Professional Documents
Culture Documents
3M ACCR
Voltage: 220 kV
Based on the October 14 line energizing, 3M ACCR works well. After passing a real projects running test, we believe 3Ms ACCR will have a brilliant future in field application and will help us enhance the city transmission network. Mr. Pan, Shanghai Power Yanggao Project designer.
2
3M ACCR
Voltage: 230 kV
Results:
Avoided major construction including extensive use of helicopters, barges, and road construction by using existing towers Upgraded with minimal disturbance to environmentally sensitive waterway and provincial park Preserved the existing sightline Successfully installed conductor across 5,800 ft (1.5 km), single-span with no additional towers and no tower in the waterway
3M ACCR
3M ACCR
3M ACCR
Voltage: 230 kV
Provided capacity to serve the fast-growing, congested area, including airport, and downtown sports stadium Used existing medium-duty structures without any tower modifications Avoided siting, acquiring rights-of-way, and environmental permitting Minimized installation time (3 weeks) Minimized disruption to neighborhoods and facilities near the line
I dont even want to think what the overload would have been, or the impact of that, if we were still using the old lines, Paul Richards, construction projects manager for APS, in The Arizona Republic, 9/25/06
6
3M ACCR
Results:
Increased transmission capacity using only existing towers Sagged neatly with an adjacent 954 kcmil (490 mm) ACSR conductor on the same structure Minimized impact on under-built lines and allowed them to remain in service during installation By using the 3M ACCR, the money and time saved was invaluable on this fast-paced project. The design and ordering process was a simple task because of 3Ms sales and technical staff which demonstrates a service culture of which 3M should be proud. - Richard Hoch Engineer for Allegheny Power.
7
3M ACCR
Voltage: 60 kV
We needed a way to significantly increase transmission capacity without the extra cost of making major structural changes. 3M ACCR fit our needs exactly and at quite a savings over other alternatives. - Kevin Keating, manager of engineering for Silicon Valley Power
8
3M ACCR
Voltage: 230 kV
The Timberline-Harmony line is an important part of the grid between Denver and Cheyenne, and we chose 3M ACCR as a way to safeguard against overloading when demand is high. Mike Dahl, Division Manager Electric Operations, Platte River Power Authority
Increased transmission capacity to meet the N-1 reliability requirements 3M ACCR performed as required in heavy loads and emergency conditions during 2008 tornado Used only the existing, relatively new towers Eliminated the need for permitting and other requirements which would have been necessary for new towers Preserved the sightline Avoided impacting nearby bike path and railroad
3M ACCR
Voltage: 69 kV line
3M ACCR
Results:
Increased capacity on the line, as well as overall path rating Used the existing structures Minimized environmental impact Cost savings from significantly reduced permitting and environmental study requirements
You can put the 3M ACCR on the same structures as the existing conductor, which mitigates the overall cost, and gets a large increase in capability Tony Montoya assistant regional manager for the federal Western Area Power Administration, as quoted in The Arizona Republic, September 25, 2006
11
3M ACCR
Voltage: 115 kV
12
3M ACCR
Voltage: 230 kV
Results:
Achieved capacity increase for future load growth Maintained all clearances by reconductoring on existing structures
13
3M ACCR
Voltage: 46 kV line
14
3M ACCR
15
3M ACCR
Customer: Alabama Power Project: Bynum to Anniston Location: Anniston, Alabama Year Installed: 2008 Length:
Conductor length: 28 miles (45 km) Line length: 9 miles (14.5 km)
Voltage: 230 kV
3M ACCR
Voltage: 138 kV
3M ACCR
Customer: CPFL Piratininga Project: Ramal Duratex Location: Jundia-SP, Brasil Year Installed: 2009 Length:
Conductor length: 12 miles (19 km) Line length: 2 circuit miles (3 km)
Voltage: 88 kV
3M ACCR
Customer: TATA Power Project: Borivali to Malad and Salsette to Saki Location: Mumbai, India Year Installed: 2009 Length:
Conductor length: 120 miles (193 km) Line length: 10 miles (16 km)
Voltage: 110 kV
19
3M ACCR
Voltage: 60 kV
3M ACCR
Project Overview:
Customer: Chitaenergo Project: Kharonorskaya Hydro station to Turga
(Line 64 65)
Voltage: 110 kV
3M ACCR
Voltage: 115 kV
22
3M ACCR
Voltage: 138 kV
3M ACCR
