21
------------------------------------------------------------------------------You are hereby requested to make the herein described changes from the plans and specifications or do the
following described work not included in the plans and specifications on this contract.
NOTE: THIS CHANGE IS NOT EFFECTIVE UNTIL FULLY EXECUTED.
Ch
of Carmel-
he-Sea
Description :
CHANGES TO CONTRACT PLANS AND SPECIFICAT IONS.
Addition: Provide all labor and materials related to th e following : Reference PCO #58
(Otto's tracking number). Summary of Work; At asphalt & wood siding abutement add metal
flashing at wood siding and add layer of additional siding. Caulk as needed.
Agreed Lump Sum ........... ................. ....... .. ...................... ....... .................... .
1,257.00
1,257.00
CONTRACT PRICE
CONTRACT TIME
0
5
12/28/15
$
$
1 ,462,236.00
87,927.00
89,184.00
6.1%
We, the undersigned contractor, have gi ven careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we wilt provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all seNices
necessaf}' for the work
specified, and will accept as full payment therefore the price shown above.
Contractor:
Title:
Submitted By:
7l!fif, [, tl1/t J
Andy Vanderford
Date
Project Manager
App roved :
Au thorized:
IRI
IKI
Date
City Administrator
Date
Authorized:
IRI
Attachments:
City Council
1-!s:-~
r ;,,.
Lt (.,
Note to Contracts and Budgets Office: Council awarded a 10% construction contingency in the amount of $146,224.00 and the cost of ceo
#4 i.e. the "Terraced Step" design at a Not to Exceed amount of $45,000.00 (actual cost@ $21,346.00). Thus $167,570.00 Is the adjusted
total amount of all change orders which the City Administrator has authority, or 11.46% of the Original Contract Price.
Project
Forest Theater Renovation
Description of Change
N/A
N/A
95
DATE:
12/03/15
Below pricing Is for PCO 1158- New Asphalt at Wood Siding per RF1195. Costs are for material and labor. Per
RFII95 whenl ttle new asphalt paving terminates Into the exisllng siding. Contractor to Install a sheet metal
flashing over existing siding and then add new siding&" above asphalt surfa~e. Excludes: Permits, designs
and engineering.
COST
M/U%
58
PCOII:
Related RFP t:
Related BUL II:
Related RFI t
M/U TOTAL
GC DIRECT COSTS
$780
$345
$0
$0
GC DIRECT LABOR
GC DIRECT MATERIALS
GC DIRECT EQUIPMENT
GC OTHER/INDIRECTS
$1,125
$780
$345
$0
$0
10.0%
10.0%
$78
10.0%
$0
10.0%
$0
$35
$113
GC SUBCONTRACT($) OR 'OTHERS'
$0
$0
$0
GC FEE ON SUBCONTRACT($)
$0
5.0%
$0
$1,238
$19
$1,257
Otto Construction
OTTO
I II
It_ 11
RFII95. Costs are for material and labor. Per RFI #95 where the
new asphalt paving terminates into the existing siding.
Contractor to install a sheet metal flashing over existing siding
and then add new siding 6" above asphalt surface. Excludes:
Permits, designs and engineering.
Hrs
10 Description
10.0
Rate
78
Equip
Matl
Labor
780
Sub/Mise
345
TOTAL
1,125
5
6
0
0
7
8
9
10
11
12
13
14
0
0
15
16
17
19
0
0
0
20
21
0
0
0
0
0
0
18
22
23
24
25
26
27
28
29
30
31
32
33
0
0
Totals
10.0
780
345
1,125