DESIGN PARAMETERS FOR ARBATA DAM & DIVERSION SCHEME

The Arbata dam is composed of Main Concrete spillway of length 40

at the

Centre with concrete Non flow section to a length of 49 m on right bank and 49 m on left bank. The abutments are connected to flank with earthen dam of length 220 m & 83 m on right and left bank respectively.

The Arbata Diversion Scheme consists of following components: Spillway Non overflow section Earthen Flanks Energy Dissipater system- Type-II stilling basin. Diversion channel

The above components are designed with following input parameters; Concrete Spillway: The design of spillway is based on the flood discharge of 234 cumecs. The crest of the spillway is provided with standard WES profile with u/s 1H:1V slope near the crest in order to improve the discharge coefficient and improve the stability of the spillway. The grade of concrete for the hearting is of M15 (150 & down) and casing being M15 (40 & down). The unit weight of the spillway dam for stability purposes is assumed as 2.4 t/cum & dam is assumed to be resting on good foundable rock.

Following parameters & assumptions are considered for designing of various components of Arbata Diversion Scheme. 1. CONCRETE DAM & SPILLWAY i. ii. iii. Unit weight of dam material Unit weight of water Cohesive resistance between concrete and rock iv. Friction angle between concrete & concrete v. Cohesive resistance between concrete and concrete vi. Friction angle between concrete & Rock vii. Coefficient Horizontal viii. ix. x. xi. Vertical Down stream slope of over flow dam Design head Maximum Flood Discharge .06g 0.7H:1V m 234 cumec of Earth quake .12g 400 0.50 N/mm2 45o 2.40 t/cum 1.00 t/cum 0.45 N/mm2

xii. xiii. xiv. xv.

FRL MWL Silt level Hydrodynamic force: As per IS

635.00m 637.25m 2.00m & inertia of Tail

water taken in the direction of u/s hydrodynamic force xvi. Unit weight of silt For Horizontal pressure For vertical pressure xvii. Permissible compressive stress in concrete xviii. xix. xx. xxi. xxii. Factor of safety against sliding Down stream slope of NOF dam D/s Kink elevation Design Wind speed (IS-875) Fetch computations 1.36 t/cum 1.925 t/cum as per the guidelines of IS-6512 for different loading condition -do0.7H:1V 730.00m 140kmph As per the guidelines of 6512 & USBR IS

technical

memorandum xxiii. Loading condition As per IS-6512

2.0 EARTH DAM i. ii. iii. iv. v. Top width Free Board Wind speed Specific gravity of casing/hearting Optimum Moisture Content for required Proctor compaction vi. vii. viii. ix. x. xi. xii. Dry Density Unit shear resistance Angle of internal friction Moist density Rip rap Drainage/filter designs Stability Analysis & Factor of safety 1.42 t/cum 0.00 N/mm2 34o27 1.811 t/cum Design based on IS-8237 As per the guidelines of IS-9429 As per the guidelines given in IS-7894 & 8826 3.0 GUIDE WALL & PIER Grade of Concrete M20 with 40mm & down size aggregate, fck=7N/mm2 8.00 m Based on IS 10635 Same as in NOF dam portion 2.65 27.5%

i. ii.

Pier Horizontal & Vertical anchorage design

-doAs per guidelines given in IS

4.0 ENERGY DISSIPATER i. ii. iii. The tail water rating curve Type of energy dissipater Mannings coefficient for the d/s stream of spillway Anchorage design As per guidelines given in IS4557 i. ii. iii. iv. v. vi. vii. Diameter of hole Bond strength between steel & grout Bond strength between grout & rock Unit weight of rock Permissible strength in steel Criteria for fixing anchor rod length Concrete floor 50mm 6 N/mm2 4 N/mm2 2.5t/cum 0.80fst As per IS 4557 guidelines Designed assuming 50% of uplift relief and with panels supported at corners. based on the Mannings formula USBR stilling basin II n=.035

5.0 SPILLWAY BRIDGE: i. ii. iii. Grade of concrete Span Width M20 with 20mm & down 14.00 m 7.50 m

6.0 ARBATA DIVERSION CHANNEL i. Type of channel


Trapezoidal channel, Concrete Lined beyond intake in deep cut portions & PCC lining in shallow cuts & embankment reach

ii.

Approach channel (part of reservoir)

Trapezoidal with stone pitching(Ch: 0 to 850m)

iii.

Intake

The intake is located between CH:850 to 900 m where rock is available for foundation

iv.

Discharge (considering the diversion of Surla & Haltar)

60 cumec

v. vi. vii.

Design depth Permissible velocity Side slopes

4.00m 2.00m/s 1H:1V

viii. ix. x.

Bed width Free board Drainage arrangements

3.5m 1.20m Pocket drains & as per guidelines of IS-4558

xi.

Slope of embankment in cutting

1.5H:1V & with berm width of 3.5 m at every 6m height including intercept drains as per stability consideration

xii.

Nala/stream inlets

Inlets are provided with Baffle type energy dissipater based on USBR Stilling Basin & Energy Dissipater by Pterka

xiii.

RCC lining

10 m on either side of canal Wherever located. nala inlets are

xiv.

Grade walls

At every 15m in case of approach channel

xv.

Exit/tail reach of channel

The tail reach is protected with embankment from outflanking to existing fields

7.0 INTAKE i. ii. iii. iv. v. vi. vii. viii. Type of vent Size No. of vents Invert/sill level of Intake Width at the approach Max. water level on u/s FSL on d/s of gate Type of gate Rectangular 3.85x4.5m 2 to facilitate easy operation 631.00m 25.00m 637.25m 635.00m Vertical lift gates with fixed hoist ix. Protection for Deep cuts Turfing

8.0 DIVERSION ROAD i. ii. iii. Length Bridge Width of road way 2.00km 7.7m slab bridge, MOST type 7.5m