1) Area Tabulation No.

Level 3 4 5 6 7 8 9 10 11 12 13 14 Basement Aras - 1 Aras - 2 Aras - 3 Aras - 4 Aras - 5 Aras - 6 Aras - 7 Aras - 8 Aras - 9 Aras - 10 Roof Area Caf/Exhibition/Info Off/Prefunc/MPH Office Office Office Office Office Office Office Office M&E room GFA area, m2 996 2,060 2,819 3,598 3,981 4,509 4,509 4,509 4,509 4,509 3,925 306 40,230 Circ. & Serv. area, m2 926 1,064 848 576 518 518 518 518 518 518 6,521 GLA (m2) 1,134 1,755 2,750 3,405 3,991 3,991 3,991 3,991 3,991 3,407 32,407

Assume 60% circulation & service area are air cond, The total air-cond area shall be = 36,300 sq.m

A) Air-Cond Cooling Load Estimation (MS1525) Assume that the total air-cond area = 36,300 sq.m

and the estimated cooling-load of 55Btu/sq.ft , and 1.7 cfm/sq.ft Total air-cond load = ( 36,300 x 10.76 x 55) / 12000 = 1790 ton

Assume 90% diversity factor, chiller capacity shall be 1610 ton Thus, 3 nos of 540ton centrifugal chiller is selected base on MS1525

B) Chiller Plant Electrical Load Estimation Capacity 1) 2) 3) 4) Water-cooeld chiller Chilled water pump Cond water pump Cooling tower = = = = 540 ton 1296usgpm @ 110ft 1620usgpm @ 85 ft 700 HRT Qty 3 3 3 3 kw/ton 0.615 Input power, kw 332 50 50 22.5 Total Input, kw 996 150 150 67.5 1,364

C) Air-Side Electrical Load Estimation Estimated CFM = (36,300 x 10.76 x 1.7) = 664,000 CFM = 1,129,260 CMH

Base on MS1525 of max air-side power consumption, 0.45w/cmh Power required

0.45

watt/CMH

= (1,129,260 x 0.45) / 1000 = 508 kw

508

Estimated Total Air-Cond Power Consumption base on MS1525, ACMV power = Plantroom load + air side load = 1364+ 508 = 1872 = 51.6 w/m2

Convert to w/m2

A) Air-Cond Cooling Load Estimation (Target Platinium) Assume that the total air-cond area = 36,300

sq.m
2 2

and the estimated cooling-load of 40Btu/sq.ft , and 1.5 cfm/sq.ft (Typ. Floor = 38Btu/hr.ft , 1.5cfm/ft ) Total air-cond load = ( 36,300 x 10.76 x 40) / 12000 = 1302 ton

Assume 90% diversity factor, chiller capacity shall be 1172 ton Thus, 2 nos of 400ton centrifugal chiller, and 2 no of 200 ton screw chiller is selected (to cater for better part load performance)

B) Chiller Plant Electrical Load Estimation In order to achieve maximum energy efficiency, the following has been consider. 1) 2) High efficienty chiller of 0.56kw/ton and 0.6kw/ton for 400 and 200 ton chiller respectivery Change of chilled water inlet/outlet temperature Normal design Proposed design a) Chilled water inlet 54 44 b) Chilled water outlet 58 44 As a result, design flow can be reduced to = 3) 1.714 usgpm/ton

Redece design pump head by incorporating the following :a) Select high efficiency pump (minimum 75%) b) Select high efficiency motor - EFF1 or EFF2 c) Select lower chiller's cooler and condenser water pressure loss (15ft maximum, instead of normal practice of 30ft maximum) d) Select lower water pressure drop of AHU/FCU cooling coil (8ft maximum) e) Proper piping design to reduce pipe friction loss (2.5ft/100ft maximum) f) Use of long radius elbow to minimize pipe friction loss.

By taking the above-mentioned step, the following can be achieved. Capacity 1) 2) 3) 4) 5) 6) 7) 8) Water-cooeld chiller Water-cooeld chiller CHWP-1&2 (400ton) CHWP-3&4 (200ton) CDP-1&2 (400ton) CDP-3&4 (200ton) Cooling tower Cooling tower = = = = = = = = 400 ton 200 ton 686usgpm @ 85ft 343usgpm @ 85ft 1200usgpm @ 70 ft 600usgpm @ 70 ft 500 HRT 250 HRT Qty 2 2 2 2 2 2 2 2 kw/ton 0.56 0.60 Input power, kw 224 120 15 7.5 22.5 18.5 15 7.5 Total Input, kw 448 240 30 15 45 37 30 15 860

C) Air-Side Electrical Load Estimation Estimated CFM = (36,300 x 10.76 x 1.5) = 585,890 CFM = 996,412 CMH

Base on MS1525 of max air-side power consumption, 0.45w/cmh Power required

0.45

watt/CMH

= (996,412 x 0.45) / 1000 = 448 kw

448

Estimated Total Air-Cond Power Consumption after improvement ACMV power = Plantroom load + air side load = 860 + 448 = 1308 = 36.0 w/m2

Convert to w/m2