TMIPL/IE/NHAI/RTK-JIND/130/2013 To The Project Director Cum General Manager National Highway Authority of Indian 305, Vidyaniketan Road, 01st

Floor, D- park, Model Town, Rohtak-124001(Haryana)

11th September 2013

Sub: Independent Engineer Services for 4-Laning of Rohtak-Jind Section from Km. 307.000 to Km. 347.800 of NH-71 and connecting link from Km. 347.800 of NH-71 to Km. 9.400 of NH-71A in the State of Haryana on BOT (Toll) on DBFOT basis under NHDP Phase-III Revised estimate for shifting of LT and 11KV and from existing chainage 307+000 km to existing 320+600 km Ref: NHAI Letter No. NHAI/PIU-RTK/RTK-JIND/Uitility-UHBVN/12-13/2483 dated 5th March 2013 Our Letter No. TMIPL/IE/RTK-JIND/07/2013 dated 11th March 2013 NHAI Letter No. NHAI/PIU-RTK/RTK-JIND/Uitility-UHBVN/13-14/858 dated 12th July 2013 VIL Letter No. VIL/BOT/ROHTAK-JIND/ NH-71/2013/36 dated 18/07/2013 Our Letter No. TMIPL/IE/NHAI/RTK-JIND/94/2013 dated 23rd July 2013 NHAI Letter No. NHAI/PIU-RTK/RTK-JIND/Uitility-UHBVN/13-14/1059 dated 06th August 2013 Our Letter No. TMIPL/IE/VIL/RTK-JIND/113/2013 dated 20th August 2013 VIL Letter No. VIL/BOT/ROHTAK-JIND/ NH-71/2013/52 dated September 02,2013

Sir, With reference to your letter no. NHAI/PIU-RTK/RTK-JIND/Utility-UHBVN/13-14/1059 dated 6th Aug 2013. We submit that the revised estimate for shifting of LT and 11 KU and from existing chainage 307+000 km to existing chainage 320+600 km at Rohtak Jind road in distt. Jind. received from concessionaire vide their letter no VIL/BOT/ROHTAK-JIND/NH-71/2013/52 dated September 02, 2013. In the revised estimate of Rs. 3,95,35,164/- the concessionaire has mentioned 1.5% supervision charge as work to be carried out by the concessionaire under the supervision of UHVBN which seems to be reasonable. In this regard, the following observations are furnished for your consideration (a) Since the work has to be carried out by the concessionaire, there is no requirement of paying 10% of extra as departmental charges, as requested by concessionaire, hence not recommended. (b) The proposal has been examined and it is found in order. (c) The estimate matches with ground conditions. (d) The concessionaire has adopted concerned deptt. (UHBVN) schedule of rates. The utilities has to be shifted as it is affecting Rohtak-Jind Highway Project. (e) No new work has been envisaged in utility shifting estimate and provisions covered in the estimate have not been taken in any other estimate sanctioned earlier. (f) Concessionaire has signed on each estimate as the work has to be executed by them only.

Therefore it is recommended to endorse the above mentioned amount of estimate inclusive 1.5% of supervision charges for the subject referred work. However, the final payment shall be made as per actual work doen and measurement taken at site. Thanking you and ensuring you our best services always. Yours faithfully,

For & on Behalf of TECH MECH INTERNATIONAL (P) LTD. In association with ARCHOS CONSULTANTS & ENGINEERS LTD.

UMESH JOSH (DIRECTOR)(Ram Sagar Singh) Acting Team Leader Encl: As above Copy forwarded for information to: 1. M/s Tech Mech International Pvt. Ltd. Plot No. 349, Ist Floor, Sultanpur, Near Sultanpur Metro Station , New Delhi-110030 2. M/s VIL Rohtak Jind Highways Pvt. Ltd. , House No. 1265, 01st Floor, Sector-1,Rohtak-124001(Haryana)