Electrical Audit Report for Archive Base

Electrical Audit Report


for

Archive Base

Auditor:

Merald Technology Solutions Nigeria Ltd, RC 615901


No 2, Owhor Street, Opposite Swiss Garde, Stadium Road
Port-Harcourt, Rivers state
Nigeria

Technology Solutions Nig Ltd., RC: 615901

1
Electrical Audit Report for Archive Base

Date of Audit

2nd December - 4th December


2009

Date of Report

7th December
2009

Technology Solutions Nig Ltd., RC: 615901

2
Electrical Audit Report for Archive Base

Contents

Table of Contents
Electrical System block diagram.................................................................................5

Ground Floor Main Hall..............................................................................................6


Consumers..................................................................................................................6
Comments.........................................................................................................................6
Ground Floor Front.....................................................................................................7
Consumers..................................................................................................................7
Comments.........................................................................................................................7
First Floor Main Hall...................................................................................................8
Consumers..................................................................................................................8
Comments.........................................................................................................................8
First Floor front............................................................................................................9
Consumers..................................................................................................................9
Comments.........................................................................................................................9
Second floor Main Hall..............................................................................................10
Consumers................................................................................................................10
Comments.......................................................................................................................10
Second Floor Front.....................................................................................................11
Consumers................................................................................................................11
Comments.......................................................................................................................11
External Electricals....................................................................................................12
Statistics....................................................................................................................12

Generator Set..............................................................................................................13
Comments.................................................................................................................13

Change Over Switch...................................................................................................14


Comments.................................................................................................................14

200 MEM Gear Switch...............................................................................................15


Comments.................................................................................................................15

Technology Solutions Nig Ltd., RC: 615901

3
Electrical Audit Report for Archive Base

Bus Bar Panel..............................................................................................................15


Comments.................................................................................................................15

Earthing System.........................................................................................................16
Comments.................................................................................................................16

Lightning Arrestor.....................................................................................................16
Comments.................................................................................................................16

Fire Alarm Panel........................................................................................................17


Comments.................................................................................................................17

NO Load Reading.......................................................................................................18
ON Load Reading.....................................................................................................18

Electrical Safety Audit Checklist..............................................................................19

Summary Report Form - Electrical Audit Action Plan..........................................21

Technology Solutions Nig Ltd., RC: 615901

4
Electrical Audit Report for Archive Base

GEN NEPA
37KVA SUPPLY

4c x 25mm2 PVC/SWA/PVC

4c x (1c x 16mm2) PVC


MEM 63 A
Aluminum Conductor
GEAR
SWITCH

4c x 25mm2 PVC/SWA/PVC

250 A 250 A
MCCB MCCB
CHANGE OVER
BREAKER PANEL

4c x (1c x 16 mm2) PVC


Aluminum Conductor
100A GEAR SWITCH
MEM MAKE

MEM- 200A
BUS BAR PANEL TO EXTERNAL
STREET LIGHT

FOR GF MAIN HALL FOR FF MAIN HALL FOR SF MAIN HALL

100A 100A 100A


FEDERAL FEDERAL FEDERAL
ELECTRIC ELECTRIC ELECTRIC
DB DB DB

FOR GF FRONT TOILET/ FOR FF KITCHEN/TOILET FOR SF FRONT TOILET/

CHANGING
100A ROOM 100A 100A
FEDERAL FEDERAL FEDERAL
ELECTRIC ELECTRIC ELECTRIC
DB DB DB

ELECTRICAL SYSTEM BLOCK DIAGRAM

Technology Solutions Nig Ltd., RC: 615901

5
Electrical Audit Report for Archive Base

GROUND FLOOR - MAIN HALL

Size of DB - 8-way 100 Amps Federal Electric


Size of ELCB - Not installed
Size of Isolator - 100Amps 3-pole MEM
Size of MCB - 30A (8), 25A (5),
20A (3), 15A (5), 10A (3)

CONSUMERS

 AC Split Units 1.5 HP - 05


 (4x16W) Louver fittings - 16

COMMENTS

 ELCB is not installed in DB. In case any consumer gets earthed, there is no
protection.
 There is only a two phase supply on DB instead of three phases.
 There is very poor illumination in the hall as only three light fittings are
working. The total number of installed fittings are 16.
o As no voltage drop was noticed, the reason for not working of these
fittings is either
 Defective wiring and/or
 Fittings are defective (Ballast, starter tube)
o This needs to be checked urgently.
urgently.

