Number 001 002 003 004 005 010 011 012 030 031 032
DRAWING LIST Name LOCATION PLAN SITE PLAN CADASTRAL SITE PLAN EXISTING PLATFORM PLAN PLATFORM LEVEL PLAN IN FULL STREET LEVEL PLAN CONCOURSE LEVEL PLAN LOWER LANDING & PLATFORM LEVEL PLAN LONG SECTIONS CROSS SECTIONS CROSS SECTIONS
Plan
0 5m 10m 20m 50m
LOCATION PLAN
REVISIONS
01.06.12 20.06.12 17.07.12 Concept Design Submission Concept Design Submission Concept Design Submission A B C
001
C
31/07/2012 2:26:41 p.m.
QUAY STREET
1
TYLER STREET
CANOPY ABOVE
TV
C
CANOPY ABOVE
3900
VOID
4375
CPO/ TICKET HALL
5225
CANOPY ABOVE
GALWAY STREET
CANOPY ABOVE
ABBREVIATION KEY
Draft Relief Over Track Exhaust Tunnel Ventilation Under Platform Exhaust
ALBERT STREET
QUEEN STREET
COMMERCE STREET
Unpaid Public Zone Paid Public Zone Vertical Circulation Public Amenities Retail Staff Amenities Services Fire Egress Pedestrian Entry
Plan
0 5m 10m 20m
SITE PLAN
REVISIONS
01.06.12 20.06.12 17.07.12 Concept Design Submission Concept Design Submission Concept Design Submission A B C
002
C
31/07/2012 2:26:45 p.m.
GORE STREET
Number 001 002 010 011 012 013 030 031 032
DRAWING LIST Name LOCATION PLAN CADASTRAL SITE PLAN STREET LEVEL PLAN CONCOURSE & PLATFORM LEVEL PLANS PLANT LEVELS 1 & 2 PLANS PLANT LEVELS 3, 4 & ROOF PLANS LONGITUDINAL SECTION LONGITUDINAL SECTION CROSS SECTIONS
Plan
LOCATION PLAN
0 5m 10m 20m 50m
REVISIONS
A B C
001
C
30/07/2012 4:33:00 p.m.
WELLESLEY WEST
FIRE EGRESS
VICTORIA WEST
ENTRY
ALBERT STREET
FIRE EGRESS TO LANE AT LEVEL BELOW FIRE EGRESS TO LANE AT LEVEL BELOW
ENTRY
Plan
REVISIONS
Concept Design Submission Concept Design Submission Concept Design Submission Concept Design Submission
A B C D
002
D
14/08/2012 9:37:18 a.m.
EET STR AY D
SA LA MO NE A H O US E
DRAWING LIST Number Name 001 2B LOCATION PLAN 002 2B CADASTRAL SITE PLAN 010 2B LEVELS 09 & 08 STREET LEVELS 011 2B LEVELS 07, 06, 05 & 04 UPPER PLANT AND CONCOURSE LEVELS 012 2B LEVELS 03, 02 & 01 LOWER PLANT & PLATFORM LEVELS 030 2B SECTIONS
Plan
0 5m10m 20m 50m
LOCATION PLAN
REVISIONS
01.06.12 08.06.12 20.06.12 17.07.12 Design Concept Submission Design Concept Submission - Revised Design Concept Submission Design Concept Submission A B C D
LOCATION PLAN
D
31/07/2012 2:47:50 p.m.
TS EAS
ET TRE
ROAD
ENTRY
KARAN GAHAP E
C
FIRE EGRESS
TIC
KE TIN G
B
ENTRY
MERCURY LANE
CROSS STREET
Plan
KARAN GAHAP E
ROAD
Design Concept Submission Design Concept Submission - Revised Design Concept Submission Design Concept Submission
FIR EE GR ES S
SA MO A
HO US EL AN E
REVISIONS
A B C D
BE RE SF OR D
ST RE ET
S UTH SO ET TRE
D
31/07/2012 2:47:52 p.m.
