You are on page 1of 589

KURDISTAN REGIONAL GOVERNMENT IRAQ

Ministry of Municipality & Tourism

General Directorate of Water & Sewerage

Dohuk Water Directorate

Mangesh, Batofa and Zawita Water Supply Project

TENDER DOCUMENTS - VOLUME III

BILL OF QUANTITIES

November 2015
TABLE OF CONTENTS

PART I: PREAMBLE
Introduction

Preamble to Bill A: General Requirements

Preamble to Bill B: Pipelines Installation

Preamble to Bill C: Reservoirs

Preamble to Bill D: Booster Stations

Preamble to Bill E: Water Treatment Plant

Preamble to Bill F: Dayworks

PART II: BILLS


Bill A – General Requirements

Bill B – Pipelines Installation

Batofa Pumping Lines

Mangesh Pumping Lines

Batofa Transmission Lines

Mangesh Transmission Lines

Summary Bill B – Pipelines Installation

Bill C – Reservoirs

Batufa Reservoir 5,000 m3

Mangesh Reservoir 3,000 m3

Mangesh Reservoir 500 m3

Existing Reservoirs

Summary Bill C – Reservoirs


TABLE OF CONTENTS

Bill D – Booster Stations

Booster Station 1

Bill 0: Siteworks

Bill 1: Guard House

Bill 2: Staff House

Bill 3: Store

Bill 4: Generator & Transformer

Bill 5: Reservoir 3,000 m3

Bill 6: Pumps Room

Bill 7: Chlorination Room

Summary - Booster Station 1

Booster Station 2

Bill 0: Siteworks

Bill 1: Guard House

Bill 2: Staff House

Bill 3: Store

Bill 4: Generator & Transformer

Bill 5: Reservoir 3,000 m3

Bill 6: Pumps Room

Bill 7: Chlorination Room

Summary - Booster Station 2

Booster Station 3

Bill 0: Siteworks

Bill 1: Guard House

Bill 2: Staff House


TABLE OF CONTENTS

Bill 3: Store

Bill 4: Generator & Transformer

Bill 5: Reservoir 3,000 m3

Bill 6: Pumps Room

Bill 7: Chlorination Room

Summary - Booster Station 3

Booster Station 4

Booster Station 5

Booster Station 6

Booster Station 7

Summary Bill D - Booster Stations

Bill E – Water Treatment Plant

Siteworks

Low Lift Pumpimg Station

Flow Meter

Cascade Aerator

Flash Mixer

Clarifloculator

Gravity Filter

High Lift Pumping Station

Post & Pre Chlorination Rooms

Chemicals Room

Blowers Room

Clear Water Tank

Generator & Transformer Room


TABLE OF CONTENTS

Laboratory

Central Control Room

Store & Workshop

Guard House

Staff House

Office House

Summary Bill E - Water Treatment Plant

Bill F – Dayworks

Collection Sheet

Ref: Ku1306D / 1325

Revision: 06 (10/06/ 2016) Date: Oct 30, 2013

QC Draft Final

Signature:
PART I: PREAMBLE
Introduction
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

1. INTRODUCTION

1. INTRODUCTION

1.1- GENERAL

The bill of quantities does not purport to be either exhaustive or explanatory of all the
obligations and duties of the Contractor who shall be deemed to have satisfied himself as to the
correctness and sufficiency of the rates and prices entered by him in the bill of quantities all of
which shall cover all his obligations under the Contract (including those in respect of the supply
of goods, materials, plant or services or contingencies) and all matters and things necessary for
the proper execution and completion of the works and the remedying of any defects therein and
which may reasonably be inferred to be necessary for the works as described in the Contract
Documents whether expressly mentioned therein or not.
Works in the present bill of quantities will be remeasured on completion and valued at the
rates inserted by the Contractor hereinafter in accordance with the Contract Documents.
The Contractor shall be deemed to have visited the Site, to have taken into account all
local and existing conditions. The Contractor’s attention is drawn to the location of some works
without permanent access.
The Contractor should take all necessary measurements with local owners to insure his
access to some project parts where no access is expropriated. The expenses of such works are
considered included in the mobilization items.
The Contractor shall be responsible for preparing and constructing any necessary
associated design and design changes, which shall be submitted to the approval of the Engineer
and shall be at no extra cost to the Employer.
The unit prices are to be fully inclusive value of the works described in the specifications,
in the drawings, in the bill of quantities or ordered by the Engineer for proper execution of the
works and Contract.
The rates entered against the items defined in this bill of quantities shall cover the
construction of all the works that shall include but not be limited to the supply of material, labor,
tools, equipment and transport to the various parts of the project (easy to access or not) and all
costs and profits required for the proper completion of all the works (structures, pipelines, etc …)
under this Contract without any exception and without any reservation. All the works shall be
executed as described in the Conditions of Contract, Specifications, Bill of Quantities, Drawings,
and technical rules and as directed by the Engineer. All material used in construction shall be of
best quality and in compliance with the specifications and shall be approved by the Engineer prior
to the beginning of the works. The rates shall also include but not be limited to the following:
- Installation and maintenance of site equipment and temporary facilities, dismantling and
removal of site equipment and temporary facilities after completion of the works,
- Construction and maintenance of all access roads including safety measures and traffic
regulation,
- Supplying material, labor, tools, equipment, machinery and all the required items for the
completion of the works and for the subsequent operation, maintenance and repair. All goods,
materials, equipment and accessories shall be submitted to the Engineer for approval,
- Testing of material, testing during construction, testing of water quality, pressure tests for
pipes and accessories and all the required tests in conformity with the specifications and as
directed by the Engineer,
- Supply, transport, installation, testing, site watching and fencing, etc … and all related
requirements and expenses,

Dar Al Handasah Nazih Taleb & Partners Page 1/6


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

1. INTRODUCTION

- Preparation of drawings, reports and all the required office work in order to complete the
works with the related expenses,
- All trial pits necessary to locate existing services and to determine ground condition and to
localize the potential archeological sites.
- Protection of public and private properties, preservation of the existing utilities and
indemnification against all damages caused by the construction activities,
- All the necessary safety measures, barriers, signs, lightings, etc … to ensure the safety of the
workers, people and traffic and to settle the boundaries of the work zone day and night,
- Guiding and protecting traffic and pedestrians through areas of construction including the
construction of roads and pathways, the erection of signs, barriers and lighting,
- Insurance of works, equipment, personnel and insurance against accidents,
- All costs pertaining to the Contractor work area (stores, workshops, repair zones, etc …),
- All taxes and customs fees,
- Supply of water and power including piping and wiring to all parts of the project and all
related costs,
- Supply of fuel, oil, spare parts, etc … for all the vehicles, machines and other equipment,
- Providing qualified personnel, technicians, workmen, etc… needed for the proper execution of
all works and their related charges (salaries, pensions, etc …),
- Supply of Survey and inspection facilities for the Engineer and executing all survey works to
position pipelines, structures, monitor the progress and verify the locations (X, Y, Z) of all
constructions and prepare topographic layouts to be submitted to the Engineer on paper and on
floppy disks.

1.2- ITEM DESCRIPTION

A detailed description of the items and of the conditions under which and the manner in
which the work is to be done and measured is set out in the preamble to the bill of quantities.
Each item in the bills A, B, C, D and E is described in a paragraph of identical number and name
in this preamble. Reference shall also be made to all other documents forming the Contract
(Technical Specifications, Drawings, etc …). Items entitled “NOT USED” in the bills shall not be
included in this Contract.

1.3- RATES AND PRICES

The Contractor shall be deemed to have inserted against each item in the bill of quantities
such rates and prices as he may deem necessary to cover the requirements of the Contract. Where
neither price nor rate is entered against an item it shall be deemed to be "nil" and measured
accordingly. The term "included" or any such similar term shall be deemed to be nil. Rates and
prices shall be inserted in the rate column of the bill of quantities.
The unit prices inserted in the bill of quantities are to be the full inclusive value of the
work described in the specifications and in this preamble and shall cover the cost of all labor
subsistence and traveling, materials, temporary work, constructural plant, watching and any other
cost whatsoever, together with all risks, liabilities and obligations set forth or implied in the
Contract Documents.
It should be noted that no payment will be provided by the Client for Materials and Plant
brought to the site by the Contractor for incorporation in the Permanent Works.

Dar Al Handasah Nazih Taleb & Partners Page 2/6


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

1. INTRODUCTION

1.4- MEASUREMENT

The price shall include all necessary for completion of the works and shall include the
prices for all necessary building work such as forming box outs, supports plinths, cable trenches,
and the like and all necessary safety and access works including guards, handrails, fire fighting
equipment and the like.
All measurements in the bill of quantities are strictly net. The principle of net
measurements shall apply to all works executed. All quantities measured for payment shall be
measured by the Engineer on the basis of actual net quantities of work fixed in position.
Net measurements shall be done according to the net dimensions. The net dimensions are
the dimensions shown on the contract drawings. In case of lack of details on some drawings and
in case of design changes approved by the Engineer, the Contractor shall prepare and submit to
the approval of the Engineer any necessary associated drawings, and accordingly, the net
dimensions shown on the above drawings and approved by the Engineer shall be the base for the
measurements.
Lump sum items shall not be subject to remeasurement and shall include the prices of all
necessary equipment, construction, installation, testing and commissioning among others. The
lump sum entered in the bill of quantities shall include the price for a complete installation as
described in the bill of quantities, specifications and other documents forming this Contract.
The quantities given in the bill of quantities shall not be considered as limiting or
extending the amount of the work to be done by the Contractor and of the materials to be supplied
by him. The Contractor shall be responsible for checking quantities and for making any necessary
surveys and investigations prior to placing any order for materials.

1.5- ITEMS TO BE FULLY INCLUSIVE

Unless otherwise stated, the rates and prices for all items shall be fully inclusive of all
that is necessary to fulfill the liabilities and obligations arising out of the Contract and shall
include but will not be limited to:
- Survey and Design where expressly required by the Contract,
- Labor and all associated costs,
- Materials, goods, equipment, all consumable, accessories and all associated costs,
- Provision of plant,
- Temporary works (including all safety measures to be taken by the Contractor for a 24/24h
whole protection on the site),
- Establishment charges, overheads and Contractor’s profit,
- All bonds and insurances,
- Employer's facilities,
- Tests and all associated costs (if not included in separate items),
- Payments of duty and taxes on imported materials and equipment,
- Protection of public and private properties,
- Any damage occurred on the site must be repaired at the Contractor’s expense,
- All access roads (temporary or not: allowing free passing over or across for vehicles and
personnel in the neighborhood),

Dar Al Handasah Nazih Taleb & Partners Page 3/6


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

1. INTRODUCTION

- Succeed running and moving of all equipment in perfect conditions,


- Provide operation and maintenance manuals,
- All work, services and materials which according to the true intent and meaning of the
Contract may be reasonably inferred as necessary for completion of the works as described in
the drawings, specifications, bill of quantities, or in the Contract, whether expressly mentioned
or not,
- All duties, obligations, liabilities and responsibilities which the Contract places upon the
Contractor in connection with or in relation to the Contract,
- All costs of detailed survey, design, royalties and supply to the Engineer of all necessary
drawings and documents. All necessary drawings, as-built drawings and documents will also
be computerized by the Contractor and supplied to the Engineer as well,

1.6- COVERAGE

Where the bill of quantities does not include separate items for Contractor’s equipment,
temporary works, facilities for the Engineer and the like, the Contractor shall be deemed to have
covered his obligations in these respects in the rates and prices for permanent works.

1.7- ABBREVIATIONS

The following abbreviations are used in the Bill of Quantities:


Sq. Square mm Millimeter
Cu. Cubic m Meter
unit Unit km Kilometer
hr Hour % Per Cent
kg Kilogram dia. Diameter
Prov. Sum Provisional Sum ha Hectare
DN Nominal Diameter L Linear
PN Flange Pressure Rating EO Extra Over
L.S. Lump Sum PI Provisional Item
kW Kilowatt BOQ Bill Of Quantities
m3 Cubic Meter month Month
m2 Square Meter HVAC Heating Ventilation & Air Conditioning
dm3 Cubic Decimeter set set
O&M Operating & Maintenance l.m. Linear meter
Day Day P.S. Provisional Sum

1.8- DEFINITION OF RANGE OF DIMENSIONS

A hyphen between two dimensions means a range of dimensions, which includes all
dimensions exceeding that preceding the hyphen but not exceeding that following the hyphen.

1.9- PRICE SCHEDULES

Where in the bill of quantities or specification there is a schedule or subsidiary bill setting
out the quantities of materials, plant and work which comprise a unit of work measured as a lump
sum under a single item in a part of the bill of quantities, the said quantities shall not be subject to
measurement but may be used by the Engineer in valuing any variation to the lump sum item and
for the purpose of scheduling payments.

Dar Al Handasah Nazih Taleb & Partners Page 4/6


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

1. INTRODUCTION

1.10- SOME DEFINITIONS

The following definitions shall apply to items in the bill of quantities:


Extra-Over
Any “Extra-Over” (EO) item shall be measured and paid in addition to the measurement
of the basic item to which it relates.
Included
Where the term included is used in the Preamble or in the bills any items stated to be
included within another item shall not be subject to measurement and their costs shall be deemed
to be included within the rates of the billed item.
Provisional Items
Provisional Items shall be used at the discretion of the Engineer and only if ordered or
required by the Engineer in writing.

1.11- DEALING WITH WATER

Items in the bill of quantities shall be deemed to include for dealing with water flows and
keeping the works free of water.

1.12- WATER AND POWER

Unless otherwise explicitly stated in the Contract, water and power for the purpose of
constructing, cleaning, testing, and commissioning the works shall be provided by the Contractor
at his own expense, and shall not be measured separately.

1.13- DISPOSAL SITES

All disposal sites shall be provided by the Contractor in accordance with the local
authorities and shall not be used by the Contractor prior to the approval of the Engineer.
Preparatory works shall be carried out by the Contractor if required by the local authorities or by
the Engineer.

1.14- TRANSPORT OF MATERIAL

All materials shall be transported at the Contractor’s expense from and to all works sites
(including Contractor work area, storage areas, etc …) whether these sites are accessible or not.
The Contractor shall bear all charges related to access roads construction unless a separate item
for access roads construction is included in the bill of quantities.

1.15- TESTS

The Contractor shall conduct all required tests (pressure test for the piping system,
pumping tests for wells, etc …) and shall supply all necessary labour, measuring equipment,
instruments and accessories to complete the tests as specified in the technical documents and as
directed by the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 5/6


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

1. INTRODUCTION

1.16- PROVISIONAL SUMS

- Provisional sums have been included in the Contract at the amounts as stated in the Bill of
Quantities.
- It is to be clearly understood that the provisional sums shall only be used, in whole or in part,
in accordance with the Employer’s Representatives’ instruction and only after the Employer’s
Representative has obtained the specific approval of the Employer before taking any action
between.
- The existence of provisional sums does in no way entitle the Contractor to any claim and/or
additional payment for fulfilling his obligations described in the Contract.

Dar Al Handasah Nazih Taleb & Partners Page 6/6


Preamble to Bill A: General Requirements
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

2. PREAMBLE TO BILL A: GENERAL REQUIREMENTS

2. PREAMBLE TO BILL A: GENERAL REQUIREMENTS

ITEM A.1: MOBILIZATION / DEMOBILIZATION

The rate shall include the full mobilization / demobilization of all resources and
equipment necessary for the execution and completion of the works. The rate shall also include
the design and construction of offices, stores, workshops, clinics and all other facilities required
for the completion of the works under this Contract. The price shall be paid as a lump sum and the
works shall include but not be limited to:
- Insurance of works, equipment and personnel,
- Protection of public and private properties,
- All necessary procedures for the supply and testing of material in conformity with the
specifications and as directed by the Engineer,
- Temporary works and site protection, watching, fencing and lighting,
- Supplying the required equipment in order to execute all the required works including but not
limited to:
Transport material and equipment to the different parts of the project,
Ensure storage areas and disposal sites,
Generate compressed air,
Supply water and power to complete the works,
Keep the site free of water for excavation, backfilling and concrete works,
Supply compressed water ( not less than 2 bars),
Accomplish excavation including removal of excavated material and
backfilling,
Mix, transport and cast concrete including reinforcement steel works,
Supply, install and test pipes and related fittings and accessories,
Install wrought steel
Perform geotechnical investigations,
Supply, install and test mechanical, electrical, hydraulics and
electromechanical equipment,
Wells drilling and boring with all related works.
- Providing water (including potable water), power, sanitary facilities and communication
means (telephones, cellular phones, …
- Management, operation and maintenance of site equipment,
- Construction and maintenance of access and service roads for reservoir sites, pumping station
sites, disposal sites, pipelines, Contractor working area, concrete batch plant, etc … Access
and service roads shall be constructed prior to the beginning of the works and shall be kept in
good condition for traffic for the whole duration of the project. Unless the bill of quantities
includes separate items for construction and maintenance of access and service roads, all costs
pertaining to this matter shall be deemed to be included by the Contractor in his unit rates for
this item and shall not be paid for separately.

Dar Al Handasah Nazih Taleb & Partners Page 1/2


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

2. PREAMBLE TO BILL A: GENERAL REQUIREMENTS

- 3 Nr 4x4 off road “Toyota double cabenet” (with a 4 cylinders engine, Latest made,
Automatic transmission and including AC) and 1 Nr. “Toyota Land Cruiser” (Latest made,
Automatic transmission and including AC) to be provided to the Supervision staff. Vehicles
will be handed over to the client immediately upon completion of the project.
- Indemnification and remedying of all damages caused by the execution of the works to the
private or public properties,
- Guiding and protecting traffic and pedestrians through areas of construction including the
erection of signs, barriers and lighting,
- Removal of utilities, plants, machinery and all other facilities after the completion of the
works including reinstatement to the Engineer’s satisfactory,
- Construction of all necessary structures ( pipes, canals, …) or supplying the necessary
equipment ( pumps, machines, …) to divert water from the work zone throughout the period
of the project,
- Ensuring that all parts of the project are operating as required after the completion of the
works and after testing and remedying of all defects that may appear while testing,
- Completion of all procedures necessary for the taking over and commissioning,
- All items necessary to complete the mobilization / demobilization including all related costs.
The rate shall also cover providing, furnishing, maintaining and cleaning of the Resident
Engineer’s office including all related costs. The Resident Engineer’s office
shall be suitably located in the project zone and shall be composed of 4 offices, a meeting room, a
bedroom, a WC and a kitchen and shall be equipped with all the necessary items for the good
performance of the supervision team, these items shall include but not be limited to:
- Tables, desks, rolling chairs, chairs, shelves, cabinets, beds, etc., …
- 3 Computers (recent processor), network installation, internet DSL connection, printer (A3),
photocopier, fax machine, stationery, …
- Coffee machine and refrigerator
- Electrical supply, potable water supply, toilet, sewage disposal system, …
- Air conditioners, heaters,
- Telephones and related charges including: 1 central for telephone and one land line, 2 cellular
lines with a maximum monthly expense of 250US$.

ITEM A.2: OPERATION AND MAINTENANCE

This item shall cover the operation and maintenance of the project for a 24 Months
period.

Dar Al Handasah Nazih Taleb & Partners Page 2/2


Preamble to Bill B: Pipelines Installation
Ministry of Municipality and Tourism Mangesh, Batofa & Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Part I : Preamble

3. PREAMBLE TO BILL B: PIPELINES INSTALLATION

3. PREAMBLE TO BILL B: PIPELINES INSTALLATION

ITEM B.1: CUTTING OF PAVED ROADS FOR PIPE TRENCHES AND MANHOLES

Cutting of paved roads to construct pipe trenches shall be measured by linear meter along
the center line of pipes and shall include for asphalt (or concrete) cutting on both sides of the
trench using asphalt saw, trench widening where required (particularly on manholes locations),
and removal of asphaltic (or concrete) layers and aggregates to the disposal sites. Cutting of paved
roads to construct pipe trenches shall be classified for payment according to trench type.

ITEM B.2: EXCAVATION FOR PIPE TRENCHES

Excavation to construct pipe trenches shall be measured by linear meter along the center
line of pipes and shall be carried out in all the indicated locations (easy to access or not), with or
without machines (if necessary) and in all types of soil (including rock which is subject to the
extra over of item B.2.a). The works shall include for trench dewatering (maximum flow of
diverted water of 10 l/s for each 100m length of excavated trench), supporting of excavation
(maximum depth of 5m.), traffic regulation, safety provisions, transport of excavated material
unsuitable for re-use to the disposal sites and storing of excavated material that are suitable in the
opinion of the Engineer for re-use.
The excavation shall be carried out according to the dimensions shown on the drawings or
directed by the Engineer. The price shall neither account for extra excavation depth nor for extra
excavation width caused by trench wall sliding or any other reason. Excavation to construct pipe
trenches shall be classified for payment according to trench type.

ITEM B.3: UNCLASSIFIED EXCAVATION (for pipe supporting and protection)

Unclassified Excavation to support and protect pipes when laid under river beds or in
unstable and sliding ground or in steep slopes and to construct thrust blocks when pipe direction
changes horizontally or vertically and where required by the Engineer on the pipe, shall be
measured by cubic meters and shall be carried out in all the indicated locations (easy to access or
not), with or without machines (if necessary) and in all types of soil (including rock which is
subject to the extra over of item B.3.a). The works shall include for dewatering and supporting of
excavation, traffic regulation, safety provisions, transport of excavated material unsuitable for re-
use to the disposal sites and storing of excavated material that are suitable in the opinion of the
Engineer for re-use.
Unclassified Excavation shall be measured by cubic meters and shall be carried out in the
locations shown on the drawings, indicated by the Engineer and where is needed.

ITEM B.4: REINFORCED CONCRETE CLASS B (for pipeworks)

Reinforced concrete class B (350 kg of cement per one cubic meter of concrete) to
support and protect pipes when laid under river beds or in unstable and sliding ground or in steep
slopes and to construct concrete casing and thrust blocks when pipe direction changes
horizontally or vertically and where required by the Engineer on the pipe, shall be measured by
cubic meters and shall be carried out in the locations shown on the drawings, proposed by the
Contractor and approved by the Engineer, and where is needed. The works shall include but not
be limited to:
- Supply of all the components of the concrete (cement, aggregates, water, formwork,
admixtures and all the related accessories),

Dar Al Handasah Nazih Taleb & Partners Page 1/7


Ministry of Municipality and Tourism Mangesh, Batofa & Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Part I : Preamble

3. PREAMBLE TO BILL B: PIPELINES INSTALLATION

- Supplying, transporting, storing and placing reinforcing steel bars for concrete structures as
shown on the drawings and / or as required,
- Fixing of formwork,
- Batching, mixing, pouring, vibrating, curing and testing of concrete,
- Submission of detailed bar bending schedule,
- Shop Drawings of structure and revision thereto if any,
- Fixing bars in any position & in any member,
- Fixing bars horizontally, vertically and sloped,
- Work to any diameter, section & length,
- Forming straight, bent, & curved bars and links,
- Cutting tying wires, spacers, chairs and the like.
- Drilling of anchor holes, epoxy grouts for anchors bars of exposed pipe supports on rocks and
slopes>50% (wherever necessary).
- All items necessary to complete the works.

ITEM B.5: CONCRETE CLASS C (for pipeworks)

This item shall consist of executing concrete class C which is composed of minimum
250kg cement / m3 as a bedding, around and above the pipe in the trench (in case of buried high
slopes pipe and wherever requested by the Engineer). This item shall include the following works:
- Supply of all the components of the concrete (cement, aggregates, water, formwork,
admixtures and all the related accessories),
- Fixing of formwork,
- Batching, mixing, pouring, vibrating, curing and testing of concrete,
- Expansion joints where needed
- All items necessary to complete the works.
This item shall be measured in cubic meter and shall be the net volume in accordance with the
drawings.

ITEM B.6: SUPPLY, LAYING AND TESTING OF DUCTILE IRON PIPES AND
ACCESSORIES

The price of one linear meter shall include furnishing, transporting, storing, installing and
testing of ductile iron pipes for potable water in roads, off roads and in special crossing areas
(bridges, watercourses, terraced ground, steep slopes, etc …) according to contract drawings or
according to shop drawings proposed by the Contractor and approved by the Engineer.
The price shall also include pipe cutting, pipe chamfering and all types of joints, Tees,
Reducers, elbows, adaptors, short pipes, puddle flanges, double sockets, flanges, bolts, nuts and
jointing material necessary to connect ductile iron pipes to existing or proposed pipes, valves,
accessories, manholes, wells, reservoirs, pumping stations,…and to fasten pipes to pipe supports
(clamps, collars, rubber rings, nuts, washers, anchors in concrete, etc ...).

Dar Al Handasah Nazih Taleb & Partners Page 2/7


Ministry of Municipality and Tourism Mangesh, Batofa & Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Part I : Preamble

3. PREAMBLE TO BILL B: PIPELINES INSTALLATION

The price shall cover as well hydrostatic pressure testing and disinfection testing of laid
pipes and remedying of all defects that may appear while testing. Ductile iron pipes shall be
classified for payment according to pipe diameter.

ITEM B.7: SUPPLY, LAYING AND TESTING OF WELDED STEEL PIPES AND
ACCESSORIES

The price of one linear meter shall include furnishing, transporting, storing, installing and
testing of welded steel pipes for potable water in roads, off roads and in special crossing areas
(bridges, watercourses, terraced ground, steep slopes, etc …) according to contract drawings or
according to shop drawings proposed by the Contractor and approved by the Engineer.
The price shall also include pipe cutting, pipe chamfering and all types of joints, Tees,
Reducers, elbows, adaptors, short pipes, puddle flanges, double sockets, flanges, bolts, nuts and
jointing material necessary to connect to existing or proposed pipes, valves, accessories,
manholes, wells, reservoirs, pumping stations,…and to fasten pipes to pipe supports (clamps,
collars, rubber rings, nuts, washers, anchors in concrete, etc ...).
The price shall cover as well hydrostatic pressure testing and disinfection testing of laid
pipes and remedying of all defects that may appear while testing. Welded steel pipes shall be
classified for payment according to pipe diameter.

ITEM B.8: SUPPLY AND INSTALLATION OF AIR VALVES

The price shall include furnishing, transporting, storing and installing air valves (single
air release valves, triple function air valves and anti shock triple function air valves) in the
locations shown on the drawings, indicated by the Engineer and where needed. The price shall
also include but not be limited to:
- Supply and installation of tee (one piece or an assembly of multiple pieces),
- Supply and installation of joints, connections, flanges, bolts and nuts, dismantling joints,
flange adaptors,…
- Supply and installation of reducers,
- Supply and installation of transition pipes,
- Supply and installation of an isolating butterfly valve for each air valve,
- Supply and installation of a steel venting pipe for manhole with DN equal to the air valve
diameter,
- Construction of concrete supports and fixing devices (collars, clamps, nuts, washers, rubber
rings, steel plates, anchors in concrete…
- All components necessary to provide a complete installation.
Air valves shall be measured by number and shall be classified for payment according to
the type, diameter and nominal pressure of the air valve.
Note: The Contractor shall include in his shop drawings details of installation of each air valve
and shall not begin the works without the Engineer’s approval. Triple Function (Double
air valves) shall be used for the pumping and transmission lines and as required by the
Engineer. For the distribution lines, single air valves shall be used for pipe diameters
4” and triple Function (Double air valves) for pipe diameters > 4” and as required by the
Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 3/7


Ministry of Municipality and Tourism Mangesh, Batofa & Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Part I : Preamble

3. PREAMBLE TO BILL B: PIPELINES INSTALLATION

ITEM B.9: SUPPLY AND INSTALLATION OF WASHOUT VALVES

The price shall include furnishing, transporting, storing and installing washout valves in
the locations shown on the drawings, indicated by the Engineer and where needed. Each washout
valve shall include but not be limited to:
- Supply and installation of tee (one piece or an assembly of multiple pieces),
- Supply and installation of valve, extension spindle, spindle guard and surface box unit
installed on the manhole top slab,
- Supply and installation of joints, connections, flanges, bolts and nuts, dismantling joints,
flange adaptors,…
- Supply and installation of reducers,
- Supply and installation of flap valve (if it is not possible to install a discharge pipe to a water
course or a canal),
- Construction of concrete supports,
- All components necessary to provide a complete installation.
In addition to the above components, the price shall include the installation of a
polyethylene or ductile iron pipe of the same diameter as the washout valve and according to the
service pressure from the manhole to the nearest watercourse or draining canal (maximum length
= 50 m) including asphalt (or concrete) cutting and removal, excavation in all types of soil and
locations (easy to access or not) to construct pipe trench, surrounding pipe with sand, backfilling,
repaving and pouring concrete if necessary.
Washout valves shall be measured by number and shall be classified for payment
according to the diameter and nominal pressure of the washout valve.
Note: The Contractor shall include in his shop drawings details of installation of each washout
valve and shall not begin the works without the Engineer’s approval.

ITEM B.10: SUPPLY AND INSTALLATION OF BUTTERFLY VALVES

The price shall include furnishing, transporting, storing and installing butterfly valves
(and related joints, flanges, concrete supports, adapters, fixing and mounting accessories,..) and
all necessary to make a complete installation in the locations shown on the drawings, indicated by
the Engineer and where needed. Dismantling joints or flange adaptors shall be provided and
installed with the butterfly valves of the distribution and transmission lines.
Butterfly valves shall be measured by number and shall be classified for payment
according to diameter and nominal pressure.
Note: The Contractor shall include in his shop drawings details of installation of each valve
(and related joints and adaptors) and shall not begin the works without the Engineer’s
approval. The Engineer is entitled to change the location of some valves if he deems
necessary.

ITEM B.11: SUPPLY AND INSTALLATION OF PRESSURE RELIEF VALVES

This item shall consists of furnishing, transporting, storing, installing and testing pressure
relief valves and related fittings and accessories in the locations shown on the drawings or where
requested by the Engineer. The price shall include all items necessary to make a complete

Dar Al Handasah Nazih Taleb & Partners Page 4/7


Ministry of Municipality and Tourism Mangesh, Batofa & Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Part I : Preamble

3. PREAMBLE TO BILL B: PIPELINES INSTALLATION

installation (tees, elbows, reducers, short pipes, puddle flanges, by-pass pipes, joints, …) and to
insure the pressure drop indicated on the drawings.
Pressure relief valves shall be measured by number and shall be classified for payment
according to the diameter and nominal pressure of the pressure relief valve.
Note: The Contractor shall include in his shop drawings details of installation of each pressure
relief valve and shall not begin the works without the Engineer’s approval.