 There are no legends of DB wiring. This is making trouble shooting difficult.


difficult.
 Power cables each 1Cx 8mm are tapped from incoming of DB Isolator. This is
to feed power to GF DB, installed for security changing room and toilets. As a
result, DB looks jammed and unsafe for maintenance and troubleshooting.

Technology Solutions Nig Ltd., RC: 615901

6
Electrical Audit Report for Archive Base

GROUND FLOOR - FRONT


[Security changing room, toilet and staircase]

Size of DB - 4-way 100 Amps Federal Electric


Size of ELCB - Not installed
Size of Isolator - 100 Amps 3-pole MEM
Size of MCB - 30A (2), 25A (4), 20A
(1), 15A (2), 10A (1)

CONSUMERS

 Bore hole Pump - 1(1.5HP,230-240V,50-60Hz)


 Bulbs and fittings connected - 4

COMMENTS

 There is no incoming power to DB for the last several months. Therefore,


the bulbs, fans etc are not functioning.
 Incoming power is tapped from the main hall DB instead of the bus bar panel.
 Wiring has a problem so it needs to be fixed immediately.
immediately.
 There is no legend of DB wiring.
 Size of Isolator is very high and so are the sizes of MCBs, as connected load
is very low.
 Two MCB are missing from DB.
 There is no protection equipment installed to protect the system from earth
leakage current

Technology Solutions Nig Ltd., RC: 615901

7
Electrical Audit Report for Archive Base

FIRST FLOOR - MAIN HALL

Size of DB - 8-way 100 Amps MEM


Size of ELCB - Not installed
Size of Isolator - 100 Amps 3-pole MEM
Size of MCB - 30A (5), 25A (7), 20A (6), 10A (6)

CONSUMERS
 AC Split Units - 6 (1.5HP,PANASONIC)
 Louver fittings - 16 (4X16W)

COMMENTS

 DB is powered with two phase supply only. only.


 Similar to ground floor DB, two phase power is tapped from incoming of the
Isolator to feed power to kitchen DB.
 There is no legend for electrical wires going out from the panel
 DB wiring is clumsy, making it difficult to measure voltages and load current.
 Since most of the time there is no power, the fire alarm system remains
mostly non-operational. This is because its UPS can only sustain for half an
hour.
 No emergency light was seen in the big hall.
 The illumination level is low as most of the fittings are non-operational.
 13Amps SSOs are connected in ring with 2.5 mm2. These were found to be
OK.
OK.
 Similarly, 15Amps SSOs connected in radial with 4mm2 wire is OK. OK.

Technology Solutions Nig Ltd., RC: 615901

8
Electrical Audit Report for Archive Base

FIRST FLOOR - FRONT


[KITCHEN AND CHANGING ROOM]

Size of DB - 4-way; 100 Amps MEM


Size of ELCB - Not installed
Size of Isolator - 100Amps 3-pole MEM
Size of MCB - 30A (2), 25A (3), 15A (4), 10A (3)

CONSUMERS

 Refrigerator - 1
 Micro wave oven - 1
 Water Dispenser - 1
 Electric kettle - 2

COMMENTS

 The ring wired circuit of single 13Amps socket outlet supplies power to
o Refrigerator
o Microwave oven
o Water dispenser
o Electric Kettle.
 The power cable between 13A SSO to consumer is sagging.
 All bulbs were found to be fused.
 No earth leakage protection equipment is mounted in the incoming DB.
 There is only two phase incoming supply at DB Isolator, tapped from first floor
main hall DB isolator, instead of a three phase supply from bus bar panel.
 No legend of DB wiring.
 Size of DB and Isolator is high.

