You are on page 1of 2

766 Federal Register / Vol. 72, No.

4 / Monday, January 8, 2007 / Notices

delivery downstream into the interstate DEPARTMENT OF ENERGY offices or may be viewed on the
pipeline grid. Commission’s Web site at http://
Federal Energy Regulatory www.ferc.gov/ using the ‘‘e-Library’’
Discovery further states that copies of
Commission link. Enter the docket number,
the filing have been mailed to each of
[Docket No. CP07–52–000; Downeast excluding the last three digits, in the
its customers, interested state
Pipeline, LLC, Docket Nos. CP07–53–000, docket number field to access the
commissions and other interested
CP07–54–000, CP07–55–000] document. For assistance, please contact
persons. FERC Online Support at
Any person desiring to intervene or to Downeast LNG, Inc.; Notice of ferconlinesupport@ferc.gov or
protest this filing must file in Applications for Certificates of Public Telephone: 202–502–6652; Toll-free: 1–
accordance with Rules 211 and 214 of Convenience and Necessity and 866–208–3676; or for TTY, contact (202)
the Commission’s Rules of Practice and Section 3 Authorization 502–8659.
Procedure (18 CFR 385.211 and On January 25, 2006, the Commission
December 29, 2006. Staff granted Downeast LNG’s request to
385.214). Protests will be considered by Take notice that on December 22,
the Commission in determining the utilize the Pre-Filing process and
2006, Downeast LNG, Inc. (Downeast assigned Docket No. PF06–13–000 to
appropriate action to be taken, but will LNG), 748 U.S. Route 1, Robbinston,
not serve to make protestants parties to Staff activities involving the Downeast
Maine 04671, filed an application in LNG import terminal project and
the proceeding. Any person wishing to Docket No. CP07–52–000 pursuant to Downeast Pipeline’s proposed pipeline.
become a party must file a notice of section 3(a) of the Natural Gas Act Now, as of the filing of this application
intervention or motion to intervene, as (NGA), and Parts 153 and 380 of the on December 22, 2006, the Pre-Filing
appropriate. Such notices, motions, or regulations of the Federal Energy Process for this project has ended. From
protests must be filed on or before Regulatory Commission (Commission), this time forward, these proceedings
January 12, 2007. Anyone filing an 18 CFR Parts 153 and 380, for will be conducted in Dockets No. CP07–
intervention or protest must serve a authorization to site, construct and 52–000, CP07–52–000, CP07–54–000,
copy of that document on the Applicant. operate a liquefied natural gas (LNG) and CP07–55–000 as noted in the
Anyone filing an intervention or protest receiving terminal and associated caption of this Notice.
on or before the intervention or protest facilities to be located in Washington Downeast LNG is seeking
date need not serve motions to intervene County, Maine as a place of entry for the authorization pursuant to Section 3(a) of
or protests on persons other than the importation of LNG. the NGA to site, construct and operate:
Applicant. Also take notice that on December 22, (1) An LNG receiving facility (including
2006, Downeast Pipeline, LLC docking facilities and associated piping
The Commission encourages (Downeast Pipeline), 748 U.S. Route 1, appurtenances); and (2) an LNG storage
electronic submission of protests and Robbinston, Maine 04671, filed and vaporization facility (including two
interventions in lieu of paper using the pursuant to Section 7(c) of the NGA and LNG storage tanks, each with a storage
‘‘eFiling’’ link at http://www.ferc.gov. the Commission’s regulations; (1) an capacity of 160,000 cubic meters,
Persons unable to file electronically application in Docket No. CP07–53–000 vaporization units with an average
should submit an original and 14 copies for a certificate of public convenience capacity of 500,000 Mcf/d and peak
of the protest or intervention to the and necessity; (i) authorizing Downeast capacity 625,000 Mcf/d, and associated
Federal Energy Regulatory Commission, Pipeline to construct, own and operate piping and control equipment).
888 First Street, NE., Washington, DC the Downeast Pipeline under Part 157, Downeast Pipeline proposes to
20426. Subpart A of the Commission’s construct about 31 miles of single 30-
This filing is accessible online at regulations, (ii) approving the pro forma inch diameter pipeline. The proposed
http://www.ferc.gov, using the Tariff submitted as Exhibit P of the Pipeline will originate at the Import
‘‘eLibrary’’ link and is available for application, and (iii) approving the Terminal site boundary and terminate in
proposed initial rates for pipeline the vicinity of the Maritimes and
review in the Commission’s Public
transportation services; (2) an Northeast Pipeline at the existing
Reference Room in Washington, DC.
application in Docket No. CP07–54–000, Baileyville Compressor Station in
There is an ‘‘eSubscription’’ link on the Baileyville, Maine. The proposed
for a blanket certificate authorizing
Web site that enables subscribers to Downeast Pipeline to engage in certain Pipeline facilities will include pig
receive e-mail notification when a self-implementing routine activities launcher and receiver traps, mainline
document is added to a subscribed under Part 157, Subpart F, of the valves and interconnection and
docket(s). For assistance with any FERC Commission’s regulations; and (3) an metering facilities, and will be designed
Online service, please e-mail application in Docket No. CP07–55–000, for maximum allowable operating
FERCOnlineSupport@ferc.gov, or call for a blanket certificate authorizing pressure of 1,580 psig and capacity of
(866) 208–3676 (toll free). For TTY, call Downeast Pipeline to transport natural up to 625,000 Mcf/d, as more fully
(202) 502–8659. gas, on an open access and self- described in the filing.
implementing basis, under Part 284, Pursuant to Section 157.9 of the
Magalie R. Salas,
Subpart G of the Commission’s Commission’s rules, 18 CFR 157.9 and
Secretary. regulations. to ensure compliance with the Energy
[FR Doc. E6–22687 Filed 1–5–07; 8:45 am] Any questions regarding these Policy Act of 2005, the Commission
BILLING CODE 6717–01–P applications should be directed to Dean Staff will issue a Notice of Schedule for
Girdis, Downeast LNG, Inc., 748 U.S. Environmental Review within 90 days
Route 1, Robbinston, ME 04671 or Lisa of the date of this Notice. The Notice of
jlentini on PROD1PC65 with NOTICES