ITEM B.12: CONSTRUCTION OF REINFORCED CONCRETE MANHOLES

Construction of reinforced concrete manholes shall be done according to the details and
dimensions shown on the drawings and the price shall include but not be limited to:
- Traffic regulation, safety provisions and transport of excavated material unsuitable for re-use
to the disposal sites,
- Supply of all the components of the blinding concrete class D and reinforced concrete class A
(cement, aggregates, water, steel reinforcement, formwork, admixtures and all the related
accessories),
- Fixing of smooth formwork,
- Bending, cutting and placing of steel reinforcement,
- Batching, mixing, pouring, vibrating, curing and testing of concrete,
- Supply and installation of an access ladder and a heavy duty or medium duty ductile iron
cover and frame (according to the road classification and locations of manholes) as mentioned
in the technical specification and directed by the Engineer,
- Two layers of external bituminous coating,
- Epoxy mortar 12 mm thick on the concrete frame of the cover of manholes.
- Backfilling and surface reinstatement,
- Construction of reinforced concrete supports for all accessories inside manhole,
- Casting of reinforced concrete at the intersection area between the pipes and the exterior side
of the manhole walls, reinforced concrete shall be of enough thickness to ensure water
proofing (maximum volume for each manhole is 0.5m3),
- All items necessary to make a complete installation.
- Reinforced concrete manholes shall be measured by number and shall be classified for
payment according to manhole type.
Note: The Contractor shall include in his shop drawings details of installation of all fittings and
accessories inside each manhole and shall not begin the works without the Engineer’s
approval.

ITEM B.13: SELECTED FILL & BACKFILL (around thrust blocks & pipe supports)

Backfilling around thrust blocks and pipe supports shall include furnishing, transporting,
storing, placing, compacting and testing of backfill. Backfill shall consist of unclassified fill
(excavated material suitable for re-use or borrowed area products at the Contractor's expense)
according to the required thickness specified in the drawings, in the technical specifications and
as directed by the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 5/7


Ministry of Municipality and Tourism Mangesh, Batofa & Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Part I : Preamble

3. PREAMBLE TO BILL B: PIPELINES INSTALLATION

Backfilling around thrust blocks and pipe supports shall be measured by cubic meters and
shall also include land reinstatement.

ITEM B.14: BACKFILLING PIPE TRENCHES

Backfilling of pipe trenches shall be measured by linear meters along the center line of
pipes and shall include furnishing, transporting, storing, placing, compacting and testing of
backfill. Backfill shall consist of a sand fill protecting layer (initial backfill used for ductile iron
pipes) surrounding the pipes (or gravel bedding or cement stabilizer sand bedding and surround if
required) followed by an unclassified fill layer (main backfill: excavated material suitable for re-
use or borrowed area products at the Contractor's expense) according to the required thickness
specified in the drawings, in the technical specifications and as directed by the Engineer.
Backfilling of pipe trenches shall be classified for payment according to trench type.

ITEM B.15: REPAVING OF PIPE TRENCHES AND AROUND MANHOLES

Repaving of pipe trenches shall be measured by linear meters along the center line of
pipes and shall include furnishing, transporting, storing, placing, spreading, compacting and
testing the necessary materials for repaving pipe trenches and around manholes which consist of
an aggregate base course underneath an asphaltic (or concrete) layer(s) according to the required
thickness specified in the drawings and related to the road classification, in the technical
specifications and as directed by the Engineer.
Repaving of pipe trenches shall also include the recutting works of asphalt (or concrete)
required by collapse of trench edges and repaving of the whole cut area (originally paved) as
directed by the Engineer. Repaving of pipe trenches shall be classified for payment according to
trench type.

ITEM B.16: SUPPLY AND INSTALLATION OF INLINE CHECK VALVES

This item shall consist of furnishing, transporting, storing, installing and testing inline
check valves and related fittings and accessories in the locations shown on the drawings or where
requested by the Engineer. The price shall include but not be limited to:
- Supply and installation of two gate valves,
- Supply and installation of an inline check valve tilting disc type, slanted seat check valve or
45 angled seat short stroke flex swing , with separate or integrated bypass.
- Supply and installation of dismantling joints,
- All items necessary to make a complete installation (tees, elbows, reducers, short pipes,
puddle flanges, by-pass pipes, joints, …) and to insure the pressure drop indicated on the
drawings,
Inline check valves shall be measured by number and shall be classified for payment
according to the diameter of the inline check valve.
*Note: The Contractor shall include in his shop drawings details of installation of each
inline check valve and shall not begin the works without the Engineer’s approval.

Dar Al Handasah Nazih Taleb & Partners Page 6/7


Ministry of Municipality and Tourism Mangesh, Batofa & Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Part I : Preamble

3. PREAMBLE TO BILL B: PIPELINES INSTALLATION

ITEM B.17: SUPPLY, INSTALLATION AND CONSTRUCTION OF PRESSURE


BREAK TANKS AND RELATED ACCESSORIES

This item shall consists of furnishing, transporting, storing, installing and testing pressure break
tanks (P.B.T.) and related fittings and accessories in the locations shown on the drawings and
where required by the Engineer. The price shall include but not be limited to:
- Supply and installation of one float valve,
- Supply and installation of three gate valves,
- Supply and installation of a filter with a washout valve,
- Supply and installation of a pressure relief valve,
- Supply and installation of dismantling joints,
- Supply and installation of pipes short pieces,
- All items necessary to make a complete installation (tees, elbows, reducers, short pipes, puddle
flanges, by-pass pipes, joints, …),
- Construction of two reinforced concrete manholes one upstream type E and one downstream
the P.B.T. type A,
- Construction of the Pressure Break Tank according to the dimensions mentioned on the
drawings including all civil works:
o Asphalt (or concrete) cutting and excavation in all types of soil and locations (easy to
access or not) including dewatering, supporting of excavation, traffic regulation, safety
provisions and transport of excavated material unsuitable for re-use to the disposal sites,
o Supply of all the components of the reinforced concrete (cement, aggregates, water, steel
reinforcement, formwork, admixtures and all the related accessories),
o Fixing of smooth formwork,
o Bending, cutting and placing of steel reinforcement,
o Batching, mixing, pouring, vibrating, curing and testing of concrete,
o Supply and installation of an access ladder and a heavy or medium duty cover and frame,
o 2 layers of external bituminous coating,
o Backfilling and surface reinstatement,
o Construction of reinforced concrete supports for all accessories inside manhole,
o Casting of reinforced concrete at the intersection area between the pipes and the exterior
side of the manhole walls, reinforced concrete shall be of enough thickness to ensure
water proofing,
o All items necessary to make a complete installation.
- All necessary extra excavation for pipe laying upstream and downstream not mentioned on the
pipe profiles,
Pressure break tanks shall be measured by number and shall be classified for payment according to
the pipe diameter and nominal pressure.
Note: The Contractor shall include in his shop drawings details of installation of each pressure
break tank and shall not begin the works without the Engineer’s approval.

Dar Al Handasah Nazih Taleb & Partners Page 7/7


Preamble to Bill C: Reservoirs
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.1: EARTHWORK

ITEM C.1.1: CLEARING AND GRUBBING

This item shall consist of general cleaning and grubbing of the ground surface where
needed and or directed by the Engineer. This item shall include the following works:
- Removal of trees, trunks, roots, vegetation, surface debris, stones, rocks or any kind of dirt,
- Cart-away of removed material to dump area where permitted or on tips allocated by the
Contractor at his own responsibility,
- Preparation and submittal of one topographical survey plan scale 1/200 after clearing and
grubbing completion.
This item shall be measured in square meter of cleared and grubbed area and shall be the
net projected horizontal area in accordance to the drawings and survey plan submitted and
approved by the Engineer.

ITEM C.1.2: UNCLASSIFIED EXCAVATION

This item shall consist of excavating and disposing materials of any kind and type
encountered during work. This item shall pertain but not limited to pumping stations, reservoirs,
retaining walls, roads, underground walls, etc. Excavation works shall be carried out in all the
indicated locations on the drawings (easy to access or not), where needed and instructed by the
Engineer. This item shall include the following works:
- Blasting as specified in technical specification subject to the Engineer approval,
- Temporary disposition of water and electricity necessary for the work execution,
- Remove, seal, re-route existing utilities, if any, as required subject to Engineer consent,
- Excavation in any type of soil, to any depth, whatever found to be: Soft, Hard, Clay, Rock,
Hard rock etc,
- Removal of top soil to the required depth as indicated and specified on the drawings and as
directed by the Engineer,
- Keeping excavation free of water by any means,
- Any additional excavation to provide working space for structural works,
- Planking, strutting, shoring, sheet piling etc. necessary to support the vertical excavation
edges,
- Retrieving excavated material by any means, depositing in temporary heaps, selecting and
setting aside approved excavated material to be used in backfilling around structures and as
directed by the Engineer, including multiple handling of material,
- Cart-away surplus material to disposal sites where permitted or on tips allocated by the
contractor at his own responsibility.
This item shall be measured in cubic meter and shall be the net volume according to the
excavation limits indicated on Contract Drawings and as directed and approved by the Engineer.
Wherever excavation limits are not indicated on Contract Drawings, the limits shall be 50cm
away of blinding edges.

Dar Al Handasah Nazih Taleb & Partners Page 1/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.1.3: SELECTED FILL & BACKFILL

These items shall consist of supplying, transporting, placing and compacting one or more
layer of selected fill or backfill materials spread around structures, and where is needed, as
specified in technical specification and/or as directed by the Engineer. The following items shall
include the following works:
- Surface preparation, leveling, ramming, trimming, and grading of bottom excavation,
- Material procurement or excavation, loading and hauling,
- Material preparation, selecting or mixing, moisturizing, hauling, placing etc,
- Filling, compacting in horizontal or sloped layers.
Wherever backfilling limits are not indicated on Contract Drawings, the limits shall be
50cm away of blinding edges.
This item shall be measured in cubic meter and shall be the net volume according to the
Contract Drawings and as directed and approved by the Engineer

ITEM C.1.4: ROCK AND STRUCTURAL BACKFILL

This item shall consist of supplying, transporting, placing and compacting one or more
layers of backfill materials.
This item shall include the following works:
- Protection of nearby structure during execution.
- Surface preparation, leveling, ramming, trimming, and grading of bottom excavation.
- Material procurement or excavation, loading and hauling.
- Material preparation, selecting or mixing, moisturizing, hauling, placing etc.
- Filling with selected rockfill material and compacting in horizontal layers not exceeding 30
cm in thickness.
- Compaction shall be forwarded with heavy equipment weighing 8 tons/lm of width as a
minimum with sufficient subsequent number of passes to attain the required degree of
compaction stated in the technical specifications.
Structural backfill shall consist of very sandy GRAVEL with COBBLES and
BOULDERS (as a rockfill) which exists on site.
Rockfill should be well-graded, sound, dense, hard and durable rock capable of being
spread and compacted in layers and should conform to the following gradation and specifications.
- Gradation:
Nominal maximum particle size: 300mm
Passing a 12 inch sieve and retaining on 6 inch sieve: 90-100%
Passing a 6 inch sieve and retaining on 1 inch sieve: 50-75%
Passing a 1 inch sieve and retaining on No.4 sieve: 15-45%
Passing a No.4 sieve and retaining on No.200 sieve: 0-25%
Passing a No. 200 sieve: 0-5%
- Specifications:

Dar Al Handasah Nazih Taleb & Partners Page 2/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

Water Absorption =< 2%


Specific Gravity >= 2.65 gr/cm3
LA =< 35%
Soundness (Na2SO4) =< 12%
Compressive strength loss after freezing/thawing cycle =< 10%
Compressive strength >= 500 kgf/cm2
This item shall be measured in cubic meter and shall be the net volume according to the
Contract Drawings and as directed and approved by the Engineer.

ITEM C.1.5: QUARRY RUN AGGREGATE BASE COURSE

This item shall consist of supplying, transporting, placing and compacting one or more
layers of Quarry run aggregate base course and/or resized very sandy GRAVEL with COBBLES
and BOULDERS materials.
This item shall include the following works:
- Protection of nearby structure during execution.
- Surface preparation, leveling, ramming, trimming, and grading of bottom excavation.
- Material procurement or excavation, loading and hauling.
- Material preparation, selecting or mixing, moisturizing, hauling, placing etc.
- Filling with selected rockfill material and compacting in horizontal layers not exceeding 30
cm in thickness.
- Compaction shall be forwarded with heavy equipment weighing 8 tons/lm of width as a
minimum with sufficient subsequent number of passes to attain the required degree of
compaction stated in the technical specifications.
Quarry run aggregate base course and/or resized very sandy GRAVEL with COBBLES
and BOULDERS which will be placed within the upper part of the structural backfill should
consist of good quality rock with a minimum Compressive Strength of 500 Kgf/cm2. The
aggregate should be well-graded and should conform to the following gradation and
specifications.
Very sandy GRAVEL with COBBLES and BOULDERS can also be used as base course
after resizing it into a gradation of 0/50mm and within the specifications given below.
- Gradation:
Sieve Size Percentage Passing
2" 100
1.5" 90-100
3/4" 50-80
No.: 4 25-45
No.: 40 10-20
No.: 200 2-8

Dar Al Handasah Nazih Taleb & Partners Page 3/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- Specifications:
Sand Equivalent (ES %) >= 40%
Soundness (Na2SO4) =< 12%
Clay Content =< 5%
L.L. =< 25%
P.I. =< 6%
Fraction passing No.: 200 sieve shouldn’t be greater than two-thirds of fraction passing
No.: 40.
L.A. =< 35%
Soaked CBR at 98% proctor compaction >= 80%
This item shall be measured in cubic meter and shall be the net volume according to the
Contract Drawings and as directed and approved by the Engineer

ITEM C.1.6: MANHOLES AND STRUCTURES

Construction of reinforced concrete manholes and structures Precast or cast-in-place such


as chambers, etc., with masonry transition to cover frame, covers, steps, anchorage and
accessories shall be done according to the details and dimensions shown on the drawings or as
directed by the engineer and the price shall include but not be limited to:
- Traffic regulation, safety provisions and transport of excavated material unsuitable for re-use
to the disposal sites,
- Supply of all the components of the blinding concrete class D and reinforced concrete class A
(cement, aggregates, water, steel reinforcement, formwork, admixtures and all the related
accessories),
- Fixing of smooth formwork,
- Bending, cutting and placing of steel reinforcement,
- Batching, mixing, pouring, vibrating, curing and testing of concrete,
- Supply and installation of an access ladder and a heavy duty or medium duty ductile iron
cover and frame (according to the road classification and locations of manholes) as mentioned
in the technical specification and directed by the Engineer,
- Two layers of external bituminous coating,
- Epoxy mortar 12 mm thick on the concrete frame of the cover of manholes.
- Backfilling and surface reinstatement,
- Construction of reinforced concrete supports for all accessories inside manhole,
- Casting of reinforced concrete at the intersection area between the pipes and the exterior side
of the manhole walls, reinforced concrete shall be of enough thickness to ensure water
proofing (maximum volume for each manhole is 0.5m3),
- All items necessary to make a complete installation.
- Reinforced concrete manholes shall be measured by number and shall be classified for
payment according to manhole type.

Dar Al Handasah Nazih Taleb & Partners Page 4/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

Note: The Contractor shall include in his shop drawings details of installation of all fittings and
accessories inside each manhole and shall not begin the works without the Engineer’s
approval.

ITEM C.1.7: WATER DISTRIBUTION SYSTEM

This item shall include all necessary to install a complete water distribution system for the whole treatment
plant site and buildings including but not limited to:
Supply, install, connect and test the pipes for water network complete including detectable
warning tape, corrosion protection for iron pipes, chlorination, disinfection and water quality
testing, and all other related works, all as specified, and to the satisfaction of the Engineer.
The pipes should be HDPE Pipes, PE 100 RC, PN 10, to DIN 8074/8075, or to ISO 4427. the
diameters of the pipes range from 20mm to 75mm and of lengths sufficient to cover all the
roads and supply all the buildings and the landscaping areas.
Trench excavation in any type of soil including rock complete including, but not limited to
the following:
Grading or leveling and compacting or trimming bottom of excavation;
Planking, strutting or trimming sides of excavation;
Keeping excavation free from all water sources;
Protection of existing service utilities (if any) and provision of necessary temporary works to
maintain utilities in use during and until completion of works;
Backfilling with selected excavated or imported fill materials;
Compacting in layers to required density;
Removing and disposing off surplus materials to approved dumping area;
and all other related works, all as specified, shown on drawings and to the satisfaction of the
Engineer.
Sand Material for Pipe Bedding and Cover
Reinforced Concrete Encasement (Especially in locations close to the sewer pipes or tanks).
Supply, install, connect and test the necessary fittings and accessories (Elbows, Tees,
Reducers, Adaptors,...) for water pipes complete including all necessary fixing accessories,
corrosion protection, chlorination, disinfection and water quality testing, and all related
works, all as specified, shown on the drawings and to the satisfaction of the Engineer.
Supply and install the necessary valves and gate valves assemblies to BS or ISO standard
complete including valves, wheels, flange spigots, flange sockets, flange adaptors,
dismantling joints, double flanged pipes, socket/spigot pieces, all necessary fittings (bends,
reducers, etD.), gate and flap valves, accessories (air valves, washouts,...), concrete supports,
corrosion protection, connecting, testing and all other related works, all as specified, and to
the satisfaction of the Engineer.
Water Connections Using Tapping Collars or Tapping Saddles and including: 150 mm
extendible ductile iron surface box unit, Stop valve, ferrule, saddle, excavation works, all
necessary operating devices and accessories, extension protective PVC tube, Protective hood,
testing, backfilling, compacting in layers and all other related works. Preparation of design
and shop drawings and submission to the Engineer for approval.

Dar Al Handasah Nazih Taleb & Partners Page 5/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.1.8: SANITARY SEWER SYSTEM

This item shall include all necessary to install a complete sanitary sewer system for the whole treatment
plant site and buildings including but not limited to:
Supply, install, connect and test the pipes for pressure and gravity sewer system with all
necessary fittings, jointing materials and fixing accessories, complete all as specified, and to
the satisfaction of the Engineer. The pipes should be uPVC for gravity sewer lines and ductile
iron for pressure pipes. The diameters of the pipes range from 80mm to 200mm and of
lengths sufficient to cover all the roads and collect all the buildings sewers.
Trench excavation in any type of soil including rock complete including, but not limited to
the following:
Grading or leveling and compacting or trimming bottom of excavation;
Planking, strutting or trimming sides of excavation;
Keeping excavation free from all water sources;
Protection of existing service utilities (if any) and provision of necessary temporary works to
maintain utilities in use during and until completion of works;
Backfilling with selected excavated or imported fill materials;
Compacting in layers to required density;
Removing and disposing off surplus materials to approved dumping area;
and all other related works, all as specified, shown on drawings and to the satisfaction of the
Engineer.
Sand Material for Pipe Bedding and Cover
Reinforced Concrete Encasement (Especially in locations close to the water supply pipes and
facilities).
Supply, install, connect and test the following fittings and accessories (Elbows, Tees,
Reducers, Adaptors,...) for pipes complete including all necessary fixing accessories,
corrosion protection, and all related works, all as specified, and to the satisfaction of the
Engineer.
Supply all required materials, equipment and accessories, and construct the reinforced
concrete manholes and chambers of whatever depths and dimensions precast or cast in place,
complete including, but not limited to, the following:
Site clearing and all necessary excavation in any type of soil;
Keeping excavation free from all water sources;
Precast or cast-in-place concrete using moderate sulphate resistant cement to ASTM C150,
Type II, 14 MPa for blinding, and high sulphate resistant cement to ASTM C150, Type V, 35
MPa for reinforced concrete works, including formwork of any type and any shape,
reinforcement and accessories;
Concrete benching with topping;
Protective coating of external surfaces in contact with soil;
Fiber reinforced epoxy lining to all internal surfaces;
Breaking into pipes;
Backfilling with selected excavated or borrow fill materials;
Compacting in layers to required density;

Dar Al Handasah Nazih Taleb & Partners Page 6/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

Removing and disposing off resulting and surplus materials to approved dumping area;
Covers and frames, steps, and all necessary accessories;
And all other related works, all as specified, shown on drawings and to the satisfaction of the
Engineer.
Reinforced concrete thrust blocks, any dimension.
Supply and install the necessary valves and gate valves assemblies to BS or ISO standard
complete including valves, wheels, flange spigots, flange sockets, flange adaptors, dismantling
joints, double flanged pipes, socket/spigot pieces, all necessary fittings (bends, reducers, etc.),
gate and flap valves, accessories (airvalves, washouts, ...), concrete supports, corrosion
protection, connecting, testing and all other related works, all as specified, and to the
satisfaction of the Engineer.
Connection of Pipes to Manholes
Lifting Stations wherever necessary: Wet well for buildings sewer line with reinforced concrete
manhole or chamber including heavy duty manhole cover and frame, of clear opening 600mm,
and with removable R.D. cover 1x1m2 for lifting the submersible pumps (1duty and 1 standby)
including aluminum steps and all civil, mechanical and electrical works. The pump discharge
flow and head will be calculated as necessary, the pump selection shall be proposed by the
Contractor to the approval of the Engineer.
Lifting Station discharge manhole
Preparation of design and shop drawings and submission to the Engineer for approval.

ITEM C.1.9: STORMWATER DRAINAGE SYSTEMS

This item shall include all necessary to install a complete storm water drainage system for
the whole treatment plant site (roads, external spaces, buildings surround, …) including but not
limited to:
- Supply, install, connect and test the necessary pipes for drainage system with all necessary
fittings, jointing materials and fixing accessories, complete all as specified, shown on the
drawings and to the satisfaction of the Engineer. The pipes should be Reinforced Concrete
pipes 300mm diameter and of lengths sufficient to cover all the roads and collect all the
spaces and buildings drainage systems.
- Trench excavation in any type of soil including rock complete including, but not limited to
the following:
Grading or leveling and compacting or trimming bottom of excavation;
Planking, strutting or trimming sides of excavation;
Keeping excavation free from all water sources;
Protection of existing service utilities (if any) and provision of necessary temporary
works to maintain utilities in use during and until completion of works;
Backfilling with selected excavated or imported fill materials;
Compacting in layers to required density;
Removing and disposing off surplus materials to approved dumping area;
and all other related works, all as specified, and to the satisfaction of the Engineer.
- Excavation for ditches with varying depth, 500mm to 1000mm: proposed where road finished
around level is lower than adjacent around embankment.

Dar Al Handasah Nazih Taleb & Partners Page 7/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- Sand Material for Pipe Bedding and Cover


- Supply, install, connect and test the necessary fittings and accessories (Elbows, Tees,
Reducers, Adaptors,...) for pipes complete including all necessary fixing accessories,
corrosion protection, and all related works, all as specified, and to the satisfaction of the
Engineer.
- Reinforced Concrete Manholes and Gullies
Supply all required materials and equipment, and construct (precast or cast in place)
reinforced concrete manholes of whatever depths and dimensions, inlet structures,
complete including, but not limited to the following:
Site clearing and all necessary excavation in any type of soil;
Keeping excavation free from all water sources;
Cast-in-place concrete using moderate sulphate resistant cement to ASTM C150, Type II,
14 MPa for blinding, and 30 MPa for reinforced concrete works, including all necessary
formwork of any type and any shape, reinforcement and accessories;
Concrete benching;
Protective coating of external surfaces in contact with soil;
Breaking into pipes;
Backfilling with selected excavated or borrow fill materials;
Compacting in layers to required density;
Removing and disposing off resulting and surplus materials to approved dumping area;
Grill cover with frame, steps, curb inlet, and all accessories;
And all other related works, all as specified, shown on drawings and to the satisfaction of
the Engineer.
Precast or cast in situ reinforced concrete gully clear internal size 600 x 600 x 600mm,
with grill cover
Preparation of design and shop drawings and submission to the Engineer for approval.

ITEM C.1.10: AUTOMATIC IRRIGATION SYSTEM FOR LANDSCAPED AREAS

This item shall include the Design, and submission of all necessary calculations and shop
drawings to the Engineer for approval, then supply all required materials, equipment, tools and
accessories, and construct the approved automatic irrigation system complete including but not
limited to, (All Civil, Mechanical and Electrical Works), underground tanks of suitable capacities,
pumps, controllers, station valves, electrical valves, solenoid valves, irrigation piping system
including manifold pipes, lateral pipes, manholes, bubblers, spray heads, pressure compensating
drip emitters, dripline, emitters, all necessary fittings and accessories, connection to water
line/tank, electrical installations including connections, communication cables, accessories, surge
protection, start-up tests, testing and commissioning, and all other related works, all as specified,
shown on approved shop drawings, to the satisfaction of the Engineer. Trees, shrubs, ground
covers and grass plantation shall have each separate programs.

Dar Al Handasah Nazih Taleb & Partners Page 8/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.1.11: DIVERSION OF KHABUR RIVER FOR THE CONSTRUCTION OF THE


INTAKE STRUCTURE

This item shall include but not limited to the following works:
- All necessary works for the Khabur River water course diversions during the whole period of
works of execution of the intake structure and all the relative works of water course training
and all the necessary works requested by the Engineer.
- Identification of work sections requiring diversion.
- Submittal of a program of works for the concerned structure showing the chronological orders
of execution together with the proposed diversion works. This program is subject to the
Engineer's approval.
- Proposed method statement including relevant design calculation, shop drawings & revised
drawings.
- List of proposed manpower, machinery, material and equipment to carry out each work
section diversion.
- Water diversion schemes.
- Cofferdams with all relevant design criteria & calculation.
- Modifications of water courses alignments works.
- Water extraction & conveying systems such as gravity pipe line or channels, etc. with all
relevant technical details that lead to the system selection.
- Shoring, bracing, strutting etc.
- Excavation, backfilling & or filling.
- Reinstatement of the excavated, backfilled and or filled area to its original status by any
means.
- Assurance that all pursuant works are done in dry state.
- Any other features and structures necessary for diverting the water course and making the
working area dry.
- Continuous supply of potable water, irrigation water, etc. to all users during the period of
project construction if applicable.
All aforesaid shall be presented to the Engineer for his consent and approval 15 days prior
to commencement of works. Work shall not start unless approval is forwardeE. However, the
contractor shall not be relieved from his obligations and responsibilities towards designing &
executing the diversion proposed at his own risk, and no re-evaluation or compensation shall take
effect whatsoever in case of proposal failure even if Engineer approval is duly ascertaineE. The
contractor shall be solely responsible for safety & workability of the diversion schemes and all
related works as noted above.

Dar Al Handasah Nazih Taleb & Partners Page 9/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.2: CONCRETE & MASONRY

Note: In case the concrete is to be supplied by a batch plant outside the site, computerized
delivery note should be issued by the batching plant and delivered to the Engineer for each
transit mixer.

ITEM C.2.1: REINFORCED CONCRETE CLASS A

This item shall consist of executing reinforced concrete class A which is composed of
minimum 350 kg cement/m3 (f’c = 300 Kg/cm2) for foundations, beams, retaining walls, columns,
slabs, canals, manholes, reservoirs, underground walls and any other reinforced concrete element.
This item shall include the following works:
- Specifying design mix to be followed subject to Engineer approval,
- Supplying, transporting and storing of the concrete ingredients,
- Mixing, Pouring, transporting, placing, vibrating and curing and depicting areas of pouring
against earth or un-blinded hardcore if any,
- Horizontal, sloped, vertical and curved work,
- Placing or finishing to falls and cross falls,
- Smooth finish,
- Construction and contraction joints, water bars, dowels and caps,
- Working around pipes, reinforcements, cutting channels, chases, mortises, pockets and holes
including grouting, filling and making good,
- Form-work main frames, plywood and timber and polystyrene layers where needed,
- Form-work design and construction if any,
- Supports, battens, struts, bracing, wedging and fixing, easing, striking and removing of
formwork,
- Overlaps, passing at angles and re-propping if approved,
- Supporting concrete of any thickness at any height,
- Any width or height of formwork,
- Any concrete section or profile, projection or recesses including sealing open ends,
- All cutting, splayed edging or alike,
- Forming grooves, chamfers, ribs, mortises, pockets, pipe holes, duct holes, cable holes and
providing battens and boxing,
- Supplying and placing PVC pipes for drainage in retaining walls,
- Adaptation to accommodate projecting pipes, reinforcing bars and alike,
- Access openings and temporary openings,
- Precast concrete elements with all necessary elements joints treatment,
- Fairfaced concerete for all roofs concrete (slab, beam, column, wall) in reservoirs, BS and arts
of WTP; it includes all the necessary for the proper completion of works (Appropriate
formwork, greasy oil, surface treatment, scaffolds, etc…),

Dar Al Handasah Nazih Taleb & Partners Page 10/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- Supply, transportation, storing and installation of aluminum false-ceiling with elements of


width of 10 cm at least where needed. The item shall also include the supply of all
accessories, tools, labour and all necessary requirements to complete the work as directed by
the Engineer.
- Mould release agents and surfaces curing,
- Re-using formwork and or removing formwork from site,
- All necessary additives (Air Entrainment Agent, plasticizers, protection of concrete in contact
with water, waterproofing for reservoirs …) as indicated on the drawings, in the specifications
or as directed by the Engineer.
- Supplying, transporting, storing and placing reinforcing steel (deformed and plain) for
concrete structures.
- Submission of detailed bar bending schedule,
- Shop Drawings of structure and revision thereto if any,
- Fixing bars in any position and in any member,
- Fixing bars horizontally, vertically and sloped,
- Work to any diameter, section and length,
- Forming straight, bent, and curved bars and links,
- Cutting, tying wires, spacers, chairs and the like.
- All necessary works for dowel bars placement (Drilling, filling with mortar…).
This item shall be measured in cubic meter and shall be the net volume in accordance
with the drawings.

ITEM C.2.2: BLINDING CONCRETE

This item shall consist of executing blinding concrete of class “C” or “D” which is
composed of minimum 250 kg of cement/m3 (f’c =200 Kg/cm2 ) underneath the structures and
where needed and as directed by the Engineer. This item shall include the following works:
- Specifying design mix to be followed subject to Engineer approval,
- Furnishing, transporting and storing of the concrete ingredients,
- Mixing, Pouring, transporting, placing, vibrating and curing and depicting areas of pouring
against earth or un-blinded hardcore if any,
- Horizontal, sloped, vertical and curved work,
- Placing or finishing to falls and cross falls,
- Basic plain finish, tamped finish or wrought finish,
- Formwork to edges and sloping tops,
- Any width or height of form-work,
- Form-work main frames, plywood and timber,
- Supports, battens, struts, bracing, wedging and fixing, easing, striking and removing of
formwork,
- All cutting, splayed edging or alike,
- Re-using formwork and or removing formwork from site.

Dar Al Handasah Nazih Taleb & Partners Page 11/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

This item shall be measured in cubic meter and shall be the net volume in accordance
with the drawings.

ITEM C.2.3: HOLLOW CONCRETE BLOCKS

This item shall consist of supplying, transporting, storing, and placing concrete blocks for
ribbed slabs and walls including cement mortar furnishing and placing, where needed and as
directed by the Engineer.
This item shall include galvanized steel angles to fix the hollow blocks walls to the
reinforced concrete columns, beams and ceilings. All joints between reinforced concrete and
hollow block wall shall have expanded galvanized steel mesh fixed on both sides of joints with
minimum of 15 cm overlap. This item shall also include all the requirements of the technical
specifications.
This item shall be sound and thermal proofing.
This item shall be measured in cubic meters of built walls and ribbed slabs and shall be
the net volume after deduction of all openings and reinforced concrete elements, and in
accordance with the drawings or as executed in situ, measured in the presence of the Engineer and
according to his approval.

