Jondarian Project Stockpile Mass Analysis: and How Its Affected by Conveyor Speed
Jondarian Project Stockpile Mass Analysis: and How Its Affected by Conveyor Speed
Overview
Introduction The control volume Instantaneous volume and mass Conservation of mass Relationship of Vaverage with (mstockpile)/dt Relationship of Vaverage with time t to fill stockpile Conclusions
Introduction
Conveyor
Mass flows in and out during operation Change in mass in stockpile mstockpile = min mout
Conservation of mass
By the conservation of mass
Net change in mass within system = Total mass entering system Total mass leaving the system mstockpile = min mpowerplant
Questions ?????