Revisions

Rev Date Description of change

00

14/05/12

ISSUED FOR CONSTRUCTION

614 460 614

1927 445

1497

2102 600 750


1. Do not scale from this drawing. 2. All dimensions to be checked on site by the contractor and such dimensions to be his responsibility. 3. Report all drawing errors, omissions and discrepancies to the architect.

3
1300

A
1
500 1450 756

B
900 900

1716

............................................................. SIGNED FOR AND ON BEHALF OF

ITEM DESCRIPTION A,B,C CALORIFIER 1,2,3 PRESSURE VESSEL

............................................................. SIGNED FOR AND ON BEHALF OF

Drawn

Note: Supports for Hot Water Calorifiers to be set at max1700mm apart as recommended by manufacturer.

Checked

Reviewed

Approved

CONSTRUCTION

GH-206