You are on page 1of 2

Federal Register / Vol. 73, No.

74 / Wednesday, April 16, 2008 / Notices 20711

preferable alternative, a finding on at a minimum, no-action and the advised that your entire comment—
impairment of park resources and preferred alternative. including your personal identifying
values, a listing of measures to The monument does not have a information—may be made publicly
minimize environmental harm, and an general management plan as required by available at any time. While you can ask
overview of public involvement in the the Redwood Amendment of 1978 and us in your comment to withhold from
decision-making process. NPS management policies. public review your personal identifying
FOR FURTHER INFORMATION CONTACT:
Issues to be addressed will include information, we cannot guarantee that
Therese Johnson, 1000 Highway 36, but are not limited to the following: The we will be able to do so.
Rocky Mountain National Park, Estes protection and interpretation options for
Dated: April 2, 2008.
Park, Colorado 80517, 303–772–5474, the cliff dwellings and TJ Ruin and
long-term direction for protection and Michael D. Snyder,
therese_johnson@nps.gov. Regional Director, Intermountain Region,
management. The needs of all users
SUPPLEMENTARY INFORMATION: Copies of (cultural heritage visitors, wilderness National Park Service.
the Record of Decision may be obtained hikers, nature watchers, and Native [FR Doc. E8–8134 Filed 4–15–08; 8:45 am]
from the contact listed above or online Americans) and the appropriateness and BILLING CODE 4312–FA–P
at http://parkplanning.nps.gov/romo. adequacy of current facilities.
Dated: April 3, 2008. Identifying and analyzing various
options for long-term management of DEPARTMENT OF THE INTERIOR
Michael D. Snyder,
Regional Director, Intermountain Region,
the monument, adjacent land, and National Park Service
National Park Service. facilities.
[FR Doc. E8–8116 Filed 4–15–08; 8:45 am] DATES: Any comments on the scope of Notice of Availability of Draft General
BILLING CODE 4310–08–M issues to be addressed in the plan Management Plan/Environmental
should be submitted no later than 30 Impact Statement/Wilderness Study for
days after publication of this notice. Sleeping Bear Dunes National
DEPARTMENT OF THE INTERIOR Public meetings regarding the general Lakeshore.
management plan will be held during
National Park Service AGENCY: National Park Service,
the scoping period. Specific dates,
Department of the Interior.
times, and locations will be made
General Management Plan and ACTION: Notice of Availability of Draft
available in the local media, on the
Environmental Impact Statement, Gila National Park Service Planning, General Management Plan/
Cliff Dwellings National Monument, NM Environment and Public Comment Environmental Impact Statement/
(PEPC) Web site (http:// Wilderness Study for Sleeping Bear
AGENCY: National Park Service, Dunes National Lakeshore.
Department of the Interior. parkplanning.nps.gov/gicl), or by
contacting the Superintendent of Gila SUMMARY: Pursuant to Section 102(2)(C)
ACTION: Notice of intent to prepare an
Cliff Dwellings National Monument. of the National Environmental Policy
environmental impact statement for the
ADDRESSES: Information on the planning Act of 1969, 42 U.S.C. 4332(2)(c), the
general management plan for Gila Cliff
Dwellings National Monument. process and copies of newsletters will National Park Service (NPS) announces
be available from the office of the the availability of a draft General
SUMMARY: Pursuant to the National Superintendent, HC 68 Box 100, Silver Management Plan/Environmental
Environmental Policy Act of 1969, 42 City, NM 88061–0100. Impact Statement/Wilderness Study
U.S.C. 4332(C), the National Park FOR FURTHER INFORMATION CONTACT: (GMP/EIS/WS) for Sleeping Bear Dunes
Service is preparing an environmental Superintendent Steve Riley, Gila Cliff National Lakeshore, Michigan.
impact statement for a general Dwellings National Monument, HC 68 DATES: The draft GMP/EIS/WS will
management plan for Gila Cliff Box 100, Silver City, NM 88061–0100; remain available for public review for
Dwellings National Monument, New phone: (505) 536–9461. 45 days following the publishing of the
Mexico. The environmental impact SUPPLEMENTARY INFORMATION: Public and notice of availability in the Federal
statement will be approved by the agency involvement will be solicited at Register by the U.S. Environmental
Director, Intermountain Region. several key steps in the planning Protection Agency. Public meetings will
The general management plan will process including initial scoping, be held during the 45-day review period
prescribe the resource conditions and alternatives development, and the draft on the GMP/EIS/WS in Benzie, Lelanau,
visitor experiences that are to be plan. and Grand Traverse Counties, Michigan,
achieved and maintained in the If you wish to comment on any issues in early summer 2008. In concert with
monument over the next 15 to 20 years. associated with the plan, you may one of the public meetings, a hearing on
The clarification of what must be submit your comments to the planning the wilderness study will be conducted
achieved according to law and policy team by any one of several methods. consistent with Section 3(d)(1) of the
will be based on review of the You may mail comments to Gila Cliff Wilderness Act. Specific dates and
monument’s purpose, significance, Dwellings National Monument, HC 68 locations will be announced in local
special mandates, and the body of laws Box 100, Silver City, NM 88061–0100. and regional media sources of record
and policies directing park You may also comment electronically at and on the national lakeshore’s Web
management. Based on determinations http://parkplanning.nps.gov/gicl. site.
of desired conditions, the general Finally, you may hand-deliver You may submit your comments by
management plan will outline the kinds comments to the monument any one of several methods. You may
of resource management activities, headquarters located forty-four miles comment via the Internet through the
jlentini on PROD1PC65 with NOTICES

