Implementation of M.B.Lal Committee Recommendations -Status as on 28.2.

2014
Marketing Division
Sln.
Item Description

High Volume Long Range Monitor


(HVLR)

Total requirement
(Nos)
268

PO placed
(Nos)

Item
Installed
(Nos)
268 108

Target date for


completion

Installation : By Dec' 14

Automatic Actuated Rim Seal


Fire Detection & Suppression
system for Class 'A' Floating roof
tanks (FRT)

159

Hydrocarbon Detection (HC) &


Alarm System

347

30 Nil
(Material
Supply & Installation :
received at
site)
Phase-I : 30 nos by July'
14 &
Phase-II : 55 nos by Dec'
14
347

33
Supply :
i) Point type received.
Ii) Open path delivery is
in progress, completion
by April' 14
Installation :
i) Point Type : By Dec' 14
ii) Open path : By Dect'
14

Remarks (if any)

1) PO no. 12000041-OQ-10002 dtd 17.5.12 is placed for supply of 45


nos HVLR monitors. All 45 monitors have been received and
installation of all 45 nos monitors is completed.
2) PO no. 13000013-OQ-10002 dtd 15.4.13 is placed for supply of
223 nos monitors. All 223 monitors have been received . Installation
will be completed by Dec'14 in phases.

Phase 1:
1) PO dtd 23.7.13 placed for Lot-1 qty of 18 nos tanks (dia >32 M)
on M/s HSE Engineers Pvt Ltd.
2) PO dtd 25.7.13 placed for Lot-2 qty of 12 nos (dia >32 M) on
M/s Vimal Fire Control Pvt Ltd.
Phase-II:
In 2nd Phase, tender for 55 tanks tanks above 3000 KL capacity
floated on 31.7.13. The negotiation is under progress.
Delivery of point type detectors is completed. Delivery of open path
detectors is in progress. 70% qty of HCD is delivered and received at
the locations. The delivery of balance 25% is to be completed by
April'14. HC detectors will be part of independent Safety loop and
Safety PLC. Installation will done in phased manner alongwith all
instrumentation jobs by Dec'14.

Sln.

Item Description

Total requirement
(Nos)

PO placed
(Nos)

Item
Installed
(Nos)
1077
135

1077

Remote operated shut off valve


(ROSOV)

Target date for


completion

Supply :
i) ROSOV with Pneumatic
Actuator by May' 14
Ii) ROSOV with EH
Actuator by May' 14
Installation :
i) ROSOV with Pneumatic
Actuator by Dec' 14
Ii) ROSOV with EH
Actuator by Dec' 14

Replacement of Hammer Blinds


with Double block and bleed
valve (DBBV)

469

469

106

Medium Expansion Foam


generators (MEFG)

366

366

366

Remarks (if any)

1) PO no.12000354-OQ-10002 dated 28.2.13 is placed for supply of


ROSOVs with Pneumatic actuators. Delivery will start in phases
commencing from Oct'13 to May'14.
2) PO no.12000378-OQ-10002 dated 28.3.2013 is placed for supply
of ROSOVs with Electro-hydraulic actuators . Delivery will start in
phases commencing from Oct'13 to May'14.
Installation will done in phased manner alongwith all
instrumentation jobs.

1) PO no.12000258-OQ-10002 dtd 16.11.12 is placed for supply of


DBB valves of size more than 300 mm. All DBB valves have been
Installation :
received.
WIP, Completion by Dec'
2)PO no 13000034-OQ-10002 dtd 8.5.13 is placed for supply of DBB
14
valves of size less than 300 mm. All DBB valves have been received.
Installation will be completed by Dec'14 in phases.
Supply : Completed.

Delivery & Installation completed

Installation: Completed
7

Mass Flow Meters (MFM)

8
9

Emergency Kits
Closed circuit television (CCTV)

10

Up-gradation of Fire water


system -Double Fire
Contingencies

18

18 Nil

Supply : Completed .

Installation : Mar' 14
69 sets
69 sets NA
Completed
82 locations
82 locations 82 locations Completed
29 locations

8 locations 10 locations by Dec'13


completed and balance by Dec'14

Delivery completed. Installation by Mar'14.

Delivery completed.
Recommendation Complied.
HPCL has engaged Consultant to carry out hydraulic study at the
locations. Assessment Report has been submitted. PO placed for
procurement of 105 nos Fire engines and 118 nos Jockey pumps.
Work for fabrication of Water Tanks started. Completion in phases.

Sln.

Item Description

Total requirement
(Nos)

PO placed
(Nos)

11

Emergency Response Centre


(ERC)

NA

NA

12

Training

600 nos per annum 600 nos per NA


annum

Item
Installed
(Nos)
NA

Target date for


completion
NA

Completed

Remarks (if any)

As per Ministry direction, one Industry committee has been formed


on 17.5.13 to finalize the location and scope of work for setting up
the Emergency Response Centres on the lines of existing facilities in
the Refineries. Committee submitted Draft report to OISD. It was
decided to finalise specs after studying such facilities abroad and
then pilot at two locations on BOO basis.
Purchase Orders dtd. 7.2.2013 placed on M/s Institute of Fire Safety
& Disaster Management Studies, Vadodara & M/s Eminent Career
Development Link, Thrissur. Tender covers 1200 personnel training
in 2 years period. So far, 1439 participants have been covered.
Recommendation complied.