS room (m x m x m) 3x3x4
DG room (m x m x m) 10 x 10 x 4
Operator rest room (m x m x m) 3x3x4
Control Room (m x m x m) 4 x4x4
Water filtration unit (m x m x m) 15 x 10 x 4
Toilets (m x m x m) 1.5 x 1.5 x 3
10. Other parameters
Pressure Gauges at Each Discharge & 4 pressure gauge + 4 Pressure
Pressure Transmitter at Common Delivery Transmittle
10.1
10.2 PLC Operation 4 x4x4
Sluice gates, trash rack, stop logs, As per Tender Document
manhole, ladder, exhaust fans etc. for
10.3 intake sump/pump house
10.4 Approach road for intake structure Bitumen /CC as per site condition
ITEM – 3:- RAW WATER PUMPING MAIN UP TO WTP:(for each water supply projects to be
furnished)
(100 marks & must score minimum 75 marks to technically qualify)

Sl. Description Details to be filled by Bidder for


No. each water supply project
(attach PDR sheets to explain)

1 Total Design capacity (MLD) 28


2 Hours of operation (m3/Hr) 20
3 Length of pipeline (m) 283210
4 Diameter of pipeline OD / ID and thickness (mm) 100-500 mm
5 Pipe material and class of pipe DI
6 Details of flow meter 4 Flow meter
7 No of Air valves, scour valves, isolation valves etc. with 3 air valve, 1 scour valve, 3
valve chambers isolation valve
8 Pipe bridges, pipe support structures, ducts, concrete NA
encasing, trenchless at SH, NH, railway crossings etc…
for raw water pumping main

9 Preliminary Longitudinal Sectional drawings Will be furnishing during project


execution , after topo survey
ITEM – 4:-WATER TREATMENT PLANT:(for each water supply projects to be furnished)
(100 marks & must score minimum 65 marks to technically qualify)
Sl. Description Details to be filled by Bidder for each water
No. supply project (attach PDR sheets to
explain)
1 Location Village – Patraput, G.P. – Andrahal
2 Design capacity (MLD) 28.00
3 Design flow with ……. hours of operation 20 hrs operation
(m3 / hour)
4 Treatment units proposed Convectional Water treatment process
4.1 Cascade aerator
Diameter of central shaft (mm) 600.00
Number of steps (Nos.) 4
Height of each step (m) 0.3
Diameter of bottom step (m) 0.60
Size of raw water channel (m x m) Provide Raw water Channel of Size 0.3m W X
1.4 m SWD with 0.3 m free board
bypass with control gate / valve provided yes
connecting to filter feed channel?

4.2 Parshall Flume


Length of Channel (m) 2m
Width of Channel (m) 0.70
Depth of Channel (m) 0.58
Length of Parshall Flume (m) 3
Throat Width (m) 0.15
Velocity considered (m/s) 0.80
4.3 Flash mixing tank
Size of tank and free board (dia) 15.80
Detention time (secs) 1800
Capacity of turbine mixer (KW) 2
Type of Flash Mixer Mechanism Paddel
Coagulant considered yes

4.4 Clariflocculator
Number of units (Nos.) 1.00
Diameter of clarifier (m) 15.80
Depth of side water column and free board (m) 3
Diameter of flocculation zone of each Clarifier 15.80
(m)
Slope of bottom floor (%) 01:10
- Surface Loading Rate (m2/Hr) As per CPHEEO Manual
- Detention time (hours)
- Vertical Raise rate (m/hr)
- Number and capacity of flocculation
paddles (KW)
- Scraper bridge drive capacity (KW)
- Material and diameter of sludge
withdrawal pipe
- bypass with control gate / valve
provided
4.5 Rapid sand filters Hence Provide 2 Nos. of Twin bed, Each single
- Number of filter beds (Nos.) bed having size of 2.25 m L X1.75 mW
- Size of each filter bed (m x m)
- Depth of filter bed and free board (m)
- Rate of filtration (lpm / m2)
- Depth of sand bed (m)
- Depth of supporting gravel media (m)
- Standing depth of water over filter bed
(m)
- Type of under drainage system
- Number and capacity of air blowers
- Material for piping and fittings
- Rate setters, filter rate controllers, filter
flow gauges, loss of head indicators, wash
water controllers and indicators, float
chambers, under drainage system,
calibrated notch etc. considered as per
specifications
- Sedimentation of filter back wash
water and return of supernatant to inlet
considered as per specifications
4.6 Size of below rooms / buildings As per RFP requirement and item no 2
considered:
- Chemical building (two storey) (m x m x
m)
- Air blower room (m x m x m)
- Office room (m x m x m)
- Electrical panel room (m x m x m)
- Control room (m x m x m) for PLC &
SCADA
- Laboratory (m x m x m)
- Disinfection room (m x m x m)
- Toilet (m x m x m)
- Staff quarters (m x m x m)
4.7 Filter Backwash Facility yes provided
Capacity of tank (m3) 55
Staging height (m) 4
Number and Capacity of Backwash pumps No. of Blowers 2Capacity of Blower
(Cum/min)5.90625
Valves & Fittings yes as per design
4.8 Details of disinfection facility meeting yes provided
CPHEEO / WHO guidelines