Dar Al Handasah Nazih Taleb & Partners Page 12/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.3: WATERPROOFING

ITEM C.3.1: WATERSTOP JOINTS

This item shall consist of supplying, transporting, storing and installing waterstop with all
necessary accessories complete. This item shall include the following works:
- Waterstop application as per manufacturer recommendation, fastening, splicing, welding to
special water-stop elements such as cross waterstop, Tee waterstop etc.
- Waterstop support and protection against damage during progress of work,
- Filler application to joint. The joint filler shall be 2 cm in thickness, material subject to
Engineer approval,
- Joint sealant (if necessary) material subject to Engineer approval,
- Cleaning the joint by means of compressed air all along the joint length,
- Making sure that the filler board is at place,
- Backing cord application and Shatter to vertical edges,
- Priming,
- Sealant application as per manufacturer recommendation filling the joint from cord top on.
This item shall be measured in linear meter of installed Waterstop as indicated on
drawings.

ITEM C.3.2: BITUMINOUS COATING FOR BURIED SURFACES

This item shall consist of supplying, transporting, storing and installing 2 coats of
bituminous material forming thus a damp-proofing layer. This item shall include the following
works:
- Concrete surface preparation,
- Primer supply and application,
- Bitumen supply and application as per manufacturer recommendation.
This item shall be measured in square meter of bituminous coating application.

ITEM C.3.3: WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS

This item shall consists of supplying, transporting, storing, protecting and placing
multiple coats of waterproof material in conformity with the technical specifications, material
technical sheet and as approved by the Engineer on the interior bottom slab, interior walls and
roof of water tanks. The works under this item shall also include surface preparation (including
cracks and holes treatment) prior to the application of the coating and chemical tests on water
after the application of the coating. The waterproof material shall be suitable for use with potable
water. The number of coats to be applied, the manner of application, and the total thickness of the
coating shall be according to the manufacturer’s requirements and shall be subject to the approval
of the Engineer as well.
This item shall be measured in square meter and shall be the net area in accordance to the
drawings as directed and approved by the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 13/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.3.4: VAPOR BARRIER

This item shall consist of supplying, transporting, storing and installing vapor barrier
where needed and as directed by the Engineer. This item shall also include all the necessary for
the proper completion of works as per specification.
This item shall be measured in square meter and shall be the net area in accordance with
the drawings or as executed in situ, measured in the presence of the Engineer and according to his
approval.

ITEM C.3.5: WATERPROOFING WITH THERMAL ISOLATORS

This item shall consist of furnishing, transporting and placing waterproofing system with
thermal isolators for horizontal roofs and terraces as required and as directed by the Engineer.
This item shall include the following works:
- Cleaning the surface and plugging all holes with a non-shrink mortar type Vandex
Uni-mortar or equivalent,
- Applying of G.P. primer 0.125 l/m2 type Rooftex or equivalent,
- Applying of polyurethane resin 1.5 kg/m2 type Rooftex or equivalent,
- Installation of geotextile protection 150 gr/m2,
- Placing 5 cm thick thermal insulation extruded polystyrene,
- Placing polyane film,
- Placing a protection layer of 5cm. thick of sand when needed
- Casting minimum 5cm thick (90 x 90cm) reinforced concrete screed (350kg of
cement/m3, f’c=300Kg/cm2) laid to fall with a slope of 0.5% including 1x1 cm
groove,
- All the necessary for the proper completion of works as per specification.
This item shall be measured in square meter of waterproofing membrane, thermal isolator
and concrete screed quantity as indicated on the drawings and as directed and approved by the
Engineer.
Note: The measurement shall be according to the horizontal surfaces only and no excess shall be
paid for vertical surfaces.

Dar Al Handasah Nazih Taleb & Partners Page 14/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.4: DOORS AND WINDOWS

ITEM C.4.1: STEEL & WOOD DOORS & STEEL PROTECTION

The item shall include the following:


1. Submission of work shop drawings to the Engineer's approval
2. Supply and installation of fixed frames in walls, wedges, plasters, etc…. Frame width
shall be same as the width of the wall.
3. Supply and installation of all necessary steel parts, stainless steel ironmongery and
hardware, locks, frames to install glass including hinges and all accessories as
specified in the drawings or where needed and as directed by the Engineer.
4. Paintings of all kinds not less than four coats. Two minimum protective coats
(corrosion protection coats for steel or base for wood) and two minimum final coats of
color designated by the Engineer, except for some types that should be galvanized
according to the technical specifications and the Engineer instructions.
5. Transportation and scaffolds.
6. Glass and glazing (6cm or 8cm thick).
Steel works and wood / steel door works shall meet the requirements specified in the
drawings and in the technical specifications.

ITEM C.4.1.1: WOOD DOORS

This item shall include manufacturing, furnishing, transporting and installing wood doors
and all necessary requirements as specified in the drawings and as directed by the Engineer.
This item shall be measured in square meter of wood doors as indicated on the drawings
and as directed and approved by the Engineer.

ITEM C.4.1.2: STEEL DOORS

This item shall be measured in unit of steel doors as indicated on the drawings and as
directed and approved by the Engineer.
This item shall be measured per unit of doors installed in situ in accordance with the
drawings, as indicated in the doors schedule, as directed and approved by the Engineer.

ITEM C.4.1.3: STEEL PROTECTION FOR WINDOWS

This item shall include the manufacturing, supply, transportation, storing, placing and
installation of steel protection bars for windows powder coated as specified in the drawings and as
directed by the Engineer.
This item shall be measured in m2 of steel works as indicated on the drawings and as
directed and approved by the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 15/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.4.2: ALUMINUM DOORS AND WINDOWS

This item shall include all necessary members and major components for aluminum
doors, windows and louvers such as aluminum vertical exterior mullions, horizontal rails in
addition to labor, tools and all components needed to complete the work in accordance with the
requirement of the Engineer and as described on drawings.
The work is deemed to include but not be limited to the following:
- All aluminum works shall be powder coated.
- Complying with the Shop Drawings.
- Materials and workmanship.
- Work at any height above ground floor level.
- All framing including heads, sills, abutments internal and external angles.
- Reinforcement whenever needed to avoid deflections.
- Architrave and accessories
- Glazing beads, gaskets, weather-strips
- Glass and glazing (6cm or 8cm thick).
- Movement joints.
- Brackets, bolts, fixing and fastening.
- Jointing and sealant externally and internally between the Aluminum frame and its
perimeter.
- Cutting and fitting around obstructions.
- Ironmongery and operating gears.
- Aluminum rolling shutters.
- All aluminum works shall be weather proofed and heavy duty.
Samples of the proposed aluminium and glass profiles shall be submitted to the
Engineer's approval.
This item shall also include the submission of workshop drawings to be approved by the
Engineer.
Aluminium works shall meet the requirements specified in the drawings as required and
directed by the Engineer.
This item shall be measured per unit of doors, windows or louvers installed in situ in
accordance with the drawings, as indicated in the windows schedule, as directed and approved by
the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 16/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.5: FINISHES

ITEM C.5.1: CEMENT PLASTER WORK

This item shall consist of furnishing, transporting, and placing streaked or flat plaster with
a minimum thickness of 15 mm for internal plastering and 20mm for external plastering, in two or
three layers where needed and as directed by the Engineer.
Plaster for this item shall be composed of 600 kg cement per cubic meter of sand.
This item shall include the following works:
- Mixing plaster components without using lime,
- Providing plaster protecting by special mastering,
- Wetting the plaster components with water.
This item shall be measured in square meter and shall be the net area in accordance with
the drawings, as directed and approved by the Engineer.

ITEM C.5.2: FLOOR TILES

This item shall be measured in square meter and shall be the net area in accordance with
the drawings, as directed and approved by the Engineer.
a- Colored Ceramic Tiles
This item shall be measured in square meter and shall be the net area in accordance with
the drawings, as directed and approved by the Engineer.
This item shall include the following works:
Installing 7cm sand and 3cm cement sand mortar,
- Installing white cement,
- Tile cleaning and polishing,
- All the necessary for the proper completion of works.
b- Internal Floor Finishing Screed With Hardener:
This item shall be measured in square meter and shall be the net area in accordance with
the drawings, as directed and approved by the Engineer.
This item shall consist of casting 15 cm thick concrete floor finishing class B, where
needed or directed by the Engineer. This item shall include the following works:
- Preparation works: Sub-grade preparation, finishing grading, setting of forms and
screed, and furnishing of reinforcement.
- Providing and placing 10 cm thick concrete class B.
- Providing and applying 0.5 mm color grade hardener including sodium silicate
solution to provide hardness, dust proof and all proofing to the screed floors.
- Including bituminous putty joints 3x3cm wherever and dimmed to be necessary
according to the instructions of the Engineer.
- Providing shop drawings before installation to be approved by the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 17/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- All the necessary for the proper completion of works.

ITEM C.5.3: WALL TILES

a- Colored Glazed Ceramic Wall Tiles (China Tiles)


This item shall consist of supplying, transporting, storing and placing colored glazed
ceramic wall tiles of first choice without warping with pattern including sand, mortar and white
cement.
This item shall include cleaning, polishing and all the necessary for the proper completion
of works.
This item shall be measured in square meter and shall be the net area in accordance with
the drawings, as directed and approved by the Engineer.
b- Natural Stone Cladding Rough Finish Light Ivory Color 5cm Thick
This item shall consist of supplying, transporting, storing and placing 5cm natural stone
cladding with rough finish and light ivory color, including 3 cm mortar, where needed and as
directed by the Engineer.
This item shall have a 2cm wide area of smooth finish all around the stone edges and the
rest of the face area shall be rough finished.
- Stones shall be fixed taking into consideration horizontal linearity of 20 cm height
and width 1x1 cm groove in between,
- 5x5 cm horizontal galvanized steel angles fixed on reinforced concrete,
This item shall be measured in square meter and shall be the net area (without including
opening surfaces) in accordance with the drawings, as directed and approved by the Engineer.
c- Natural Stone Cladding Smooth Finish 3cm Thick
This item shall consist of supplying, transporting, storing and placing 3cm thick nature
stone cladding smooth finish (ivory color or else), including 3cm mortar, as needed and directed
by the Engineer.
This item shall be measured in square meter and shall be the net area in accordance with
the drawings, as directed and approved by the Engineer.

ITEM C.5.4: SKIRTING

This item shall consist of supplying, transporting, storing and placing 20cm or 30cm
x10cm height colored ceramic skirting, including 1cm mortar, where needed and as directed by
the Engineer.
This item shall be measured per linear meter and shall be in accordance with the
drawings, as directed and approved by the Engineer.

ITEM C.5.5: WALL PAINT

This item shall include supplying, transporting, storing and executing paints without
counting for openings and gaps internal and external finishes needed in compliance with the
technical specifications, the drawings and as directed by the Engineer.
This item shall include the following works:
- Cleaning before and after paint,

Dar Al Handasah Nazih Taleb & Partners Page 18/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- Applying two base coats,


- Applying minimum two coats of paints on concrete with or without concrete plaster
with or without two layers of mastic,
- All the necessary for proper completion of the works.
Three (3) Types of Paints are to be applied:
a- Washable Emulsion Paint Or Enamel Paint
b- Epoxy (For Fair Faced Concrete Protection)
c- Coarse Scratched Paint
This item shall be measured in square meter and shall be the actual painted surface area
without including opening surfaces in accordance with the drawings, as directed and approved by
the Engineer.

ITEM C.5.6: RED CLAY ROOFING TILES

In all This item shall consist of supplying, transporting, and fixing red clay roofing tiles, all
fixed on 5x5 cm wooden batten which is fixed on reinforced concrete roof where needed and as
directed by the Engineer. This item shall also include the following works:
- Supplying and placing flashing, classic trims and ridge,
- All the necessary for the proper completion of works as requested.
This item shall be measured in square meters of red clay roof tiles quantity as indicated on
the drawings, as directed and approved by the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 19/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.6: EXTERNAL WORKS

ITEM C.6.1: CONCRETE CURBS

This item shall consist of supplying, transporting, storing and placing pre-cast concrete
curbs where needed and as directed by the Engineer.
This item shall include the following works:
- Construct non-mountable pre-cast curb to road walkways dimension of which shall be
20 cm x 30 cm x 50 cm.
- Item shall include for excavation, back-fill, cart away of surplus material, supply and
erection of non-mountable curb (concrete class A) including blinding (concrete class
D), hunching concrete (concrete Class B) with the required dowels as per the detailed
drawings and mortar (1:3 mix). Provision shall include also all equipment necessary
for the proper execution of works as shown and specified to the satisfaction of the
Engineer.
- The Contractor shall submit tests (one series of tests for each 2000 curbs applied on 9
units) from an independent lab showing the following curbs specifications: All pre-
cast curbs shall have a cement content of 350 kg/m3 minimum and should according
to French fascicule No. 31 be of class A and have a flexural strength greater than
10Mpa.
This item shall be measured in linear meter of concrete curbs installed as indicated on
approved shop drawings.

ITEM C.6.2: COLORED CEMENT TILES 40x40x4cm THICK

This item shall consist of supplying, transporting, storing and placing 40x40x4cm thick colored
cement tiles with a tile face grooved in square of 5cm where needed and as directed by the
Engineer.
Tiles to be used shall be in compliance to the following standards and subject to the
Engineer’s approval.
Tile shall consist of two layers:
An ordinary cement layer tile face with a minimum thickness of 15 mm (at a rate of 500
kg of cement per m3 of sand).
And a second layer with a minimum thickness of 25 mm (at a rate of 350 kg of cement
per m3 of aggregates).
A special mix design for the concrete should allow minimal presence of air within the
concrete and improve its compactness. The cement layer tile face should be vibrated and the two
layers compressed up to 150kg/cm2.
Dimensions tolerances are the following:
Tiles sides shall not exceed 1mm for 20cm (horizontally).
Tiles thickness (vertically) shall not exceed 4mm including relative thickness variation at
center and edges.
This item shall also include:

Dar Al Handasah Nazih Taleb & Partners Page 20/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- All necessary machinery and tools for bed leveling, filling with approved granular
material up to the required datum level (thickness not to exceed 20 cm), moisturizing
and compacting the fill by mean of plate compactor or steel tandem roller 500 kg.
- Not less than 4 cm thick sand supply, spreading and compacting above the granular
fill as well as the supply of (1:3) mortar mix to be applied below tiles at a thickness of
3 cm.
- Polishing and joint filling by approved means with a fluid mix of water and cement to
be approved by the Engineer.
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer.

ITEM C.6.3: CONCRETE FLOOR FINISHING

This item shall consist of casting concrete external floor finishing class B 10cm. thick, as
shown on Drawings, where needed or directed by the Engineer.
This item shall include the following works:
- Preparation works: Sub-grade preparation, finishing grading, setting of forms and
screed, and furnishing of reinforcement, consisting of steel layer of 8 mm in diameter
spaced at 20 cm maximum in both direction,
- Providing and placing concrete class B (cement mix shall be composed of 350 kg of
cement per cubic meter),
- Providing and applying 0.5 cm hardener including sodium silicate solution to provide
hardness, dust proof and oil proofing to the screed floors,
- Bituminous putty joints 3x3cm wherever deemed to be necessary according to the
instructions of the Engineer,
- All the necessary for the proper completion of works.
This item shall be measured in square meter of concrete floor finishing surface which
shall be the net area in accordance with the drawings, as directed and approved by the Engineer.

ITEM C.6.4: FENCE

This item shall be measured in linear meter of fence installed as indicated on drawings
and as directed and approved by the Engineer.

ITEM C.6.5: GATE

This item shall consist of fabricating, supplying, transporting, storing, and fixing a
metallic gate.
- All steel to be powder coated,
- Including all the necessary for proper completion of the works as per specification.
- Two reinforced concrete columns
a- Type G1 500x240
This item shall consist of fabricating, supplying, transporting, storing, and fixing a
metallic gate type G1, 5m long x 2.4m height, as indicated on drawings, where needed and as
directed by the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 21/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

This item shall be composed of 2 swinging leaves, including one swinging steel door for
pedestrian and the following:
- Steel tube frame of 100x50x5mm thick and vertical steel post 50x10mm thick welded
to steel frame each 10cm including horizontal plate of 200mmx0.5mm thick welded
to the steel post and frame at 80 cm from ground, both leaves of gates APE fixed to
35x35cm reinforced concrete column height 270 cm fixed by 6 numbers of stainless
steel hinges each leaf, including also roller fixed on the bottom of the frame and
metallic guide rail of 50x30x3mm thick steel “U” channel imbedded to the asphalt,
This item shall be measured per unit of gate installed as indicated on drawings and as
directed and approved by the Engineer.
b- Type G2 400x240
This item shall consist of fabricating, supplying, transporting, storing, and fixing a
metallic pulling gate type G2 powder coated, 4m long x 2.4 m height, as indicated on drawings,
where needed and as directed by the Engineer.
This item shall be measured per unit of gate installed as indicated on drawings and as
directed and approved by the Engineer.

ITEM C.6.6: AGGREGATE BASE COURSE

This item shall consist of supplying, transporting, placing and compacting class D
aggregate base course material provided from quarries, crushed to the gradation defined in the
technical specification.
This item shall include the following works:
- Protection of nearby structure during execution
- Surface preparation, leveling, ramming, trimming, grading and compacting of sub-
grade.
- Material procurement or excavation, loading and hauling.
- Material preparation, crushing, selecting, moisturizing, hauling, placing etc.
- Filling with class D aggregate base course material and compacting in horizontal
layers of 30 cm maximum thickness.
- Compaction shall be forwarded with heavy equipment with sufficient subsequent
number of passes to attain the required degree of Compaction stated in the technical
specification.
- All necessary for the proper execution of the works.
This item shall be measured in cubic meter of aggregate base course materials compacted
in accordance with the drawings and as directed and approved by the Engineer.

ITEM C.6.7: BITUMINOUS BASE COURSE

This item shall consist of supplying, transporting, storing, spreading and compacting
prime coat (average 1 lit/m2) and one or two layers of bituminous base course (6 cm minimum
thickness for each layer after compaction) separated by tack coat.
This item shall also include the following works:
- Specifying asphalt design mix and base coarse material subject to Engineer approval

Dar Al Handasah Nazih Taleb & Partners Page 22/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- Resources (Equipment, materials, Manpower etc.)


- Keeping the surface free of water at all time prior to execution
- Prime coat surface application at required rate including vertical edges
- 1 or 2 layers of bituminous base course and a layer of tack coat (in case of two
bituminous layers).
- Base course mix application, spreading and leveling and compacting
- Providing temporary signs and diversion signs if necessary
- Protection and cleaning at delivery
- Cleaning the paved area and making it good
- All necessary for the proper execution of the works.
This item shall be measured in square meter and shall be the net value as indicated on the
drawings and as measured in the presence of the Engineer and according to his approval.
a. One Layer Thickness = 6cm
This item shall be measured in square meter and shall be the net value as indicated on the
drawings and as measured in the presence of the Engineer and according to his approval.
b. Two Layers Thickness = 2x6cm
This item shall be measured in square meter and shall be the net value as indicated on the
drawings and as measured in the presence of the Engineer and according to his approval.

ITEM C.6.8: AGRICULTURAL TOP SOIL

Supply, spread and lightly compact in layers varying between 150 and 450 mm, to the
required thickness, agricultural topsoil, complete all as specified, shown on drawings and to the
satisfaction of the Engineer.
This item shall be measured in cubic meter and shall be the net value as indicated on the
drawings and as measured in the presence of the Engineer and according to his approval.

ITEM C.6.9: TREES AND SHRUBS, GROUND COVERS AND GRASS COVERS

Supply, install and maintain trees, shrubs, ground covers and grass covers complete
including all necessary fertilizers, fertilizing, planting, accessories, mulching, plant support,
pruning, watering, protection, maintenance and all other related works, all as specified, shown on
the drawings and to the satisfaction of the Engineer.

Prior to starting of any work the Contractor shall, at no additional cost, design the
plantation of trees, shrubs, ground covers and grass, and submit all necessary plantation layout
and shop drawings to the Engineer for approval.

This item shall be measured in square meter and shall be the net value as indicated on the
drawings and as measured in the presence of the Engineer and according to his approval.

Dar Al Handasah Nazih Taleb & Partners Page 23/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.7: METAL WORKS

ITEM C.7.1: KITCHEN CABINETS

This item shall consist of supplying, transporting, storing and placing 60 cm width
stainless steel kitchen floor cabinets where needed and as directed by the Engineer.
This item shall include:
- Stainless steel doors with all its accessories,
- Stainless steel shelves and drawers,
- Stainless steel counter top of 60 cm wide,
- Stainless steel sink with one bowl and one drainer,
- All necessary items for the proper completion of the works.
This item shall be measured in linear meter of floor and wall kitchen cabinets installation
quantity as indicated on approved shop drawings.

ITEM C.7.2: STAINLESS STEEL CAT LADDER

This item shall consist of fabricating, supplying, transporting, storing, and fixing a
stainless steel cat ladder where needed and as directed by the Engineer.
This item shall be composed of:
- 2 numbers of 3” stainless steel tube fixed to concrete with anchors and steel plates,
- 1” stainless steel steps welded to steel tube at 35cm center to center,
- 2 numbers of 2” stainless steel tube,
- 1” stainless steel ring at 50cm center to center for protection,
- All the necessary for proper completion of the works as per specification.
This item shall be measured per linear meter of stainless steel cat ladder installed as
indicated on drawings and as directed and approved by the Engineer.

ITEM C.7.3: STEEL WORKS

This item shall consist of supplying, transporting, storing and installing all kind of steel
works (stainless steel) such as: reservoirs and valve chambers access openings, reservoirs vent
pipes, hand rails, steps, cable trenches covers, grills, checkered plates, grating etc… as shown on
drawings and as deemed to be necessary and as requested by the Engineer on site. The works shall
include the following:
- Submission of application details and revision thereto if any subject to Engineer
consent.
- Supply and installation of all components, elements, fixing devices, supports, fittings,
coverings and accessories.
- Fabrication, erection, including temporary support and bracing.
- Any number, section type, size or length of components and fittings.

Dar Al Handasah Nazih Taleb & Partners Page 24/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- Axle, locks, rails, operating mechanism, bolts, nuts, washers, rivets, anchor bolts,
fixing devices and the like.
- Cleaning, painting (3 layers of epoxy painting or galvanizing or Zink coating) of all
equipment and fittings as described in the technical specifications and as requested by
the Engineer.
- All necessary welding works and piping works with fitting and supports.
- All that is necessary for proper execution and completion of the works.
This item shall be measured in kilogram of steel works installed as indicated on drawings
and as requested by the Engineer.

ITEM C.7.4: DRAINAGE PIPES FOR RESERVOIRS

This item shall consist of fabricating, supplying, transporting, storing, and installing
galvanized steel or PVC pipes for rain water drainage for the reservoirs including pipe
connections, tools, labor and all necessary requirements to make a complete installation.
All reservoirs shall be drained properly to the nearest stream without damaging property
as approved by the Engineer. The number, diameter and location of drainage pipes shall be as
indicated on reservoirs drawings.
This item shall be measured by linear meter of drainage pipes for each reservoir
completely installed with all necessary connections and fixing accessories to the approval of the
Engineer. Draining the roof slabs of reservoirs and pumping station including the floor drains.

ITEM C.7.5: DUCTILE IRON COVER AND FRAME

Supply and installation of a heavy or medium duty of Ductile Iron cover (according to the
road classification and location of manholes) and frame as mentioned in the technical
specification and directed by the Engineer.
This item shall be measured per unit of ductile iron cover completely installed to the
approval of the Engineer.

ITEM C.7.6: VALVE CHAMBER ACCESS DOOR

Supply and installation of a steel door as indicated on the drawings, mentioned in the
technical specification and directed by the Engineer. This item shall be measured per unit of
access doors completely installed to the approval of the Engineer.
This item shall include the following:
1. Supply and installation of fixed frames in walls, wedges, plasters, etc ...
2. Supply and installation of all necessary steel parts, stainless steel ironmongery and
hardware, locks, including hinges and all accessories.
3. Paintings of all kinds not less than four coats. Two minimum protective coats
(corrosion protection coats for steel or base for wood) and two minimum final coats of
color designated by the Engineer.
4. Transportation.

Dar Al Handasah Nazih Taleb & Partners Page 25/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.8: GEOTECHNICAL INVESTIGATION

Note: The geotechnical investigation shall be performed in order to evaluate the bearing
capacities, material characteristics and potential geotechnical problems of the foundation soil for
sites where structures will be executed and where requested by the Engineer.

ITEM C.8.1: PRELIMINARY REPORT

This item shall include but not limited to the following works:
- Plans scale 1/500 showing locations, coordinates and characteristics of all proposed
investigation boreholes.
- Report specifying:
Location, depth and characteristics of each borehole.
The nature, number and distribution of samples with all field and laboratory tests
to be performed on each sample.
The nature of investigation and tests to be conducted in each borehole, prior to
commencement of works.
For every site to be investigated a separate report should be prepared by the Contractor
and submitted to the Engineer for approval.

ITEM C.8.2: RELOCATION OF DRILLING RIG

This item shall include the relocation and operation of machinery, equipment, instruments
and alike, from borehole to another (in the same site or in another far site) including labor, tools,
accessories etc. mobilization and demobilization between consecutive boreholes or as deemed
necessary on site, complete, subject to Engineer consent.

ITEM C.8.3: VERTICAL CORING IN OVERBURDEN

This item shall consist of drilling boreholes in any type of soil except rock to a depth not
exceeding 30 meters for a diameter size to be approved by the Engineer.
This item shall include the following works:
- Drilling to any depth below 30 m.
- Casing, sampling, coring, preserving, storing, delivering and any other requirements
for soil sample preservation as requested and directed by the Engineer.

ITEM C.8.4: VERTICAL CORING IN ROCK

This item shall consist of drilling boreholes in rock to a depth not exceeding 30 meters for
a diameter size to be approved by the Engineer.
This item shall include the following works:
- Drilling in rock to any depth below 30 m.
- Casing, sampling, coring, preserving, storing, delivering and any other requirements
for soil sample preservation as requested and directed by the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 26/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.8.5: LABORATORY AND SITE TESTS ON SOIL AND ROCK SAMPLES

This item shall consist of conducting all site and laboratory tests on soil and rock samples
for each borehole, requested by the Engineer and aiming to evaluate the bearing capacity and to
identify any potential geotechnical problem. These tests could include, but not limited to:
- SPT, Specific gravity of soil, Porosity, Natural moisture content, Void index,
Unconfined Compressive Strength, Atteberg limits, Chemical tests, Abrasion test,
Los Angeles test, Sieve and hydrometer analysis, Shear test, Cohesion and angle of
friction.
- Any other site and Laboratory test necessary for the calculation of the bearing
capacity and determine the characteristics of the foundation soil on several depths.
The number of samples and tests as well as the nature of tests to be performed should be
approved by the Engineer for each borehole.

ITEM C.8.6: FINAL REPORT

The work shall consist of submitting final detailed comprehensive report, for every site to
be investigated, containing all investigations, boreholes samples and tests conducted under this
section. This item shall include detailed description of all core samples executed and it shall
summarize:
- Soil strata
- Rock degree of alteration
- Weight of discontinuities
- Water head measurements and results
- Rock quality designation (RQD).
- Detailed description of all in situ tests and laboratory tests executed.
- Calculation and conclusions of soil bearing capacity in each borehole in function of
the borehole depth.
- Proposition of the most convenient foundation type for each structure in the
concerned site.
- Recommendations for potential geotechnical problems in the foundation such as:
sliding, instability, excessive settlement… and proposals for treatment.

Dar Al Handasah Nazih Taleb & Partners Page 27/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.9: ELECTROMECHANICAL WORKS

NOT APPLICABLE

Dar Al Handasah Nazih Taleb & Partners Page 28/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.10: MECHANICAL WORKS FOR RESERVOIRS


ITEM C.10.1.a: GATE VALVE

Supply, transportation, storage, installation and testing of a gate valve at reservoir outlet,
flanged, with nominal diameter and nominal pressure as specified, including:
- flanges
- joints
- concrete supports
- tee, elbow, reducer, adapters… if necessary
- fixing and mounting accessories (Connection flanges, bolts, nuts, etc …)
Gate valves shall be measured by unit and shall be classified for payment according to
diameter and nominal pressure.

ITEM C.10.1.b: NEEDLE VALVE

Supply, transportation, storage, installation and testing of a gate control valve, Needle
plunger type, with anti-cavitation trim and flow sensor at reservoir inlet, flanged, with nominal
diameter and nominal pressure as specified, including:
- flanges
- joints
- concrete supports
- tee, elbow, reducer, adapters… if necessary
- fixing and mounting accessories (Connection flanges, bolts, nuts, etc …)
Gate valves shall be measured by unit and shall be classified for payment according to
diameter and nominal pressure.

ITEM C.10.2: STRAINER FOR WATER METERS

The item shall include the supply, transportation, storing and installation of a strainer for
water meter mounted upstream the water meter, including all necessary accessories as directed by
the Engineer.
The strainer for water meter shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.

ITEMS C.10.3:WATER METER

Supply, transportation, storage, installation and testing of water meter, including:


- flanges
- joints
- concrete supports
- tee, elbow, reducer… if necessary

Dar Al Handasah Nazih Taleb & Partners Page 29/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- fixing and mounting accessories (Connection flanges, bolts, nuts, etc …)


- flow straightener / stabilizer of same diameter “DN” and nominal pressure “PN” to be
installed directly before the water meter if so required by the manufacturer.

ITEM C.10.3.1: WATER METER COUNTER

This item shall be installed on distribution pipes including signal transmitter 4.20mA.
This item shall be measured by unit and classified for payment according to pipeline
(mounted on) diameter and nominal pressure.

ITEM C.10.3.2: MECHANICAL FLOWMETER

This item shall be installed on transmission and pumping lines feeding reservoirs including
pulsed output and data logger connection.
This item shall be measured by unit and classified for payment according to pipeline
(mounted on) diameter and nominal pressure.

ITEM C.10.4: BUTTERFLY VALVE

Supply, transportation, storage, installation and testing of a butterfly valve, flanged-type,


with nominal diameter and nominal pressure as specified, including:
- flanges
- joints
- concrete supports
- tee, elbow, reducer, adapter… if necessary
- fixing and mounting accessories (Connection flanges, bolts, nuts, etc …)
Butterfly valves shall be measured by unit and shall be classified for payment according to
diameter and nominal pressure.

