Marketing Division
Sln.
Item Description
Total requirement
(Nos)
268
PO placed
(Nos)
Item
Installed
(Nos)
268 108
Installation : By Dec' 14
159
347
30 Nil
(Material
Supply & Installation :
received at
site)
Phase-I : 30 nos by July'
14 &
Phase-II : 55 nos by Dec'
14
347
33
Supply :
i) Point type received.
Ii) Open path delivery is
in progress, completion
by April' 14
Installation :
i) Point Type : By Dec' 14
ii) Open path : By Dect'
14
Phase 1:
1) PO dtd 23.7.13 placed for Lot-1 qty of 18 nos tanks (dia >32 M)
on M/s HSE Engineers Pvt Ltd.
2) PO dtd 25.7.13 placed for Lot-2 qty of 12 nos (dia >32 M) on
M/s Vimal Fire Control Pvt Ltd.
Phase-II:
In 2nd Phase, tender for 55 tanks tanks above 3000 KL capacity
floated on 31.7.13. The negotiation is under progress.
Delivery of point type detectors is completed. Delivery of open path
detectors is in progress. 70% qty of HCD is delivered and received at
the locations. The delivery of balance 25% is to be completed by
April'14. HC detectors will be part of independent Safety loop and
Safety PLC. Installation will done in phased manner alongwith all
instrumentation jobs by Dec'14.
Sln.
Item Description
Total requirement
(Nos)
PO placed
(Nos)
Item
Installed
(Nos)
1077
135
1077
Supply :
i) ROSOV with Pneumatic
Actuator by May' 14
Ii) ROSOV with EH
Actuator by May' 14
Installation :
i) ROSOV with Pneumatic
Actuator by Dec' 14
Ii) ROSOV with EH
Actuator by Dec' 14
469
469
106
366
366
366
Installation: Completed
7
8
9
Emergency Kits
Closed circuit television (CCTV)
10
18
18 Nil
Supply : Completed .
Installation : Mar' 14
69 sets
69 sets NA
Completed
82 locations
82 locations 82 locations Completed
29 locations
Delivery completed.
Recommendation Complied.
HPCL has engaged Consultant to carry out hydraulic study at the
locations. Assessment Report has been submitted. PO placed for
procurement of 105 nos Fire engines and 118 nos Jockey pumps.
Work for fabrication of Water Tanks started. Completion in phases.
Sln.
Item Description
Total requirement
(Nos)
PO placed
(Nos)
11
NA
NA
12
Training
Item
Installed
(Nos)
NA
Completed