Work Execution Plan for Jabel Tank Farm

This document outlines a 28-week work execution programme for a Front End Engineering Design (FEED) for additional water storage at the Jabel Tank Farm in Dukhan, Qatar. The programme involves preliminary design, sketch design, detailed design, and closeout stages. It includes tasks such as surveys, feasibility studies, civil/structural design, and submission of a final project closeout report. The start date is March 3, 2013 and planned completion is October 4, 2013.

Uploaded by

sakeedfaheed
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views4 pages

Work Execution Plan for Jabel Tank Farm

This document outlines a 28-week work execution programme for a Front End Engineering Design (FEED) for additional water storage at the Jabel Tank Farm in Dukhan, Qatar. The programme involves preliminary design, sketch design, detailed design, and closeout stages. It includes tasks such as surveys, feasibility studies, civil/structural design, and submission of a final project closeout report. The start date is March 3, 2013 and planned completion is October 4, 2013.

Uploaded by

sakeedfaheed
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Work Execution Programme Overview
  • Project Timeline
  • Additional Duration Details

WORK EXECUTION PROGRAMME -"FEED for Additional Water Storage at Jabel Tank

ID

WBS

Task Name

FEED for Additional Water Storage at Jabel Tank Farm in DukhanQatar

1.1

1.1.1

Mobilization of leads & Initial Meeting,Data Retrieval with Client

1.1.2

Project planning , Execution plan,Quality Plan

1.1.3

Topographical Survey & report

1.1.4

Geotechnical Survey & report

1.1.5

Site Survey report & document retrieval

1.1.6

Review & Approval by Client

1.2

10

1.2.1

Feasibility Report

11

1.2.2

Civil/Structural Design

12

1.2.3

Mechanical/Instrumentation Design

13

1.2.4

Electrical Design

14

1.2.5

Loss Prevention

15

1.2.6

Review & Approval by Client

16

1.3

Preliminary Design Stage

17

1.3.1

Civil/Structural Design

18

1.3.2

Mechanical/Instrumentation Design

19

1.3.3

Electrical Design

20

1.3.4

Loss Prevention

21

1.3.5

Tie In Details & Engineering Package

22

1.3.6

Review & Approval by Client

23

1.4

24

1.4.1

Site Survey & Document Retrieval

Sketch Design Stage

Detailed Design Stage


Civil/Structural /Mechanical/Electrical Instrumentation Design

25

1.4.2

Loss Prevention

26

1.4.3

Tie In Details & Engineering Package

27

1.4.5

EPIC Tender

28

1.4.6

Review & Approval by Client

29

1.5

Approved Drawings for Construction Package

30

1.6

Bill Of Quantities,Construction Cost Estimate & Project Schedule

31

1.6.1

Submission & Approval of Cost estimate,comparison & analysis

32

1.7

33

1.7.1

Final Dossier & Close Out


Submission of Project close out report

Storage at Jabel Tank Farm in Dukhan-Qatar"


Duration
(weeks)

Start Date

Finish date

28

3/3/2013

10/4/2013

3/3/2013

4/16/2013

3/3/2013

3/10/2013

3/10/2013

3/24/2013

3/10/2013

3/24/2013

3/10/2013

3/24/2013

3/25/2013

4/8/2013

4/9/2013

4/16/2013

4/17/2013

5/24/2013

4/17/2013

5/1/2013

5/2/2013

5/16/2013

5/2/2013

5/16/2013

5/2/2013

5/16/2013

5/2/2013

5/16/2013

5/17/2013

5/24/2013

5/25/2013

7/2/2013

5/25/2013

6/15/2013

5/25/2013

6/15/2013

5/25/2013

6/15/2013

5/25/2013

6/15/2013

6/16/2013

6/24/2013

6/25/2013

7/2/2013

7/3/2013

8/30/2013

7/3/2013

8/7/2013

7/3/2013

7/17/2013

7/3/2013

7/24/2013

8/8/2013

8/22/2013

8/23/2013

8/30/2013

8/31/2013

9/29/2013

8/31/2013

9/21/2013

9/22/2013

9/29/2013

9/30/2013

10/4/2013

9/30/2013

10/4/2013

ID
WBS
Task Name
1
1
FEED for Additional Water Storage at Jabel Tank Farm in Dukhan-
Qatar
2
1.1
Site Survey & Document Retri
25
1.4.2
Loss Prevention
26
1.4.3
Tie In Details & Engineering Package
27
1.4.5
EPIC Tender 
28
1.4.6
Review & Approval by Cl
Duration 
(weeks)
Start Date
Finish date
28
3/3/2013
10/4/2013
4
3/3/2013
4/16/2013
1
3/3/2013
3/10/2013
2
3/10/2013
3/24/201
2
7/3/2013
7/17/2013
3
7/3/2013
7/24/2013
2
8/8/2013
8/22/2013
1
8/23/2013
8/30/2013
4
8/31/2013
9/29/2013
3
8/31/2013
9/21/2