ITEM C.10.5: AIR VALVE

Supply, transportation, storage, installation and testing of a flanged-type air valves: single
air release valves and triple function (double) air valves, as shown and specified, including:
- Tee
- Isolating valve
- Joints, connections, flanges, reducers, transition pipes, bolts, nuts, etc …
- Concrete supports
- fixing and mounting accessories
Air valves shall be measured by unit and shall be classified for payment according to the
type, diameter and nominal pressure of the air valve.

Dar Al Handasah Nazih Taleb & Partners Page 30/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

ITEM C.10.6: STRAINER

This item shall include furnishing, transporting, storing, installing and testing strainers
inside the reservoirs on the end of each outlet pipe as indicated on drawings and as directed by the
Engineer. The works shall include but not be limited to:
- Installation of strainers, flanges and all related fittings,
- Construction of concrete supports,
- All components necessary to provide a complete installation.
Strainers shall be measured by unit and shall be classified for payment according to
diameter and nominal pressure.

ITEM C.10.7: FLOAT-VALVE

Supply, transportation, storage, installation and testing of a float-valve, flanged-type, with


nominal diameter and nominal pressure as specified in the Drawings and Bill of Quantities,
including:
- flanges
- joints
- fixing and mounting accessories (Connection flanges, bolts, nuts, etc …)
Float-valves shall be measured by unit and shall be classified for payment according to
diameter and nominal pressure.

ITEM C.10.8: GAUGE GLASS LEVEL INDICATOR

Supply, transportation, storage, installation and testing of a gauge glass level indicator for
the reservoir including fixing and mounting accessories.
The price shall be paid by unit of glass level indicator completely installed and tested.

ITEM C.10.9: PIPES AND FITTINGS FOR RESERVOIRS

This item shall include furnishing, transporting, storing, installing and testing ductile iron
pipes or welded steel pipes with internal and external epoxy coating and fittings to link the
reservoirs to the pumping pipes, distribution pipes, transmission pipes and drainage pipes as
indicated on drawings and as directed by the Engineer. The works shall include but not be limited
to:
- All necessary pipes and fittings (Dismantling joints, tees, elbows, reducers, anchoring
pipes with puddle flanges, …) inside reservoirs,
- All necessary pipes and fittings (Dismantling joints, tees, elbows, reducers, anchoring
pipes with puddle flanges, …) to connect the reservoirs to the pumping lines,
- All necessary pipes and fittings (Dismantling joints, tees, elbows, reducers, anchoring
pipes with puddle flanges, …) to connect the reservoirs to the distribution lines,
- All necessary pipes and fittings (Dismantling joints, tees, elbows, reducers, anchoring
pipes with puddle flanges, …) to connect the reservoirs to the transmission lines,

Dar Al Handasah Nazih Taleb & Partners Page 31/32


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

4. PREAMBLE TO BILL C: RESERVOIRS

- All necessary pipes and fittings (Dismantling joints, tees, elbows, reducers, anchoring
pipes with puddle flanges, …) to connect the reservoirs to the overflow and washout
pipes,
- Overflow and washout pipes shall be extended to the nearest watercourse (including
pipes, fittings, excavation, backfilling, land reinstatement, …) in order to properly drain
the reservoirs,
- Pipe brackets, rubber joints, bolts, nuts, etc …
- Construction of concrete supports,
- All components necessary to provide a complete installation.
This item shall be paid as a lump sum for a complete pipes and fittings system installed and
tested as specified in the bill of quantities, according to the technical specifications, supplier’s
recommendation and to the satisfaction of the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 32/32


Preamble to Bill D: Booster Stations
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

5. PREAMBLE TO BILL D: BOOSTER STATIONS

5. PREAMBLE TO BILL D: BOOSTER STATIONS

ITEM D.1 to D.8

Refer to the description in Preamble to Bill C

Dar Al Handasah Nazih Taleb & Partners Page 1/2


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

5. PREAMBLE TO BILL D: BOOSTER STATIONS

ITEM D.9: ELECTROMECHANICAL WORKS

Refer to Technical Specifications, Part VII: Particular Specifications

ITEM D.9.1.1: MECHANICAL INSTALLATION FOR BUILDINGS

Supply, transportation, storage, installation and testing of all equipment and materials for a
complete mechanical installation in the pumping station as shown and specified, including:
- Water supply system, including:
Main water pipe with tapping from intake chamber or
the borehole inspection chamber and pressure reducer
Valve box with gate & check valve
Galvanized steel tank 1000 liters or 4000 liters
Booster if needed of 1 pump 0.6 l/s at 10 m head
Electric water heater 80 liters / 1500 W
Cold and hot water piping with fittings and accessories
Faucets, mixers, valves, check valves, vents…
- Wastewater and rainwater drainage system, including:
Floor drains
Floor cleanouts
Roof drains
Vents and roof vent caps
Reinforced concrete inspection chamber 60 x 60 cm
including cast iron frame and cover
Piping with fittings and accessories
Septic tank
- Sanitary fixtures including complete sets of toilet seat, lavatory, shower basin with
complete accessories. Number of sets to be defined according to related pumping
station drawings.
- Exhaust fan with louver shutters as per drawings.
- Split Unit including insulation and refrigerant charging of copper pipes as shown in
drawings (where needed), pad, electrical wirings, modulating valves, valves, strainers,
automatic air vents, electric heater, thermostats and controls.
This item shall be paid as a lump sum for a complete mechanical system installed and
tested in the pumping station according to the technical specifications, supplier’s recommendation
and to the satisfaction of the Engineer.

Dar Al Handasah Nazih Taleb & Partners Page 2/2


Preamble to Bill E: Water Treatment Plant
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

6. PREAMBLE TO BILL E: INTAKE, LOW LIFT PUMPING STATION,


HIGH LIFT PUMPING STATION AND TREATMENT PLANT

6. PREAMBLE TO BILL E: INTAKE, LOW LIFT PUMPING STATION, HIGH


LIFT PUMPING STATION AND TREATMENT PLANT

ITEM E.1 to E.8

Refer to the description in Preamble to Bill C

ITEM E.1.12 COAGULANT STORAGE

This item shall be measured as Lump Sum as directed & approved by the Engineer and
shall include but not limited to the following works:
general cleaning and grubbing of the ground surface where needed and or directed
by the Engineer
excavating and disposing materials of any kind and type encountered during work
supplying, transporting, placing and compacting one or more layer of selected fill
or backfill materials spread around structures, and where is needed, as specified in
technical specification and/or as directed by the Engineer.
executing reinforced concrete class A which is composed of minimum 350 kg
cement/m3 (f’c = 300 Kg/cm2 ) for foundations, beams, retaining walls, columns,
slabs, canals, manholes, reservoirs, underground walls and any other reinforced
concrete element.
executing blinding concrete of class “C” or “D” which is composed of minimum
250 kg of cement/m3 (f’c =200 Kg/cm2) underneath the structures and where
needed and as directed by the Engineer.
All necessary doors and windows as shown on the drawings and/or as directed or
approved by the Engineer
For Electrometrical works efer to Technical Specifications, Part VII: Particular
Specifications

ITEM E.1.13 CHLORINE STORE

This item shall be measured as Lump Sum as directed & approved by the Engineer and
shall include but not limited to the following works:
general cleaning and grubbing of the ground surface where needed and or directed
by the Engineer
excavating and disposing materials of any kind and type encountered during work
supplying, transporting, placing and compacting one or more layer of selected fill
or backfill materials spread around structures, and where is needed, as specified in
technical specification and/or as directed by the Engineer.
executing reinforced concrete class A which is composed of minimum 350 kg
cement/m3 (f’c = 300 Kg/cm2 ) for foundations, beams, retaining walls, columns,
slabs, canals, manholes, reservoirs, underground walls and any other reinforced
concrete element.

Dar Al Handasah Nazih Taleb & Partners Page 1/4


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

6. PREAMBLE TO BILL E: INTAKE, LOW LIFT PUMPING STATION,


HIGH LIFT PUMPING STATION AND TREATMENT PLANT

executing blinding concrete of class “C” or “D” which is composed of minimum


250 kg of cement/m3 (f’c =200 Kg/cm2) underneath the structures and where
needed and as directed by the Engineer.
All necessary doors and windows as shown on the drawings and/or as directed or
approved by the Engineer
For Electrometrical works efer to Technical Specifications, Part VII: Particular
Specifications

Dar Al Handasah Nazih Taleb & Partners Page 2/4


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

6. PREAMBLE TO BILL E: INTAKE, LOW LIFT PUMPING STATION,


HIGH LIFT PUMPING STATION AND TREATMENT PLANT

ITEM E.9: ELECTROMECHANICAL WORKS

Refer to the description in Preamble to Bill D

ITEM E.9.1.2: LABORATORY EQUIPMENTS

A fully equipped secure laboratory shall be provided consisting of the following areas:
General Laboratory
Micro-Biological Laboratory
Chemical and Equipment Store
Office with Computer facility for data logging etc.
Facilities and equipment shall be provided by the Contractor to enable the laboratory staff
to carry out the following tests conveniently, efficiently and to the required accuracy for the
specified water quality parameters.
Analysis of all parameters listed in Table 1
In addition:
- Suspended Solids
- Chlorine residuals
- Sludge concentrations
- Treatment chemicals checks
- Jar tests
- Sludge settling tests
- Sieve analysis (filter media etc.)
- THM’s
- Filter media analysis
The laboratory shall be equipped with:
Refrigerator
Drying oven
Incubator
Balance (on concrete slab)
Fume Cupboard
Gas supply
Safety equipment – Fist Aid, Eyewash etc.
Microscope
Range of hydrometers
Vacuum generator

Dar Al Handasah Nazih Taleb & Partners Page 3/4


Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

6. PREAMBLE TO BILL E: INTAKE, LOW LIFT PUMPING STATION,


HIGH LIFT PUMPING STATION AND TREATMENT PLANT

Waste disposal
All equipment shall include sufficient spares for five years operation, chemicals and other
requirements to allow the laboratory to function as above.

Dar Al Handasah Nazih Taleb & Partners Page 4/4


Preamble to Bill F: Dayworks
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water & Sewerage Bill Of Quantities
Dohuk Water Directorate Part I : Preamble

7. PREAMBLE TO BILL F - DAYWORKS

7. PREAMBLE TO BILL F: DAYWORKS

The Contract Rates for various classes of labor in the Dayworks Schedule shall cover all
the Contractor’s obligations whatsoever in providing and maintaining such labor at the place of
work including wages, payment for conditions and for skill, bonus traveling and subsistence
allowances and expenses, guaranteed time, holidays with pay, insurance of all kinds, pensions,
site supervision, watching, administrative and welfare chores, the use and maintenance of staging,
scaffolding, portable electric tools, non-mechanical plant and hand tools of every kind, overheads,
profit and all incidental expenses.

Dar Al Handasah Nazih Taleb & Partners Page 1/1


PART II: BILLS
Bill A – General Requirements
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill A - GENERAL REQUIREMENTS


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
A.1 MOBILIZATION / DEMOBILIZATION
This item shall be paid as a lump sum valuD. 65% of the lump sum value will
be paid upon mobilization completion, and the remaining 35% after the Only…….……...………………………………
termination of site clearance upon completion of works. 1 L.S. ……………………………. ID
A.2 OPERATION AND MAINTENANCE Only…….……...………………………………
Carry out operation and maintenance of the Project for 24 Months 24 Month ……………………………. ID
Total Bill A - General Requirements (ID)

Only
IRAQI DINAR

1/1
Bill B – Pipelines Installation
Batofa Pumping Lines
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Pumping Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.1 CUTTING OF PAVED ROADS FOR PIPE TRENCHES AND MANHOLES
This item shall be measured by linear meter along the pipe centerline.
B.1.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...…………………………
11,250 l.m. …………………………………. ID
B.2 EXCAVATION FOR PIPE TRENCHES
This item shall be measured by linear meter along the pipe centerline.
B.2.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...…………………………
11,250 l.m. …………………………………. ID
B.3 UNCLASSIFIED EXCAVATION (for pipe supporting and protection) Only…….……...…………………………
This item shall be measured by cubic meters. 235 m3 …………………………………. ID
B.4 REINFORCED CONCRETE CLASS B (for pipeworks) Only…….……...…………………………
This item shall be measured by cubic meters. 150 m3 …………………………………. ID
B.5 CONCRETE CLASS C (for pipeworks) Only…….……...…………………………
This item shall be measured by cubic meters. 150 m3 …………………………………. ID
B.7 SUPPLY, LAYING AND TESTING OF WELDED STEEL PIPES AND
ACCESSORIES
This item shall be measured in linear meter of pipes completely installed and
tested.
B.7.3 DN 800 mm
X52,
PFA 20,
Minimum Wall Thickness: 8.12 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.5mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...…………………………
microns, 10,150 l.m. …………………………………. ID

1/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Pumping Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.7.4 DN 800 mm
X52,
PFA 30,
Minimum Wall Thickness: 11.38 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.5mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...…………………………
microns, 1,100 l.m. …………………………………. ID
B.8.2 SUPPLY AND INSTALLATION OF TRIPLE FUNCTION (DOUBLE) AIR
VALVES ANTI SHOCK TYPE
This item shall be measured in unit of triple function air-release valve anti shock
type completely installed and tested.
B.8.2.2 DN200 mm - PN16 bars Only…….……...…………………………
17 unit …………………………………. ID
B.9 SUPPLY AND INSTALLATION OF WASHOUT VALVES
This item shall be measured in unit of washout valve completely installed and
tested.
B.9.15 DN300 mm - PN16 bars Only…….……...…………………………
5 unit …………………………………. ID
B.9.16 DN300 mm - PN40 bars Only…….……...…………………………
2 unit …………………………………. ID
B.10 SUPPLY AND INSTALLATION OF BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
B.10.18 DN800 mm - PN16 bars Only…….……...…………………………
8 unit …………………………………. ID
B.10.19 DN800 mm - PN40 bars Only…….……...…………………………
2 unit …………………………………. ID
B.12 CONSTRUCTION OF REINFORCED CONCRETE MANHOLES
This item shall be measured in unit of manholes
B.12.1 For a manhole type A Only…….……...…………………………
25 unit …………………………………. ID

2/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Pumping Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.12.3 For a manhole type C Only…….……...…………………………
11 unit …………………………………. ID
B.12.5 For a manhole type E Only…….……...…………………………
2 unit …………………………………. ID
B.13 SELECTED FILL & BACKFILL (around thrust blocks & pipe supports) Only…….……...…………………………
This item shall be measured by cubic meters. 235 m3 …………………………………. ID
B.14 BACKFILLING PIPE TRENCHES
This item shall be measured by linear meters along the center line of pipes
B.14.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...…………………………
11,250 l.m. …………………………………. ID
B.15 REPAVING OF PIPE TRENCHES AND AROUND MANHOLES
This item shall be measured by linear meters along the center line of pipes
B.15.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...…………………………
11,250 l.m. …………………………………. ID
B.16 SUPPLY AND INSTALLATION OF INLINE CHECK VALVES
This item shall be measured in unit of triple function single air-release valve
completely installed and testeD.
B.16.2 b1 Only…….……...…………………………
3 unit …………………………………. ID
Total Bill B - Batofa Pumping Lines (ID)
Only
IRAQI DINAR

3/3
Bill B – Pipelines Installation
Mangesh Pumping Lines
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Pumping Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.1 CUTTING OF PAVED ROADS FOR PIPE TRENCHES AND MANHOLES
This item shall be measured by linear meter along the pipe centerline.
B.1.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...……………………………
22,000 l.m. ………………………………. ID
B.1.3 For a 70cm width trench (DN300 mm Pipes) Only…….……...……………………………
1,400 l.m. ………………………………. ID
B.1.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...……………………………
12,000 l.m. ………………………………. ID
B.2 EXCAVATION FOR PIPE TRENCHES
This item shall be measured by linear meter along the pipe centerline.
B.2.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...……………………………
22,000 l.m. ………………………………. ID
B.2.3 For a 70cm width trench (DN300 mm Pipes) Only…….……...……………………………
1,400 l.m. ………………………………. ID
B.2.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...……………………………
12,000 l.m. ………………………………. ID
B.3 UNCLASSIFIED EXCAVATION (for pipe supporting and protection) Only…….……...……………………………
This item shall be measured by cubic meters. 480 m3 ………………………………. ID
B.4 REINFORCED CONCRETE CLASS B (for pipeworks) Only…….……...……………………………
This item shall be measured by cubic meters. 310 m3 ………………………………. ID
B.5 CONCRETE CLASS C (for pipeworks) Only…….……...……………………………
This item shall be measured by cubic meters. 250 m3 ………………………………. ID
B.6 SUPPLY, LAYING AND TESTING OF DUCTILE IRON PIPES AND
ACCESSORIES
This item shall be measured in linear meter of pipes completely installed and
tested.
B.6.1 DN 100 mm Only…….……...……………………………
16,600 l.m. ………………………………. ID
B.6.2 DN 150 mm Only…….……...……………………………
5,400 l.m. ………………………………. ID
B.6.5 DN 300 mm Only…….……...……………………………
1,400 l.m. ………………………………. ID

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Pumping Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.7 SUPPLY, LAYING AND TESTING OF WELDED STEEL PIPES AND
ACCESSORIES
This item shall be measured in linear meter of pipes completely installed and
tested.
B.7.3 DN 800 mm
X52,
PFA 20,
Minimum Wall Thickness: 8.12 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.5mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...……………………………
microns, 11,500 l.m. ………………………………. ID
B.7.4 DN 800 mm
X52,
PFA 30,
Minimum Wall Thickness: 11.38 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.5mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...……………………………
microns, 500 l.m. ………………………………. ID
B.8 SUPPLY AND INSTALLATION OF AIR VALVES
B.8.1 SUPPLY AND INSTALLATION OF TRIPLE FUNCTION (DOUBLE) AIR
VALVES
This item shall be measured in unit of triple function single air-release valve
completely installed and testeD.
B.8.1.1 DN50 mm - PN16 bars Only…….……...……………………………
13 unit ………………………………. ID
B.8.1.2 DN50 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
B.8.1.6 DN100 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Pumping Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.8.1.7 DN100 mm - PN25 bars Only…….……...……………………………
3 unit ………………………………. ID
B.8.1.8 DN100 mm - PN40 bars Only…….……...……………………………
3 unit ………………………………. ID
B.8.2 SUPPLY AND INSTALLATION OF TRIPLE FUNCTION (DOUBLE) AIR
VALVES ANTI SHOCK TYPE
This item shall be measured in unit of triple function air-release valve anti shock
type completely installed and tested.
B.8.2.1 DN100 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
B.8.2.2 DN200 mm - PN16 bars Only…….……...……………………………
14 unit ………………………………. ID
B.9 SUPPLY AND INSTALLATION OF WASHOUT VALVES
This item shall be measured in unit of washout valve completely installed and
tested.
B.9.1 DN50 mm - PN16 bars Only…….……...……………………………
7 unit ………………………………. ID
B.9.4 DN80 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
B.9.6 DN80 mm - PN40bars Only…….……...……………………………
1 unit ………………………………. ID
B.9.15 DN300 mm - PN16 bars Only…….……...……………………………
13 unit ………………………………. ID
B.9.16 DN300 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
B.10 SUPPLY AND INSTALLATION OF BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
B.10.3 DN100 mm - PN40 bars Only…….……...……………………………
1 unit ………………………………. ID
B.10.6 DN150 mm - PN40 bars Only…….……...……………………………
1 unit ………………………………. ID

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Pumping Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.10.10 DN300 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
B.10.18 DN800 mm - PN16 bars Only…….……...……………………………
8 unit ………………………………. ID
B.12 CONSTRUCTION OF REINFORCED CONCRETE MANHOLES
This item shall be measured in unit of manholes
B.12.1 For a manhole type A Only…….……...……………………………
52 unit ………………………………. ID
B.12.2 For a manhole type B Only…….……...……………………………
3 unit ………………………………. ID
B.12.3 For a manhole type C Only…….……...……………………………
9 unit ………………………………. ID
B.12.5 For a manhole type E Only…….……...……………………………
4 unit ………………………………. ID
B.13 SELECTED FILL & BACKFILL (around thrust blocks & pipe supports) Only…….……...……………………………
This item shall be measured by cubic meters. 480 m3 ………………………………. ID
B.14 BACKFILLING PIPE TRENCHES
This item shall be measured by linear meters along the center line of pipes
B.14.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...……………………………
22,000 l.m. ………………………………. ID
B.14.3 For a 70cm width trench (DN300 mm Pipes) Only…….……...……………………………
1,400 l.m. ………………………………. ID
B.14.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...……………………………
12,000 l.m. ………………………………. ID
B.15 REPAVING OF PIPE TRENCHES AND AROUND MANHOLES
This item shall be measured by linear meters along the center line of pipes b2
B.15.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...……………………………
22,000 l.m. ………………………………. ID
B.15.3 For a 70cm width trench (DN300 mm Pipes) Only…….……...……………………………
1,400 l.m. ………………………………. ID
B.15.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...……………………………
12,000 l.m. ………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Pumping Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.16 SUPPLY AND INSTALLATION OF INLINE CHECK VALVES
This item shall be measured in unit of triple function single air-release valve
completely installed and testeD.
B.16.1 DN200 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
B.16.2 DN700 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
Total Bill B - Mangesh Pumping Lines (ID)

Only
IRAQI DINAR

5/5
Bill B – Pipelines Installation
Batofa Transmission Lines
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.1 CUTTING OF PAVED ROADS FOR PIPE TRENCHES AND MANHOLES
This item shall be measured by linear meter along the pipe centerline.

B.1.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...……………………………
57,750 l.m. ………………………………. ID
B.1.2 For a 60cm width trench (DN200 & DN250 mm Pipes) Only…….……...……………………………
3,100 l.m. ………………………………. ID
B.1.4 For a 80cm width trench (DN400 mm Pipes) Only…….……...……………………………
2,200 l.m. ………………………………. ID
B.1.5 For a 90cm width trench (DN500 & DN600 mm Pipes) Only…….……...……………………………
41,000 l.m. ………………………………. ID
B.2 EXCAVATION FOR PIPE TRENCHES
This item shall be measured by linear meter along the pipe centerline.
B.2.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...……………………………
57,750 l.m. ………………………………. ID
B.2.2 For a 60cm width trench (DN200 & DN250 mm Pipes) Only…….……...……………………………
3,100 l.m. ………………………………. ID
B.2.4 For a 80cm width trench (DN400 mm Pipes) Only…….……...……………………………
2,200 l.m. ………………………………. ID
B.2.5 For a 90cm width trench (DN500 & DN600 mm Pipes) Only…….……...……………………………
41,000 l.m. ………………………………. ID
B.3 UNCLASSIFIED EXCAVATION (for pipe supporting and protection)
Only…….……...……………………………
This item shall be measured by cubic meters.
585 m3 ………………………………. ID
B.4 REINFORCED CONCRETE CLASS B (for pipeworks)
Only…….……...……………………………
This item shall be measured by cubic meters. 375 m3 ………………………………. ID
B.5 CONCRETE CLASS C (for pipeworks)
Only…….……...……………………………
This item shall be measured by cubic meters. 300 m3 ………………………………. ID

1/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.6 SUPPLY, LAYING AND TESTING OF DUCTILE IRON PIPES AND
ACCESSORIES
This item shall be measured in linear meter of pipes completely installed and
tested.
B.6.1 DN 100 mm Only…….……...……………………………
35,000 l.m. ………………………………. ID
B.6.2 DN 150 mm Only…….……...……………………………
22,750 l.m. ………………………………. ID
B.6.4 DN 250 mm Only…….……...……………………………
3,100 l.m. ………………………………. ID
B.6.6 DN 400 mm Only…….……...……………………………
2,200 l.m. ………………………………. ID
B.6.7 DN 500 mm Only…….……...……………………………
8,000 l.m. ………………………………. ID
B.7 SUPPLY, LAYING AND TESTING OF WELDED STEEL PIPES AND
ACCESSORIES
This item shall be measured in linear meter of pipes completely installed and
tested.
B.7.1 DN 600 mm
X52,
PFA 20,
Minimum Wall Thickness: 6.93 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.0mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...……………………………
microns, 20,250 l.m. ………………………………. ID

2/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.7.2 DN 600 mm
X52,
PFA 30,
Minimum Wall Thickness: 9.38 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.0mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...……………………………
microns, 12,750 l.m. ………………………………. ID
B.8 SUPPLY AND INSTALLATION OF AIR VALVES
B.8.1 SUPPLY AND INSTALLATION OF TRIPLE FUNCTION (DOUBLE) AIR
VALVES
This item shall be measured in unit of triple function single air-release valve
completely installed and tested.
B.8.1.1 DN50 mm - PN16 bars Only…….……...……………………………
39 unit ………………………………. ID
B.8.1.2 DN50 mm - PN25 bars Only…….……...……………………………
17 unit ………………………………. ID
B.8.1.3 DN50 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
B.8.1.5 DN80 mm - PN25 bars Only…….……...……………………………
4 unit ………………………………. ID
B.8.1.7 DN100 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
B.8.1.8 DN100 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
B.8.1.9 DN150 mm - PN16 bars Only…….……...……………………………
9 unit ………………………………. ID
B.8.1.10 DN150 mm - PN25 bars Only…….……...……………………………
5 unit ………………………………. ID

3/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.9 SUPPLY AND INSTALLATION OF WASHOUT VALVES
This item shall be measured in unit of washout valve completely installed and
tested.
B.9.1 DN50 mm - PN16 bars Only…….……...……………………………
16 unit ………………………………. ID
B.9.2 DN50 mm - PN25 bars Only…….……...……………………………
17 unit ………………………………. ID
B.9.3 DN50 mm - PN40 bars Only…….……...……………………………
1 unit ………………………………. ID
B.9.4 DN80 mm - PN16 bars Only…….……...……………………………
11 unit ………………………………. ID
B.9.5 DN80 mm - PN25 bars Only…….……...……………………………
8 unit ………………………………. ID
B.9.8 DN150 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
B.9.10 DN200 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
B.9.11 DN200 mm - PN40 bars Only…….……...……………………………
3 unit ………………………………. ID
B.9.12 DN250 mm - PN16 bars Only…….……...……………………………
10 unit ………………………………. ID
B.9.13 DN250 mm - PN25 bars Only…….……...……………………………
6 unit ………………………………. ID
B.9.14 DN250mm - PN40 bars Only…….……...……………………………
3 unit ………………………………. ID

4/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.10 SUPPLY AND INSTALLATION OF BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
B.10.1 DN100 mm - PN16 bars Only…….……...……………………………
15 unit ………………………………. ID
B.10.2 DN100 mm - PN25 bars Only…….……...……………………………
9 unit ………………………………. ID
B.10.3 DN100 mm - PN40 bars Only…….……...……………………………
1 unit ………………………………. ID
B.10.4 DN150 mm - PN16 bars Only…….……...……………………………
7 unit ………………………………. ID
B.10.5 DN150 mm - PN25 bars Only…….……...……………………………
4 unit ………………………………. ID
B.10.8 DN250 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
B.10.9 DN250 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
B.10.12 DN400 mm - PN40 bars Only…….……...……………………………
3 unit ………………………………. ID
B.10.13 DN500 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
B.10.14 DN500 mm - PN25 bars Only…….……...……………………………
4 unit ………………………………. ID
B.10.15 DN600 mm - PN16 bars Only…….……...……………………………
9 unit ………………………………. ID
B.10.16 DN600 mm - PN25 bars Only…….……...……………………………
7 unit ………………………………. ID
B.10.17 DN600 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID

5/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.11 SUPPLY AND INSTALLATION OF PRESSURE RELIEF VALVES
This item shall be measured in unit of pressure relief valve completely installed
and tested.
B.11.1 DN100 mm - PN16 bars Only…….……...……………………………
4 unit ………………………………. ID
B.11.2 DN100 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
B.11.3 DN100 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
B.11.4 DN150 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
B.11.10 DN500 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
B.11.11 DN500 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
B.11.12 DN600 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
B.11.13 DN600 mm - PN25 bars Only…….……...……………………………
4 unit ………………………………. ID
B.11.14 DN600 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
B.12 CONSTRUCTION OF REINFORCED CONCRETE MANHOLES
This item shall be measured in unit of manholes
B.12.1 For a manhole type A Only…….……...……………………………
175 unit ………………………………. ID

6/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.12.2 For a manhole type B Only…….……...……………………………
19 unit ………………………………. ID
B.12.3 For a manhole type C Only…….……...……………………………
11 unit ………………………………. ID
B.12.4 For a manhole type D Only…….……...……………………………
11 unit ………………………………. ID
B.12.5 For a manhole type E Only…….……...……………………………
3 unit ………………………………. ID
B.13 SELECTED FILL & BACKFILL (around thrust blocks & pipe supports) Only…….……...……………………………
This item shall be measured by cubic meters. 585 m3 ………………………………. ID
B.14 BACKFILLING PIPE TRENCHES
This item shall be measured by linear meters along the center line of pipes
B.14.1 For a 50cm width trench (DN100 & DN150 mm Pipes)
Only…….……...……………………………
57,750 l.m. ………………………………. ID
B.14.2 For a 60cm width trench (DN200 & DN250 mm Pipes) Only…….……...……………………………
3,100 l.m. ………………………………. ID
B.14.4 For a 80cm width trench (DN400 mm Pipes) Only…….……...……………………………
2,200 l.m. ………………………………. ID
B.14.5 For a 90cm width trench (DN500 & DN600 mm Pipes) Only…….……...……………………………
41,000 l.m. ………………………………. ID
B.15 REPAVING OF PIPE TRENCHES AND AROUND MANHOLES
This item shall be measured by linear meters along the center line of pipes
B.15.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...……………………………
57,750 l.m. ………………………………. ID
B.15.2 For a 60cm width trench (DN200 & DN250 mm Pipes) Only…….……...……………………………
3,100 l.m. ………………………………. ID

7/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Batofa Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.15.4 For a 80cm width trench (DN400 mm Pipes) Only…….……...……………………………
2,200 l.m. ………………………………. ID
B.15.5 For a 90cm width trench (DN500 & DN600 mm Pipes)
Only…….……...……………………………
41,000 l.m. ………………………………. ID
B.17 SUPPLY, INSTALLATION AND CONSTRUCTION OF PRESSURE
BREAK TANKS AND RELATED ACCESSORIES Only…….……...……………………………
This item shall be measured in unit 2 unit ………………………………. ID
Total Bill B - Batofa Transmission Lines (ID)

