Product Portfolio and Growth

Products Capacity 1984 - 85 2000-01 (Unit )


Caustic Soda Chlorine HCl (100%) Sodium Hypo Compressed Hydrogen Gas Captive Power Plant MW 30 30 30 30 30 30 TPD TPD TPD TPD NM3/month 100 40 50 100 40 50 160 90 60 1 225 160 125 4 1.5 lac 265 160 125 4 1.5 lacs 300 250 125 4 1.5 lacs 300 250 125 4 0.6 lacs

02-03

05-06

07-08

08-09

10- 11

Aluminium Chloride

TPD

32

32

41

Stable Bleaching Powder (SBP)

TPD

48

48

Valued Customers

Tata Group

Hindustan UniLever Limited

and the list goes on ..

Key Manufacturing Processes & Technology


Manufacturing of Caustic Soda
State of the Art 4th & 5th Generation, Energy efficient & Eco friendly Membrane cell Technology, supplied by M/s. UHDE

Generation of Power
State of the Art CFBC Boiler (suitable for inferior quality of Coal & Eco friendly), supplied by M/s. Krupp TG Set by M/s. BHEL

Product Volume Caustic Soda


00 0 000 000 00

MT

000 00 000 00 0
' 0000 Target Actual 00 0 00 0 00 00 0000 ' 0000 ' 0000 ' 0000 ' 00 - 00 ' 00 - 00 8 88 88 8 88 88 888 88 000 00 888 88 000 00 00 0 0 0 0 00 0 00 0 00 0 00 0 00 0 0 0 0 00 0 00 0

Turnover

00 0 00 0

Rs. in Crores

00 0 00 0 00 0 00 0 0 0 0
T ar ge t A c t ua l '00 00 000 00 . 000 00 . 0000 888 88 . 888 88 . '00 00 000 00 . 000 00 . '00 00 000 00 . 000 00 . '00 00 000 00 . 000 00 . '00 00 000 00 . 000 00 . '00 00 000 00 .

Profit after Tax


0 0 0 0

Rs. In crores

0 0 0 0 0 0 0 0 0 0 0
T a r ge t A c t ua l ' 00 00 00. 00 00. 00 00 00 00. 00 88. 88 ' 00 00 88. 88 00. 00 ' 00 00 88. 88 88. 88 ' 00 00 88 88 . 00 00 . ' 00 00 00. 0 0 00. 0 0 ' 00 00 00. 00

POWER SCENARIO
Total Power requirement 36 MW Power Generated from CPP 30 MW Power Import from JSEB 6MW Type of Fuel Bituminous Coal E & F Grade Coal GCV 3800 4500 Kcal/Kg Coal Rate Linkage Coal (60%) - Rs. 1650/MT (Average) Through E Auction / Other Sources Rs. 3800/MT

POWER SCENARIO
Power Generation Cost Rs. 3.24/KWH Variable Cost Rs. 3.00/KWH Fixed Cost (Salary & Wages, Maintenance Exp., Ash handling Exp.) Rs.0.24/Kwh Power rate of JSEB Rs. 4.90/KWH Contract Demand with JSEB 14.12 MVA i.e. 12MW Maximum Demand from JSEB 23 MVA i.e. 19.55MW