4.9 Plant road connecting units, approach As er tender document


road, Street Lights, Drainage Systems
considered as per specifications
ITEM – 5:- CONTACT TANK / CLEAR WATER STORAGE RESERVOIR AND PUMPING
STATION:(for water supply projects to be furnished)
(100 marks & must score minimum 60 marks to technically qualify)
Sl. Description Details to be filled by Bidder
No. for each water supply project
(attach PDR sheets to explain)
1.Contact Tank / Clear Water Storage Reservoir and treated water pumping station
1.1 Total Design capacity (MLD) 2.8
1.2 Hours of operation (m3/Hr) 20 hrs
1.3 Number of compartments (Nos.) 2
1.4 Capacity of each compartment (m3) 1.4
1.5 Clear height of pump room (m) 4m
1.6 Number of clear water pumps W + S (Nos.) 2+1
1.7 Type of pumps HCF
1.8 Design head for each clear water pump (m)
1.9 Material for piping and fittings DI
1.10 Number and size of valves As per design
a) Actuator operated butterfly valves on suction
(Nos. / mm)
b) Non return valves (Nos. / mm)
c) Actuator operated butterfly valves on delivery
(Nos. / mm)
d) Automatic air valves (Nos. / mm)
e) Expansion joint / bellow (Nos. / mm)
2 Capacity of EOT crane (Ton) 5 ton
3. Power Supply by Govt
3.1 Source and distance of electricity supply 1.5 KM
3.2 Transformer capacity (KVA) As per design
4 Details of surge protection system yes required, will furnish detail
during project execution
5 Size of below rooms: As per ITEM no 2
- LT room (m x m x m)
- Battery / UPS room (m x m x m)
- DG room (m x m x m)
- Control room (m x m x m)

6 Other Parameters
6.1 Details of flow meter Pressure Gauge at each Pump
Discharge & Pressure
Transmitter at Common Delivery
6.2 Detail of Level Transmitter at ULGR
6.3 Detail of Level Indicator at ULGR
6.4 Pressure Gauge at each Pump Discharge & Yes
Pressure Transmitter at Common Delivery
6.5 Details of exhaust fans As per RFP requirement
ITEM – 6:-CLEAR WATER TRANSMISSION MAINS UP TO ESR:(foreach water
supply projects to be
furnished)
(100 marks & must score minimum 75 marks to
technically qualify)
Sl. Description Details to be filled by Bidder
No. for water supply project
(attach PDR sheets to
explain)
1 Number of hours of flow considered (hours) 20
2 Pipe :i) Material, ii)class of pipe, iii) length DI As per IS : 8329
of pipe
3 No of Air valves, scour valves, isolation 1 No Air Valve for each rising
valves etc. with valve chambers main, 1 scour valve, 3 isolation
valve
4 Pipe bridges, pipe support structures, As per site and re route of rising
ducts, concrete encasing, trenchless at SH, main condition
NH, railway crossings etc… for raw water
pumping main
ITEM – 7:- BOOSTER STATIONS: (If required)(for each water supply
projects to be furnished)
(100 marks & must score minimum 60 marks to technically qualify)
Sl. Description Details to be
No. filled by Bidder
for each water
supply project
IBPS- IBPS-
1 1
Booster Sumps & Booster Pumping Station Part - Part -
A 2 – 22

