You are on page 1of 3

Description

Unit

Unit
USD

Quantity

Total Price

A Pekerjaan Persiapan
1 Mobilisasi & Demobilisasi
2 Pegukuran & Pemasagan Patok
3 Direksi Keet
4 Pelaporan & Dokumentasi

LS

1.00

BH

20.00

LS

1.00

LS

1.00

5 Izin Pemerinta Desa


6 Soil Test ( Sondir Dan Boring )

Unit

3.00

Titik

121.24

3.00

363.71

7 Galian C

M3

3.65

2,300.00

8,390.40

SubTotal A
B Pekerjaan Tanah Jalan & Lokasi

1 pekerjaan Clearing
2 Pekerjaan galian/Potong Tanah

M3

0.70

4,600.00

3,201.60

M3

3.65

1,340.00

4,888.32

3 Penimbunan & Pemadatan Tanah


4 Penimbunan & Pemadatan Sirtu

M3

0.28

1,380.00

380.88

M2

98.95

920.00

91,035.84

SubTotal B

C Pekerjaan Pondasi Reg


1 Pasang Bauwplank
2 Piling Pipe 7''

M'

100.00

Joint

153.22

14.00

2,145.02

M'

54.58

24.00

1,309.82

M3

2.30

15.00

34.56

LS

292.75

1.00

292.75

Btg

958.40

9.00

8,625.64

7 Plate 10 mm
8 Pile Cap

Lbr

508.64

30.00

15,259.32

LS

219.91

1.00

219.91

9 Pipe 6''
10 Galian Cellar

Mtr

10.99

24.00

263.81

M3

3.65

8.00

29.18

4 Conductor Pipe
7 Urugan Tanah Dipadatkan
5 Cerlar Box
6 H Beam 200x200

SubTotal C

D Pembuatan Disposal Pit dan Lain2


1 Pasang Bauwplank
2 HDPE
3 Plastik 200 Gram
4 Pipe pvc 8''

M'

200.00

M2

1.34

700.00

940.80

M2

Btg

5 Flare
6 Gorong2 Betom Dia 80 Cm

58.82

2.00

117.65

M3

288.00

M'

766.33

20.00

15,326.52

SubTotal D

Total

152,825.74