Cargo Survey Report for Blue Sky Vessel

The surveyor attended the mv Blue Sky to survey the loading of two pieces of machinery: a 6.8-meter bulldozer and an 8-meter wheel loader. The machines were delivered and stored at the port before being lifted onto the vessel one by one. The bulldozer was lifted using chains under its tracks while the wheel loader was lifted using wire legs attached to its hooking points. The machines were stowed in hold 17 and secured with chain lashings. During stowage, a container bumped the bulldozer's blade, causing scratches. Otherwise, loading was conducted carefully and the machines were in good condition.

Uploaded by

To Ze
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
170 views6 pages

Cargo Survey Report for Blue Sky Vessel

The surveyor attended the mv Blue Sky to survey the loading of two pieces of machinery: a 6.8-meter bulldozer and an 8-meter wheel loader. The machines were delivered and stored at the port before being lifted onto the vessel one by one. The bulldozer was lifted using chains under its tracks while the wheel loader was lifted using wire legs attached to its hooking points. The machines were stowed in hold 17 and secured with chain lashings. During stowage, a container bumped the bulldozer's blade, causing scratches. Otherwise, loading was conducted carefully and the machines were in good condition.

Uploaded by

To Ze
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Ref:Q15/05/07

SURVEYREPORT
ThisistocertifythattheundersignedCargoSurveyorattendedonboardthemvBlue
SkywhileberthedatF/GberthCapeTownHarbouron the19th May 2007,asper
therequestofMessersMondeoExpressFreight,forthepurposeofsurveying,
supervisingandreportingontheloadingofnewBellmachinery.
Wenowreportasfollows:

Vesselsparticulars:
Vesselsname

:BlueSky

Voyagenumber

: 68N

VesselsOwners

:LubecaMarineGermany

VesselsCharters

:AnnashippingLuanda

Lengthoverall

: 88.6m

GrossRegisteredTonnage

: 3120

Flag

:AntiguaandBarbuda

PortofRegistry

:BarbudaHamilton

TypeofVessel

:MultiPurpose

NumberofHatches

: Two

NumberofHolds

: One

Page2
TableofContents:
1. Cargodescription
2. Loading/Stowage/LashingandSecuring
3. GeneralConditionReport
4. IndividualDamageReport
5. Remarks/Conclusion
1.

CargoDescription:

CargoShipped

: 2x Bellequipmentmachines

Theshipmentcomprisedof 2bellmachinesoneabulldozertheotheraWheelloader,
beingpresentedforshipmentasfollows:
A 6.8meterBulldozerfittedwith bladeandall accessories,steeltrackdriven.The8
metreWheelloaderfittedwithbucketandall accessories,wheeldriven were
deliveredbyNatrotransportonthe16thMay2007tobeshippedonthevesselBlue
Skyvoyage68N. TheWheelloadermachinewasoffloadedandstoredinsideSAPO
warehouseandthebulldozerwasoffloadedandstoredoutsideonthequaysidedueto
thefactthatthemachinewasontracks.
2. Loading,Stowage,LashingandSecuring
Oncethevesselwasreadyforthetwomachinestobeloadedtheyweremanoeuvred
toalongsidethevesselundertherelevantcargohook.
TheBulldozermachinewasupliftedusingasixmeterspreaderbeam withtwo
michnonchainsslungunderthetracks.Thechainswerefittedtoeithersideofthe
spreaderbeam.
TheWheelloadermachinewasupliftedusingfourcontainerwirelegs,whichwere
shackledtothemachineinthefrontandrearonthehookingpointssuppliedonthe
machine.
Themachineswerehandleddirectintotheirplaceofstow,usingthevesselsown
cargoworkinggear.Theywerestowedinbay 17ondeckwiththeirlengthsinafore
andaftdirection.Twelvemetercontainerswerestowedeithersideofthetanks,anda
sixmetercontainerbehindthem.
Themachinesweresecuredusingchainlashingswithtensionersplacedatintervals
alongthelengthofeachmachine.

Page3

Photographscoveringtheloadingoperationcanbefoundappendedtothisreport.

4.

GeneralConditionReport:

Theconditionofthemachineswasconsideredtobeinagoodcondition,withno
damagesnotedpriortoshipmentandduringtheloadingoperation.Althoughwhenthe
sixmetercontainerwasbeingpositionintostow,thecontainerrubbedandbumped
thebladeontheleftsideoftheBulldozercausingsomescratchesandremovalof
paintontheblade.Pleaseseephotosattached.
5.

Remarks/Conclusion

Weareoftheopinionthattheloadingoperationwasconductedinagoodfashion,as
bothSAPOandthestevedoresemphasisedextremecautionwhilehandlingthe
machines.

SignedatCapeTownonthis24th dayof May 2007.

CTucker
CargoSurveyor

NO:1
Deliverycondition of
Wheelloadergood

NO:2
Deliveryconditionof
Bulldozergood

NO:3
Bulldozerbeingdrivenof
trailer.

NO:4
WheelLoaderbeingdriven
oftrailor.

NO:5
Stowageonvessel.

NO:6
Stowageondeckand
securingbytensionchains.

NO:7
Stowageondeckand
securingbytensionchains.

NO:8
Damagetobladeoftheleft
side.

NO:9
Scratchesuptheleftsideof
blade.