Technology Solutions Nig Ltd., RC: 615901

9
Electrical Audit Report for Archive Base

SECOND FLOOR - MAIN HALL

Size of DB - 8-way 100Amps MEM


Size of ELCB - Not installed
Size of Isolator - 100Amps 3pole MEM

CONSUMERS

 AC Split unit - 2 (3phase,4.8KW power)


 Louver fitting - 16 (4x16W)

COMMENT

 Three phase power is tapped from Isolator incoming for another DB.
 Also three phase power is tapped for supplying power to Air conditioning units
 No earth leakage current protection system is installed.
 Only one split AC is working while second one’s compressor is not functional.
 Light illumination level is low as most of fittings are non-functional. It needs
wiring and fitting to be checked and fixed.
 There is no emergency light installed.

Technology Solutions Nig Ltd., RC: 615901

10
Electrical Audit Report for Archive Base

SECOND FLOOR - FRONT


[Changing room]

Size of DB - 4-way, 100Amps MEM


Size of ELCB - Not installed
Size of Isolator - 100Amps, 3 pole MEM
Size MCB - 25A (3), 20A (7), 15A (2)

COMMENTS
 DB incoming supply is tapped from second floor main hall DB Isolator’s
incoming.
 No ELCB is installed in DB to protect the system from earth leakage current.
 Isolators and MCB are oversized.
 In general illumination level is low.
low.

Technology Solutions Nig Ltd., RC: 615901

11
Electrical Audit Report for Archive Base

EXTERNAL ELECTRICALS

STATISTICS

No of fittings - 15 (400w)
Broken glass - 1
Broken fitting - 1

COMMENTS

 The perimeter lights are all in one circuit (radial), terminated to a 32Amps
gear switch.MEM Gear Switch is mounted on the fence behind the main
building.
 The fittings are looped with a 2.5 mm2 PVC/SWA/PVC cable and they are
terminated with 3c x 1.5mm2 industrial flexible cords.
 The poles are not earthed.
earthed.
 Termination at the JB is not neatly done.
done.
 Some of the 6” x 6” boxes used to conceal the connections between loops
and fitting rid connectors are not earthed, not covered and are not made in
screw.
 Some of the fittings are dirty and have debris inside.
 Some of the fittings mounted on the security posts are unearthed and cables
are flying around the post, not concealed.
 33KV NEPA lines are passing through the base yard. The overhead line is
recommended to be replaced with underground XLPE cable.
 One perimeter fitting is broken in pieces and is hanging behind the diesel
tank.
 Junction boxes appear to be IP55 but water was seen inside.
 There is no terminal strip inside the junction boxes. Wires are directly joined
using pliers.
 No PVC gland is used; therefore, the possibility of water, dust and insects
entering the region is high.
 Galvanized 20mm conduit is recommended in place of existing plastic PVC
conduit pipe.
 External wall mounted bulkhead fittings (2) are hanging. It is IP41, while it
should be IP55.

Technology Solutions Nig Ltd., RC: 615901

12
Electrical Audit Report for Archive Base

GENERATOR SET
[37KVA, DUEZ MAKE, AIR COOLED]

COMMENTS

 There is no electrical lighting point in generator room.


 There is no emergency light installed.
 The following indicators in the Genset are nonfunctional
 Engine RPM meter
 Engine HR meter
 Engine Oil Pressure
 Generator Frequency Meter
 Generator Voltage Meter

 Engine speed and thus frequency goes on changing as it is controlled


manually with two naked wires joint together, which often get loosened.
 During the audit period, frequency got down twice.
 Genset body is not earthed at all. No earth pit and earth chamber could be
located.
 There is no separate earth cable from Genset to 63 Amps gear switch
installed in Genset room.
 4C Cable AL armor is used as earth cable from 63A gear switch to 250A
Change over Switch.
 25mm2 cu armored cable is sagging/hanging in changeover switch room.