Only
IRAQI DINAR

8/8
Bill B – Pipelines Installation
Mangesh Transmission Lines
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.1 CUTTING OF PAVED ROADS FOR PIPE TRENCHES AND MANHOLES
This item shall be measured by linear meter along the pipe centerline.
B.1.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...…………………………
120,250 l.m. …………………………………. ID
B.1.2 For a 60cm width trench (DN200 & DN250 mm Pipes) Only…….……...…………………………
15,950 l.m. …………………………………. ID
B.1.3 For a 70cm width trench (DN300 mm Pipes) Only…….……...…………………………
3,000 l.m. …………………………………. ID
B.1.5 For a 90cm width trench (DN500 & DN600 mm Pipes) Only…….……...…………………………
18,500 l.m. …………………………………. ID
B.1.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...…………………………
32,250 l.m. …………………………………. ID
B.2 EXCAVATION FOR PIPE TRENCHES
This item shall be measured by linear meter along the pipe centerline.
B.2.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...…………………………
120,250 l.m. …………………………………. ID
B.2.2 For a 60cm width trench (DN200 & DN250 mm Pipes) Only…….……...…………………………
15,950 l.m. …………………………………. ID
B.2.3 For a 70cm width trench (DN300 mm Pipes) Only…….……...…………………………
3,000 l.m. …………………………………. ID
B.2.5 For a 90cm width trench (DN500 & DN600 mm Pipes) Only…….……...…………………………
18,500 l.m. …………………………………. ID
B.2.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...…………………………
32,250 l.m. …………………………………. ID

1/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.3 UNCLASSIFIED EXCAVATION (for pipe supporting and protection)
Only…….……...…………………………
This item shall be measured by cubic meters.
1,200 m3 …………………………………. ID
B.4 REINFORCED CONCRETE CLASS B (for pipeworks) Only…….……...…………………………
This item shall be measured by cubic meters. 775 m3 …………………………………. ID
B.5 CONCRETE CLASS C (for pipeworks) Only…….……...…………………………
This item shall be measured by cubic meters. 650 m3 …………………………………. ID
B.6 SUPPLY, LAYING AND TESTING OF DUCTILE IRON PIPES AND
ACCESSORIES
This item shall be measured in linear meter of pipes completely installed and
tested.
B.6.1 DN 100 mm Only…….……...…………………………
94,250 l.m. …………………………………. ID
B.6.2 DN 150 mm Only…….……...…………………………
26,000 l.m. …………………………………. ID
B.6.3 DN 200 mm Only…….……...…………………………
3,450 l.m. …………………………………. ID
B.6.4 DN 250 mm Only…….……...…………………………
12,500 l.m. …………………………………. ID
B.6.5 DN 300 mm Only…….……...…………………………
3,000 l.m. …………………………………. ID

2/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.7 SUPPLY, LAYING AND TESTING OF WELDED STEEL PIPES AND
ACCESSORIES
This item shall be measured in linear meter of pipes completely installed and
tested.
B.7.1 DN 600 mm
X52,
PFA 20,
Minimum Wall Thickness: 6.93 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.0mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...…………………………
microns, 9,000 l.m. …………………………………. ID
B.7.2 DN 600 mm
X52,
PFA 30,
Minimum Wall Thickness: 9.38 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.0mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...…………………………
microns, 9,500 l.m. …………………………………. ID
B.7.3 DN 800 mm
X52,
PFA 20,
Minimum Wall Thickness: 8.12 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.5mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...…………………………
microns, 10,000 l.m. …………………………………. ID

3/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.7.4 DN 800 mm
X52,
PFA 30,
Minimum Wall Thickness: 11.38 mm,
Three-layers extruded polypropylene external coating: Minimum thickness:
2.5mm,
Liquid epoxy internal lining measured on a dry film: Minimum thickness: 300 Only…….……...…………………………
microns, 22,500 l.m. …………………………………. ID
B.8 SUPPLY AND INSTALLATION OF TEES
This item shall be measured in unit of tee completely installed and tested.
B.8.1 Main diameter DN100 mm - PN16 bars Only…….……...…………………………
3 unit …………………………………. ID
B.8.2 Main diameter DN100 mm - PN25 bars Only…….……...…………………………
11 unit …………………………………. ID
B.8.3 Main diameter DN100 mm - PN40 bars Only…….……...…………………………
4 unit …………………………………. ID
B.8.4 Main diameter DN150 mm - PN16 bars Only…….……...…………………………
2 unit …………………………………. ID
B.8.5 Main diameter DN150 mm - PN25 bars Only…….……...…………………………
2 unit …………………………………. ID
B.8.6 Main diameter DN150 mm - PN40 bars Only…….……...…………………………
2 unit …………………………………. ID
B.8.7 Main diameter DN250 mm - PN16 bars Only…….……...…………………………
2 unit …………………………………. ID
B.8.8 Main diameter DN250 mm - PN25 bars Only…….……...…………………………
4 unit …………………………………. ID
B.8.12 Main diameter DN600 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
B.8.13 Main diameter DN600 mm - PN25 bars Only…….……...…………………………
3 unit …………………………………. ID
B.8.14 Main diameter DN800 mm - PN16 bars Only…….……...…………………………
3 unit …………………………………. ID

4/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.8.15 Main diameter DN800 mm - PN25 bars Only…….……...…………………………
9 unit …………………………………. ID
B.9 SUPPLY AND INSTALLATION OF WASHOUT VALVES
This item shall be measured in unit of washout valve completely installed and
tested.
B.9.1 DN50 mm - PN16 bars Only…….……...…………………………
26 unit …………………………………. ID
B.9.2 DN50 mm - PN25 bars Only…….……...…………………………
56 unit …………………………………. ID
B.9.3 DN50 mm - PN40 bars Only…….……...…………………………
14 unit …………………………………. ID
B.9.4 DN80 mm - PN16 bars Only…….……...…………………………
5 unit …………………………………. ID
B.9.5 DN80 mm - PN25 bars Only…….……...…………………………
20 unit …………………………………. ID
B.9.6 DN80 mm - PN40bars Only…….……...…………………………
4 unit …………………………………. ID
B.9.7 DN150 mm - PN16 bars Only…….……...…………………………
2 unit …………………………………. ID
B.9.8 DN150 mm - PN25 bars Only…….……...…………………………
4 unit …………………………………. ID
B.9.9 DN150mm - PN40 bars Only…….……...…………………………
2 unit …………………………………. ID
B.9.12 DN250 mm - PN16 bars Only…….……...…………………………
3 unit …………………………………. ID
B.9.13 DN250 mm - PN25 bars Only…….……...…………………………
6 unit …………………………………. ID
B.9.15 DN300 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
B.9.16 DN300 mm - PN25 bars Only…….……...…………………………
11 unit …………………………………. ID

5/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.10 SUPPLY AND INSTALLATION OF BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
B.10.1 DN100 mm - PN16 bars Only…….……...…………………………
19 unit …………………………………. ID
B.10.2 DN100 mm - PN25 bars Only…….……...…………………………
42 unit …………………………………. ID
B.10.3 DN100 mm - PN40 bars Only…….……...…………………………
9 unit …………………………………. ID
B.10.4 DN150 mm - PN16 bars Only…….……...…………………………
6 unit …………………………………. ID
B.10.5 DN150 mm - PN25 bars Only…….……...…………………………
4 unit …………………………………. ID
B.10.6 DN150 mm - PN40 bars Only…….……...…………………………
6 unit …………………………………. ID
B.10.7 DN200 mm - PN25 bars Only…….……...…………………………
3 unit …………………………………. ID
B.10.8 DN250 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
B.10.9 DN250 mm - PN25 bars Only…….……...…………………………
9 unit …………………………………. ID
B.10.11 DN300 mm - PN25 bars Only…….……...…………………………
2 unit …………………………………. ID
B.10.15 DN600 mm - PN16 bars Only…….……...…………………………
5 unit …………………………………. ID
B.10.16 DN600 mm - PN25 bars Only…….……...…………………………
4 unit …………………………………. ID
B.10.18 DN800 mm - PN16 bars Only…….……...…………………………
7 unit …………………………………. ID
B.10.19 DN800 mm - PN25 bars Only…….……...…………………………
10 unit …………………………………. ID

6/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.11 SUPPLY AND INSTALLATION OF PRESSURE RELIEF VALVES
This item shall be measured in unit of pressure relief valve completely installed
and tested.
B.11.1 DN100 mm - PN16 bars Only…….……...…………………………
5 unit …………………………………. ID
B.11.2 DN100 mm - PN25 bars Only…….……...…………………………
8 unit …………………………………. ID
B.11.3 DN100 mm - PN40 bars Only…….……...…………………………
1 unit …………………………………. ID
B.11.4 DN150 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
B.11.5 DN150 mm - PN25 bars Only…….……...…………………………
3 unit …………………………………. ID
B.11.6 DN150 mm - PN40 bars Only…….……...…………………………
2 unit …………………………………. ID
B.11.7 DN250 mm - PN16 bars Only…….……...…………………………
2 unit …………………………………. ID
B.11.8 DN250 mm - PN25 bars Only…….……...…………………………
4 unit …………………………………. ID
B.11.9 DN300 mm - PN25 bars Only…….……...…………………………
2 unit …………………………………. ID
B.11.12 DN600 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
B.11.13 DN600 mm - PN25 bars Only…….……...…………………………
2 unit …………………………………. ID
B.11.15 DN800 mm - PN16 bars Only…….……...…………………………
5 unit …………………………………. ID
B.11.16 DN800 mm - PN25 bars Only…….……...…………………………
3 unit …………………………………. ID

7/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.12 CONSTRUCTION OF REINFORCED CONCRETE MANHOLES
This item shall be measured in unit of manholes
B.12.1 For a manhole type A Only…….……...…………………………
363 unit …………………………………. ID
B.12.2 For a manhole type B Only…….……...…………………………
38 unit …………………………………. ID
B.12.3 For a manhole type C Only…….……...…………………………
11 unit …………………………………. ID
B.12.4 For a manhole type D Only…….……...…………………………
18 unit …………………………………. ID
B.12.5 For a manhole type E Only…….……...…………………………
11 unit …………………………………. ID
B.13 SELECTED FILL & BACKFILL (around thrust blocks & pipe supports) Only…….……...…………………………
This item shall be measured by cubic meters. 1,200 m3 …………………………………. ID
B.14 BACKFILLING PIPE TRENCHES
This item shall be measured by linear meters along the center line of pipes
B.14.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...…………………………
120,250 l.m. …………………………………. ID
B.14.2 For a 60cm width trench (DN200 & DN250 mm Pipes) Only…….……...…………………………
15,950 l.m. …………………………………. ID
B.14.3 For a 70cm width trench (DN300 mm Pipes) Only…….……...…………………………
3,000 l.m. …………………………………. ID
B.14.5 For a 90cm width trench (DN500 & DN600 mm Pipes) Only…….……...…………………………
18,500 l.m. …………………………………. ID
B.14.6 For a 110cm width trench (DN800 mm Pipes) Only…….……...…………………………
32,250 l.m. …………………………………. ID

8/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill B - Mangesh Transmission Lines


ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
B.15 REPAVING OF PIPE TRENCHES AND AROUND MANHOLES
This item shall be measured by linear meters along the center line of pipes

B.15.1 For a 50cm width trench (DN100 & DN150 mm Pipes) Only…….……...…………………………
120,250 l.m. …………………………………. ID
B.15.2 For a 60cm width trench (DN200 & DN250 mm Pipes) Only…….……...…………………………
15,950 l.m. …………………………………. ID
B.15.3 For a 70cm width trench (DN300 mm Pipes) Only…….……...…………………………
3,000 l.m. …………………………………. ID
B.15.4 For a 90cm width trench (DN500 & DN600 mm Pipes) Only…….……...…………………………
18,500 l.m. …………………………………. ID
B.15.5 For a 110cm width trench (DN800 mm Pipes) Only…….……...…………………………
32,250 l.m. …………………………………. ID
B.17 SUPPLY, INSTALLATION AND CONSTRUCTION OF PRESSURE
BREAK TANKS AND RELATED ACCESSORIES Only…….……...…………………………
This item shall be measured in unit 6 unit …………………………………. ID
Total Bill B - Mangesh Transmission Lines (ID)
Only
IRAQI DINAR

9/9
Bill B – Pipelines Installation
Summary Bill B – Pipelines Installation
Ministry of Municipality and Tourism General Directorate of Water Sewerage Mangesh, Batofa and Zawita Water Supply Project
Dohuk Water Directorate Bill Summary

Bill Of Quantities: Mangesh, Batofa and Zawita Water Supply Project


Summary Bill B - Pipelines Installation

Description Amount (ID)

Bill B - Batofa Pumping Lines


Bill B - Mangesh Pumping Lines

Bill B - Batofa Transmission Lines

Bill B - Mangesh Transmission Lines

Total Carried to General Summary

1/1
Bill C – Reservoirs
Batufa Reservoir 5,000 m3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*2,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.1: EARTHWORK
C.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and
shall be the net projected horizontal area in accordance to the drawings & 3,250 m2 Only…….……...……………………………
survey plan submitted and approved by the Engineer. ………………………………. ID
C.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 14,500 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...……………………………
edges. ………………………………. ID
C.1.4 ROCKFILL AND STRUCTURAL BACKFILL
This item shall be measured in cubic meter and shall be the net volume
according to the Contract Drawings and as directed & approved by the 12,300 m3 Only…….……...……………………………
Engineer. ………………………………. ID
Sub-Total C.1 (ID)
C.2: CONCRETE & MASONRY
C.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...……………………………
595 m3
………………………………. ID
b. For Slabs and Beams Only…….……...……………………………
315 m3
………………………………. ID
c. For Walls and Columns Only…….……...……………………………
440 m3
………………………………. ID
C.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...……………………………
130 m3
accordance with the drawings. ………………………………. ID
Sub-Total C.2 (ID)

1/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*2,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.3: WATERPROOFING
C.3.1 WATERSTOP JOINTS
This item shall be measured in linear meter of installed Waterstop as indicated Only…….……...……………………………
150 l.m.
on drawings. ………………………………. ID
C.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating Only…….……...……………………………
200 m2
application. ………………………………. ID
C.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...……………………………
3,600 m2
accordance to the drawings as directed and approved by the Engineer. ………………………………. ID
C.3.4 VAPOR BARRIER
This item shall be measured in square meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence 1,250 m2 Only…….……...……………………………
of the Engineer and according to his approval. ………………………………. ID
C.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 1,250 m2 Only…….……...……………………………
as directed and approved by the Engineer. ………………………………. ID
Sub-Total C.3 (ID)
C.5: FINISHES
C.5.5 WALL PAINT
EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface
700 m2 Only…….……...……………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ………………………………. ID
Sub-Total C.5 (ID)

2/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*2,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.6: EXTERNAL WORKS
C.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 1,250 m2 Only…….……...……………………………
………………………………. ID
C.6.4 FENCE
This item shall be measured in linear meter of fence installed as indicated on Only…….……...……………………………
230 l.m.
drawings and as directed and approved by the Engineer. ………………………………. ID
C.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings 1 unit Only…….……...……………………………
and as directed and approved by the Engineer. ………………………………. ID
C.6.6 AGGREGATE BASE COURSE
This item shall be measured in cubic meter of aggregate base course materials
compacted in accordance with the drawings and as directed and approved by 20 m3 Only…….……...……………………………
the Engineer. ………………………………. ID
C.6.7 BITUMINOUS BASE COURSE
a. TWO LAYERS THICKNESS = 2x6cm
This item shall be measured in square meter and shall be the net value as
indicated on the drawings and as measured in the presence of the Engineer 60 m2
Only…….……...……………………………
and according to his approval. ………………………………. ID
C.6.8 AGRICULTURAL TOP SOIL
This item shall be measured in cubic meter of materials in accordance with Only…….……...……………………………
the drawings and as directed and approved by the Engineer.
125 m3
………………………………. ID
C.6.9 TREES AND SHRUBS, GROUND COVERS AND GRASS COVERS
This item shall be measured in cubic meter of materials in accordance with Only…….……...……………………………
250 m2
the drawings and as directed and approved by the Engineer. ………………………………. ID
Sub-Total C.6 (ID)

3/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*2,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.7: METAL WORKS
C.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 12 l.m. Only…….……...……………………………
Engineer. ………………………………. ID
C.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated Only…….……...……………………………
on drawings and as requested by the Engineer. 1,500 kg
………………………………. ID
C.7.4 DRAINAGE PIPES FOR RESERVOIRS
This item shall be measured by linear meter of drainage pipes for each
reservoir completely installed with all necessary connections and fixing 70 l.m.
accessories to the approval of the Engineer. Draining the roof slabs of Only…….……...……………………………
reservoirs and pumping station including the floor drains. ………………………………. ID
C.7.5 DUCTILE IRON COVER AND FRAME
This item shall be measured per unit of ductile iron cover completely installed 4 unit Only…….……...……………………………
to the approval of the Engineer. ………………………………. ID
C.7.6 VALVE CHAMBER ACCESS DOOR
This item shall be measured per unit of access doors completely installed to 1 unit Only…….……...……………………………
the approval of the Engineer. ………………………………. ID
Sub-Total C.7 (ID)
C.8: GEOTECHNICAL INVESTIGATION
Note: The geotechnical investigation shall be performed in order to evaluate
the bearing capacities, material characteristics and any potential
geotechnical problems of the foundation soil for sites where structures will be
executed and where requested by the Engineer.
C.8.1 PRELIMINARY REPORT
This item shall be paid by unit of report, for each site to be investigated, upon
1 unit
approval and acceptance of the aforesaid report after revision and Only…….……...……………………………
modification of Engineer instructions and comments. ………………………………. ID

4/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*2,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.8.2 RELOCATION OF DRILLING RIG
This item shall be paid by unit of relocation from completed borehole to the
1 unit
Engineer satisfaction to another borehole (in the same site or in another far Only…….……...……………………………
site). ………………………………. ID
C.8.3 VERTICAL CORING IN OVERBURDEN
This item shall be in linear meter of borehole accepted by the Engineer,
quantity of which shall be the distance between the natural ground level and 16 l.m.
the top of rock formation as measured in situ and determined by the Engineer. Only…….……...……………………………
………………………………. ID
C.8.4 VERTICAL CORING IN ROCK
This item shall be in linear meter of borehole accepted by the Engineer,
quantity of which shall be the distance between the level and the bottom of 8 l.m.
overburden and the lower cored rock formation as measured in situ and Only…….……...……………………………
determined by the Engineer. ………………………………. ID
C.8.5 LABORATORY AND SITE TESTS ON SOIL AND ROCK SAMPLES
This item shall be in unit of set of tests for each borehole, necessary to
conclude the soil bearing capacity in function of the depth in each borehole or 5 unit
to identify geotechnical problems, conducted as directed, & accepted by the
Engineer, payable 60% upon test completion and the remaining at the Only…….……...……………………………
submittal of the final revised report ………………………………. ID
C.8.6 FINAL REPORT
This item shall be paid by unit upon report submittal subject to Engineer 1 unit Only…….……...……………………………
consent approval & revision thereto if modification prevails. ………………………………. ID
Sub-Total C.8 (ID)
C.10: MECHANICAL WORKS FOR RESERVOIRS
C.10.1.a GATE VALVE
This item shall be measured in unit of gate valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID

5/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*2,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
11.00 NEEDLE VALVE
This item shall be measured in unit of needle valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.2 STRAINER FOR WATER METERS
The strainer for water meter shall be measured by unit and shall be classified
for payment according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.3 WATER METER
C.10.3.1 WATER METER COUNTER
This item shall be measured in unit of water meter completely installed and
tested.
DN600 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
C.10.3.2 MECHANICAL FLOWMETER
This item shall be measured by unit and classified for payment according to
pipeline (mounted on) diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.4 BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
DN600 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN800 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
C.10.5 TRIPLE FUNCTION (DOUBLE) AIR VALVES
This item shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN150 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID

6/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*2,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
DN200 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.6 STRAINER
This item shall be measured in unit of strainers completely installed and
tested.
DN600 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
C.10.7 FLOAT-VALVE
Float-valves shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.8 GAUGE GLASS LEVEL INDICATOR
The price shall be paid by unit of glass level indicator completely installed and Only…….……...……………………………
tested. 1 unit ………………………………. ID
C.10.10 PIPES AND FITTINGS FOR RESERVOIRS
This item shall be paid as a set of a complete pipes and fittings system
installed and tested for each of the corresponding springs, reservoirs types and
pumping stations, according to the technical specifications, supplier’s
recommendation and to the satisfaction of the Engineer.
For Batufa Proposed Reservoir capacity of 5000 m3 Only…….……...……………………………
1 unit ………………………………. ID
Sub-Total C.10 (ID)
Total Bill C - Res 2*2,500 m3 (ID)
Only
IRAQI DINAR

7/8
Bill C – Reservoirs
Mangesh Reservoir 3,000 m3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*1,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.1: EARTHWORK
C.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and
shall be the net projected horizontal area in accordance to the drawings & 1,800 m2 Only…….……...……………………………
survey plan submitted and approved by the Engineer. ………………………………. ID
C.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 10,000 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...……………………………
edges. ………………………………. ID
Sub-Total C.1 (ID)
C.2: CONCRETE & MASONRY
C.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...……………………………
510 m3
………………………………. ID
b. For Slabs and Beams Only…….……...……………………………
265 m3
………………………………. ID
c. For Walls and Columns Only…….……...……………………………
285 m3
………………………………. ID
C.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...……………………………
100 m3
accordance with the drawings. ………………………………. ID
Sub-Total C.2 (ID)

1/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*1,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.3: WATERPROOFING
C.3.1 WATERSTOP JOINTS
This item shall be measured in linear meter of installed Waterstop as indicated Only…….……...……………………………
150 l.m.
on drawings. ………………………………. ID
C.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating Only…….……...……………………………
90 m2
application. ………………………………. ID
C.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...……………………………
2,900 m2
accordance to the drawings as directed and approved by the Engineer. ………………………………. ID
C.3.4 VAPOR BARRIER
This item shall be measured in square meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence 930 m2 Only…….……...……………………………
of the Engineer and according to his approval. ………………………………. ID
C.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 930 m2 Only…….……...……………………………
as directed and approved by the Engineer. ………………………………. ID
Sub-Total C.3 (ID)
C.5: FINISHES
C.5.5 WALL PAINT
EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface
b. 750 m2 Only…….……...……………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ………………………………. ID
Sub-Total C.5 (ID)

2/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*1,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.6: EXTERNAL WORKS
C.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 930 m2 Only…….……...……………………………
………………………………. ID
C.6.4 FENCE
This item shall be measured in linear meter of fence installed as indicated on Only…….……...……………………………
200 l.m.
drawings and as directed and approved by the Engineer. ………………………………. ID
C.6.5 GATE
TYPE G1 500x240
a. This item shall be measured per unit of gate installed as indicated on drawings 1 unit Only…….……...……………………………
and as directed and approved by the Engineer. ………………………………. ID
C.6.6 AGGREGATE BASE COURSE
This item shall be measured in cubic meter of aggregate base course materials
compacted in accordance with the drawings and as directed and approved by 60 m3 Only…….……...……………………………
the Engineer. ………………………………. ID
C.6.7 BITUMINOUS BASE COURSE
TWO LAYERS THICKNESS = 2x6cm
This item shall be measured in square meter and shall be the net value as
a. 180 m2 Only…….……...……………………………
indicated on the drawings and as measured in the presence of the Engineer
and according to his approval. ………………………………. ID
C.6.8 AGRICULTURAL TOP SOIL
This item shall be measured in cubic meter of materials in accordance with Only…….……...……………………………
120 m3
the drawings and as directed and approved by the Engineer. ………………………………. ID
C.6.9 TREES AND SHRUBS, GROUND COVERS AND GRASS COVERS
This item shall be measured in cubic meter of materials in accordance with Only…….……...……………………………
240 m2
the drawings and as directed and approved by the Engineer. ………………………………. ID
Sub-Total C.6 (ID)

3/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*1,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.7: METAL WORKS
C.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 12 l.m. Only…….……...……………………………
Engineer. ………………………………. ID
C.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated Only…….……...……………………………
1,000 kg
on drawings and as requested by the Engineer. ………………………………. ID
C.7.4 DRAINAGE PIPES FOR RESERVOIRS
This item shall be measured by linear meter of drainage pipes for each
reservoir completely installed with all necessary connections and fixing 70 l.m.
accessories to the approval of the Engineer. Draining the roof slabs of Only…….……...……………………………
reservoirs and pumping station including the floor drains. ………………………………. ID
C.7.5 DUCTILE IRON COVER AND FRAME
This item shall be measured per unit of ductile iron cover completely installed 4 unit Only…….……...……………………………
to the approval of the Engineer. ………………………………. ID
C.7.6 VALVE CHAMBER ACCESS DOOR
This item shall be measured per unit of access doors completely installed to 1 unit Only…….……...……………………………
the approval of the Engineer. ………………………………. ID
Sub-Total C.7 (ID)
C.8: GEOTECHNICAL INVESTIGATION
Note: The geotechnical investigation shall be performed in order to evaluate
the bearing capacities, material characteristics and any potential
geotechnical problems of the foundation soil for sites where structures will be
executed and where requested by the Engineer.
C.8.1 PRELIMINARY REPORT
This item shall be paid by unit of report, for each site to be investigated, upon
1 unit
approval and acceptance of the aforesaid report after revision and Only…….……...……………………………
modification of Engineer instructions and comments. ………………………………. ID

4/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*1,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.8.2 RELOCATION OF DRILLING RIG
This item shall be paid by unit of relocation from completed borehole to the
1 unit
Engineer satisfaction to another borehole (in the same site or in another far Only…….……...……………………………
site). ………………………………. ID
C.8.3 VERTICAL CORING IN OVERBURDEN
This item shall be in linear meter of borehole accepted by the Engineer,
quantity of which shall be the distance between the natural ground level and 16 l.m.
the top of rock formation as measured in situ and determined by the Engineer. Only…….……...……………………………
………………………………. ID
C.8.4 VERTICAL CORING IN ROCK
This item shall be in linear meter of borehole accepted by the Engineer,
quantity of which shall be the distance between the level and the bottom of 8 l.m.
overburden and the lower cored rock formation as measured in situ and Only…….……...……………………………
determined by the Engineer. ………………………………. ID
C.8.5 LABORATORY AND SITE TESTS ON SOIL AND ROCK SAMPLES
This item shall be in unit of set of tests for each borehole, necessary to
conclude the soil bearing capacity in function of the depth in each borehole or 5 unit
to identify geotechnical problems, conducted as directed, & accepted by the
Engineer, payable 60% upon test completion and the remaining at the Only…….……...……………………………
submittal of the final revised report ………………………………. ID
C.8.6 FINAL REPORT
This item shall be paid by unit upon report submittal subject to Engineer 1 unit Only…….……...……………………………
consent approval & revision thereto if modification prevails. ………………………………. ID
Sub-Total C.8 (ID)
C.10: MECHANICAL WORKS FOR RESERVOIRS
C.10.1.a GATE VALVE
This item shall be measured in unit of gate valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID

5/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*1,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.10.1.b NEEDLE VALVE
This item shall be measured in unit of needle valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.2 STRAINER FOR WATER METERS
The strainer for water meter shall be measured by unit and shall be classified
for payment according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.3 WATER METER
C.10.3.1 WATER METER COUNTER
This item shall be measured in unit of water meter completely installed and
tested.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.3.2 MECHANICAL FLOWMETER
This item shall be measured by unit and classified for payment according to
pipeline (mounted on) diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.4 BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
C.10.5 TRIPLE FUNCTION (DOUBLE) AIR VALVES
This item shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN200 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID

6/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 2*1,500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.10.6 STRAINER
This item shall be measured in unit of strainers completely installed and
tested.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.7 FLOAT-VALVE
Float-valves shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.8 GAUGE GLASS LEVEL INDICATOR
The price shall be paid by unit of glass level indicator completely installed and Only…….……...……………………………
testeD. 1 unit ………………………………. ID
C.10.10 PIPES AND FITTINGS FOR RESERVOIRS
This item shall be paid as a set of a complete pipes and fittings system
installed and tested for each of the corresponding springs, reservoirs types and
pumping stations, according to the technical specifications, supplier’s
recommendation and to the satisfaction of the Engineer.
For Mangesh Pressure Break Tank capacity of 3000 m3 Only…….……...……………………………
1 unit ………………………………. ID
Sub-Total C.10 (ID)
Total Bill C - Res 2*1,500 m3 (ID)
Only
IRAQI DINAR

7/7
Bill C – Reservoirs
Mangesh Reservoir 500 m3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.1: EARTHWORK
C.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and
shall be the net projected horizontal area in accordance to the drawings & 1,600 m2 Only…….……...……………………………
survey plan submitted and approved by the Engineer. ………………………………. ID
C.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 4,100 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...……………………………
edges. ………………………………. ID
Sub-Total C.1 (ID)
C.2: CONCRETE & MASONRY
C.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...……………………………
79 m3
………………………………. ID
b. For Slabs and Beams Only…….……...……………………………
35 m3
………………………………. ID
c. For Walls and Columns Only…….……...……………………………
106 m3
………………………………. ID
C.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...……………………………
15 m3
accordance with the drawings. ………………………………. ID
Sub-Total C.2 (ID)

1/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.3: WATERPROOFING
C.3.1 WATERSTOP JOINTS
This item shall be measured in linear meter of installed Waterstop as indicated Only…….……...……………………………
55 l.m.
on drawings. ………………………………. ID
C.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...……………………………
25 m2
………………………………. ID
C.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...……………………………
625 m2
accordance to the drawings as directed and approved by the Engineer. ………………………………. ID
C.3.4 VAPOR BARRIER
This item shall be measured in square meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence 150 m2 Only…….……...……………………………
of the Engineer and according to his approval. ………………………………. ID
C.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 150 m2 Only…….……...……………………………
as directed and approved by the Engineer. ………………………………. ID
Sub-Total C.3 (ID)
C.5: FINISHES
C.5.5 WALL PAINT
EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
275 m2 Only…….……...……………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ………………………………. ID
Sub-Total C.5 (ID)

2/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.6: EXTERNAL WORKS
C.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 150 m2 Only…….……...……………………………
………………………………. ID
C.6.4 FENCE
This item shall be measured in linear meter of fence installed as indicated on Only…….……...……………………………
135 l.m.
drawings and as directed and approved by the Engineer. ………………………………. ID
C.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings 1 unit Only…….……...……………………………
and as directed and approved by the Engineer. ………………………………. ID
C.6.6 AGGREGATE BASE COURSE
This item shall be measured in cubic meter of aggregate base course materials
compacted in accordance with the drawings and as directed and approved by 185 m3 Only…….……...……………………………
the Engineer. ………………………………. ID
C.6.7 BITUMINOUS BASE COURSE
TWO LAYERS THICKNESS = 2x6cm
This item shall be measured in square meter and shall be the net value as
560 m2 Only…….……...……………………………
indicated on the drawings and as measured in the presence of the Engineer and
according to his approval. ………………………………. ID
C.6.8 AGRICULTURAL TOP SOIL
This item shall be measured in cubic meter of materials in accordance with the Only…….……...……………………………
80 m3
drawings and as directed and approved by the Engineer. ………………………………. ID
C.6.9 TREES AND SHRUBS, GROUND COVERS AND GRASS COVERS
This item shall be measured in cubic meter of materials in accordance with the Only…….……...……………………………
160 m2
drawings and as directed and approved by the Engineer. ………………………………. ID
Sub-Total C.6 (ID)

3/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.7: METAL WORKS
C.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 12 l.m. Only…….……...……………………………
Engineer. ………………………………. ID
C.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...……………………………
1,000 kg
drawings and as requested by the Engineer. ………………………………. ID
C.7.4 DRAINAGE PIPES FOR RESERVOIRS
This item shall be measured by linear meter of drainage pipes for each reservoir
completely installed with all necessary connections and fixing accessories to the 70 l.m.
approval of the Engineer. Draining the roof slabs of reservoirs and pumping Only…….……...……………………………
station including the floor drains. ………………………………. ID
C.7.5 DUCTILE IRON COVER AND FRAME
This item shall be measured per unit of ductile iron cover completely installed 2 unit Only…….……...……………………………
to the approval of the Engineer. ………………………………. ID
C.7.6 VALVE CHAMBER ACCESS DOOR
This item shall be measured per unit of access doors completely installed to the 1 unit Only…….……...……………………………
approval of the Engineer. ………………………………. ID
Sub-Total C.7 (ID)
C.8: GEOTECHNICAL INVESTIGATION
Note: The geotechnical investigation shall be performed in order to evaluate
the bearing capacities, material characteristics and any potential geotechnical
problems of the foundation soil for sites where structures will be executed and
where requested by the Engineer.
C.8.1 PRELIMINARY REPORT
This item shall be paid by unit of report, for each site to be investigated, upon
1 unit
approval and acceptance of the aforesaid report after revision and modification Only…….……...……………………………
of Engineer instructions and comments. ………………………………. ID

4/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.8.2 RELOCATION OF DRILLING RIG
This item shall be paid by unit of relocation from completed borehole to the
1 unit
Engineer satisfaction to another borehole (in the same site or in another far Only…….……...……………………………
site). ………………………………. ID
C.8.3 VERTICAL CORING IN OVERBURDEN
This item shall be in linear meter of borehole accepted by the Engineer, quantity
of which shall be the distance between the natural ground level and the top of 16 l.m.
rock formation as measured in situ and determined by the Engineer. Only…….……...……………………………
………………………………. ID
C.8.4 VERTICAL CORING IN ROCK
This item shall be in linear meter of borehole accepted by the Engineer, quantity
of which shall be the distance between the level and the bottom of overburden 8 l.m.
and the lower cored rock formation as measured in situ and determined by the Only…….……...……………………………
Engineer. ………………………………. ID
C.8.5 LABORATORY AND SITE TESTS ON SOIL AND ROCK SAMPLES
This item shall be in unit of set of tests for each borehole, necessary to conclude
the soil bearing capacity in function of the depth in each borehole or to identify 5 unit
geotechnical problems, conducted as directed, & accepted by the Engineer,
payable 60% upon test completion and the remaining at the submittal of the Only…….……...……………………………
final revised report ………………………………. ID
C.8.6 FINAL REPORT
This item shall be paid by unit upon report submittal subject to Engineer 1 unit Only…….……...……………………………
consent approval & revision thereto if modification prevails. ………………………………. ID
Sub-Total C.8 (ID)
C.10: MECHANICAL WORKS FOR RESERVOIRS
C.10.1.a GATE VALVE
This item shall be measured in unit of gate valve completely installed and
tested.
DN150 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID

5/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.10.1.b NEEDLE VALVE
This item shall be measured in unit of needle valve completely installed and
tested.
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.2 STRAINER FOR WATER METERS
The strainer for water meter shall be measured by unit and shall be classified for
payment according to diameter and nominal pressure.
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.3 WATER METER
C.10.3.1 WATER METER COUNTER
This item shall be measured in unit of water meter completely installed and
tested.
DN150 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.3.2 MECHANICAL FLOWMETER
This item shall be measured by unit and classified for payment according to
pipeline (mounted on) diameter and nominal pressure.
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.4 BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
testeD.
DN150 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
4 unit ………………………………. ID

6/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - Reservoirs
3
Bill C - Res 500 m
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.10.5 TRIPLE FUNCTION (DOUBLE) AIR VALVES
This item shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN50 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
DN100 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
C.10.6 STRAINER
This item shall be measured in unit of strainers completely installed and tested.

