7/19/2012
Amcons crew has been doing a lot of cleaning, removing any dust and debris from each wing so they can become finished surfaces. The carpenters from Mohs Construction have been installing cabinets and and countertops throughout Wings A and B as materials become available and approved. Theyve completed installing window trim, resident bathroom doors, bathroom lavatories, and shelving for linen closets in Wings A and B. They continue to install the residential kitchen cabinets. Masons from Summit Concrete continue installing veneer brick along the exterior of the chapel and window lintels of Wing E North. Footings for the link have been poured and the structural block wall erected. Plumbers and tinners from J-Berd Mechanical have been installing HVAC and interior wall plumbing in Wing E. Plumbers have been placing hose connnectors onto wall plumbing fittings as fixtures and cabinets are being installed through Wings A and B. Theyve also completed installing the subgrade HVAC for the link as well as the subgrade tile and sump pump which keeps water and contaminants from becoming airborne. Phone Station Inc.s crew has been on site installing data cover plates, and pulling data wire. They have placed the data server towers for Wings A and B. Sheetrockers from Absolute Drywall have completed sheetrocking and firetaping in Wing D. They have sheetrocked the electrical room and commercial kitchen in Wing E North to allow electricians to install the switchgear and in preparation for the commercial refridgerator and freezer. They continue to sheetrock in Wing E South Therapy area. Painters from Swanson Painting are painting rooms, door frames, hallways, ceilings, and accent colors in Wing C. Brothers Fire Protection has returned to the site to install more of the wet sprinkler lines in Wing D. Electricians from R&K Electric continue to install outlets and lighting cans throughout the North half of Wing E. They have been installing finish electrical coverplates, switches, and lighting fixtures in Wings A and B. They continue work installing electrical panels in Wing C electrical rooms. Metro Home Insulation has completed insulating the South half of Wing E. They completed insulating the exterior walls of the electrical room and kitchen in Wing E North. Excavators from Partners Construction Service completed excavation and backfill of the structural block wall for the link. They regraded the site to proper elevation for placement of curb and gutter. Siehndel Constructions crew placed concrete curb and gutter for both the East and West sides of the site in only two days.