Project: Owner: Consultant: Main Contractor:

Ballroom Renovation, First Floor Four Seasons Hotel, Nile Plaza, Garden City, Cairo Talaat Mostafa Group Shaker Consultancy Group The Richmond Group, Egypt

SITE MANAGERS WEEKLY REPORT This form should be completed each Saturday and returned to RGs Vice Pres ident. A brief summary of each of the following topics should be included in the report: I. Project Update A. Work starting or completed: The mechanical room is painted and the floor also is finished and the AHU is installed in the room the ceramic tiles of the kitchen and dishwashing areas are installed and the filling of the floor tiles of the dishwashing area is almost finished the marble architraves of the pre-function area are installed and the installation of the entrance foyer architrave has started the gypsum board ceiling second fix in the pre-function is almost finished and the putty coating ad the final finish for the ceiling has started- gypsum board ceiling second fix has started in the ballroom the kitchen equipment are supplied marble wall cladding in the ballroom has started B. Work Continuing: Electrical work woodwork wall cladding in the ballroom installation of the architraves gypsum works in the ballroom and in the kitchen area installation of the panelfold door supports C. Stop Work Orders D. Other Delays:. Job meetings held and/or special visitors to site: Normal visits were done from FSH and TMG to check the consistency of the work done. Problems encountered and/or pending change orders Subcontractors scheduled for work during the upcoming wee k. Electrical works marble works Gypsum works Wood works fire fighting works installation of the supports and rail of the panelfold door Major work / Materials/ and or Shop Drawings inspected, tested and/or approved. The marble sample of the elevator lobby floor is approved the coordination plan proposal of the ballroom is approved table and curtain motors power outlets shop drawing is approved as noted Information of special interest.

E. II. III.

IV.

V.

Complete the report even when there is NO construction activity stating the reason and when work is expected to resume. The report should always be signed by both the Site Manager and Project Manager.

Site Manager: Eng. Shaimaa Shoeib Date:

January 16, 2010