DN150 mm - PN16 bars Only…….……...……………………………


1 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.7 FLOAT-VALVE
Float-valves shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.8 GAUGE GLASS LEVEL INDICATOR
The price shall be paid by unit of glass level indicator completely installed and Only…….……...……………………………
tested. 1 unit ………………………………. ID
C.10.10 PIPES AND FITTINGS FOR RESERVOIRS
This item shall be paid as a set of a complete pipes and fittings system installed
and tested for each of the corresponding springs, reservoirs types and pumping
stations, according to the technical specifications, supplier’s recommendation
and to the satisfaction of the Engineer.
For Mangesh Regionnal Proposed Reservoir capacity of 500 m3 Only…….……...……………………………
1 unit ………………………………. ID
Total Bill C - Res 500 m3 (ID)
Only
IRAQI DINAR

7/8
Bill C – Reservoirs
Existing Reservoirs
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.2: CONCRETE & MASONRY
C.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in Only…….……...……………………………
accordance with the drawings.
1,300 m3
………………………………. ID
C.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...……………………………
accordance with the drawings.
200 m3
………………………………. ID
Sub-Total C.2 (ID)
C.3: WATERPROOFING
C.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating Only…….……...……………………………
application.
2,500 m2
………………………………. ID
C.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in
4,000 m2 Only…….……...……………………………
accordance to the drawings as directed and approved by the Engineer.
………………………………. ID
Sub-Total C.3 (ID)
C.7: METAL WORKS
C.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 175 l.m. Only…….……...……………………………
Engineer. ………………………………. ID
C.7.6 VALVE CHAMBER ACCESS DOOR
This item shall be measured per unit of access doors completely installed to 63 unit Only…….……...……………………………
the approval of the Engineer. ………………………………. ID
Sub-Total C.7 (ID)

1/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.10: MECHANICAL WORKS FOR RESERVOIRS
C.10.1.a GATE VALVE
This item shall be measured in unit of gate valve completely installed and
tested.
DN100 mm - PN16 bars Only…….……...……………………………
43 unit ………………………………. ID
DN100 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
DN100 mm - PN40 bars Only…….……...……………………………
1 unit ………………………………. ID
DN150 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN150 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
DN200 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID
DN250 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
DN250 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN350 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN400 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
DN400 mm - PN40 bars Only…….……...……………………………
1 unit ………………………………. ID
DN600 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN800 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID

2/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.10.1.b NEEDLE VALVE
This item shall be measured in unit of needle valve completely installed and
tested.
DN100 mm - PN16 bars Only…….……...……………………………
21 unit ………………………………. ID
DN100 mm - PN25 bars Only…….……...……………………………
19 unit ………………………………. ID
DN100 mm - PN40 bars Only…….……...……………………………
5 unit ………………………………. ID
DN150 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID
DN150 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
DN250 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID
DN250 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
DN400 mm - PN25 bars Only…….……...……………………………
1 unit ………………………………. ID
DN400 mm - PN40 bars Only…….……...……………………………
1 unit ………………………………. ID
DN600 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
C.10.2 STRAINER FOR WATER METERS
The strainer for water meter shall be measured by unit and shall be classified
for payment according to diameter and nominal pressure.
DN100 mm - PN16 bars Only…….……...……………………………
22 unit ………………………………. ID
DN100 mm - PN25 bars Only…….……...……………………………
20 unit ………………………………. ID
DN100 mm - PN40 bars Only…….……...……………………………
6 unit ………………………………. ID

3/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
DN150 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN150 mm - PN25 bars Only…….……...……………………………
3 unit ………………………………. ID
DN250 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN250 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
DN400 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
DN400 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
DN600 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.3 WATER METER
C.10.3.1 WATER METER COUNTER
This item shall be measured in unit of water meter completely installed and
tested.
DN100 mm - PN16 bars Only…….……...……………………………
42 unit ………………………………. ID
DN150 mm - PN16 bars Only…….……...……………………………
7 unit ………………………………. ID
DN200 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID
DN250 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID

4/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
DN350 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN600 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN800 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
C.10.3.2 MECHANICAL FLOWMETER
This item shall be measured by unit and classified for payment according to
pipeline (mounted on) diameter and nominal pressure.
DN100 mm - PN16 bars Only…….……...……………………………
22 unit ………………………………. ID
DN100 mm - PN25 bars Only…….……...……………………………
20 unit ………………………………. ID
DN100 mm - PN40 bars Only…….……...……………………………
6 unit ………………………………. ID
DN150 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN150 mm - PN25 bars Only…….……...……………………………
3 unit ………………………………. ID
DN250 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN250 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
DN400 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
DN400 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
DN600 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN800 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID

5/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.10.4 BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
DN100 mm - PN16 bars Only…….……...……………………………
131 unit ………………………………. ID
DN100 mm - PN25 bars Only…….……...……………………………
39 unit ………………………………. ID
DN100 mm - PN40 bars Only…….……...……………………………
11 unit ………………………………. ID
DN150 mm - PN16 bars Only…….……...……………………………
25 unit ………………………………. ID
DN150 mm - PN25 bars Only…….……...……………………………
5 unit ………………………………. ID
DN200 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID
DN250 mm - PN16 bars Only…….……...……………………………
18 unit ………………………………. ID
DN250 mm - PN25 bars Only…….……...……………………………
3 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID
DN350 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN400 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN400 mm - PN25 bars Only…….……...……………………………
3 unit ………………………………. ID
DN400 mm - PN40 bars Only…….……...……………………………
3 unit ………………………………. ID
DN600 mm - PN16 bars Only…….……...……………………………
9 unit ………………………………. ID
DN800 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID

6/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
C.10.5 TRIPLE FUNCTION (DOUBLE) AIR VALVES
This item shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN50 mm - PN16 bars Only…….……...……………………………
56 unit ………………………………. ID
DN50 mm - PN25 bars Only…….……...……………………………
7 unit ………………………………. ID
DN50 mm - PN40 bars Only…….……...……………………………
5 unit ………………………………. ID
DN80 mm - PN16 bars Only…….……...……………………………
7 unit ………………………………. ID
DN100 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN100 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
DN100 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
DN150 mm - PN16 bars Only…….……...……………………………
4 unit ………………………………. ID
DN200 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID
C.10.6 STRAINER
This item shall be measured in unit of strainers completely installed and
tested.
DN100 mm - PN16 bars Only…….……...……………………………
42 unit ………………………………. ID
DN150 mm - PN16 bars Only…….……...……………………………
7 unit ………………………………. ID
DN200 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID
DN250 mm - PN16 bars Only…….……...……………………………
2 unit ………………………………. ID

7/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
DN300 mm - PN16 bars Only…….……...……………………………
5 unit ………………………………. ID
DN350 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN600 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
DN800 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID
C.10.7 FLOAT-VALVE
Float-valves shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN100 mm - PN16 bars Only…….……...……………………………
22 unit ………………………………. ID
DN100 mm - PN25 bars Only…….……...……………………………
20 unit ………………………………. ID
DN100 mm - PN40 bars Only…….……...……………………………
6 unit ………………………………. ID
DN150 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN150 mm - PN25 bars Only…….……...……………………………
3 unit ………………………………. ID
DN250 mm - PN16 bars Only…….……...……………………………
6 unit ………………………………. ID
DN250 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
DN300 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
DN400 mm - PN25 bars Only…….……...……………………………
2 unit ………………………………. ID
DN400 mm - PN40 bars Only…….……...……………………………
2 unit ………………………………. ID
DN600 mm - PN16 bars Only…….……...……………………………
3 unit ………………………………. ID

8/9
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill C - RESERVOIRS
Existing Reservoirs
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
DN800 mm - PN16 bars Only…….……...……………………………
1 unit ………………………………. ID
C.10.8 GAUGE GLASS LEVEL INDICATOR
The price shall be paid by unit of glass level indicator completely installed and Only…….……...……………………………
tested. 63 unit ………………………………. ID
C.10.10 PIPES AND FITTINGS FOR RESERVOIRS
This item shall be paid as a set of a complete pipes and fittings system
installed and tested for each of the corresponding springs, reservoirs types and
pumping stations, according to the technical specifications, supplier’s
recommendation and to the satisfaction of the Engineer.
For Existing Reservoirs Only…….……...……………………………
63 unit ………………………………. ID
Total BILL C.10 (ID)
Total BILL C (ID)
Only
IRAQI DINAR

9/9
Bill C – Reservoirs
Summary Bill C – Reservoirs
Munistry of Municipalities and TourismGeneral Directorate of Water and Sewerage Mangesh, Batofa and Zawita Water Supply Project
Dohuk Water Directorate Summary Bill

Bill Of Quantities: Mangesh, Batofa and Zawita Water Supply Project


Summary Bill C - Reservoirs

Description Amount (ID)

Bill C - Reservoir 2*2,500 m3


Bill C - Reservoir 2*1,500 m3

Bill C - Reservoir 500 m3

Bill C - Existing Reservoirs

Total Carried to General Summary

1/1
Bill D – Booster Stations
BS1 - Bill 0: Siteworks
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and
shall be the net projected horizontal area in accordance to the drawings & 7,800 m2 Only…….……...………………………
survey plan submitted and approved by the Engineer. ……………………………………. ID
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 12,800 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
D.1.3 SELECTED FILL & BACKFILL
This item shall be measured in cubic meter and shall be the net volume
according to the Contract Drawings and as directed & approved by the
140 m3 Only…….……...………………………
Engineer. Wherever backfilling limits are not indicated on Contract Drawings,
the limits shall be 50cm away of blinding edges. ……………………………………. ID
D.1.4 ROCKFILL AND STRUCTURAL BACKFILL
This item shall be measured in cubic meter and shall be the net volume
according to the Contract Drawings and as directed & approved by the 230 m3 Only…….……...………………………
Engineer. ……………………………………. ID
D.1.7 WATER DISTRIBUTION SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
D.1.8 SANITARY SEWER SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
D.1.9 STORMWATER DRAINAGE SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
Sub-Total D.1 (ID)

1/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.6: EXTERNAL WORKS
D.6.1 CONCRETE CURBS
This item shall be measured in linear meter of concrete curbs installed as Only…….……...………………………
275 l.m.
indicated on approved shop drawings. ……………………………………. ID
D.6.4 FENCE
This item shall be measured in linear meter of fence installed as indicated on Only…….……...………………………
350 l.m.
drawings and as directed and approved by the Engineer. ……………………………………. ID
D.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings 1 unit Only…….……...………………………
and as directed and approved by the Engineer. ……………………………………. ID
D.6.6 AGGREGATE BASE COURSE
This item shall be measured in cubic meter of aggregate base course materials
compacted in accordance with the drawings and as directed and approved by 400 m3 Only…….……...………………………
the Engineer. ……………………………………. ID
D.6.7 BITUMINOUS BASE COURSE
a. TWO LAYERS THICKNESS = 2x6cm
This item shall be measured in square meter and shall be the net value as
1,350 m2 Only…….……...………………………
indicated on the drawings and as measured in the presence of the Engineer
and according to his approval. ……………………………………. ID
D.6.8 AGRICULTURAL TOP SOIL
This item shall be measured in cubic meter of materials in accordance with Only…….……...………………………
275 m3
the drawings and as directed and approved by the Engineer. ……………………………………. ID
D.6.9 TREES AND SHRUBS, GROUND COVERS AND GRASS COVERS
This item shall be measured in cubic meter of materials in accordance with Only…….……...………………………
475 m2
the drawings and as directed and approved by the Engineer. ……………………………………. ID
D.8: GEOTECHNICAL INVESTIGATION
Note: The geotechnical investigation shall be performed in order to evaluate
the bearing capacities, material characteristics and any potential
geotechnical problems of the foundation soil for sites where structures will be
executed and where requested by the Engineer.

2/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.8.1 PRELIMINARY REPORT
This item shall be paid by unit of report, for each site to be investigated, upon
1 unit
approval and acceptance of the aforesaid report after revision and Only…….……...………………………
modification of Engineer instructions and comments. ……………………………………. ID
D.8.2 RELOCATION OF DRILLING RIG
This item shall be paid by unit of relocation from completed borehole to the
1 unit
Engineer satisfaction to another borehole (in the same site or in another far Only…….……...………………………
site). ……………………………………. ID
D.8.3 VERTICAL CORING IN OVERBURDEN
This item shall be in linear meter of borehole accepted by the Engineer,
quantity of which shall be the distance between the natural ground level and 40 l.m.
the top of rock formation as measured in situ and determined by the Engineer. Only…….……...………………………
……………………………………. ID
D.8.4 VERTICAL CORING IN ROCK
This item shall be in linear meter of borehole accepted by the Engineer,
quantity of which shall be the distance between the level and the bottom of 20 l.m.
overburden and the lower cored rock formation as measured in situ and Only…….……...………………………
determined by the Engineer. ……………………………………. ID
D.8.5 LABORATORY AND SITE TESTS ON SOIL AND ROCK SAMPLES
This item shall be in unit of set of tests for each borehole, necessary to
conclude the soil bearing capacity in function of the depth in each borehole or 10 unit
to identify geotechnical problems, conducted as directed, & accepted by the
Engineer, payable 60% upon test completion and the remaining at the Only…….……...………………………
submittal of the final revised report ……………………………………. ID
D.8.6 FINAL REPORT
This item shall be paid by unit upon report submittal subject to Engineer 1 unit Only…….……...………………………
consent approval & revision thereto if modification prevails. ……………………………………. ID
Sub-Total D.8 (ID)

3/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.4 PLC and SCADA system
Supply, install, and connect a complete PLC and SCADA system as described
in specifications documents and drawings with full control of the Booster
Station, including remote terminal units (RTU) with 20% additional spare
capacity for each computer system complete with PCs, printers, LCD screens
displays, Mimic Panels, Communications interfaces, SCADA software, and
all cabling and necessary accessories for the connection between RTUs and 1 LS
all equipment, and their interfaces including all necessary interfacing
elements, cabling and accessories in order to ensure the communication
between all RTUs and the control room etc... as specified and shown on
drawings and approved by Engineers. Only…….……...………………………
……………………………………. ID
D.9.1.5 Earthing
Supply, install, connect, test and commission the following earthing system to
provide low connecting earth resistance less than 3 ohms complete including
earth rods, earth stranded bare copper conductor for earthing network, earth
pits, connectors, inspection boxes, clamps, test links, earth bar, excavation, 1 Item
backfilling, earthing busbars and all other related works, all as specified,
shown on the drawings and to the satisfaction of the Engineer. Only…….……...………………………
……………………………………. ID
D.9.1.6 Lightning Protection
Supply, install, connect, test and commission the following lightning
protection system, complete including air terminator, bare copper tape down
conductors, test points, surge arrestors for power systems as well as for low
4 Item
current systems as many as needed, earthing pits, all necessary accessories,
and all other related works, all as specified, shown on the drawings and to the Only…….……...………………………
satisfaction of the Engineer. ……………………………………. ID

4/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.7 Site Lighting
D.9.1.7.1 Feeder pillar
Supply, install, connect, test and commission the following feeder pillar
complete including reinforced concrete foundation, 60cmx60cm manhole for
cables access, galvanized steel plate for cable protection, ventilation louver
with screen, galvanized steel protection barrier, PVC sleeves, cabling and 1 LS
connections, all necessary accessories and other related works, all as
specified, shown on the drawings, to the satisfaction of the Engineer, and with Only…….……...………………………
full coordination with electrical local authority. ……………………………………. ID
D.9.1.7.2 Lighting Poles
Supply, install, connect, test and commission the following lighting poles,
complete with die cast aluminum lighting fixture including starters, lamp
holder, reflector and lamp, including concrete base with all required civil and
installation works with all necessary accessories, and all other related works,
all as specified, shown on the drawings and to the satisfaction of the Engineer. Only…….……...………………………
……………………………………. ID
D.9.1.7.2.1 8 m high, single bracket galvanized steel, street lighting pole, with one Only…….……...………………………
7 Item
luminaire housing 1x150W HPS lamp IP65. ……………………………………. ID
D.9.1.7.2.2 8 m high, double brackets galvanized steel, street lighting pole, with two Only…….……...………………………
luminaire housing 2x150W HPS lamp IP65. 6 Item
……………………………………. ID
D.9.1.7.7 Concrete encased duct for road crossings and cable draw pit
D.9.1.7.7.1 40cm x 40cm cable draw pit Only…….……...………………………
1 Item
……………………………………. ID
D.9.1.7.7.2 Concrete encased 1 x 100mm UPVC duct for road crossings Only…….……...………………………
10 lm
……………………………………. ID
D.9.1.7.4 External lighting cables
Supply, install, connect, test and commission the following directly burried
steel wire armoured cables for external lighting installation, complete with all
required civil and installation works with all necessary accessories, and all 1 LS
other related works, all as specified, shown on the drawings and to the Only…….……...………………………
satisfaction of the Engineer. ……………………………………. ID

5/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.7.5 Earthing for Feeder pillar and lighting poles.
Supply, install, connect, test and commission earthing system to provide low
connecting earth resistance less than 3 ohms complete including earth rods,
earth stranded bare copper conductor for feeder pillar and lighting poles
3 Item
earthing, earth pits, connectors, inspection boxes, clamps, excavation,
backfilling and all other related works, all as specified, shown on the drawings Only…….……...………………………
and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.8 Trenching and Ducting
D.9.1.8.1 Supply, install, and commission the following trenches and 6" duct banks for
main power network cabling system, complete with all needed excavation
works, backfilling and other related civil works, all as specified, shown on the 1 LS
drawings and to the satisfaction of the Engineer. Only…….……...………………………
……………………………………. ID
D.9.1.8.2 Supply, install, and commission the following manholes for main power
network cabling system, complete with all needed concrete casting, iron cast
covers, sleeves, excavation works, backfilling and other related civil works, 1 LS
all as specified, shown on the drawings and to the satisfaction of the Engineer. Only…….……...………………………
……………………………………. ID
D.9.1.9 Cabling
Supply, install, connect, test and commission the following steel wire
armoured cables for the main power network, complete including conduits,
terminal and junction boxes, jointing of cables, sealing compounds, fixing
materials, and supports, all necessary accessories, and all other related works,
all as specified, shown on the drawings and to the satisfaction of the Engineer.

MV cables Only…….……...………………………
1 LS
……………………………………. ID
LV cables Only…….……...………………………
1 LS
……………………………………. ID

6/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.10 Telephone System
D.9.1.10.1 Allow for local Telephone and DATA connection fees including the supply
and installation of all necessary cables, builder's work and accessories, and all
other related works, all as directed and to the satisfaction of the Engineer, and 1 LS
in full coordination with local relevant authority. Only…….……...………………………
……………………………………. ID
D.9.1.10.2 Supply, install, connect, test and commission the following
telecommunication system complete including cables CAT6 (minimum 25)
unless otherwise stated, UPS, pulled-in conduits or cable trays, boxes, frames,
1 LS
racks, fittings, devices, equipment, accessories and all other related works, all
as specified, shown on the drawings and to the satisfaction of the Engineer Only…….……...………………………
……………………………………. ID
D.9.1.11 Analogue Addressable Fire Alarm System
Supply, install, connect, test and commission a complete analogue addressable
fire alarm system including Main Fire Alarm Panel, repeater Panels, Manual
Call Stations, fire alarm bells, fire detectors, boxes, fire cables, conduits, 1 LS
connections, fittings and accessories and all realted works, all as specified and Only…….……...………………………
to the satisfaction of the Engineer. ……………………………………. ID
D.9.2 Telemetry Cables for the Pumping Lines including Telemetry ducts and Only…….……...………………………
1 LS
Telemetry manholes along the pumping line profile ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS1 - 0: Siteworks (ID)
Only
IRAQI DINAR

7/7
Bill D – Booster Stations
BS1 - Bill 1: Guard House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 25 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...…………………………
edges. …………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...…………………………
15 m3
…………………………………. ID
b. For Slabs and Beams Only…….……...…………………………
18 m3
…………………………………. ID
c. For Walls and Columns Only…….……...…………………………
15 m3
…………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...…………………………
5 m3
accordance with the drawings. …………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence 50 m3 Only…….……...…………………………
of the Engineer and according to his approval. …………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 60 m2 Only…….……...…………………………
as directed and approved by the Engineer. …………………………………. ID
Sub-Total D.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
TYPE WD1 (210x100)
This item shall be measured per unit of Wood door installed in situ in
2 Unit
accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...…………………………
and approved by the Engineer. …………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
a. TYPE W1 225x130cm
This item shall be measured per unit of windows including rolling shutter
1 Unit
installed in situ in accordance with the drawings, as indicated in the windows Only…….……...…………………………
schedule, as directed and approved by the Engineer. …………………………………. ID
b. TYPE W2 100x200cm
This item shall be measured per unit of windows installed in situ in
2 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
c. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in
2 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
d. TYPE D1 210x80cm
This item shall be measured per unit of windows installed in situ in
2 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
e. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in
2 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.4 (ID)

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in
accordance with the drawings, as directed and approved by the Engineer 150 m2 Only…….……...…………………………
…………………………………. ID
D.5.2 FLOOR TILES
COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 50 m2 Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer. …………………………………. ID
D.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with Only…….……...…………………………
the drawings, as directed and approved by the Engineer. 60 l.m.
…………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface
140 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface
120 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
D.5.6 RED CLAY ROOFING TILES
This item shall be measured in square meters of red clay roof tiles quantity as Only…….……...…………………………
indicated on the drawings, as directed and approved by the Engineer. 50 m2
…………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 55 m2 Only…….……...…………………………
…………………………………. ID
Sub-Total D.6 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.7: METAL WORKS
D.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets 3 l.m. Only…….……...…………………………
installation quantity as indicated on approved shop drawings. …………………………………. ID
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 4 l.m. Only…….……...…………………………
Engineer. …………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated Only…….……...…………………………
1,000 kg
on drawings and as requested by the Engineer. …………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Guard House Only…….……...…………………………
1 set
…………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-GH, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as 1 LS Only…….……...…………………………
specified, shown on drawings and to the satisfaction of the engineer.
…………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with
autononomy 3 hrs, boxes wires, cover plates, chassis, with all needed accessories and 1 LS
Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer.
…………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...…………………………
and fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS1- 1: Guard House (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS1 - Bill 2: Staff House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 85 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...…………………………
edges. …………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...…………………………
34 m3
…………………………………. ID
b. For Slabs and Beams Only…….……...…………………………
56 m3
…………………………………. ID
c. For Walls and Columns Only…….……...…………………………
27 m3
…………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...…………………………
20 m3
accordance with the drawings. …………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence 105 m3 Only…….……...…………………………
of the Engineer and according to his approval. …………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 160 m2 Only…….……...…………………………
as directed and approved by the Engineer. …………………………………. ID
Sub-Total D.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
a. TYPE WD1 (210x100)
This item shall be measured per unit of Wood door installed in situ in
8 Unit
accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...…………………………
and approved by the Engineer. …………………………………. ID
b. TYPE WD2 (225x130)
This item shall be measured per unit of Wood door installed in situ in
1 Unit
accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...…………………………
and approved by the Engineer. …………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
a. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in
2 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
b. TYPE W7 120x65cm
This item shall be measured per unit of windows including rolling shutter
2 Unit
installed in situ in accordance with the drawings, as indicated in the windows Only…….……...…………………………
schedule, as directed and approved by the Engineer. …………………………………. ID
c. TYPE W8 200x130cm
This item shall be measured per unit of windows installed in situ in
4 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
d. TYPE D1 210x80cm
This item shall be measured per unit of windows installed in situ in
2 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
e. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in
1 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in
accordance with the drawings, as directed and approved by the Engineer 305 m2 Only…….……...…………………………
…………………………………. ID
D.5.2 FLOOR TILES
COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in
145 m2 Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer.
…………………………………. ID
D.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with Only…….……...…………………………
130 l.m.
the drawings, as directed and approved by the Engineer. …………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface
305 m2
area without including opening surfaces in accordance with the drawings, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface
210 m2
area without including opening surfaces in accordance with the drawings, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
D.5.6 RED CLAY ROOFING TILES
This item shall be measured in square meters of red clay roof tiles quantity as Only…….……...…………………………
indicated on the drawings, as directed and approved by the Engineer. m2
…………………………………. ID
Sub-Total D.5 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 160 m2 Only…….……...…………………………
…………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets 4 l.m. Only…….……...…………………………
installation quantity as indicated on approved shop drawings. …………………………………. ID
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 4 l.m. Only…….……...…………………………
Engineer. …………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Staff House Only…….……...…………………………
1 set
…………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-SH, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as 1 LS Only…….……...…………………………
specified, shown on drawings and to the satisfaction of the engineer. …………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with
1 LS
autononomy 3 hrs, boxes wires, cover plates, chassis, with all needed accessories and Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...…………………………
and fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS1- 2: Staff House (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS1 - Bill 3: Store
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 30 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...…………………………
edges. …………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...…………………………
7 m3
…………………………………. ID
b. For Slabs and Beams Only…….……...…………………………
19 m3
…………………………………. ID
c. For Walls and Columns Only…….……...…………………………
16 m3
…………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...…………………………
6 m3
accordance with the drawings. …………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence 45 m3 Only…….……...…………………………
of the Engineer and according to his approval. …………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 75 m2 Only…….……...…………………………
as directed and approved by the Engineer. …………………………………. ID
Sub-Total D.3 (ID)

1/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings
and as directed and approved by the Engineer.
TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in
1 unit
accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...…………………………
and approved by the Engineer. …………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
TYPE W4 150x80cm
This item shall be measured per unit of windows including rolling shutter
6 Unit
installed in situ in accordance with the drawings, as indicated in the windows Only…….……...…………………………
schedule, as directed and approved by the Engineer. …………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer
190 m2
…………………………………. ID
INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 60 m2 Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer. …………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface
190 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface
130 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.5 (ID)

2/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 75 m2 Only…….……...…………………………
…………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 5 l.m. Only…….……...…………………………
Engineer. …………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Store & Workshop Only…….……...…………………………
1 set
…………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-BS1-S/W, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be 1 LS
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...…………………………
…………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2x40W,
switches, socket outlets, power outlets,disconnecting switches,emergency lighting with
autononomy 3 hrs, boxes wires, cover plates, chassis, with all needed accessories and 1 LS
Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID

3/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...…………………………
and fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS1- 3: Store (ID)
Only
IRAQI DINAR

4/4
Bill D – Booster Stations
BS1 - Bill 4: Generator & Transformer
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 275 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...…………………………
edges. …………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...…………………………
140 m3
…………………………………. ID
b. For Slabs and Beams Only…….……...…………………………
300 m3
…………………………………. ID
c. For Walls and Columns Only…….……...…………………………
390 m3
…………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...…………………………
55 m3
accordance with the drawings. …………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 400 m2 Only…….……...…………………………
as directed and approved by the Engineer. …………………………………. ID
Sub-Total D.3 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings
and as directed and approved by the Engineer.
TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in
1 unit
accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...…………………………
and approved by the Engineer. …………………………………. ID
TYPE SD7 (250x300)
This item shall be measured per unit of Steel door with louvers installed in
3 unit
situ in accordance with the drawings, as indicated in the doors schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
TYPE W12 250x250cm
This item shall be measured per unit of windows installed in situ in
2 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer 900 m2
…………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 320 m2 Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer. …………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface
900 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface
350 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 400 m2 Only…….……...…………………………
…………………………………. ID
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing
surface which shall be the net area in accordance with the drawings, as 180 m2 Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 7 l.m. Only…….……...…………………………
Engineer. …………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated Only…….……...…………………………
2,250 kg
on drawings and as requested by the Engineer. …………………………………. ID
Sub-Total D.7 (ID)

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Generator and Transformer Room Only…….……...…………………………
1 set
…………………………………. ID
D.9.2 Electrical Works
D.9.2.1 Power Distribution Transformers.
Supply, install, connect test and commission the following oil immersed MV/LV power
distribution transformer complete with all needed connections, joints, cable
terminations, cable glands, wiring and protection devices from MV power network to
transformer's primary input; and from transformer's secondary output to the power
metering device and to complete the connection to the main power network with all
necessary LV cables, auxiliaries, cable supports, as well as the connection to the
earthing loop, all as specified, shown on drawings, to the satisfaction of the engineer
and in full coordination with local authority.
Transformer, 2500 kVA, 33/3.3 kV. Only…….……...…………………………
2 Item
…………………………………. ID
Transformer, 300 kVA, 3.3/0.4 kV. Only…….……...…………………………
1 Item
…………………………………. ID
D.9.2.2 Stand-by Power Generators.
Supply, install, connect, test and commission the following standby power Generator-
Sets with synchronizing and totalizing panels , acoustic treatment for each generator
and anti vibration installation. Complete with all needed connections, wiring, protection
devices, control and monitoring digital panel board, fuel diesel tank for each generator
with low level emergency turn off controller, and a storage back-up Diesel tank,
delivered full with all needed plumbing works, fuel impuruties separator filter,
emergency stop push-button, exhaust pipes with filters, turn on and off manual and
automatic system to be integrated to the ATS system, complete the connection to the
main power network, as well as the connection to the main earthing loop, all as
specified, shown on drawings and to the satisfaction of the engineer.