Customer: Rseau de Transport dElectricit (RTE) Project: Avoine Distr Location: France Year Installed: 2010 Length:
Conductor length: 9.3 miles (15 km) Line length: 0.75 miles (1.2 km)
Voltage: 400 kV
Results:
Provided ampacity increase as a pilot on thermally limited, 400 kV line Installed in close quarters near Distr substation Passed intensive customer testing, including corona, strength, short circuit, resistance and thermal-mechanical testing, for use on extra-high voltage applications
24
3M ACCR
3M ACCR
Customer: Manila Electric Company (MERALCO) Project: Novalishe-Kaybiga Line Location: Manila, Philippines Year Installed: 2010 Length:
Conductor length: 7.22 miles (11.55 km) Line length: 2.1 miles (3.4 km)
Voltage: 115 kV
3M ACCR
ACCR
Project Overview:
Customer: Amprion GmbH (TSO of RWE) Project: BL 4307, Hannekenfhr - Gersteinwerk Location: Lingen, Germany Year Installed: 2009 Length:
Conductor length: 5.2 miles (8.4 km) Line length: 2.6 miles (4.2 km)
27
3M ACCR
ACCR
Customer: E.ON Netz GmbH Project: Ostermoor - Marne Location: Brunsbttel, Germany Year Installed: 2009 Length:
Conductor length: 1.70 miles (2.70 km) Line length: 0.6 miles (0.9 km)
Increased capacity to support load growth created by renewable energy (on-shore wind farms) Preserved clearance on underbuilt 20 kV line owned by other utility
28
3M ACCR
Voltage: 88 kV
Results:
Avoided lengthy permitting delays and logistical problems involved in expanding right of way Minimized environmental impact in an environmentally protected area Saved costs by not needing to acquire new right of way We originally considered a conventional ACSR upgrade, but the problems posed by construction in the protected area were significant. The innovative 3M ACCR solution saves us a lot of time and expense, allowing us to improve service about one year sooner on a line that is already operating at full capacity. Vitor Luiz G. Gardiman, Bandeirante Energias executive operations manager for high tension.
29
3M ACCR
Voltage: 138 kV
We would have required two sets of foundations in that difficult terrain, taking an estimated 10 months to complete. The ACCR stringing needed only 4 months, with no Construction time. Paulo Ricardo Bombassaro Engineering Director of CPFL Piratininga
3M ACCR
Customer: Georgia Power Project: Kraft-McIntosh Location: Savannah, GA Year Installed: 2011 Length:
Conductor length: 106.2 miles (161.3 km) Line length: 34.3 miles (53.8 km)
Voltage: 230 kV
Doubled capacity of lines while maintaining clearance Used existing towers with few modifications Maintained existing right of way (additional right-of-way was not available) Minimized impact on wet land Installed quickly within the outage window (Only one circuit could be out at a time - 10 weeks in the spring and 10 weeks in the fall) Saved several million dollars
31
3M ACCR
Voltage: 115 kV
32
3M ACCR
Customer: AES Eletropaulo Project: Bandeirantes - Itaim Location: Sao Paulo, Brazil Year Installed: 2011 Length:
Conductor length: 6.88 miles (11 km) Line length: 1.00 miles (1.6 km)
Voltage: 138 kV
33
3M ACCR
Customer: Guadalupe Valley Electric Co-op Project: Schertz Parkway T-361 Location: San Antonio, TX Year Installed: 2011 Length:
Conductor length: 9.10 miles (14.63 km) Line length: 3.00 miles (4.73 km)
Voltage: 138 kV
Increased ampacity by more than 60% Installed without the need to replace existing towers or add new towers Afforded additional capacity at a substantial savings
3M ACCR conductor was chosen after an extensive review of the transmission load issues, and the economics regarding replacement and addition of steel transmission structures. The higher ampacity conductor afforded GVEC the additional capacity needed to meet the planning requirement at a substantial savings to the GVEC membership. - Rene Hernandez, system engineer for GVEC. 34
3M ACCR
Customer: EDP Escelsa Project: Rio Doce Crossing Location: Linhares, Esprito Santo, Brazil Year installed: 2011 Length:
Conductor length: 3.6 miles (5.8 km) Line length: 0.574 miles (918 meters)
35
3M ACCR
Voltage: 110 kv
Solution: 3M ACCR 427-T13 (215 mm2) 3M ACCR 636-T16 (320 mm2) Results
Saved time and money Avoided having to acquire additional right-of-way in urban area Increased ampacity to 1240 1600 amps, providing reliable power during contingencies
36
ACCR
A five-year investment program that began in 2011 will include additional infrastructure upgrades, of which ACCR will be an important component, Anatoly Pinizhaninov, chief engineer.
