You are on page 1of 8

A Minor/Major Project Report On

<<Project Name>>

Submitted for the Partial Fulfillment of the Award of Bachelor of Technology (B.Tech) in <<Stream>> Kurukshetra University Kurukshetra

Under the Guidance of:


<<Name of Supervisor>> <<Designation, Department>>

An ISO: 9001-2008 Certified Institute

Department of Computer Science &Engineering/Information Technology

KURUKSHETRA UNIVERSITY KURUKSHETRA

CERTIFICATE

To whomsoever it may concern

This is to certify that following students have submitted their Minor/Major project on << Project Title>> for the part ial fulfillment of the B.Tech Degree in << Stream >>. They have successfully completed the project in the given deadline period under the supervision of <<Faculty Name>> (<<Designation>>) in <<Stream>> Deptt. RPIIT Technical Campus, Karnal.

1. <<Name of the Student (Roll No.)>> 2. <<Name of the Student (Roll No.)>> 3. <<Name of the Student (Roll No.)>>

<<Name>> (Project Supervisor)

<<Name>> (Project Coordinator)

<<Name>> HOD, <<Deptt. Name>>

Project Report Sequence


1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Certificate of Successful Completion Acknowledgement Problem Abstract Index* List of Abbreviations List of Tables (with page nos.) List of Figures/Graphs/Charts (with page nos.) Workload Matrix Chapters (as mentioned in the Index) References Bibliography Appendix A. Project Log Sheets (as per the scheduled meetings) B. Data & Sheets (Questionnaires/ Interviews, if any) C. Formulation Details (if any) D. Referred Papers (if any)

Note: The Header and Footer must start from First Chapter and end at Bibliography/ References Page. The maximum Page limit for the report is 80 (or 4000 words, whichever is minimum) excluding Acknowledgement, Certificate, Index, List of Abbreviations, Figures, Tables and Appendix. One copy with Spiral-Binding for Pre-Submission and Three copies with Hard-Binding (including attached CDs) for the Final Submission is required as per the binding format. Report Format: Font Type: Font Size: Line Format: Margins: Header: Footer:

Times New Roman Normal Text (12), Headings (14, Bold), Sub-Headings (12, Bold Italic) Spacing (1.5), Alignment (Justified) Left-1.5, Right-1.0, Top-1.25, Bottom-1.0 <<Project Title>>, Left-Aligned, Size-10 Left- RPIIT Technical Campus, Right- Page No., Size-10

For References, Bibliography & Appendix: Font Type: Times New Roman Font Size: 10 Line Format: Spacing (1.0), Alignment (Justified) Margins: Left-1.5, Right-1.0, Top-1.25, Bottom-1.0 Binding: Minor Project- Black Colored Hard Binding with Silver Embedded Color & Logo. Major Project- Brown Colored Hard Binding with Golden Embedded Color & Logo.

INDEX
CONTENTS Certificate of Successful Completion Acknowledgement Problem Abstract List of Abbreviations List of Tables (with page nos.) List of Figures/Graphs/Charts (with page nos.) Workload Matrix Chapter 1: Chapter 2: Chapter 3: Chapter 4: Chapter 5: Chapter 6: Chapter 7: Chapter 8: References Bibliography Appendix A. B. C. D. Project Log Sheets (as per the scheduled meetings) Data & Sheets (Questionnaires/ Interviews, if any) Formulation Details (if any) Referred Papers/ Existing Systems (if any) INTRODUCTION & PROBLEM BACKGROUND LITERATURE REVIEW REQUIREMENT ANALYSIS & DESIGN (UML/ DFD/ FLOW CHARTS/CIRCUIT DIAGRAMS etc.) SOFTWARE/HARDWARE IMPLEMENTATION (With Screen Shots & Pseudo-codes) SYSTEM TESTING (Unit/ Functional) & RESULTS CRITICAL EVALUATION CONCLUSIONS FUTURE SCOPE & LIMITATIONS PAGE NO. I II III 1. 2. 4. 6. -

Workload Matrix
Sr. No.
1. 2. 3. 4. 5.

Components
Problem Identification & Definition Primary & Secondary Research Research Analysis Requirement Analysis System Architecture & Design (Flow Diagrams, UML & ERD etc.) Implementation, Results & Testing Individual/ Group Findings & Conclusion

Student #1

Student #2

Student #3

6. 7.

Signature

Note:
1. Contribution of each individual for each required component must be in percentage (%). 2. Multiple students may participate in one component. 3. Signatures are mandatory for authentication.

Signatures:

<<Name>> (Group Leader)

<<Supervisor Name>> (Project Supervisor)

RPIIT Technical Campus


Minor/Major Project Log Sheet
Semester & Class: Title of Project: . .

Points to be discussed with Supervisor:

Record of Discussion:

Points to cover by the next meeting/ in Final report (Suggested Modifications):

Sr. No. 1. 2. 3. 4.

Roll No.

Student Name

Remarks

Supervisors Initials

Project Draft Proposal Form


Roll No: Names: Branch: A. Proposed Project Title Semester:

B. Problem Background and Description? [Limited to 250 words, Use extra Sheet (if needed)]

C. Define Scope, Limitations and Audience of the proposed project?

D. List the Methods of Research (both Primary & Secondary) needed for the project.

Signatures:

IMPORTANT DATES OF MINOR/MAJOR PROJECT ACTIVITIES


1. Submission of Group Project Synopsis/ Draft Proposal by 05/02/2012. 2. Notification for the Group Presentations by 07/02/2013. 3. Departmental Induction on Process and Requirements by DRC* members on 11/02/13. 4. Start of Scheduled Synopsis Presentations from 11/02/2013 in respective Project Labs (upto 15/02/13). 5. Notification of Guide Allocation by 19/02/2013. 6. First Supervisory Clinic by 22/02/2013. 7. Second Mandatory Supervisory Meeting by 08/03/2013. 8. Third Mandatory Supervisory Meeting by 22/03/2013. 9. Mid-Point Presentation on 16/03/2013 (Saturday) in front of DRC. 10. Forth Mandatory Supervisory Meeting by 05/04/2013. 11. Fifth Mandatory Supervisory Meeting by 12/04/2013. 12. Pre-Submission of the Project Report on 19/04/2013 to Project Coordinators. 13. Final Review Meeting with Supervisor from 23/04/2013 to 25/04/2013. 14. Final Project Submission on 30/04/2013 15. Final Presentation and Project Demonstration on May 02-04, 2013.

*DRC DEPARTMENTAL REVIEW COMMITTEE

MANOJ VERMA [HOD CSE/IT DEPTT.]

You might also like