No.
CWR
within ESR –
WTP at
to – 1 Zone-
No. 2
ESR
at
Zone-
1
1 Hours operation (m3/Hr) 36 849.6
2 Number of compartments (Nos.) 2 2
3 Capacity of each compartment (m3) 591.84 16967.
52
4 Clear height of pump room (m) 4.5 4.5
5 Number of pumps W + S (Nos.) 2+1 3+3
6 Type of pumps HCF HCF
7 Design head for each clear water pump (m) 260 305
8 Material for piping and fittings
9 Number and size of valves As per As per
a) Actuator operated butterfly valves on suction (Nos. / design design
mm)
b) Non return valves (Nos. / mm)
c) Actuator operated butterfly valves on delivery (Nos. /
mm)
d) Automatic air valves (Nos. / mm)
e) Expansion joint / bellow (Nos. / mm)
f) Any other
10 Capacity of EOT crane / Chain pulley block (Ton) 4.5 3.5
Ton Ton
11 Source and distance of electricity supply Electri Electri
city city
12 Transformer capacity (KVA) 350 1000
13 Details of surge protection system yes yes
14 Size of below rooms: As per As per
- LT room (m x m x m) Item Item
- Control Room (m x m x m) no 2 no 2
15 Details of flow meter yes yes
16 Detail of Level Transmitter yes yes
17 Pressure Gauge at each Pump Discharge & yes yes
Pressure Transmitter at Common Delivery
18 Details of exhaust fans as per as per
NIT NIT
DETAILS OF ESR
Type of tank : ELSR / GLSR capacity(ltr) capacity(m3

CWR at WTP 2800000 2800

GSR- 1.0 1000000 1000


GSR- 2.0 700000 700
ESR – 1.1 60000 60
ESR – 2.2 355000 355
ESR – 3.1 285000 285
ESR – 4.1 115000 115
ESR – 4.2 225000 225
ESR – 4.3 135000 135
ESR – 5.1 305000 305
ESR – 5.2 265000 265
ESR – 5.3 205000 205
ESR – 6.1 375000 375
ESR – 7.1 30000 30
ESR – 7.2 210000 210
ESR – 7.3 190000 190
ESR – 8.1 50000 50
ESR – 8.2 70000 70
ESR – 8.3 170000 170
ESR – 8.4 190000 190
ESR – 9.1 265000 265
ESR – 9.2 280000 280
ESR – 10.1 30000 30
ESR – 10.2 145000 145
ESR – 10.3 95000 95
ESR – 11.1 240000 240
ESR – 11.2 110000 110
ESR – 12.1 50000 50
ESR – 12.2 145000 145
ESR – 12.3 200000 200
ESR – 13.1 50000 50
ESR – 13.2 185000 185
ESR – 13.3 165000 165
ESR – 14.1 220000 220
ESR – 14.2 230000 230
ESR – 15.1 65000 65
ESR – 15.2 350000 350
ESR – 15.3 210000 210
ESR – 16.1 175000 175
ESR – 16.2 70000 70
ESR – 16.3 155000 155
ESR – 16.4 155000 155
ESR – 17.1 55000 55
ESR – 17.2 355000 355
ESR – 17.3 160000 160
ESR – 2.1 50000 50
ESR – 18.1 80000 80
ESR – 18.2 130000 130
ESR – 18.3 180000 180
ESR – 19.1 50000 50
ESR – 19.2 150000 150
ESR – 19.3 70000 70
ESR – 20.1 80000 80
ESR – 20.2 285000 285
ESR – 21.1 95000 95
ESR – 21.2 340000 340
ESR – 22.1 50000 50
ESR – 22.2 285000 285
ESR – 23.1 200000 200
ESR – 23.2 125000 125
ESR – 24.1 130000 130
ESR – 24.2 185000 185
ESR – 24.3 50000 50
ESR – 25.1 315000 315
ESR – 25.2 180000 180
ESR – 25.3 170000 170
ESR – 26.1 20000 20
ESR – 26.2 105000 105
ESR – 26.3 310000 310
ESR – 26.4 185000 185
ITEM – 9:- CLEAR WATER DISTRIBUTION MAINS FROM ESRs TO VILLAGE
CHAMBERS(for each
water supply projects to be furnished)
(100 marks & must score minimum 75 marks to technically qualify)
Sl. Description Details to be
No. filled by Bidder
for each water
supply project
(attach PDR
sheets to
explain)
1 Number of hours of flow considered (hours) 20
2 Pipe :i) Material, ii)class of pipe, iii) length of pipe DI As per IS :
8329
3 No of Air valves, scour valves, isolation valves etc. with valve chambers Zero air valve, 1
scour valve, one
isolation valve
with valve
chamber
4 Pipe bridges, pipe support structures, ducts, concrete encasing, NA
trenchless at SH, NH, railway crossings etc… for raw water pumping
main
5 Detail of Level Indicator One level
indicator with one
ELSR/GLSR
6 Chamber at each village to collect treated water from ESR confirm
7 Preliminary Longitudinal Sectional drawings Will be
furnishing during
project
execution , after
topo survey