You are on page 1of 3

Production Systems Planning, Control & Networking

E-business and E-work Applications


Functional decomposition
< < us es > > Maintain work
Shipowner
specification list Shipowner,
Sign contract
S hipow ner Shipyard
S ubm it enquiry Receive enquiry
Submit Enquiry Shipowner
E stim ate produc tion Repair worklist to
Shipyard
purchasing department
< < us es > > Examine Enquiry
Request work Shipyard
specification list Shipyard,
Plan the work
P lan p rodu c tion subcontractors
Rec eive tender
S ubm it tender Submit work specification Shipowner
list Shipyard,
Ship inspection
shipowner
Shipyard
Prepare estimate Shipyard,
S ubm it shiprepair contract Update repair worklist shipowner,
Receive work subcontractors
< < u ses > > S hipy ard specification list
S ubm it reques t for quotation
Estimate Shipyard Materials requisition, Shipyard
manhours Plan the work (Production), RFQs (Production)
Estimate Subcontractors
S tart shiprepair work < < us es > > materials, RFQs
Keep manhours Combine Material Shipyard
Estimate Shipyard Requirements (Purchasing)
Receive quotation subcontracts, RFQs
record

< < us es> > Estimate Shipyard


time Follow up Orders to suppliers
Shipyard (Purchasing)
subcontractors work

Rec eive reques t for Produce tender


qu otation Materials delivery Suppliers
S ub mit quot ation
Trac k s hiprepair work
Shipyard
Submit tender
Produce shiprepair invoice Shipyard

Update produc tion plan Update plan Negotiations

S ubco ntra c tor Submit invoice Shipyard


Accepted No
?

Payment of the invoice Shipowner


P lan produc tion Yes
E s tim ate produc tion

Makris, S., D. Mourtzis, N. Papakostas, G. Chryssolouris and I. Gaviotis, "An e-Collaboration Software Framework for the Ship Repair
Supply Chain", Proceedings of the 12th International Conference on Computer Applications in Shipbuilding-ICCAS, Busan, -Korea,
(August 2005) pp. 717-727.
Production Systems Planning, Control & Networking
E-business and E-work Applications
Internet based Collaboration

Makris, S., D. Mourtzis, N. Papakostas, G. Chryssolouris and I. Gaviotis, "An e-Collaboration Software Framework for the Ship Repair
Supply Chain", Proceedings of the 12th International Conference on Computer Applications in Shipbuilding-ICCAS, Busan, -Korea,
(August 2005) pp. 717-727.
Production Systems Planning, Control & Networking
E-business and E-work Applications
Standards Based Data Modeling
Ship Product Model Exchange Requirements
TC 184/SC 4 Ship_operational_log
Part Libraries Ship Structures (Common Model)
ISO 13584 ISO 10303, Part 102 (Withdrawn)
ISO TC 184/SC 4/WG 2 ISO TC 184/SC 4/WG 3/T 23

Ship Core Structure Distribution Systems Mission Subsystems/Equipm. Miscellaneous

Ship Arrangements Electrical Ship Mechanical Systems Operational Logs, Calendar_date


ISO AP 215 ISO AP 212 ISO AP 226 Records & Messages Ship_arrival_date_f rom
WG 3/T 23 JWG 9 WG 3/T 23 ISO AP 234 JWG with TC 8
Ship Hull Forms Piping Outfit and Furnishings
ISO AP 216 ISO AP 227 and AP 217 Calendar_date
WG 3/T 23 WG 3/T 20 and T 23 Ship_arrival_date_to
Ship Structures HVAC Electronics
ISO AP 218 ISO AP 227
WG 3/T 23 WG 3/T 20
Calendar_date
Hydraulics/Pneumatics Weapons Ship_inf ormation

Enquiry
Ship_characteristics
Application Tender_due_date
ARM AP1 ARM AP2
Protocols
ISO Job_Inf ormation L[1:?]
Shipyard_job

Units of
UoF 1 UoF 2 UoF 3
Functionality
Text
General_notes

Building Text
Terms_and_conditions_of _the_repair
Blocks

Chryssolouris, G., Makris, S., Xanthakis, V., Konstantinis, V., An XML based implementation of the Value Added Chain in
Manufacturing: A Ship repair Case Study, CIRP Journal of Manufacturing Systems, (Vol.32, No.6, 2003)

You might also like