M. Tonery, King & Spalding LLP, 1185 Schedule for Environmental Review
Avenue of the Americas, New York, NY will indicate, among other milestones,
10036. the anticipated date for the Commission
These filings are available for review Staff’s issuance of the final
at the Commission’s Washington, DC environmental impact statement (FEIS)

VerDate Aug<31>2005 17:57 Jan 05, 2007 Jkt 211001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\08JAN1.SGM 08JAN1
Federal Register / Vol. 72, No. 4 / Monday, January 8, 2007 / Notices 767

for the Downeast LNG’s and Downeast area, and on landowners and protests on persons other than the
Pipeline’s proposals. The Notice of communities. For example, the Applicant.
Schedule for Environmental Review Commission considers the extent to The Commission encourages
will also alert other agencies of the which the applicant may need to electronic submission of protests and
requirement to complete necessary exercise eminent domain to obtain interventions in lieu of paper using the
reviews and authorizations within 90 rights-of-way for the proposed pipeline ‘‘eFiling’’ link at http://www.ferc.gov.
days of the date of issuance of the and balances that against the non- Persons unable to file electronically
Commission Staff’s FEIS. environmental benefits to be provided should submit an original and 14 copies
There are two ways to become by the project. of the protest or intervention to the
involved in the Commission’s review of If the Commission decides to set the Federal Energy Regulatory Commission,
this Project. First, any person wishing to application for a formal hearing before 888 First Street, NE., Washington, DC
obtain legal status by becoming a party an Administrative Law Judge, the 20426.
to the proceeding for this project should Commission will issue another notice This filing is accessible online at
file with the Federal Energy Regulatory describing that process. At the end of http://www.ferc.gov, using the
Commission, 888 First Street, NE., the Commission’s review process, a ‘‘eLibrary’’ link and is available for
Washington, DC 20426, a motion to final Commission order approving or review in the Commission’s Public
intervene in accordance with the denying a certificate will be issued. Reference Room in Washington, DC.
requirements of the Commission’s Rules Comment Date: January 22, 2007. There is an ‘‘eSubscription’’ link on the
of Practice and Procedure (18 CFR Web site that enables subscribers to
§§ 385.214 or 385.211) and the Magalie R. Salas,
receive e-mail notification when a
Regulations under the NGA (18 CFR Secretary. document is added to a subscribed
157.10) by the comment date, below. A [FR Doc. E6–22691 Filed 1–5–07; 8:45 am] docket(s). For assistance with any FERC
person obtaining party status will be BILLING CODE 6717–01–P Online service, please e-mail
placed on the service list maintained by FERCOnlineSupport@ferc.gov, or call
the Secretary of the Commission and (866) 208–3676 (toll free). For TTY, call
will receive copies of all documents DEPARTMENT OF ENERGY (202) 502–8659.
filed by the applicant and by all other
parties. A party must submit 14 copies Federal Energy Regulatory Magalie R. Salas,
of filings made with the Commission Commission Secretary.
and must mail a copy to the applicant [Docket No. RP97–81–029] [FR Doc. E6–22670 Filed 1–5–07; 8:45 am]
and to every other party in the BILLING CODE 6717–01–P
proceeding. Only parties to the Kinder Morgan Interstate Gas
proceeding can ask for court review of Transmission LLC; Notice of
Commission orders in the proceeding. Negotiated Rates DEPARTMENT OF ENERGY
However, a person does not have to