37
3M ACCR
Customer: BC Hydro Project: Fraser River Crossing Location: British Columbia, Canada Year Installed: 2012 Length:
Conductor length: 2.7 (4.35 km) Line length: .87 miles (1.40 km)
Voltage: 230 kV
Successfully installed conductor 4,600 ft across river . Installed 3M ACCR without having to replace tower which had been damaged by erosion to the foundations at the rivers edge Installed in 7 days, so line could be re-energized as quickly as possible
38
3M ACCR
Project Overview:
Customer: Henan Ping Mine Company Project: Yueshang Line Location: Pingdingshan, China Year Installed: 2011 Length:
Conductor length: 1.92 miles (3.2 km) Line length: . circuit miles ( km)
Voltage: 35 kV
Results: Saved upgrade time using existing towers Doubled capacity Provided reliable power for mine company
39
3M ACCR
Project Overview:
Customer: Shenzhen Power Utility Project: Liyue Line Location: Shenzhen, Guangdong Province, China Year Installed: 2012 Length:
Conductor length: 16.67 miles (26.83 km) Line length: 2.8 circuit miles (4.5 km)
Voltage: 220 kV
40
3M ACCR
Project Overview:
Customer: Central Maine Power Project: Penobscot River Crossing Location:. Bucksport, ME Year Installed: 2011 Length:
Conductor length: 1.48 miles (2.38 km) Line length: 0.48 miles (.77 km) circuit length
Voltage: 115 kV
Results:
Increased clearances for the river to meet Army Corp of Engineers requirements Minimized environmental impact
41
3M ACCR
Voltage: 115 kV
Results:
Increased ampacity by 58% Required minimal structure work Avoided significant real estate acquisition costs
42
3M ACCR
1 or 2 Photos of installation
Voltage: 110 kV
Solution: 3M ACCR 1033-T13 Results: Proved ease of installation Installed and operating without any problems and fully in-line with expectations Energized since June 2011 Replaced a slightly larger ACSR, twin bundle (right circuit in upper picture) with a single Curlew ACCR (left circuit in upper picture)
43
3M ACCR
Voltage: 220 kV
44
3M ACCR
Customer: PEPCO Project: Dickerson-Quince Orchard & Dickerson-Pleasantview Location: Maryland/Suburban D.C. Year Installed: 2011 Length:
Conductor length: 108.2 miles (173.8 Km) Circuit length: 18.0 miles (28.9 Km)
Voltage: 230 kV
45
3M ACCR
Project Overview:
Customer: PSE&G (Public Service Enterprise Group) Project: Branchburg to Readington Location: Branchburg, New Jersey Year Installed: 2010 Length:
Conductor length: 14.93 miles (23.89 km) Line length: 4.98 miles (7.96 km);
Voltage: 230 kV
Results:
Increased ampacity Used existing towers
46
3M ACCR
Project Overview
Customer: Perm Energo Project: Perm - Tets-6 Location: Perm, Ural region, Russia Year Installed: 2010 Length:
Conductor length: 32.53 miles (52.35 km) Line length: 5.16 miles (8.3 km)
Voltage: 110 kV
Results:
Increased ampacity from 450 A to 700 A to serve an expanded combined cycle power plant Used exiting rights of way to avoid logistical and permission issues in a crowded urban area
In cooperation with IDGC of the Ural, we have found the best power output option, which is cheaper and more effective by its implementation at the same time. It was very vital for us to timely receive lines with enhanced capacity, so network companies successfully managed this challenge and performed their obligations at a high-quality level and right on time, Andrey Vagner, First Deputy General Director of IES
47
3M ACCR
Voltage: 110 kV
Increased ampacity from 450A up to 1000A Used exiting towers and existing right of way to avoid logistical and permitting issues in urban area Avoided disrupting multilane highways and railroad tracks Installed in one month
48
3M ACCR
Project Overview:
Customer: PEPCO Project: Palmers Corner to Burches Hill Location: Clinton, MD (near Washington, D.C.) Year Installed: 2012 Length:
