You are on page 1of 7

1.

LOTO Procedure
LOCKOUT TAGOUT PROCEDURE

Equipment
Identification

Equipment Name/Description:

Ball Mill

Equipment Location:

Ceramics Studio Room 253c

Total # of Energy Isolation


Devices/locks:

NOTICE

BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL.


ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL
PERFORM LOCKOUT TAGOUT PROCEDURE

Energy
Source

Location

Type of EID/lock to
be used

Steps for locking &


tagging

Verification
Procedure

Electrical

End of cord

Plastic clamshell and


padlock

Stop machine,
unplug cord, and
install clamshell,
lock, and tag.

Attempt to start
machine, visually
confirm it will not
start.

IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION


PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*

LOTO Procedure # A-xxxxxxx

Revision #:

Approved by:

Date:

1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE

Equipment
Identification

Equipment Name/Description:

Bench Grinder

Equipment Location:

Ceramics Studio Room 253

Total # of Energy Isolation


Devices/locks:

NOTICE

BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL.


ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL
PERFORM LOCKOUT TAGOUT PROCEDURE

Energy
Source

Location

Type of EID/lock to
be used

Steps for locking &


tagging

Verification
Procedure

Electrical

End of cord

Plastic clamshell and


padlock

Stop machine,
unplug cord, and
install clamshell,
lock, and tag.

Attempt to start
machine, visually
confirm it will not
start.

IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION


PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*

LOTO Procedure # A-xxxxxxx

Revision #:

Approved by:

Date:

1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE

Equipment
Identification

Equipment Name/Description:

Electric Kiln

Equipment Location:

Ceramics Studio Room 253e

Total # of Energy Isolation


Devices/locks:

NOTICE

BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL.


ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL
PERFORM LOCKOUT TAGOUT PROCEDURE

Energy
Source

Location

Type of EID/lock to
be used

Steps for locking &


tagging

Verification
Procedure

Electrical

Remote
junction or
breaker
box

Plastic breaker
adaptor

Stop machine, flip


breaker switch to the
off position, install
plastic breaker
adaptor, lock, and
tag.

Attempt to start
machine, visually
confirm it will not
start.

IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION


PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*

LOTO Procedure # A-xxxxxxx

Revision #:

Approved by:

Date:

1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE

Equipment
Identification

Equipment Name/Description:

Jigger Jolly

Equipment Location:

Ceramics Studio

Total # of Energy Isolation


Devices/locks:

NOTICE

BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL.


ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL
PERFORM LOCKOUT TAGOUT PROCEDURE

Energy
Source

Location

Type of EID/lock to
be used

Steps for locking &


tagging

Verification
Procedure

Electrical

End of cord

Plastic clamshell and


padlock

Stop machine,
unplug cord, and
install clamshell,
lock, and tag.

Attempt to start
machine, visually
confirm it will not
start.

IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION


PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*

LOTO Procedure # A-xxxxxxx

Revision #:

Approved by:

Date:

1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE

Equipment
Identification

Equipment Name/Description:

Pneumatic Clay Extruder

Equipment Location:

Ceramics Studio Room 253

Total # of Energy Isolation


Devices/locks:

NOTICE

BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL.


ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL
PERFORM LOCKOUT TAGOUT PROCEDURE

Energy
Source

Location

Type of EID/lock to
be used

Steps for locking &


tagging

Verification
Procedure

Pneumatic

Valve on
main line

Plastic clamshell or
lockable valve, hasp,
lock, tag

Stop machine, turn


valve to off position
and install clamshell
or use valve locking
mechanism, install
hasp, lock, and tag.

Attempt to start
machine, visually
confirm pressure
gauge at zero.

IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION


PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*

LOTO Procedure # A-xxxxxxx

Revision #:

Approved by:

Date:

1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE

Equipment
Identification

Equipment Name/Description:

Pottery Wheel

Equipment Location:

Ceramics Studio Room 253,


253b

Total # of Energy Isolation


Devices/locks:

NOTICE

BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL.


ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL
PERFORM LOCKOUT TAGOUT PROCEDURE

Energy
Source

Location

Type of EID/lock to
be used

Steps for locking &


tagging

Verification
Procedure

Electrical

End of cord

Plastic clamshell and


padlock

Stop machine,
unplug cord, and
install clamshell,
lock, and tag.

Attempt to start
machine, visually
confirm it will not
start.

IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION


PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*

LOTO Procedure # A-xxxxxxx

Revision #:

Approved by:

Date:

1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE

Equipment
Identification

Equipment Name/Description:

Pug Mill (extruder de-aerator)

Equipment Location:

Ceramics Studio Room 253c

Total # of Energy Isolation


Devices/locks:

NOTICE

BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL.


ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL
PERFORM LOCKOUT TAGOUT PROCEDURE

Energy
Source

Location

Type of EID/lock to
be used

Steps for locking &


tagging

Verification
Procedure

Electrical

End of cord

Plastic clamshell and


padlock

Stop machine,
unplug cord, and
install clamshell,
lock, and tag.

Attempt to start
machine, visually
confirm it will not
start.

IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION


PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*

LOTO Procedure # A-xxxxxxx

Revision #:

Approved by:

Date:

You might also like