visitor activities, and development that north of Silver City, New Mexico, on national lakeshore’s Web site at http://
would be appropriate in the future. A NM Road 15. Before including your www.nps.gov/slbe; simply click on the
range of reasonable management address, phone number, e-mail address, GMP page. You may also comment via
alternatives will be developed through or other personal identifying the Internet through the NPS Planning,
this planning process and will include, information in your comment, be Environment, and Public Comment Web

VerDate Aug<31>2005 19:08 Apr 15, 2008 Jkt 214001 PO 00000 Frm 00104 Fmt 4703 Sfmt 4703 E:\FR\FM\16APN1.SGM 16APN1
20712 Federal Register / Vol. 73, No. 74 / Wednesday, April 16, 2008 / Notices

site (http://parkplanning.nps.gov); Before including your address, priorities, projects, and management of
simply click on the link to Sleeping telephone number, electronic mail the national heritage area over the
Bear Dunes National Lakeshore. You address, or other personal identifying following ten years. Management
may mail comments to Superintendent information in your comments, you approach, funding sources, and
Shultz, Sleeping Bear Dunes National should be aware that your entire education, preservation, conservation
Lakeshore, 9922 Front Street, Empire, comment (including your personal and interpretation opportunities and
Michigan 49630–9797. You may contact identifying information) may be made priorities were all considered during the
the Superintendent by facsimile at 231– publicly available at any time. While analysis, as were marketing and tourism
326–5382. Finally, you may hand- you can ask us in your comments to opportunities and priorities and the
deliver comments to the Sleeping Bear withhold your personal identifying development of physical components
Dunes National Lakeshore headquarters information from public review, we including visitor centers, destination
at the address above. cannot guarantee that we will be able to centers, a museum, and access
ADDRESSES: Copies of the draft GMP/ do so. We will make all submissions corridors. The full range of foreseeable
EIS/WS are available from the from organizations or businesses, from environmental consequences was
Superintendent, Sleeping Bear Dunes individuals identifying themselves as assessed and disclosed in relation to
National Lakeshore, 9922 Front Street, representatives or officials of impacts on historic, cultural, natural
Empire, Michigan 49630–9797. organizations or businesses, available and recreational resources, the
SUPPLEMENTARY INFORMATION: This for public inspection in their entirety. environment, and the quality of the
GMP/EIS/WS will guide the visitor experience.
Dated: March 12, 2008.
management of the Sleeping Bear Dunes The NPS will implement Alternative
Ernest Quintana, C, the preferred alternative (the selected
National Lakeshore for the next 25 Regional Director, Midwest Region.
years. The draft GMP/EIS/WS considers action), as described in the National
[FR Doc. E8–7983 Filed 4–15–08; 8:45 am] Coal Heritage Area Management Action
five draft conceptual alternatives—a no-
BILLING CODE 4310–HH–M Plan/Environmental Impact Statement
action and four action alternatives,
for the National Coal Heritage Area
including the NPS preferred alternative.
because it best reflects and fulfills the
The draft GMP/EIS/WS assesses impacts DEPARTMENT OF THE INTERIOR goals of the National Coal Heritage
to a variety of natural resources, a
Area’s mission, as well as the purpose
variety of cultural resources, visitor National Park Service and intent of the National Coal Heritage
opportunities and use, wilderness
Final Management Action Plan/ Area’s enabling legislation. The selected
character, socioeconomics, and NPS
Environmental Impact Statement; alternative is based on a combined focal
operations.
Record of Decision; National Coal point/corridor development approach
The NPS preferred alternative
