You are on page 1of 2

Proses : Peyzaj mimar tarafndan hazrlanan bahe sulama projesine gre su ihtiyac, bahe sulama su deposu kapasitesi ve yeri

belirlenir. Su deposunun temini ve imalat/montaj peyzaj grubu veya inaat grubu tarafndan yaplr. Su deposu betonarme, paslanmaz sac veya polietilen malzemeden imal edilebilir. Su deposu toprak altnda veya toprak stnde olabilir. Irrigation water requirement, water storage tank capacity and place shall be determined by irrigation Project which has been designed by landscape architect. Procurement, manufacture/installation of water storage tank shall be done by landscape group or civil group. Water storage tank may be made from concrete, stainless steel or polyethylene material. Water storage tank may be placed under ground or above ground. Peyzaj mimar tarafndan hazrlanan bahe sulama projesine gre, yine peyzaj mimar tarafndan yaplan hidrolik hesap neticesinde bahe sulama hidroforunun debisi ve basn kayb belirlenir. Bahe sulama hidroforu dalg pompa veya paket hidrofor eklinde olabilir. Her durumda hidrofor, elektrik panosu, balant elemanlar vb. ile komple temin edilir. Hidroforun monte edilecei yerde bir kaide ihtiyac varsa, bu kaide inaat grubu tarafndan yaplr. stenen kaidenin lleri, hidrofor montajndan nce inaat grubuna verilmelidir. Hidroforun monte edilecei yere elektrik beslemesi ekilmesi, elektrik grubunun kapsamnda olacandan, hidrofor monte edilmeden nce, elektrik grubuna hidroforun yeri ve elektrik beslemesi ihtiyac ile ilgili bilgi verilmelidir. Irrigation pump capacity shall be calculated by landscape architect. Pumps may be submersible pump or booster pump set. In either case, pumps shall be procured with electrical panel, connection parts etc. If there is a base requirement for pump, it shall be made by civil group. Required base dimensions shall be given to civil group before the pump installation. Information about place and power supply of pump shall be given to electrical group before the pump installation because of power supply is in scope of electrical group. Sistemin arza riskini azaltmak iin filtrasyon sistemi kurulabilir. Filtrasyon iin disk ve elek filtreler, hidrosiklonlar ve kum filtreleri kullanlr. Sulama sisteminde kullanlacak suyun kalitesi kt ise, tm bu filtrelerin bir arada kullanlmas gerekebilir. Bu tip durumlarda, otomatik filtre sistemi kullanmak iletmeyi kolaylatracaktr. Pompa kna kurulacak filtrasyon sisteminde 100-120 micron aplar seilebilir. Filter process may be considered for to reduce the fault risk. Disc and sieve filters, hydrocyclons and sand filters may be used for filtering. If irrigation water quality is not enough, all these filters may be used. In this case, using of automatic filter system shall make easy the operation. 100-120 micron diameters may be selected for filtration system which has been installed the discharge side of pump. Peyzaj mimarndan aksi bir talep gelmedike, bahe sulama sisteminde PE borular kullanlr. Ana datm hatlar HDPE, tali datm hatlar LDPE borulardan kurulur. Normal artlarda borulama mekanik grup kapsamnda olmasa da, iveren ve/veya peyzaj grubunun talebi dorultusunda belli noktalara boru hatlar ekilebilir. Hatlar toprak altnda olacandan trench yapm ii nemlidir. Trench yapm, genellikle inaat grubunun kapsamndadr. Ancak, trench yapm srasnda, mekanik mhendisi, inaat grubuna mutlaka spervizyon salamaldr. letme aamasnda sknt yaanmamas iin trench iindeki yataklamaya, ilk doldurmaya ve final doldurmaya azami zen gsterilmelidir. Polyethylene pipes shall be used for irrigation system unless the landscape architect asked otherwise. Main supply lines shall be HDPE (High Density Polyethylene) pipes, secondary supply

lines shall be LDPE (Low Density Polyethylene) pipes. Piping is not in scope of mechanical group but pipeline may be installed to specific places according to client and/or landscape architect request. Trench excavation and filling shall be important because of pipeline will be under ground. Trench excavation and filling shall be in scope of civil group but during the excavation and filling process, mechanical engineer has to be in site for supervision. Bedding, initial filling and final filling shall be important for untroubled irrigation process. Toprak alt HDPE borular genellikle elektrofzyon kaynak yntemi ile birletirilir. Bu yntemde kaynak, manon ksmndaki stma rezistanslar ile yaplr. Manon iine borular yerletirildikten sonra kaynak makinesinin ular, manonun delik ierisindeki rezistans ularna balanarak, rezistanslar akm ile stlr. Rezistanslarn snmas sonucu, manonun et kalnlnn, borunun et kalnlndan fazla olmasndan dolay, boru cidarnn ss, manon cidarnn ssndan daha yksek olur. Bu s farkndan dolay boru ierisinde basn oluur. Boru zerindeki basn ile boru ierisinde oluan basn sayesinde kaynak ilemi gerekleir. Underground HDPE pipes are usually connected by electro fusion welding method. In this method, welding is done by heating resistances which are located on sleeve coupling side. Welding machines tips are connected to resistance tips after the pipes are located into sleeve coupling. Resistances are heated by flux. Sleeve coupling wall thickness is became more than the pipe wall thickness and pipe wall temperature is became more than the sleeve coupling wall because of the resistance temperature is increased. Pressure is consisted inside the pipe as a result of this temperature difference. Welding process is accomplished by pressure which is outside of pipe and pressure which is inside of pipe. Bunun dnda aln kaynak (butt welding), soket fzyon kaynak (socket fusion welding), ekstrzyon kaynak ke kaynak (extrusion welding edge welding) gibi kaynak yntemleri ve flanl birletirme, kaplin adaptrl birletirme gibi birletirme yntemleri de vardr. Also butt welding, socket fusion welding, extrusion welding (edge welding), flanged joining and couplings can be used for joining of pipes.

You might also like