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
Generator-Set, prime rating 1000 kVA, 3.3kV, 50Hz, PF0.8. Only…….……...…………………………
2 Item
…………………………………. ID
Fuel Diesel Tank, Black steel, 10000L. Only…….……...…………………………
2 Item
…………………………………. ID
SYNCHRONIZING Panel for the above mentioned generators. Only…….……...…………………………
1 Item
…………………………………. ID
Galvanized steel exhaust pipes with filter, insulation and aluminum jacketing. Only…….……...…………………………
2 Item
…………………………………. ID
D.9.2.3 Main Distribution Panel Boards
Supply, install, connect, test and commission the following Power Distribution Panel
Boards, complete with protection devices, monitoring devices, metering devices,
control components, ventilation fans, bus bars, ACBs, MCCBs, MCBs, Relays, Timers,
Contactors, Starters, cables, cable glands, all needed connections accessories and
supports , all as specified, shown on drawings and to the satisfaction of the engineer.

MV 33kV Switchgear, connecting the overhead MV cables to the transformers,


complete with all needed protection devices, power supply, cables, connections and 1 Item Only…….……...…………………………
fittings. …………………………………. ID
MV 3.3kV Switchgear, connecting the MV cables to the transformers, complete with all
needed protection devices, power supply, cables, connections and fittings. 1 Item Only…….……...…………………………
…………………………………. ID
LV Switchgear for the connection between the transformers and the MDBs complete Only…….……...…………………………
with all needed protection devices, cables, connections and fittings. 2 Item
…………………………………. ID
Main Distribution Panel Board MDB: Only…….……...…………………………
1 Item
…………………………………. ID
Secondary Distribution Board DB-BS1-G&T Only…….……...…………………………
1 Item
…………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2.4 Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-BS1-G&T complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be 1 LS
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...…………………………
…………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W,
switches, socket outlets, power outlets,disconnecting switches,emergency lighting with
autononomy 3 hrs, boxes wires, cover plates, chassis, with all needed accessories and 1 LS
Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer.
…………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...…………………………
and fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
D.9.2.5 Capacitor bank, 400 KVAR, 3phase including air circuit breaker, complete with
all needed connections, fittings, cabling, accessories, all as specified, and to the 3 Item Only…….……...…………………………
satisfaction of the engineer. …………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS1- 4: Generator & Transformer (ID)
Only
IRAQI DINAR

6/6
Bill D – Booster Stations
BS1 - Bill 5: Reservoir 7,000 m3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 800 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...…………………………
edges. …………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...…………………………
950 m3
…………………………………. ID
b. For Slabs and Beams Only…….……...…………………………
455 m3
…………………………………. ID
c. For Walls and Columns Only…….……...…………………………
795 m3
…………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...…………………………
160 m3
accordance with the drawings. …………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.1 WATERSTOP JOINTS
This item shall be measured in linear meter of installed Waterstop as indicated Only…….……...…………………………
420 l.m.
on drawings. …………………………………. ID

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating Only…….……...…………………………
300 m2
application. …………………………………. ID
D.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...…………………………
6,200 m2
accordance to the drawings as directed and approved by the Engineer. …………………………………. ID
D.3.4 VAPOR BARRIER
This item shall be measured in square meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence 1,580 m2 Only…….……...…………………………
of the Engineer and according to his approval. …………………………………. ID
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 1,580 m2 Only…….……...…………………………
as directed and approved by the Engineer. …………………………………. ID
Sub-Total D.3 (ID)
D.5: FINISHES
D.5.5 WALL PAINT
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface
1,150 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 1,580 m2 Only…….……...…………………………
…………………………………. ID
Sub-Total D.6 (ID)

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 15 l.m. Only…….……...…………………………
Engineer. …………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated Only…….……...…………………………
on drawings and as requested by the Engineer. 2,250 kg
…………………………………. ID
D.7.4 DRAINAGE PIPES FOR RESERVOIRS
This item shall be measured by linear meter of drainage pipes for each
reservoir completely installed with all necessary connections and fixing 140 l.m.
accessories to the approval of the Engineer. Draining the roof slabs of Only…….……...…………………………
reservoirs and pumping station including the floor drains. …………………………………. ID
D.7.5 DUCTILE IRON COVER AND FRAME
This item shall be measured per unit of ductile iron cover completely installed 8 unit Only…….……...…………………………
to the approval of the Engineer. …………………………………. ID
Sub-Total D.7 (ID)
D.10: MEDHANICAL WORKS FOR RESERVOIRS
D.10.1.a GATE VALVE
This item shall be measured in unit of gate valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
D.10.1.b NEEDLE VALVE
This item shall be measured in unit of gate valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.10.2 STRAINER FOR WATER METERS
The strainer for water meter shall be measured by unit and shall be classified
for payment according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
D.10.3 WATER METER
D.10.3.1 WATER METER COUNTER
This item shall be measured in unit of water meter completely installed and
tested.
DN800 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
D.10.3.2 MECHANICAL FLOWMETER
This item shall be measured by unit and classified for payment according to
pipeline (mounted on) diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
D.10.4 BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...…………………………
4 unit …………………………………. ID
D.10.5 TRIPLE FUNCTION (DOUBLE) AIR VALVES
This item shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN200 mm - PN16 bars Only…….……...…………………………
2 unit …………………………………. ID
D.10.6 STRAINER
This item shall be measured in unit of strainers completely installed and
tested.
DN800 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.10.7 FLOAT-VALVE
Float-valves shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...…………………………
1 unit …………………………………. ID
D.10.8 GAUGE GLASS LEVEL INDICATOR
The price shall be paid by unit of glass level indicator completely installed and Only…….……...…………………………
tested. 1 unit …………………………………. ID
D.10.10 PIPES AND FITTINGS FOR RESERVOIRS
This item shall be paid as a set of a complete pipes and fittings system
installed and tested for each of the corresponding springs, reservoirs types and
pumping stations, according to the technical specifications, supplier’s
recommendation and to the satisfaction of the Engineer.
For BS1 Reservoir Only…….……...…………………………
1 unit …………………………………. ID
Sub-Total D.10 (ID)
Total Bill BS1- 5: Reservoir 2x3,000 m3 (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS1 - Bill 6: Pumps Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 150 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...…………………………
edges. …………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...…………………………
80 m3
…………………………………. ID
b. For Slabs and Beams Only…….……...…………………………
160 m3
…………………………………. ID
c. For Walls and Columns Only…….……...…………………………
220 m3
…………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...…………………………
35 m3
accordance with the drawings. …………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 350 m2 Only…….……...…………………………
as directed and approved by the Engineer. …………………………………. ID
Sub-Total D.3 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings
and as directed and approved by the Engineer.
c. TYPE SD3 (210x110)
This item shall be measured per unit of Steel door with louvers installed in
2 unit
situ in accordance with the drawings, as indicated in the doors schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
i. TYPE W9 90x80cm
This item shall be measured per unit of windows installed in situ in
16 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in
accordance with the drawings, as directed and approved by the Engineer 1,350 m2 Only…….……...…………………………
…………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in
350 m2 Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer.
…………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface
750 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface
475 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing
surface which shall be the net area in accordance with the drawings, as 350 m2 Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 10 l.m. Only…….……...…………………………
Engineer. …………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated Only…….……...…………………………
1,125 kg
on drawings and as requested by the Engineer. …………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
BS1 Pumps Room Only…….……...…………………………
1 set
…………………………………. ID

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Pumpsets
D.9.2.1 From Booster Station 1 to Booster Station 2, Horizontal Split case double suction pump,
capacity 560 m3/hr at 210 m head, 1500 rpm, suitable for 2 ppm chlorine content.
Complete with all motor and pump built in protection devices as per specifications
(PTC thermistor, overload, Oil leak detector, motor bearing temperature, pumps bearing 5 ea
temperature). Pumps shall be fitted with mechanical shaft seal type spring loaded flat
faces arranged such that replacement of wearing components can be carried out without
Only…….……...…………………………
the need to dismantle the pump.
…………………………………. ID
D.9.2.2 Anti Water Hammer System:
- Surge vessel at the pumping station location (Type: Bladder, Number of units: 2, Size:
7000 liters each, Connection: 300 mm, Header Size: 400 mm, PN 25, Factory Test
Pressure: 39 bar, Precharge pressure: 6.4 bar).
- One way discharge tank at PEG F264 (Material: Concrete, Number of Units: 1, Base 1 LS
Area: 4.9m2, Height: 5m, Water Capacity: 19.6m3, Connection In: 50mm, Connection
Out: 300mm).
- Control of the pumping station (Drive: Soft starter, Drive Configuration: 8s/16s,
Only…….……...…………………………
Startup delay interval: Min 60 sec.).
…………………………………. ID
D.9.3 Suction Pipes, Valves, Instruments and Accessories
D.9.3.1 Main suction header, DN800, Ductile Iron, including fittings and wall inserts) from Only…….……...…………………………
reservoir header to pumps suction pipes 1 set
…………………………………. ID
D.9.3.2 DN450 motorized double flanged gate valve Only…….……...…………………………
5 ea
…………………………………. ID
D.9.3.3 Suction pipe, DN450, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...…………………………
5 set
washers, Gaskets, etc. …………………………………. ID
D.9.3.4 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...…………………………
5 ea
…………………………………. ID
D.9.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...…………………………
1 LS
…………………………………. ID
D.9.4 Discharge Piping, Valves, Instruments and Accessories
D.9.4.1 Discharge pipe, DN400, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...…………………………
5 Set
washers, Gaskets, etc. …………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.4.2 DN400 motorized double flanged gate valve, DI, PN25 Only…….……...…………………………
5 ea
…………………………………. ID
D.9.4.3 DN400 Non slam check valves nozzle type, complete with lever and limit switch, DI, Only…….……...…………………………
5 ea
PN25 …………………………………. ID
D.9.4.4 Main Discharge header, DN800, Ductile Iron, including fittings and wall inserts) from Only…….……...…………………………
1 Set
Pump Discharge Piping to 1 m from outer face of the pumps room wall …………………………………. ID
D.9.4.5 High Pressure Switch/Transmitter Only…….……...…………………………
5 ea
…………………………………. ID
D.9.4.6 Vibration sensor / Analyzer Only…….……...…………………………
5 set
…………………………………. ID
D.9.5 Gantry Crane
D.9.5.1 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting
chain, control box, runway beams, rails, limit switches, etc. and Third Party Load Test 1 ea Only…….……...…………………………
certificate …………………………………. ID
D.9.6 Electrical Works
Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-P complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands,
control equipments, disconnecting switches with all needed accessories, fittings and 5 item
related works all as specified, shown on drawings and to the satisfaction of the Only…….……...…………………………
engineer. Cables shall be laid inside galvanized steel cable trays and ladders installed
…………………………………. ID
inside concrete trenches.
- Secondary distribution board DB-TP-BS1 complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be 1 LS
Only…….……...…………………………
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. …………………………………. ID
- Lighting and power installation, complete including, highbay lighting fixtures
1x250W HPS IP65, switches, socket outlets, power outlets,disconnecting 1 LS Only…….……...…………………………
switches,emergency lighting with autononomy 3 hrs, boxes wires, cover plates, chassis, …………………………………. ID
with all needed accessories and fittings, all as specified, and to the satisfaction of the
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...…………………………
and fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS1- 6: Pumps Room (ID)
Only
IRAQI DINAR

6/6
Bill D – Booster Stations
BS1 - Bill 7: Chlorination Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 25 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...…………………………
edges. …………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...…………………………
6 m3
…………………………………. ID
b. For Slabs and Beams Only…….……...…………………………
30 m3
…………………………………. ID
c. For Walls and Columns Only…….……...…………………………
4 m3
…………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...…………………………
5 m3
accordance with the drawings. …………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 25 m2 Only…….……...…………………………
as directed and approved by the Engineer. …………………………………. ID
Sub-Total D.3 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings
and as directed and approved by the Engineer.
b. TYPE SD2 (210x245)
This item shall be measured per unit of Steel door with louvers (in both lower
and upper parts of the door) installed in situ in accordance with the drawings, 1 unit
as indicated in the doors schedule, as directed and approved by the Engineer. Only…….……...…………………………
…………………………………. ID
c. TYPE SD3 (210x110)
This item shall be measured per unit of Steel door with louvers installed in
1 unit
situ in accordance with the drawings, as indicated in the doors schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
m. TYPE W13 150x140cm
This item shall be measured per unit of windows installed in situ in
3 Unit
accordance with the drawings, as indicated in the windows schedule, as Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer 150 m2
…………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 25 m2 Only…….……...…………………………
accordance with the drawings, as directed and approved by the Engineer. …………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface
130 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface
50 m2 Only…….……...…………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing
surface which shall be the net area in accordance with the drawings, as 25 m2 Only…….……...…………………………
directed and approved by the Engineer. …………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 4 l.m. Only…….……...…………………………
Engineer. …………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Chlorination Building Only…….……...…………………………
1 set
…………………………………. ID

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Chlorination System
D.9.2.1 1 Ton Chlorine Drum container Only…….……...…………………………
4 ea
…………………………………. ID
D.9.2.2 Chlorine container roller support (for duty containers) Only…….……...…………………………
2 ea
…………………………………. ID
D.9.2.3 Weighing scale Only…….……...…………………………
1 ea
…………………………………. ID
D.9.2.4 Chlorine container support rack (for Stand by containers) Only…….……...…………………………
2 ea
…………………………………. ID
D.9.2.5 Chlorine gas manifold made from stainless steel SS.316, complete with isolation valves, Only…….……...…………………………
fittings and all accessories 2 set
…………………………………. ID
D.9.2.6 Pressure gauge for each manifolD. Only…….……...…………………………
2 ea
…………………………………. ID
D.9.2.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and Only…….……...…………………………
2 ea
all accessories …………………………………. ID
D.9.2.8 Automatic changeover device between gas manifolds Only…….……...…………………………
1 ea
…………………………………. ID
D.9.2.9 Gas pressure reducing and shut off valve, electrically operated Only…….……...…………………………
2 ea
…………………………………. ID
D.9.2.10 Automatic vacuum chlorination, 10 Kg/hr Only…….……...…………………………
2 ea
…………………………………. ID
D.9.2.11 Automatic Duty/Standby Changeover Panel for Chlorinators Only…….……...…………………………
1 ea
…………………………………. ID
D.9.2.12 Chlorine Analyzer Only…….……...…………………………
1 ea
…………………………………. ID
D.9.2.13 Injection Point Only…….……...…………………………
1 ea
…………………………………. ID
D.9.2.14 Booster Pump Only…….……...…………………………
2 ea
…………………………………. ID
D.9.2.15 Chlorine Sampling Pumps Only…….……...…………………………
2 ea
…………………………………. ID
D.9.2.16 Chlorine gas leak detector Only…….……...…………………………
1 ea
…………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2.17 Warning light and alarm Only…….……...…………………………
1 set
…………………………………. ID
D.9.2.18 Air Supply / Extract fans Only…….……...…………………………
1 set
…………………………………. ID
D.9.2.19 Drench shower Only…….……...…………………………
1 set
…………………………………. ID
D.9.2.20 Breathing apparatus Only…….……...…………………………
3 ea
…………………………………. ID
D.9.2.21 Any other item to make the system complete in all respects (List details) Only…….……...…………………………
1 LS
…………………………………. ID
D.9.3 Gantry Crane
D.9.3.1 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting
chain, control box, runway beams, rails, limit switches, etc. and Third Party Load Test 1 ea Only…….……...…………………………
certificate …………………………………. ID
D.9.4 Electrical Works
Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-PCHR; complete including protection devices,
starters, monitoring devices, ventilation, power and control cables, connections, cable
glands, control equipments, disconnecting switches with all needed accessories
including connection to PLC fittings and related works all as specified, shown on 1 LS
drawings and to the satisfaction of the engineer. Cables shall be laid inside galvanized
steel cable trays and ladders installed inside concrete trenches. Only…….……...…………………………
…………………………………. ID
- Secondary distribution board DB-BS1-CHR complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be 1 LS
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...…………………………
…………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W,
switches, socket outlets, power outlets,disconnecting switches,emergency lighting with
autononomy 3 hrs, boxes wires, cover plates, chassis, with all needed accessories and 1 LS
Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 1
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...…………………………
fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...…………………………
and fittings, all as specified, and to the satisfaction of the engineer. …………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS1- 7: Chlorination Room (ID)
Only
IRAQI DINAR

6/6
Bill D – Booster Stations
Summary - Booster Station 1
Munistry of Municipalities and TourismGeneral Directorate of Water and Sewerage Mangesh, Batofa and Zawita Water Supply Project
Dohuk Water Directorate Summary Bill

Bill Of Quantities: Mangesh, Batofa and Zawita Water Supply Project


Summary Bill D - Booster Station 1

Description Amount (ID)

Bill 0: Siteworks

Bill 1: Guard House

Bill 2: Staff House

Bill 3: Store

Bill 4: Generator & Transformer

Bill 5: Reservoir 2*3,000 m3

Bill 6: Pumps Room

Bill 7: Chlorination Room

Total Carried to General Summary

1/1
Bill D – Booster Stations
BS2 - Bill 0: Siteworks
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and shall
be the net projected horizontal area in accordance to the drawings & survey plan 7,800 m2 Only…….……...………………………
submitted and approved by the Engineer. ……………………………………. ID
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 12,800 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
D.1.3 SELECTED FILL & BACKFILL
This item shall be measured in cubic meter and shall be the net volume according
to the Contract Drawings and as directed & approved by the Engineer. Wherever
backfilling limits are not indicated on Contract Drawings, the limits shall be 50cm
140 m3
Only…….……...………………………
away of blinding edges. ……………………………………. ID
D.1.4 ROCKFILL AND STRUCTURAL BACKFILL
This item shall be measured in cubic meter and shall be the net volume according
to the Contract Drawings and as directed & approved by the Engineer. 230 m3 Only…….……...………………………
……………………………………. ID
D.1.7 WATER DISTRIBUTION SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
D.1.8 SANITARY SEWER SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
D.1.9 STORMWATER DRAINAGE SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
Sub-Total D.1 (ID)

1/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.6: EXTERNAL WORKS
D.6.1 CONCRETE CURBS
This item shall be measured in linear meter of concrete curbs installed as indicated Only…….……...………………………
275 l.m.
on approved shop drawings. ……………………………………. ID
D.6.4 FENCE
This item shall be measured in linear meter of fence installed as indicated on Only…….……...………………………
350 l.m.
drawings and as directed and approved by the Engineer. ……………………………………. ID
D.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings and 1 unit Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
D.6.6 AGGREGATE BASE COURSE
This item shall be measured in cubic meter of aggregate base course materials
compacted in accordance with the drawings and as directed and approved by the 400 m3 Only…….……...………………………
Engineer. ……………………………………. ID
D.6.7 BITUMINOUS BASE COURSE
a. TWO LAYERS THICKNESS = 2x6cm
This item shall be measured in square meter and shall be the net value as indicated
1,350 m2 Only…….……...………………………
on the drawings and as measured in the presence of the Engineer and according to
his approval. ……………………………………. ID
D.6.8 AGRICULTURAL TOP SOIL
This item shall be measured in cubic meter of materials in accordance with the Only…….……...………………………
275 m3
drawings and as directed and approved by the Engineer. ……………………………………. ID
D.6.9 TREES AND SHRUBS, GROUND COVERS AND GRASS COVERS
This item shall be measured in cubic meter of materials in accordance with the Only…….……...………………………
475 m2
drawings and as directed and approved by the Engineer. ……………………………………. ID
D.8: GEOTECHNICAL INVESTIGATION
Note: The geotechnical investigation shall be performed in order to evaluate the
bearing capacities, material characteristics and any potential geotechnical
problems of the foundation soil for sites where structures will be executed and
where requested by the Engineer.

2/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.8.1 PRELIMINARY REPORT
This item shall be paid by unit of report, for each site to be investigated, upon
1 unit
approval and acceptance of the aforesaid report after revision and modification of Only…….……...………………………
Engineer instructions and comments. ……………………………………. ID
D.8.2 RELOCATION OF DRILLING RIG
This item shall be paid by unit of relocation from completed borehole to the
1 unit
Engineer satisfaction to another borehole (in the same site or in another far site). Only…….……...………………………
……………………………………. ID
D.8.3 VERTICAL CORING IN OVERBURDEN
This item shall be in linear meter of borehole accepted by the Engineer, quantity
of which shall be the distance between the natural ground level and the top of rock 40 l.m.
Only…….……...………………………
formation as measured in situ and determined by the Engineer. ……………………………………. ID
D.8.4 VERTICAL CORING IN ROCK
This item shall be in linear meter of borehole accepted by the Engineer, quantity
of which shall be the distance between the level and the bottom of overburden and 20 l.m.
the lower cored rock formation as measured in situ and determined by the Only…….……...………………………
Engineer. ……………………………………. ID
D.8.5 LABORATORY AND SITE TESTS ON SOIL AND ROCK SAMPLES
This item shall be in unit of set of tests for each borehole, necessary to conclude
the soil bearing capacity in function of the depth in each borehole or to identify 10 unit
geotechnical problems, conducted as directed, & accepted by the Engineer,
payable 60% upon test completion and the remaining at the submittal of the final Only…….……...………………………
revised report ……………………………………. ID
D.8.6 FINAL REPORT
This item shall be paid by unit upon report submittal subject to Engineer consent
1 unit
approval & revision thereto if modification prevails. Only…….……...………………………
……………………………………. ID
Sub-Total D.8 (ID)

3/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.4 PLC and SCADA system
Supply, install, and connect a complete PLC and SCADA system as described in
specifications documents and drawings with full control of the Booster Station,
including remote terminal units (RTU) with 20% additional spare capacity for
each computer system complete with PCs, printers, LCD screens displays, Mimic
Panels, Communications interfaces, SCADA software, and all cabling and 1 LS
necessary accessories for the connection between RTUs and all equipment, and
their interfaces including all necessary interfacing elements, cabling and
accessories in order to ensure the communication between all RTUs and the
control room etc... as specified and shown on drawings and approved by Only…….……...………………………
Engineers. ……………………………………. ID
D.9.1.5 Earthing
Supply, install, connect, test and commission the following earthing system to
provide low connecting earth resistance less than 3 ohms complete including earth
rods, earth stranded bare copper conductor for earthing network, earth pits,
1 Item
connectors, inspection boxes, clamps, test links, earth bar, excavation, backfilling,
earthing busbars and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.6 Lightning Protection
Supply, install, connect, test and commission the following lightning protection
system, complete including air terminator, bare copper tape down conductors, test
points, surge arrestors for power systems as well as for low current systems as
4 Item
many as needed, earthing pits, all necessary accessories, and all other related
works, all as specified, shown on the drawings and to the satisfaction of the Only…….……...………………………
Engineer. ……………………………………. ID

4/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.7 Site Lighting
D.9.1.7.1 Feeder pillar
Supply, install, connect, test and commission the following feeder pillar complete
including reinforced concrete foundation, 60cmx60cm manhole for cables access,
galvanized steel plate for cable protection, ventilation louver with screen,
galvanized steel protection barrier, PVC sleeves, cabling and connections, all 1 LS
necessary accessories and other related works, all as specified, shown on the
drawings, to the satisfaction of the Engineer, and with full coordination with Only…….……...………………………
electrical local authority. ……………………………………. ID
D.9.1.7.2 Lighting Poles
Supply, install, connect, test and commission the following lighting poles,
complete with die cast aluminum lighting fixture including starters, lamp holder,
reflector and lamp, including concrete base with all required civil and installation
works with all necessary accessories, and all other related works, all as specified, Only…….……...………………………
shown on the drawings and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.7.2.1 8 m high, single bracket galvanized steel, street lighting pole, with one luminaire Only…….……...………………………
housing 1x150W HPS lamp IP65. 5 Item
……………………………………. ID
D.9.1.7.2.2 8 m high, double brackets galvanized steel, street lighting pole, with two luminaire Only…….……...………………………
housing 2x150W HPS lamp IP65. 10 Item
……………………………………. ID
D.9.1.7.2.3 8 m high, four brackets galvanized steel, street lighting pole, with four luminaire Only…….……...………………………
housing 1x150W HPS lamp IP65. 1 Item
……………………………………. ID
D.9.1.7.3 Concrete encased duct for road crossings and cable draw pit
D.9.1.7.3.1 40cm x 40cm cable draw pit Only…….……...………………………
3 Item
……………………………………. ID
D.9.1.7.3.2 Concrete encased 1 x 100mm UPVC duct for road crossings Only…….……...………………………
15 lm
……………………………………. ID

5/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.7.4 External lighting cables
Supply, install, connect, test and commission the following directly burried steel
wire armoured cables for external lighting installation, complete with all required
civil and installation works with all necessary accessories, and all other related 1 LS
works, all as specified, shown on the drawings and to the satisfaction of the Only…….……...………………………
Engineer. ……………………………………. ID
D.9.1.7.5 Earthing for Feeder pillar and lighting poles.
Supply, install, connect, test and commission earthing system to provide low
connecting earth resistance less than 3 ohms complete including earth rods, earth
stranded bare copper conductor for feeder pillar and lighting poles earthing, earth
4 Item
pits, connectors, inspection boxes, clamps, excavation, backfilling and all other
related works, all as specified, shown on the drawings and to the satisfaction of Only…….……...………………………
the Engineer. ……………………………………. ID
D.9.1.8 Trenching and Ducting
D.9.1.8.1 Supply, install, and commission the following trenches and 6" duct banks for main
power network cabling system, complete with all needed excavation works,
1 LS
backfilling and other related civil works, all as specified, shown on the drawings Only…….……...………………………
and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.8.2 Supply, install, and commission the following manholes for main power network
cabling system, complete with all needed concrete casting, iron cast covers,
sleeves, excavation works, backfilling and other related civil works, all as 1 LS
Only…….……...………………………
specified, shown on the drawings and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.9 Cabling
Supply, install, connect, test and commission the following steel wire armoured
cables for the main power network, complete including conduits, terminal and
junction boxes, jointing of cables, sealing compounds, fixing materials, and
supports, all necessary accessories, and all other related works, all as specified,
shown on the drawings and to the satisfaction of the Engineer.
LV cables Only…….……...………………………
1 LS
……………………………………. ID

6/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.10 Telephone System
D.9.1.10.1 Allow for local Telephone and DATA connection fees including the supply and
installation of all necessary cables, builder's work and accessories, and all other
related works, all as directed and to the satisfaction of the Engineer, and in full 1 LS
Only…….……...………………………
coordination with local relevant authority.
……………………………………. ID
D.9.1.10.2 Supply, install, connect, test and commission the following telecommunication
system complete including cables CAT6 (minimum 25) unless otherwise stated,
UPS, pulled-in conduits or cable trays, boxes, frames, racks, fittings, devices, 1 LS
equipment, accessories and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer ……………………………………. ID

7/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.11 Analogue Addressable Fire Alarm System
Supply, install, connect, test and commission a complete analogue addressable fire
alarm system including Main Fire Alarm Panel, repeater Panels, Manual Call
Stations, fire alarm bells, fire detectors, boxes, fire cables, conduits, connections, 1 LS
fittings and accessories and all realted works, all as specified and to the Only…….……...………………………
satisfaction of the Engineer. ……………………………………. ID
D.9.2 Telemetry Cables for the Pumping Line including Telemetry ducts and Telemetry Only…….……...………………………
1 LS
manholes along the pumping line profile ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS1 - 0: Siteworks (ID)
Only
IRAQI DINAR

8/8
Bill D – Booster Stations
BS2 - Bill 1: Guard House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according to
the excavation limits indicated on Contract Drawings and as directed & approved
by the Engineer. Wherever excavation limits are not indicated on Contract
25 m3
Only…….……...………………………
Drawings, the limits shall be 50cm away of blinding edges. ……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
15 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
18 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
15 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
5 m3
accordance with the drawings. ……………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 50 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 60 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
TYPE WD1 (210x100)
This item shall be measured per unit of Wood door installed in situ in accordance
2 Unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
a. TYPE W1 225x130cm
This item shall be measured per unit of windows including rolling shutter installed
1 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
b. TYPE W2 100x200cm
This item shall be measured per unit of windows installed in situ in accordance with
2 Unit
the drawings, as indicated in the windows schedule, as directed and approved by the Only…….……...………………………
Engineer. ……………………………………. ID
c. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in accordance with
2 Unit
the drawings, as indicated in the windows schedule, as directed and approved by the Only…….……...………………………
Engineer. ……………………………………. ID
d. TYPE D1 210x80cm
This item shall be measured per unit of windows installed in situ in accordance with
2 Unit
the drawings, as indicated in the windows schedule, as directed and approved by the Only…….……...………………………
Engineer. ……………………………………. ID
e. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in accordance with
2 Unit
the drawings, as indicated in the windows schedule, as directed and approved by the Only…….……...………………………
Engineer. ……………………………………. ID
Sub-Total D.4 (ID)