Technology Solutions Nig Ltd., RC: 615901

13
Electrical Audit Report for Archive Base

CHANGE OVER SWITCH

COMMENTS

 There are two 250 Amps 3pole breakers installed inside the 100Amps BILL
changeover panel. One is connected to the Genset while the second breaker
is connected to PHCN 16 mm2 1C AL cables. There is NO interlock
(Mechanical or Electrical).In
Electrical).In case both the breakers are ON at the same
time, it might cause serious problems.

 Bottom plate of Change over switch is removed enabling easy access to


animals and insects. This can lead to short circuit.
 No cable gland is used for generator cable connection.
 No cable trucking is used for PHCN cable and generator set cable.
 Power cable for external lighting is directly connected to Change over switch.
 External cables from Change over switch are hanging /sagging in change
over panel room. No trucking is used.
 Changeover switch of 250Amps is highly oversized for 65A maximum
capacity Genset.

Technology Solutions Nig Ltd., RC: 615901

14
Electrical Audit Report for Archive Base

200A MEM GEAR SWITCH

COMMENTS

 Top cover is open and cables from gear switch to bus bar panel are not well
connected.
 Cable wire color code is not correct. Black wire is used for Y phase and the
same color is used for Neutral also.

BUS BAR PANEL

COMMENTS

 In coming cable insulation is over heated.


 However, top entry of cable is properly connected.

Technology Solutions Nig Ltd., RC: 615901

15
Electrical Audit Report for Archive Base

EARTHING SYSTEM

COMMENTS

 Earthing pit and earthing chamber could not be located therefore earth
resistance could not be measured.
 None of the electrical panels like DBs, Gear Switches, Bus bar panel, Genset
body are properly earthed.

LIGHTENING ARRESTOR

COMMENTS

 Lightening arrestor is not connected to the earth chamber. Rather, an earth


copper strip is directly going to earth. Earth resistance could not be measured
as there is no earth chamber.

Technology Solutions Nig Ltd., RC: 615901

16
Electrical Audit Report for Archive Base

FIRE ALARM PANEL

COMMENTS

 It has been observed that there is frequent power failure as PHCN power is
disconnected for the last two months and the Genset remains under
breakdown very frequently. Last month there was no power for more than two
weeks. Under such a situation the fire alarm system will be nonfunctional as
its UPS could last only half an hour. In case of a fire, the system will fail and
there would be serious consequences.

Technology Solutions Nig Ltd., RC: 615901

17
Electrical Audit Report for Archive Base

NO LOAD READING

Vab Vbc Vac Va-n Vb-n Vc-n


(volts) (volts) (volts) (volts) (volts) (volts) Ia (amps) Ib (amps) Ic (amps) In (amps) Remarks
CHANGE OVER - - - -
SWITCH 390 389 390 225 224 223
200A GEAR - - - -
SWITCH 388 390 390 222 224 223
GF MAIN DB 0 388 390 221 230 230 - - - -
FF MAIN DB 0 388 390 224 226 224 - - - -
SF MAIN DB 390 389 390 225 227 226 - - - -
SF FRONT DB 389 389 389 225 227 226 - - - -

ON LOAD READING

Vab Vbc Vac Va-n Vb-n Vc-n


(volts) (volts) (volts) (volts) (volts) (volts) Ia (amps) Ib (amps) Ic (amps) In (amps) Remarks
CHANGE OVER
SWITCH 390 389 390 225 226 218 34.00 49.90 50.00 27.00
200A GEAR
BREAKER 388 388 389 225 224 218 34.00 48.00 49.00 24.00
DB GF MAIN 0 384 385 216 214 214 11.00 7.20 11.10 2.50
FF MAIN DB 0 388 385 215 215 214 0.54 9.00 9.40 12.00
SF MAIN DB 385 385 384 211 217 220 11.00 10.00 11.00 2.30
SF FRONT DB 384 385 384 211 216 220 0.50 1.40 1.80 2.00

Technology Solutions Nig Ltd., RC: 615901

18
Electrical Audit Report for Archive Base

Electrical Safety Audit Checklist


Issue Date: 4th Dec 2009

Portfolio: Electrical Audit

Service Unit: Complete SLB Archive Base

Location inspected: Schlumberger Archive Base, East-West Road P/H

Inspected by: Yogendra Singh, D.Parikh, Er. Akujobi Sylvestar

Date of inspection: 2nd Dec to 4th Dec, 2009

Status
Yes No

Has portable electrical equipment including extension leads and power boards
been tested and tagged in accordance with the Guideline for Testing of Portable N/A
Electrical Equipment?