Heritage Area, West Virginia and is a hybrid of Alternatives A and B,
manages the national lakeshore
which were also evaluated in the
primarily for preservation of its natural AGENCY: National Park Service, National Coal Heritage Area
resources and for the opportunities it Department of the Interior. Management Action Plan/
provides for visitor enjoyment of the
ACTION: Notice of Availability of the Environmental Impact Statement. The
natural, cultural and recreational
Record of Decision for the Final selected alterantive includes the nine
resources in scenic outdoor settings. In
Management Action Plan/ Destination Centers and Experience
addition, the Wilderness Act, the
Environmental Impact Statement, Zones proposed in Alternative A and
enabling legislation for the national the development of a large-scale, state-
lakeshore, and the NPS management National Coal Heritage Area.
of-the-art interpretive and educational
policies require that all lands SUMMARY: Pursuant to Section 102(2)(C) museum/visitor center complex near
administered by the NPS at the national of the National Environmental Policy Beckley proposed in Alternative B. The
lakeshore be evaluated for their Act of 1969, Pub. L. 91–190, 83 Stat. selected alternative is estimated to cost
suitability for inclusion within the 852, 853, codified as amended at 42 approximately $78 million over a 10-
national wilderness preservation U.S.C. 4332(2)(C), the National Park year period.
system. The purpose of the wilderness Service announces the availability of the The NPS has selected Alternative C
study, incorporated into the GMP/EIS is Record of Decision for the Final for implementation because it best
to determine if and where lands and Management Action Plan and meets the legislative intent of the
waters within the national lakeshore Environmental Impact Statement (Final National Coal Heritage Area Act to
should be proposed for wilderness MAP/EIS) for the National Coal Heritage ‘‘develop and implement integrated
designation. The study identifies Area in West Virginia. The Regional cultural, historical, and land resource
possible wilderness configurations Director, Northeast Region, approved management policies and programs to
within the park and evaluates their the Record of Decision for the project, retain, enhance, and interpret
effects. The NPS preferred alternative selecting Alternative C-Focal Point with significant values of the lands, water,
proposes 32,200 acres for wilderness Corridor Development, which was and structures of the Area.’’ The
designation. Based on the findings of described on pages II–1 to II–11 of the Selected Alternative captures a broad
this study, a formal wilderness proposal Final MAP/EIS and announced to the range of visitors and encourages local
will be submitted to the Director of the public in a Notice of Availability capacity building simultaneously. It
NPS for approval and subsequent published in the Federal Register on gives visitors several options for
consideration by the U.S. Department of September 23, 2002. exploring the 11-county heritage area
the Interior, the President of the United The selected alternative, and three with a large interpretive center, several
States, and Congress under the additional alternatives including Visitor Centers and nine Destination
jlentini on PROD1PC65 with NOTICES

provisions of the Wilderness Act. Alternative D, the No-Action Centers. The Selected Alternative
FOR FURTHER INFORMATION CONTACT: Alternative, were analyzed in the Draft provides for strong central leadership
Superintendent Shultz, Sleeping Bear and Final Environmental Impact that would take an active role in the
Dunes National Lakeshore, at the Statements. Each alternative was development of a broad-based
address or telephone number above. evaluated as to how it would guide the preservation and conservation effort that

VerDate Aug<31>2005 17:19 Apr 15, 2008 Jkt 214001 PO 00000 Frm 00105 Fmt 4703 Sfmt 4703 E:\FR\FM\16APN1.SGM 16APN1

You might also like