You are on page 1of 5

Baider

 Al  Arab  JV  Al  Saraf  Company  

 
Baider  Al  Arab  JV  Al  Saraf  Company  
 
 
 
 
Proposed  Pipeline  Alignment  
 
for  
 
Kogas  Akkas  B.V.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Contract  Number—2012-­‐11-­‐SV  
 
 
 
 
Date-­‐  26  September  2012  
 
 
 
 
 
 

KOGAS AKKAS B.V


Contract Number—2012-11-SV  
Route Overview

Route Details

Route Referance Client

JV

R1
Syrian Border to T1
Drawing Title

Proposed Pipeline Alignment sheet


Job Title
Baider Al Arab JV Al Saraf Company

Proposed Akkas Export pipe route

Date Drawn Job No. Drawing No. Rev.


24/09/12 SE
Surveyed by Checked 2012-11-SV PA 01
AL AL
Route Overview

Route Details

Route Referance Client

JV

R2 T1 to K3
Drawing Title

Proposed Pipeline Alignment sheet


Job Title
Baider Al Arab JV Al Saraf Company

Proposed Akkas Export pipe route

Date Drawn Job No. Drawing No. Rev.


24/09/12 SE
Surveyed by Checked 2012-11-SV PA 02
AL AL
Route Overview

Route Details

Route Referance Client

JV

R3
CPF to T1
Drawing Title

Proposed Pipeline Alignment sheet


Job Title
Baider Al Arab JV Al Saraf Company

Proposed Akkas Export pipe route

Date Drawn Job No. Drawing No. Rev.


24/09/12 SE
Surveyed by Checked 2012-11-SV PA 03
AL AL
Route Overview

Route Details

Route Referance Client

JV

R4
Proposed Akkas
Drawing Title

Proposed Pipeline Alignment sheet


Job Title
Baider Al Arab JV Al Saraf Company

Proposed Akkas Export pipe route


Power Station to T1
Date Drawn Job No. Drawing No. Rev.
24/09/12 SE
Surveyed by Checked 2012-11-SV PA 04
AL AL

You might also like