Do all power boards have thermal overload switches? N/A

Are all Test and Tag test dates current? N/A

Is all equipment maintained in good condition and inspected regularly and


records kept? N/A

Are all electrical incidents reported? N/A

Are earth leakage current devices (ELCB’s) installed in the circuits? N

Have ELCB’s been checked to ensure they are working correctly? N/A

Has a risk assessment been conducted on electrical equipment? N/A

Have all people been trained in the use of all equipment? N/A

Technology Solutions Nig Ltd., RC: 615901

19
Electrical Audit Report for Archive Base

Are training records kept for the safe use of all equipment? N/A

Has earth resistance of all earth chambers measured and maintained below the
limit? N/A

Are all lighting fittings and Power boards in good condition? N

Are any leads causing a trip hazard? N

Are out of service tags for faulty equipment available and used? N

Have staff received a general Electrical Safety Induction? N/A

Is a safety manual available and distributed to staff? N/A

Has fire alarm system been tested N/A

Technology Solutions Nig Ltd., RC: 615901

20
Electrical Audit Report for Archive Base

Summary Report Form --- Electrical Audit Action Plan

Portfolio: Electrical Audit

BASE SLB Archive Base

Location inspected: Schlumberger Archive Base, East-West Road P/H

Inspected by: Merald Technology Solutions Nigeria Ltd

Date of inspection: 2nd Dec to 4th Dec, 2009

Completion Complete
Location Issue/ Hazard Proposed Action Responsibility
Date d Y/N

GF - Main hall Illumination is very low as 13 out Electrical wiring and/or fittings must be
of 16 fittings are not working checked and fixed ASAP SLB - -

DB has no power supply so, no - -


GF - Front lighting points, sockets etc of Wiring of DB supply has to be checked SLB
guard changing room are working and fixed

Technology Solutions Nig Ltd., RC: 615901

21
Electrical Audit Report for Archive Base

GF and FF Only two phase power is Connect three phase supply SLB - -
DBs connected

GF and FF Incoming supply is tapped from Connect power from Bus Bar Panel SLB - -
front DBs Main hall’s respective DBs

Proper earth pit and chamber should be


Whole Base Earthing made and a separate earth cable should SLB - -
run for earthing the electrical panels

Insure power supply to fire alarm control


Main building Fire Alarm panel by keeping PHCN and Genset SLB - -
operational

DBs Earth leakage current protection Install ELCBs SLB - -

Changeover 1)No interlock with PHCN power Mechanical/Electrical interlock to be


Switch and Gen set power provided to avoid bridging of PHCN and SLB - -
2)Breakers are oversized Genset power and reduce size of breakers

200Amps Panel top is open and one live Fix the problem by covering top and use
Gear Switch cable and N-cables are black red cable for live line SLB - -
color

Technology Solutions Nig Ltd., RC: 615901

22
Electrical Audit Report for Archive Base

Indicators and governer system must be


GEN SET Very bad condition fixed, Gen body should be earthed, Power
cable should pass through truncking, and SLB - -
should be well glanded before termination.

PHCN Power Disconnected since last two Needs to be reconnected


months, 33KV overhead wires and an underground XLPE cable should SLB - -
passing through base replace overhead wire between two poles

External Broken fittings, glass hanging


Electricals bulkhead fittings, JBs and Needs to be fixed SLB - -
terminal Strips ,bore hole pump
breaker

Technology Solutions Nig Ltd., RC: 615901

23
Electrical Audit Report for Archive Base