Conductor length: 80.34 miles (129.29 km) Line length: 6.50 miles (10.46 km)
Voltage: 230 kV
49
3M ACCR
Customer: Meralco Project: Zapote-Kamagong-Legazpi Location: Philippines Year Installed: 2012 Length:
Conductor length: 32.40 miles (52.14 km) Line length: 10.50 miles (16.90 km)
Voltage: 115 kV
Used existing structures Avoided right-of-way issues in an urban area Allowed significant cost savings and faster line construction Installed at night so heavily loaded line could be reenergized during the day
50
3M ACCR
Voltage: 138 kV
51
3M ACCR
Project Profile: New Construction in an Environmentally Sensitive Area and River Crossing
Project Overview:
Customer: CTT (Cross Texas Transmission) Project: Red River Crossing Location: Texas Year Installed: 2012 Length:
Conductor length: 8.14 miles (13.10 km) Line length: .74 miles (1.19 km)
Voltage: 345 kV
Kept tower height low enough to avoid FAA compliance issues Avoided new towers and larger foundations in the floodplain, because longer spans could be used Avoided permitting issues Part of CREZ (Competitive Renewable Energy Zone) projects to enable renewable energy development in Texas
52
3M ACCR
Project Overview:
Customer: Yinchuan Power Utility Project: Yinchuan Substation Part 1 & 2 Location: Yinchuan, Ningxia Province, China Year Installed: 2012 Length:
Conductor length: .81 miles (.1.3 km) Line length: .27 circuit miles (.43km)
Voltage: 220 kV
Results:
Doubled capacity within existing substation frame Installed in 9 days
53
3M ACCR
Customer: City of Palo Alto Project: Park Blvd. Encina Location: Palo Alto, CA Year Installed: 2012 Length:
Conductor length: 5.7 miles (9.17 km) Line length: 1.78 miles (2.86 km)
Voltage: 60 kV
Increased ampacity by 80% on line in a highly developed urban area Matched the existing sags and tensions Maintained clearance from underbuilt line Enabled the use of existing towers along narrow right of ways and city streets
With 3M ACCR we were able to avoid replacing all of the structures along the route of our sub-transmission reconductoring project. 3Ms technical staff made the procurement easy and error free, Jim Bujtor, Sr. Electric Engineer, CPAU.
54
3M ACCR
EPRI test Environmentally sensitive Minneapolis/St. Paul Blue Lake to Black Dog area River crossing Dense population and Phoenix Phoenix Metro Trunkline underbuilds AZ/CA border Topock to Davis High growth Shanghai Fort Collins Needles West Virginia YangGao to XinZhou Timberline to Harmony Firehouse to No Name Bedington to Nipetown Sansum and Montague Crossings Loudon to Brambleton Miller Substation Cost and time savings Reliability Reliability Underbuilt facilities Cost and time savings River crossing Underbuilt facilities Underbuilt facilities Load growth
55
3M ACCR
Chongqing Grid Co. Yunnan Dai Electric E.ON Netz GmbH Amprion GmbH City of Palo Alto
Qinan substation, Yuntai substation, Youngchuan Substations substation, Songlin substation Jianchuan Substation Substations Ostermoor-Marne HanekenfhrGersteinwerk Hoover Pavilion 60 kV Relocation Project Pilot line Pilot line New clearance issue Maximum amps
56
3M ACCR
American Electric Power Company Henan Zhengzhou Power Utility EDP Bandeirante Gray's Harbor PUD1 Hubei Huangshi Power Utility CPFL Meralco Eletropaulo Irkutsk Energo Sinkiang Dushanzi Petrochemical Corp. PSE&G
2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010
Time savings Daye Line Reliability Environmental impacts Henry Borden Jabaquara Cost and time savings Kaybiga-Novalishe Maximum amps Dense population and Bandeirantes - Itaim cost Irkutsk Hydro to Cost savings Kirovskaya Du Shan Zhi (Xing Jiang) Branchberg-Readington Maximum amps
57
3M ACCR
58
3M ACCR
59