intervene to have comments considered. December 28, 2006. Federal Energy Regulatory
The second way to participate is by Take notice that on December 22, Commission
filing with the Secretary of the 2006, Kinder Morgan Interstate Gas
[Docket No. CP07–48–000]
Commission, as soon as possible, an Transmission LLC (KMIGT) tendered for
original and two copies of comments in filing as part of its FERC Gas Tariff, Kinder Morgan Interstate Gas
support of or in opposition to this Fourth Revised Volume No. 1–A, Transmission LLC; Notice of
project and/or associated pipeline. The Seventh Revised Sheet No. 4L, to be Application
Commission will consider these effective January 1, 2007.
comments in determining the KMIGT states that a copy of this filing December 28, 2006.
appropriate action to be taken, but the has been served upon all parties to this Take notice that on December 20,
filing of a comment alone will not serve proceeding, KMIGT’s customers and 2006, Kinder Morgan Interstate Gas
to make the filer a party to the affected state commissions. Transmission LLC (KMIGT), 370 Van
proceeding. The Commission’s rules Any person desiring to intervene or to Gordon Street, Lakewood, Colorado
require that persons filing comments in protest this filing must file in 80228–8304, filed in Docket No. CP07–
opposition to the project provide copies accordance with Rules 211 and 214 of 48–000 an application pursuant to
of their protests only to the party or the Commission’s Rules of Practice and section 7(b) of the Natural Gas Act
parties directly involved in the protest. Procedure (18 CFR 385.211 and (NGA) for permission and approval to
Protests and interventions may be 385.214). Protests will be considered by abandon the Clay Center Compressor
filed electronically via the Internet in the Commission in determining the Station located in Clay County,
lieu of paper; see 18 CFR appropriate action to be taken, but will Nebraska, by sale, to the Clay County
285.2001(a)(1)(iii) and the instructions not serve to make protestants parties to Historical Society of Clay County,
on the Commission’s Web site under the the proceeding. Any person wishing to Nebraska, all as more fully set forth in
‘‘e-filing’’ link. The Commission become a party must file a notice of the application.
strongly encourages electronic filings. intervention or motion to intervene, as Copies of this filing are on file with
The Commission may issue a appropriate. Such notices, motions, or the Commission and are available for
preliminary determination on non- protests must be filed in accordance public inspection. This filing may also
environmental issues prior to the with the provisions of Section 154.210 be viewed on the Web at http://
completion of its review of the of the Commission’s regulations (18 CFR www.ferc.gov using the ‘‘eLibrary’’ link.
environmental aspects of the project and 154.210). Anyone filing an intervention Enter the docket number excluding the
jlentini on PROD1PC65 with NOTICES

associated pipeline. This preliminary or protest must serve a copy of that last three digits in the docket number
determination typically considers such document on the Applicant. Anyone field to access the document. For
issues as the need for the project and its filing an intervention or protest on or assistance, please contact FERC Online
economic effect on existing customers of before the intervention or protest date Support at
the applicant, on other pipelines in the need not serve motions to intervene or FERCOnlineSupport@ferc.gov or toll-

VerDate Aug<31>2005 17:57 Jan 05, 2007 Jkt 211001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\08JAN1.SGM 08JAN1

You might also like