DRAWING LIST Number Name 001 LOCATION PLAN 002 CADASTRAL SITE PLAN 010 STREET LEVEL PLAN 011 UNDER CONCOURSE & TUNNEL VENT FAN LEVEL PLANS 012 PLATFORM LEVEL PLAN 013 PLANT LEVELS ABOVE CONCOURSE PLANS 030 LONG SECTIONS 031 CROSS SECTIONS 032 CROSS SECTION ENTRY
Plan
0 5m 10m 20m 50m
LOCATION PLAN
REVISIONS
01.06.12 20.06.12 17.07.12 Concept Design Submission Concept Design Submission Concept Design Submission A B C
LOCATION PLAN
001
C
31/07/2012 3:02:41 p.m.
1
BASQUE ROAD
DUNDONALD STREET
EW N R O N TH AD O R
FIRE EGRESS
ST R EE T
ENTRY
SYMONDS STREET
MO UN T
ED EN
RO AD
Plan
REVISIONS
Concept Design Submission Concept Design Submission Concept Design Submission Concept Design Submission
NEWTON ROAD
A B C D
FL O W ER
002
D
14/08/2012 9:38:24 a.m.
CURRENT PHASE
PHASE 2
PHASE 3
PHASE 4
PHASE 5
CONCEPT DESIGN
PRELIMINARY DESIGN
DETAILED DESIGN
CONSTRUCTION DESIGN
INVESTIGATION WORK
DESKTOP ANALYSIS & INITIAL SITE INVESTIGATIONS (CAN INCLUDE SURVEY, BOREHOLES AND UTILITY POT HOLING)
CONSULTATION
IWI DIRECTLY AFFECTED LANDOWNERS STAKEHOLDERS AFFECTED BY PROXIMITY LANDOWNERS COMMUNITY PUBLIC SUBMISSION PERIOD FOR DESIGNATION
IWI DIRECTLY AFFECTED LANDOWNERS STAKEHOLDERS AFFECTED BY PROXIMITY LANDOWNERS COMMUNITY LOCALISED RESOURCE CONSENTS: AS REQUIRED WITH LANDOWNERS
IWI DIRECTLY AFFECTED LANDOWNERS STAKEHOLDERS AFFECTED BY PROXIMITY LANDOWNERS COMMUNITY LOCALISED RESOURCE CONSENTS: AS REQUIRED WITH LANDOWNERS
ONGOING CUSTOMER SUPPORT VIA HELPLINES ETC AS REQUIRED BY ANY OPERATIONAL MANAGEMENT PLANS
PLANNING APPLICATIONS
NOTICE OF REQUIREMENT FOR DESIGNATION ASSESSMENT OF EFFECTS FOR LAND USE ACTIVITIES
RESOURCE CONSENTS FOR GROUNDWATER TAKE/DIVERSIONS, CONTAMINATION, LAND DISTURBANCE, AIR DISCHARGE. NB: REQUIRES PRELIMINARY DESIGN AS A MINIMUM & MAY HAPPEN AT PRELIMINARY DESIGN PHASE OR DURING DETAILED DESIGN
ANCILLARY / LOCALISED RESOURCE CONSENTS AS REQUIRED + OUTLINE PLAN [WHICH PROVIDES THE INFORMATION REQUIRED BY THE DESIGNATION]
ENVIRONMENTAL MANAGEMENT
DEVELOP ENVIRONMENTAL MANAGEMENT FRAMEWORK FOR MANAGING FUTURE CONSTRUCTION AND OPERATIONAL EFFECTS
ENVIRONMENTAL MANAGEMENT PLAN (EMP) AT PRELIMINARY DESIGN STAGE DELIVERY WORK PLANS (DWPs) ETC AS REQUIRED FOR RESOURCE CONSENT APPLICATIONS
EMP AND DWPs UNDER DESIGNATION/NoR ARE COMPLETED EMP AND DWPs FOR RESOURCE CONSENTS ARE REFINED AND UPDATED
DESIGNATION CONDITIONS THE MECHANISM TO REQUIRE ENVIRONMENTAL MANAGEMENT PLANS AT CONSTRUCTION AND OPERATIONAL PHASES (EMP + DWPs) RESOURCE CONSENT CONDITIONS E.G. MONITORING REQUIREMENTS AND THE MECHANISM TO REQUIRE ENVIRONMENTAL MANAGEMENT PLANS AT CONSTRUCTION AND OPERATIONAL PHASES (EMP + DWPs) IMPLEMENTATION OF CONDITIONS + CONDITION MONITORING ONGOING MONITORING OF CONDITIONS AS REQUIRED (OPERATIONAL CONDITIONS)
CONDITIONS