DESIGN DATA DESCRIPTION GROUND LEVEL DISCHARGE CANAL BED LEVEL FULL SUPPLY DEPTH FREE BOARD FULL SUPPLY LEVEL CANAL BED WIDTH HEIGHT OF DROP SIDE SLOPE VELOCITY TOP WIDTH OF CANAL U/S SIDE 409.432 13.5 406.862 1.5 0.6 2.1 3.5 1.5 1.5:1 1.35 9.8 D/S SIDE 407.932 13.5 405.362 1.5 0.6 2.1 3.5 1.5 1.5:1 1.35 9.8 UNITS M CUMECS M M M M M M M M/SEC M
2.1 0.25 H1 U/S BED 406.862 ha D/S TEL D/S FSL 407.555 407.462
2.61 0.51 X
D/S BED
405.362
Lc 8.54
HEIGHT OF CREST =H1 = 250 MM HEAD LOSS = HL = 1.5 M HEAD LOSS ON U/S SIDE = 0.09 U/S TEL = 409.055 M HEAD LOSS ON D/S SIDE = 0.09 D/S TEL = 407.555 M HEAD OF WATER OVER CREST = H = Lc = 8.54 M X= 0.51 M
2.1
WING WALL
WING WALL
U/S
D/S
1.0:1.0
CURTAIN WALL
Bt 0.85
Lc 7.5
Y 0.45
WING WALL
WING WALL
PLAN
U/S TEL U/S FSL 408.624 Va 408.532
1.67 0.15 H1 U/S BED 1.2 406.862 IMPREVIOUS LAYER THK. 0.30 0.4 Vb 0.092 D/S TEL D/S FSL 407.124 407.032
H2 2.12
A 1.0 Lx 0.85
B 7.50
SECTION
DESIGN CALCULATION:1.LENGTH OF CREST (L) L= 3.5 M *USUALY U/S CANAL BED WIDTH
2.DETERMINATION OF CREST LEVEL CREST IS DESIGNED AS RECTANGULAR SECTION DISCHARGE = Q = 1.84 *(L * H)3/2 * (H/Bt)1/6
Q = DISCHARGE = 13.468 CUMECS L = LENGTH OF CREST = 3.5 M H = HEAD OVER THE CREST INCLUDING APPROACHING HEAD VELOCITY Bt =BREADTH OF CREST = 0.8 M *ASSUMED H= 1.52 SAY 1.52 M VELOCITY HEAD AT UPSTEAM SIDE = Va = V2/2g = 0.09207 M U/S FSL = 408.532 M U/S TEL = 408.624 M CREST LEVEL = CSL = 407.104 M > 407.032 M *CREST > D/S FSL HEIGHT OF CREST ABOVE U/S BED LEVEL = H1 = 0.15 M *H1 = U/S CBL - CSL - V
VELOCITY HEAD AT DOWNSTREAM SIDE = Vb = V2/2g = D/S FSL = 407.03 M D/S TEL = 407.124 M
0.09207 M
3.SHAPE OF THE CREST CREST WIDTH AT TOP = Bt = 0.55 * SQRT(H2) H2 = HEIGHT OF CREST ABOVE D/S BED LEVEL = Bt = 0.73 SAY 0.85 4.CALCULATION OF CISTERN DIMENSIONS 4a. DEPTH OF CISTERN = X = (1/4)*(H * HL)(2/3) H= 1.52 M HL = HEAD LOSS = 1.5 M X= 0.43 SAY 0.45 4b.BY VARSHNEY METHOD X = dc/3 dc = ((q2)/g)(1/3) q = DISCHARGE PER UNIT WIDTH = dc = 1.147 M X= 0.38 SAY ADOPT DEPTH OF CISTERN DPETH = LENGTH OF CISTERN = LC = 5 * (SQRT(H * HL)) LC = 7.5 SAY 7.5 LEVEL OF CISTERN = 404.912 M
1.74 M
3.848 0.4
CUMECS/M M 0.45 M
5.DESIGN OF CURTAIN WALL WIDTH OF CURTAIN WALL ON D/S AND U/S = 5a. D/S CURTAIN WALL DEPTH OF WALL = 5b. U/S CURTAIN WALL DEPTH OF WALL = 6.IMPERVIOUS FLOOR CALCULATION OF UPLIFT HEAD OF WATER CAUSING UPLIFT = THICKNESS OF FLOOR ON U/S = THICKNESS OF FLOOR ON D/S = 1.742 0.3 0.7 M M M 1.16 SAY 1.2 M *DEPTH = FSD/2 + 0.6 1.44 SAY 1.5 M *DEPTH = FSD/2 + 0.6 0.4 M *ASSUMED
DENSITY OF CONCRETE FLOOR = 2.40 T/M^3 DOWNWARD PRESSURE= 1.7 T/M^2 Lx = 0.8 SAY 1 M WEIGHTED CREEP LENGTH = Lw = (1/3)n + V n = SUM OF HORIZONTAL CONTACTS + SLOPING,CONTACTS LESS THAN 45DEG. V = SUM OF VERICAL CONTACTS + SLOPING,CONTACTS GREATER THAN 45DEG. Lw = 10.66 M I.CREEP LENGTH AT POINT (A) LwA = 5.08 M 2.CREEP LENGTH AT POINT (B) LwB = 5.37 M UPLIFT CALCULATIONS AT D/S UPLIFT AT A = 0.91 M THICKNESS OF FLOOR REQ.D AT A = UPLIFT AT B = 0.86 THICKNESS OF FLOOR REQ.D AT B = PROVIDED FLOOR THICKNESS = STABILITY OF CREST WALL
M M M
0.85
407.012
TOP WIDTH OF CREST = DEPTH OF CREST = BOT.WIDTH OF CREST = DEPTH OF BACKFILL=Df = CALCULATION OF FORCES
M M M M
1.EARTH PRESSURE CONDITIONS :- SUBMERGED S.B.C = 18 T/M^2 ANGLE OF REPOSE = 30 DEG. ANGLE OF REPOSE = 0.52 RAD. DENSITY OF SOIL = 1.2 T/M^3 DENSITY OF WATER = 1.0 T/M^3 DENSITY OF CONCRETE = 2.5 T/M^3 CO-EEFICIENT OF ACTIVE EARTH PRESSURE = Ka = FRICITIONAL COEFFICIENT = 0.6 EARTH PRESSURE = 2.1 T/M^2 EARTH HORIZONTAL LOAD = 2.03 T EARTH VERTICAL LOAD =
0.33
FORCES AND MOMENT ARE TAKEN AT BASE OF FOUNDATION ABOUT A VERT. FORCE V (TON) 0.00 4.46 HOR. FORCE H (TON)
3.0
0.65 1.90
1.32 1.32
NET MOMENT = X =
0.58 0.13
FACTOR OF SAFETY AGAINST OVER TURNING = CHEK FOR SLIDING = ECCENTRICITY = e = MOMENT IN RAFT = 1.3 0.13 0.58
CHECK FOR STRESSES AT BASE P MAX = P -MIN = 10.05 0.45 T/M^2 T/M^2 < >0 18.0 T/M^2 < S.B.C
NO TENSION
WING WALL
WING WALL
1.67
= FSD/2 + 0.6
= FSD/2 + 0.6