1 & 2 - UK M60, M6 Toll Motorways - UK Liquid Natural Gas (LNG) Terminal Milford Haven - UK River Severn Second Crossing (Bridge) - UK British Nuclear Fuels Ltd (Nuclear Waste Storage Facility) - Sellafield - UK Madeira Island Airport Runway extension deck - Portugal Second River Tagus Bridge Lisbon - Portugal Tsing Ma Bridge - Hong Kong Chek Lap Kok Airport, Hong Kong Shanghai Sports Centre Shanghai - China Underground Command Centres - Saudi Arabia Power Stations at the Palm - Dubai UAE Power Station and Desalination Phase Projects - Jebel Ali Dubai UAE Liquid Petroleum Tanks Ras Laffan - Qatar MRT Underground Railway, Singapore IRISH SALES OFFICE Westlink Industrial Estate Kylemore Road, Ballyfermot D10 Tel: +35 (0)31 626 5981 Fax: +35 (0)31 626 7801 Email: expamet@eircom.net Tel: Sales: +44 (0)1429 866611 Tel: General: +44 (0)1429 866688 Fax: +44 (0)1429 866622 Email: sales@expamet.net Technical: +44 (0)1429 866655 Tech Email: technical@expamet.net Web: www.expamet.co.uk UK SALES AND DISTRIBUTION CENTRE PO Box 52, Longhill Industrial Estate (North) Hartlepool TS25 1PR England
HY-RIB
Product Brochure
www.hy-rib.com
Quality Assurance BS EN ISO 9001 2000 and ISO 14001 2004 Registered Firms Certificate No. FM36694, EMS 45225
INTRODUCTION
Expamet Hy-Rib is an expanded metal sheet product, specifically developed for use as permanent formwork to concrete. The profile of the open mesh, in combination with the Hy-Rib tangs, allow the development of dense concrete nodules and indents on the face of the Hy-Rib, forming an enhanced mechanical key for the second phase pour. In the case of visible elements, the resulting Hy-Rib surface is suitable to receive a rendered or tiled finish. Hy-Rib is primarily used in construction joint applications but it is also used to form wall, beam & column surfaces and slabs soffits, where the formed surface will not be seen. For over 80 years Hy-Rib has been successfully used as permanent formwork on innumerable building & infrastructure projects, throughout the world. Hy-Rib has an enviable portfolio of technical data. Independent bodies have undertaken full scale testing programmes to determine and verify Hy-Ribs effectiveness in forming construction joints. The result is a product with well defined engineering properties, established formwork pressure characteristics and measured improvements to the joint performance. Hy-Rib is certified for use as permanent formwork by the British Board of Agrment (BBA).
Hy-Rib is available in three thickness grades. Each of the three Hy-Rib grades has a distinctive coloured stripe inside the rib.
0.4mm 3.39kg/m2
0.5mm 4.23kg/m2
0.75mm 6.34kg/m2
Weight
Sheet Identification
Expamet Hy-Rib comes in a wide range of widths. Width (outer rib centres) 2 Rib 3 Rib 4 Rib 5 Rib 6 Rib Expamet Hy-Rib sheet lengths: 2.0m, 3.0m, 4.0m, 5.0m.Other lengths can be made to special order. Expamet Hy-Rib depth: 20.8mm 89mm 178mm 267mm 356mm 445mm
TYPICAL APPLICATIONS
Construction joint stopends in thin & thick base and suspended slabs Vertical construction joint stopends in thin and thick walls Deep construction joints Capping beams Permanent wall and column formwork Permanent Soffit Formwork Industrial floor slabs
Water retaining & excluding structures Bolt boxes / Void formers Curved formwork Day work joints Baffles to self compacting concrete Inclined & top formwork Sprayed concrete background
Airports Railways Water Industry Highway Structures Tunnels Nuclear Installations Power Stations Chemical Production Works Commercial, Industrial, Office and Building Complexes
HY-RIB BENEFITS
HY-RIB FAQ
HY-RIB BENEFITS
In all joint applications, Hy-Rib permanent formwork can give considerable performance and economic benefit when compared with traditional solutions
Compliance with CDM requirement to design out risk (Hand Arm Vibration Syndrome associated with construction joint preparation) Product independently certified for use by the British Board of Agrment Increased surface roughness at joint Hy-Rib joint stronger in shear and flexure compared to traditionally prepared joint surface High durability surface layer Successfully used in water retaining structures
NO. Hy-Rib joints greatly reduce the risk of honeycombing. Traditional shuttering entraps air during concrete placement. Hy-Ribs unique open mesh design allows the air to be expelled through it thus reducing the risk. Tests have confirmed that the compressive strength and density of the concrete that is in contact with the Hy-Rib are higher than those of the concrete within the pour Three grades of Hy-Rib give the temporary works designer more opportunity to optimise the support system. The alternative sheet gauges allow varying spacing of supports YES. Hy-Rib should always be fixed with the point of the ribs and tangs facing into the first phase pour. Hy-Rib requires the same concrete cover as the reinforcement unless stainless steel Hy-Rib is being used. Hy-Rib can be fixed with the ribs running horizontally or vertically, provided the support is at right angles to the ribs. For further information visit our website www.hy-rib.com and download the following documents: The Specifiers Data Pack: for materials approval and specification compliance checks Temporary Works Design Pack: for formwork calculations Installation Pack: simple, best practice guidance for site workers & foreman Technical Assistance is available by telephone, call: +44 (0) 1429 866655 Fax: +44 (0) 1429 851873 or email technical@expamet.net On site training & support is also available, organised through our visiting sales representatives and via the Technical Assistance number.
Why are there three grades of Hy-Rib and which one should I use?
Engineered material with known structural properties Significant reduction in formwork pressure More economic formwork design Unrivalled design guidance Free technical advice from our technical department How do I get technical Assistance? Should the ribs run vertically or horizontally?
Compliance with CDM requirement to design out risk (Hand Arm Vibration Syndrome associated with construction joint preparation) Minimise preparation time between consecutive concrete pours Light weight for manual handling - labour saving Hy-Rib can be fixed before or after reinforcement placement. Less material wastage and reduce cutting with narrow width product Flexible in one direction - for shaping Less overall support system - due to load reduction - also eases strike Minimal surface preparation work to next pour Easier to see and monitor concrete during pour Increased rate of rise Good performance with all concrete types Technical assistance, site training and inspection available Can you explain the order code? Where can I purchase Hy-Rib?
Hy-Rib is stocked by a network of distributors throughout the UK. Contact UK Sales Department on telephone +44 (0) 1429 866611, fax +44 (0) 1429 866622 or email sales@expamet.net Export Enquires on telephone +44 (0) 1429 851810, fax +44 (0) 1429 866622 or email export@expamet.net E.g.1: 28112000-6RIB is 0.4mm sheet 2000mm long and 445mm wide (galvanised) E.g.2: 28112000-6RIB-SS316 is is 0.4mm sheet 2000mm long and 445mm wide (stainless steel grade 316)