Performance Trial of Cooling Tower No 3

On 29.08.14 the performance trial of newly Re built Cooling Tower No. 3 was conducted jointly
by Technical (Md. Fahad) & Operation (Harish Bisht).
Data has been tabulated as below.

Date
29 Aug 14

Supply
Temp.
(C)

Return
Temp.
(C)

Wet
Bulb

Dry
Bulb

Approach

Return
Flow
(measured
by
ultrasonic)

Time

Design

32

42

29

12:30

31.8

39.4

27.5

13:00

31.6

39.8

15:15

32.2

15:40

32.1

m3/hr.

10

3.0

5700

35

7.6

4.3

28.5

37

8.2

3.1

40.1

29.5

39.5

7.9

2.7

40.1

29.5

38.5

8.0

2.6

Summary:
Flow
Avg. Supply Temp.
Avg. Return Temp.
Approach
Range

Range

Design Case
5700
32
42
3.0
10

Actual
5330
31.9
39.8
3.1
7.9

5330