MATERIAL INSPECTION REPORT

CONTRACTOR : UTOC ENGINEERING PTE LTD REPORT NO. : S-PIP-MIR-008


CLIENT : EVONIK METHIONINE SEA PTE LTD DATE OF INSPECTION : 26-Sep-22
OWNER : EVONIK METHIONINE SEA PTE LTD PAGE NO. : 1 OF 1
PROJECT : EVONIK TAR OCTOBER 2022

DELIVERY SIZE
ITEM DESCRIPTION ORDER (INCH) SCH THK(mm) GRADE MATERIAL QTY CERTIFICATE NO. HEAT NO. MFR/ ORIGIN REMARKS

1 WELDED PIPE SDO/22/011757 1 1/2" 40S 3.68 TP 304/304L SS 2 210520P0160 VCB013894 YC INOX / TAIWAN

2 WELDED PIPE SDO/22/011757 1 1/2" 40S 3.68 TP 304/304L SS 2 210520P0160 VCB013894 YC INOX / TAIWAN

3 RED TEE SDO/22/011757 1 / 1/2" 40S 3.38 / 2.77 TP 304/304L SS 6 6992-19 GP221KC41 SHINSEI / JAPAN MACHINE BOTH SIDES 1"TO SCH 10S

REMARKS:

COMPANY UTOC EVONIK OTHERS (IF APPLICBALE)

NAME MOHD NASRUM

DESIGNATION QA/QC

SIGNATURE

DATE