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in accordance Only…….……...………………………
150 m2
with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in accordance 50 m2 Only…….……...………………………
with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with the Only…….……...………………………
60 l.m.
drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
140 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
120 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
D.5.6 RED CLAY ROOFING TILES
This item shall be measured in square meters of red clay roof tiles quantity as
50 m2 Only…….……...………………………
indicated on the drawings, as directed and approved by the Engineer.
……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
55 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.7: METAL WORKS
D.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets Only…….……...………………………
installation quantity as indicated on approved shop drawings. 3 l.m.
……………………………………. ID
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed as
indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
750 kg
drawings and as requested by the Engineer. ……………………………………. ID
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Guard House Only…….……...………………………
1 set
……………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-GH, complete with Cabinet, bus bars, circuit breakers,
cable glands, power cables and all related accessories and fittings, all as specified, shown on 1 LS Only…….……...………………………
drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches, socket
outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3 hrs
boxes wires, cover plates, chassis, with all needed accessories and fittings, all as specified, 1 LS
Only…….……...………………………
and to the satisfaction of the engineer.
……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets, boxes,
UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, all as 1 LS Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, all 1 LS Only…….……...………………………
as specified, and to the satisfaction of the engineer.
……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS2- 1: Guard House (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS2 - Bill 2: Staff House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 85 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
34 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
56 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
27 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
20 m3
accordance with the drawings. ……………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 105 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 160 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
a. TYPE WD1 (210x100)
This item shall be measured per unit of Wood door installed in situ in accordance
8 Unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
b. TYPE WD2 (225x130)
This item shall be measured per unit of Wood door installed in situ in accordance
1 Unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
a. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
b. TYPE W7 120x65cm
This item shall be measured per unit of windows including rolling shutter installed
2 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
c. TYPE W8 200x130cm
This item shall be measured per unit of windows installed in situ in accordance
4 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
d. TYPE D1 210x80cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
e. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
305 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 145 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with the Only…….……...………………………
130 l.m.
drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
305 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
210 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
D.5.6 RED CLAY ROOFING TILES
This item shall be measured in square meters of red clay roof tiles quantity as Only…….……...………………………
m2
indicated on the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
160 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets Only…….……...………………………
4 l.m.
installation quantity as indicated on approved shop drawings. ……………………………………. ID
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Staff House Only…….……...………………………
1 set ……………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-SH, complete with Cabinet, bus bars, circuit breakers,
cable glands, power cables and all related accessories and fittings, all as specified, shown on 1 LS Only…….……...………………………
drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches, socket
outlets, power outlets, disconnecting switches,emergency lighting with autononomy 3
hrs,boxes wires, cover plates, chassis, with all needed accessories and fittings, all as 1 LS
specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS2- 2: Staff House (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS2 - Bill 3: Store
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 30 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
7 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
19 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
16 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
6 m3
accordance with the drawings. ……………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 45 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 75 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
1 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
TYPE W4 150x80cm
This item shall be measured per unit of windows including rolling shutter installed
6 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer
190 m2
……………………………………. ID
INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 60 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
190 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
130 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)

2/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer.
75 m2
……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 5 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Store & Workshop Only…….……...………………………
1 set
……………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-S/W, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
1 LS
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
hrs,boxes wires, cover plates, chassis, with all needed accessories and fittings, all as 1 LS
specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID

3/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS2- 3: Store (ID)
Only
IRAQI DINAR

4/4
Bill D – Booster Stations
BS2 - Bill 4: Generator & Transformer
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 175 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
70 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
180 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
180 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
accordance with the drawings.
35 m3
……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 140 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
1 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
TYPE SD7 (250x300)
This item shall be measured per unit of Steel door with louvers installed in situ in
2 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
TYPE W12 250x250cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer 375 m2
……………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 120 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
without including opening surfaces in accordance with the drawings, as directed
375 m2
Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
without including opening surfaces in accordance with the drawings, as directed 250 m2
Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer.
140 m2
……………………………………. ID
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 180 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 7 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
2,250 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total D.7 (ID)

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Generator and Transformer Room Only…….……...………………………
1 set
……………………………………. ID
D.9.2 Electrical Works
D.9.2.1 Power Distribution Transformers.
Supply, install, connect test and commission the following oil immersed MV/LV power
distribution transformer complete with all needed connections, joints, cable terminations,
cable glands, wiring and protection devices from MV power network to transformer's
primary input; and from transformer's secondary output to the power metering device and to
complete the connection to the main power network with all necessary LV cables,
auxiliaries, cable supports, as well as the connection to the earthing loop, all as specified,
shown on drawings, to the satisfaction of the engineer and in full coordination with local
authority.
Transformer, 2000 kVA, 33/0.4 kV. Only…….……...………………………
2 Item
……………………………………. ID
D.9.2.2 Stand-by Power Generators.
Supply, install, connect, test and commission the following standby power Generator-Sets
with synchronizing and totalizing panels , acoustic treatment for each generator and anti
vibration installation. Complete with all needed connections, wiring, protection devices,
control and monitoring digital panel board, fuel diesel tank for each generator with low level
emergency turn off controller, and a storage back-up Diesel tank, delivered full with all
needed plumbing works, fuel impuruties separator filter, emergency stop push-button,
exhaust pipes with filters, turn on and off manual and automatic system to be integrated to
the ATS system, complete the connection to the main power network, as well as the
connection to the main earthing loop, all as specified, shown on drawings and to the
satisfaction of the engineer.

Generator-Set, prime rating 750 kVA, 0.4kV, 50Hz, PF0.8. Only…….……...………………………


2 Item
……………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
Fuel Diesel Tank, Black steel, 10000L. Only…….……...………………………
2 Item
……………………………………. ID
SYNCHRONIZING Panel for the above mentioned generators. Only…….……...………………………
1 Item
……………………………………. ID
Galvanized steel exhaust pipes with filter, insulation and aluminum jacketing. Only…….……...………………………
2 Item
……………………………………. ID
D.9.2.3 Main Distribution Panel Boards
Supply, install, connect, test and commission the following Power Distribution Panel
Boards, complete with protection devices, monitoring devices, metering devices, control
components, ventilation fans, bus bars, ACBs, MCCBs, MCBs, Relays, Timers, Contactors,
Starters, cables, cable glands, all needed connections accessories and supports , all as
specified, shown on drawings and to the satisfaction of the engineer.

MV 33kV Switchgear, connecting the overhead MV cables to the transformers, complete


with all needed protection devices, power supply, cables, connections and fittings. 1 Item Only…….……...………………………
……………………………………. ID
LV Switchgear for the connection between the transformers and the MDBs complete with Only…….……...………………………
1 Item
all needed protection devices, cables, connections and fittings. ……………………………………. ID
Main Distribution Panel Board MDB Only…….……...………………………
1 Item
……………………………………. ID
Secondary Distribution Board DB-TP-G&T Only…….……...………………………
1 Item
……………………………………. ID
D.9.2.4 Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-G&T complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside 1 LS
galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs, boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
D.9.2.5 Capacitor bank, 220 KVAR, 3phase including air circuit breaker, complete with all needed
connections, fittings, cabling, accessories, all as specified, and to the satisfaction of the 2 Item Only…….……...………………………
engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS2- 4: Generator & Transformer (ID)
Only
IRAQI DINAR

6/6
Bill D – Booster Stations
BS2 - Bill 5: Reservoir 7,000 m3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 800 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
950 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
455 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
795 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
accordance with the drawings. 160 m3
……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.1 WATERSTOP JOINTS
This item shall be measured in linear meter of installed Waterstop as indicated on Only…….……...………………………
420 l.m.
drawings. ……………………………………. ID

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
300 m2
……………………………………. ID
D.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
accordance to the drawings as directed and approved by the Engineer.
6,200 m2
……………………………………. ID
D.3.4 VAPOR BARRIER
This item shall be measured in square meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence of 1,580 m2 Only…….……...………………………
the Engineer and according to his approval. ……………………………………. ID
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 1,580 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)
D.5: FINISHES
D.5.5 WALL PAINT
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
1,150 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. 1,580 m2
……………………………………. ID
Sub-Total D.6 (ID)

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 15 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
2,250 kg
drawings and as requested by the Engineer. ……………………………………. ID
D.7.4 DRAINAGE PIPES FOR RESERVOIRS
This item shall be measured by linear meter of drainage pipes for each reservoir
completely installed with all necessary connections and fixing accessories to the 140 l.m.
approval of the Engineer. Draining the roof slabs of reservoirs and pumping Only…….……...………………………
station including the floor drains. ……………………………………. ID
D.7.5 DUCTILE IRON COVER AND FRAME
This item shall be measured per unit of ductile iron cover completely installed to 8 unit Only…….……...………………………
the approval of the Engineer. ……………………………………. ID
Sub-Total D.7 (ID)
D.10: MEDHANICAL WORKS FOR RESERVOIRS
D.10.1.a GATE VALVE
This item shall be measured in unit of gate valve completely installed and tested.

DN300 mm - PN16 bars Only…….……...………………………


1 unit ……………………………………. ID
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.1.b NEEDLE VALVE
This item shall be measured in unit of gate valve completely installed and tested.

DN800 mm - PN16 bars Only…….……...………………………


1 unit ……………………………………. ID

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.10.2 STRAINER FOR WATER METERS
The strainer for water meter shall be measured by unit and shall be classified for
payment according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.3 WATER METER
D.10.3.1 WATER METER COUNTER
This item shall be measured in unit of water meter completely installed and tested.

DN300 mm - PN16 bars Only…….……...………………………


1 unit ……………………………………. ID
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.3.2 MECHANICAL FLOWMETER
This item shall be measured by unit and classified for payment according to
pipeline (mounted on) diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.4 BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
DN300 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
DN800 mm - PN16 bars Only…….……...………………………
5 unit ……………………………………. ID
D.10.5 TRIPLE FUNCTION (DOUBLE) AIR VALVES
This item shall be measured by unit and shall be classified for payment according
to diameter and nominal pressure.
DN100 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
DN200 mm - PN16 bars Only…….……...………………………
2 unit ……………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.10.6 STRAINER
This item shall be measured in unit of strainers completely installed and tested.

DN300 mm - PN16 bars Only…….……...………………………


1 unit ……………………………………. ID
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.7 FLOAT-VALVE
Float-valves shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.8 GAUGE GLASS LEVEL INDICATOR
The price shall be paid by unit of glass level indicator completely installed and Only…….……...………………………
tested. 1 unit ……………………………………. ID
D.10.10 PIPES AND FITTINGS FOR RESERVOIRS
This item shall be paid as a set of a complete pipes and fittings system installed
and tested for each of the corresponding springs, reservoirs types and pumping
stations, according to the technical specifications, supplier’s recommendation and
to the satisfaction of the Engineer.
For BS2 Reservoir Only…….……...………………………
1 unit ……………………………………. ID
Sub-Total D.10 (ID)
Total Bill BS2- 5: Reservoir 2*3,000 m3 (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS2 - Bill 6: Pumps Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 150 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
100 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
160 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
270 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
accordance with the drawings.
45 m3
……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 450 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
c. TYPE SD3 (210x110)
This item shall be measured per unit of Steel door with louvers installed in situ in
2 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
i. TYPE W9 90x80cm
This item shall be measured per unit of windows installed in situ in accordance
18 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in
accordance with the drawings, as directed and approved by the Engineer 1,500 m2 Only…….……...………………………
……………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in
450 m2
accordance with the drawings, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
850 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

2/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
575 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 450 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 10 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
1,125 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
BS2 Pumps Room Only…….……...………………………
1 set
……………………………………. ID

3/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Pumpsets
D.9.2.1 From Booster Station 2 to Mangesh Regional Tank 1, Horizontal Split case double suction
pump, capacity 211 m3/hr at 195 m head, 1500 rpm, suitable for 2 ppm chlorine content.
Complete with all motor and pump built in protection devices as per specifications (PTC
thermistor, overload, Oil leak detector, motor bearing temperature, pumps bearing 2 ea
temperature). Pumps shall be fitted with mechanical shaft seal type spring loaded flat faces
arranged such that replacement of wearing components can be carried out without the need Only…….……...………………………
to dismantle the pump. ……………………………………. ID
D.9.2.2 From Booster Station 2 to Mangesh Regional Tank 2, Horizontal Split case double suction
pump, capacity 490 m3/hr at 115 m head, 1500 rpm, suitable for 2 ppm chlorine content.
Complete with all motor and pump built in protection devices as per specifications (PTC
thermistor, overload, Oil leak detector, motor bearing temperature, pumps bearing 5 ea
temperature). Pumps shall be fitted with mechanical shaft seal type spring loaded flat faces
arranged such that replacement of wearing components can be carried out without the need Only…….……...………………………
to dismantle the pump. ……………………………………. ID
D.9.2.3 Anti Water Hammer System (BS2-MRT):
- Surge vessel at the pumping station location (Type: Bladder, Number of units: 1, Size: 300
liters each, Connection: 150 mm, Header Size: 150 mm, PN 25, Factory Test Pressure: 36
bar, Precharge pressure: 7 bar).
- One way discharge tank at PEG D078 (Material: Concrete, Number of Units: 1, Base 1 LS
Area: 4.9m2, Height: 4m, Water Capacity: 14.7m3, Connection In: 50mm, Connection Out:
200mm).
Only…….……...………………………
- Control of the pumping station (Drive: Soft starter, Drive Configuration: 8s/16s).
……………………………………. ID
D.9.2.4 Anti Water Hammer System (BS2-MPBT):
- Surge vessel at the pumping station location (Type: Bladder + Shunt, Number of units: 1,
Size: 1500 liters each, Connection: out 400-in100 mm, Header Size: 400 mm, PN 25,
Factory Test Pressure: 36 bar, Precharge pressure: 4.6 bar).
- Open surge tank at PEG F366 (Material: Concrete, Number of Units: 1, Base Area: 7.1m2, 1 LS
Height: 6.4m, Top Elevation: 1062, Connection In: 800mm, Connection Out: 800mm).
- Control of the pumping station (Drive: Soft starter, Drive Configuration: 8s/16s, Startup
delay interval: Min 20 sec.). Only…….……...………………………
……………………………………. ID

4/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.3 Suction Pipes, Valves, Instruments and Accessories
D.9.3.1 Main suction header, DN300, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 set
reservoir header to pumps suction pipes ……………………………………. ID
D.9.3.2 DN300 motorized double flanged gate valve Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.3 Suction pipe, DN300, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, washers, Only…….……...………………………
2 set
Gaskets, etc. ……………………………………. ID
D.9.3.4 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.3.6 Main suction header, DN800, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 set
reservoir header to pumps suction pipes ……………………………………. ID
D.9.3.7 DN450 motorized double flanged gate valve Only…….……...………………………
5 ea
……………………………………. ID
D.9.3.8 Suction pipe, DN450, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, washers, Only…….……...………………………
5 set
Gaskets, etc. ……………………………………. ID
D.9.3.9 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...………………………
5 ea
……………………………………. ID
D.9.3.10 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.4 Discharge Piping, Valves, Instruments and Accessories
D.9.4.1 Discharge pipe, DN250, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
2 Set
washers, Gaskets, etc. ……………………………………. ID
D.9.4.2 DN250 automatic butterfly valve, DI, PN25 Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.3 DN250 Non slam nozzle type check valves, complete with lever and limit switch, DI, PN25 Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.4 Main Discharge header, DN300, Ductile Iron, including fittings and wall inserts) from Pump Only…….……...………………………
1 Set
Discharge Piping to 1 m from outer face of the pumps room wall ……………………………………. ID
D.9.4.5 High Pressure Switch/Transmitter Only…….……...………………………
5 ea
……………………………………. ID

5/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.4.6 Vibration sensor / Analyzer Only…….……...………………………
5 set
……………………………………. ID
D.9.4.7 Discharge pipe, DN400, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
5 Set
washers, Gaskets, etc. ……………………………………. ID
D.9.4.8 DN400 motorized double flanged gate valve, DI, PN16 Only…….……...………………………
5 ea
……………………………………. ID
D.9.4.9 DN400 Non slam check valves nozzle type, complete with lever and limit switch, DI, PN16 Only…….……...………………………
5 ea
……………………………………. ID
D.9.4.10 Main Discharge header, DN800, Ductile Iron, including fittings and wall inserts) from Pump Only…….……...………………………
1 Set
Discharge Piping to 1 m from outer face of the pumps room wall ……………………………………. ID
D.9.4.11 High Pressure Switch/Transmitter Only…….……...………………………
5 ea
……………………………………. ID
D.9.4.12 Vibration sensor / Analyzer Only…….……...………………………
5 set
……………………………………. ID
D.9.5 Gantry Crane
D.9.5.1 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting chain,
control box, runway beams, rails, limit switches, etc. and Third Party Load Test certificate 1 ea Only…….……...………………………
……………………………………. ID
D.9.6 Electrical Works
Electrical installation, complete including but not limited to the following:

- Main Control Center Panel MCCP-P complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories, fittings and related works
7 item
all as specified, shown on drawings and to the satisfaction of the engineer. Cables shall be
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Secondary distribution board DB-TP-BS2 complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside 1 LS
Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches.
……………………………………. ID

6/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Lighting and power installation, complete including, highbay lighting fixtures 1x250W
HPS IP65, switches, socket outlets, power outlets, disconnecting switches,emergency
lighting with autononomy 3 hrsboxes wires, cover plates, chassis, with all needed 1 LS
accessories and fittings, all as specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS2- 6: Pumps Room (ID)
Only
IRAQI DINAR

7/7
Bill D – Booster Stations
BS2 - Bill 7: Chlorination Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
6 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
30 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
4 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
accordance with the drawings.
5 m3
……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 25 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
b. TYPE SD2 (210x245)
This item shall be measured per unit of Steel door with louvers (in both lower and
upper parts of the door) installed in situ in accordance with the drawings, as 1 unit
indicated in the doors schedule, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID
c. TYPE SD3 (210x110)
This item shall be measured per unit of Steel door with louvers installed in situ in
1 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
m. TYPE W13 150x140cm
This item shall be measured per unit of windows installed in situ in accordance
3 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
150 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 25 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
130 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
50 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 25 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Chlorination Building Only…….……...………………………
1 set
……………………………………. ID

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Chlorination System
D.9.2.1 1 Ton Chlorine Drum container
4 ea Only…….……...………………………
……………………………………. ID
D.9.2.2 Chlorine container roller support (for duty containers)
2 ea Only…….……...………………………
……………………………………. ID
D.9.2.3 Weighing scale
1 ea Only…….……...………………………
……………………………………. ID
D.9.2.4 Chlorine container support rack (for Stand by containers)
2 ea Only…….……...………………………
……………………………………. ID
D.9.2.5 Chlorine gas manifold made from stainless steel SS.316, complete with isolation valves,
2 set Only…….……...………………………
fittings and all accessories
……………………………………. ID
D.9.2.6 Pressure gauge for each manifolD.
2 ea Only…….……...………………………
……………………………………. ID
D.9.2.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and all
2 ea Only…….……...………………………
accessories
……………………………………. ID
D.9.2.8 Automatic changeover device between gas manifolds
1 ea Only…….……...………………………
……………………………………. ID
D.9.2.9 Gas pressure reducing and shut off valve, electrically operated
2 ea Only…….……...………………………
……………………………………. ID
D.9.2.10 Automatic vacuum chlorination, 10 Kg/hr
2 ea Only…….……...………………………
……………………………………. ID
D.9.2.11 Automatic Duty/Standby Changeover Panel for Chlorinators
1 ea Only…….……...………………………
……………………………………. ID
D.9.2.12 Chlorine Analyzer
1 ea Only…….……...………………………
……………………………………. ID
D.9.2.13 Injection Point
1 ea Only…….……...………………………
……………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2.14 Booster Pump
2 ea Only…….……...………………………
……………………………………. ID
D.9.2.15 Chlorine Sampling Pumps
2 ea Only…….……...………………………
……………………………………. ID
D.9.2.16 Chlorine gas leak detector
1 ea Only…….……...………………………
……………………………………. ID
D.9.2.17 Warning light and alarm
1 set Only…….……...………………………
……………………………………. ID
D.9.2.18 Air Supply / Extract fans
1 set Only…….……...………………………
……………………………………. ID
D.9.2.19 Drench shower
1 set Only…….……...………………………
……………………………………. ID
D.9.2.20 Breathing apparatus
3 ea Only…….……...………………………
……………………………………. ID
D.9.2.21 Any other item to make the system complete in all respects (List details)
1 LS Only…….……...………………………
……………………………………. ID
D.9.3 Gantry Crane
D.9.3.1 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting chain,
control box, runway beams, rails, limit switches, etc. and Third Party Load Test certificate 1 ea Only…….……...………………………
……………………………………. ID
D.9.4 Electrical Works
Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-PCHR; complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories including connection to
PLC fittings and related works all as specified, shown on drawings and to the satisfaction of 1 LS
the engineer. Cables shall be laid inside galvanized steel cable trays and ladders installed
Only…….……...………………………
inside concrete trenches.
……………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 2
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Secondary distribution board DB-TP-CHR complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside 1 LS
Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches.
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
hrs boxes wires, cover plates, chassis, with all needed accessories and fittings, all as 1 LS
specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS2- 7: Chlorination Room (ID)
Only
IRAQI DINAR

6/6
Bill D – Booster Stations
Summary - Booster Station 2
Munistry of Municipalities and TourismGeneral Directorate of Water and Sewerage Mangesh, Batofa and Zawita Water Supply Project
Dohuk Water Directorate Summary Bill

Bill Of Quantities: Mangesh, Batofa and Zawita Water Supply Project


Summary Bill D - Booster Station 2

Description Amount (ID)

Bill 0: Siteworks

Bill 1: Guard House

Bill 2: Staff House

Bill 3: Store

Bill 4: Generator & Transformer

Bill 5: Reservoir 2*3,000 m3

Bill 6: Pumps Room

Bill 7: Chlorination Room

Total Carried to General Summary

1/1
Bill D – Booster Stations
BS3 - Bill 0: Siteworks
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and shall
be the net projected horizontal area in accordance to the drawings & survey plan 7,800 m2 Only…….……...………………………
submitted and approved by the Engineer. ……………………………………. ID
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 12,800 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
D.1.3 SELECTED FILL & BACKFILL
This item shall be measured in cubic meter and shall be the net volume according
to the Contract Drawings and as directed & approved by the Engineer. Wherever
140 m3 Only…….……...………………………
backfilling limits are not indicated on Contract Drawings, the limits shall be 50cm
away of blinding edges. ……………………………………. ID
D.1.4 ROCKFILL AND STRUCTURAL BACKFILL
This item shall be measured in cubic meter and shall be the net volume according
to the Contract Drawings and as directed & approved by the Engineer. 230 m3 Only…….……...………………………
……………………………………. ID
D.1.7 WATER DISTRIBUTION SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
D.1.8 SANITARY SEWER SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
D.1.9 STORMWATER DRAINAGE SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...………………………
1 L.S.
Engineer. ……………………………………. ID
Sub-Total D.1 (ID)

1/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.6: EXTERNAL WORKS
D.6.1 CONCRETE CURBS
This item shall be measured in linear meter of concrete curbs installed as indicated Only…….……...………………………
275 l.m.
on approved shop drawings. ……………………………………. ID
D.6.4 FENCE
This item shall be measured in linear meter of fence installed as indicated on Only…….……...………………………
350 l.m.
drawings and as directed and approved by the Engineer. ……………………………………. ID
D.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings and 1 unit Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
D.6.6 AGGREGATE BASE COURSE
This item shall be measured in cubic meter of aggregate base course materials
compacted in accordance with the drawings and as directed and approved by the 400 m3 Only…….……...………………………
Engineer. ……………………………………. ID
D.6.7 BITUMINOUS BASE COURSE
a. TWO LAYERS THICKNESS = 2x6cm
This item shall be measured in square meter and shall be the net value as indicated
1,350 m2 Only…….……...………………………
on the drawings and as measured in the presence of the Engineer and according to
his approval. ……………………………………. ID
D.6.8 AGRICULTURAL TOP SOIL
This item shall be measured in cubic meter of materials in accordance with the Only…….……...………………………
275 m3
drawings and as directed and approved by the Engineer. ……………………………………. ID
D.6.9 TREES AND SHRUBS, GROUND COVERS AND GRASS COVERS
This item shall be measured in cubic meter of materials in accordance with the Only…….……...………………………
475 m2
drawings and as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)

2/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.8: GEOTECHNICAL INVESTIGATION
Note: The geotechnical investigation shall be performed in order to evaluate the
bearing capacities, material characteristics and any potential geotechnical
problems of the foundation soil for sites where structures will be executed and
where requested by the Engineer.
D.8.1 PRELIMINARY REPORT
This item shall be paid by unit of report, for each site to be investigated, upon 1 unit
approval and acceptance of the aforesaid report after revision and modification of Only…….……...………………………
Engineer instructions and comments. ……………………………………. ID
D.8.2 RELOCATION OF DRILLING RIG
This item shall be paid by unit of relocation from completed borehole to the 1 unit
Engineer satisfaction to another borehole (in the same site or in another far site). Only…….……...………………………
……………………………………. ID
D.8.3 VERTICAL CORING IN OVERBURDEN
This item shall be in linear meter of borehole accepted by the Engineer, quantity
of which shall be the distance between the natural ground level and the top of rock 40 l.m.
formation as measured in situ and determined by the Engineer. Only…….……...………………………
……………………………………. ID
D.8.4 VERTICAL CORING IN ROCK
This item shall be in linear meter of borehole accepted by the Engineer, quantity
of which shall be the distance between the level and the bottom of overburden and 20 l.m.
the lower cored rock formation as measured in situ and determined by the Only…….……...………………………
Engineer. ……………………………………. ID
D.8.5 LABORATORY AND SITE TESTS ON SOIL AND ROCK SAMPLES
This item shall be in unit of set of tests for each borehole, necessary to conclude
the soil bearing capacity in function of the depth in each borehole or to identify 10 unit
geotechnical problems, conducted as directed, & accepted by the Engineer,
payable 60% upon test completion and the remaining at the submittal of the final Only…….……...………………………
revised report ……………………………………. ID

3/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.8.6 FINAL REPORT
This item shall be paid by unit upon report submittal subject to Engineer consent 1 unit Only…….……...………………………
approval & revision thereto if modification prevails. ……………………………………. ID
Sub-Total D.8 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.4 PLC and SCADA system
Supply, install, and connect a complete PLC and SCADA system as described in
specifications documents and drawings with full control of the Booster Station,
including remote terminal units (RTU) with 20% additional spare capacity for
each computer system complete with PCs, printers, LCD screens displays, Mimic
Panels, Communications interfaces, SCADA software, and all cabling and 1 LS
necessary accessories for the connection between RTUs and all equipment, and
their interfaces including all necessary interfacing elements, cabling and
accessories in order to ensure the communication between all RTUs and the
control room etc... as specified and shown on drawings and approved by Only…….……...………………………
Engineers. ……………………………………. ID
D.9.1.5 Earthing
Supply, install, connect, test and commission the following earthing system to
provide low connecting earth resistance less than 3 ohms complete including earth
rods, earth stranded bare copper conductor for earthing network, earth pits,
1 Item
connectors, inspection boxes, clamps, test links, earth bar, excavation, backfilling,
earthing busbars and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.6 Lightning Protection
Supply, install, connect, test and commission the following lightning protection
system, complete including air terminator, bare copper tape down conductors, test
points, surge arrestors for power systems as well as for low current systems as
4 Item
many as needed, earthing pits, all necessary accessories, and all other related
works, all as specified, shown on the drawings and to the satisfaction of the Only…….……...………………………
Engineer. ……………………………………. ID

4/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.7 Site Lighting
D.9.1.7.1 Feeder pillar
Supply, install, connect, test and commission the following feeder pillar complete
including reinforced concrete foundation, 60cmx60cm manhole for cables access,
galvanized steel plate for cable protection, ventilation louver with screen,
galvanized steel protection barrier, PVC sleeves, cabling and connections, all 1 LS
necessary accessories and other related works, all as specified, shown on the
drawings, to the satisfaction of the Engineer, and with full coordination with Only…….……...………………………
electrical local authority. ……………………………………. ID
D.9.1.7.2 Lighting Poles
Supply, install, connect, test and commission the following lighting poles,
complete with die cast aluminum lighting fixture including starters, lamp holder,
reflector and lamp, including concrete base with all required civil and installation
works with all necessary accessories, and all other related works, all as specified,
shown on the drawings and to the satisfaction of the Engineer.

6 m high, single bracket galvanized steel, street lighting pole, with one luminaire Only…….……...………………………
10 Item
housing 1x150W HPS lamp IP65. ……………………………………. ID
6 m high, double brackets galvanized steel, street lighting pole, with two luminaire Only…….……...………………………
7 Item
housing 2x150W HPS lamp IP65 ……………………………………. ID
6 m high, four brackets galvanized steel, street lighting pole, with four luminaire Only…….……...………………………
3 Item
housing 1x150W HPS lamp IP65. ……………………………………. ID
D.9.1.7.3 Concrete encased duct for road crossings and cable draw pit
40cm x 40cm cable draw pit Only…….……...………………………
1 Item
……………………………………. ID
Concrete encased 1 x 100mm UPVC duct for road crossings Only…….……...………………………
10 lm
……………………………………. ID
D.9.1.7.4 External lighting cables
Supply, install, connect, test and commission the following directly burried steel
wire armoured cables for external lighting installation, complete with all required
civil and installation works with all necessary accessories, and all other related 1 LS
works, all as specified, shown on the drawings and to the satisfaction of the Only…….……...………………………
Engineer. ……………………………………. ID

5/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.7.5 Earthing for Feeder pillar and lighting poles.
Supply, install, connect, test and commission earthing system to provide low
connecting earth resistance less than 3 ohms complete including earth rods, earth
stranded bare copper conductor for feeder pillar and lighting poles earthing, earth
3 Item
pits, connectors, inspection boxes, clamps, excavation, backfilling and all other
related works, all as specified, shown on the drawings and to the satisfaction of Only…….……...………………………
the Engineer. ……………………………………. ID
D.9.1.8 Trenching and Ducting
D.9.1.8.1 Supply, install, and commission the following trenches and 6" duct banks for main
power network cabling system, complete with all needed excavation works,
1 LS
backfilling and other related civil works, all as specified, shown on the drawings Only…….……...………………………
and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.8.2 Supply, install, and commission the following manholes for main power network
cabling system, complete with all needed concrete casting, iron cast covers,
sleeves, excavation works, backfilling and other related civil works, all as 1 LS
specified, shown on the drawings and to the satisfaction of the Engineer. Only…….……...………………………
……………………………………. ID
D.9.1.9 Cabling
Supply, install, connect, test and commission the following steel wire armoured
cables for the main power network, complete including conduits, terminal and
junction boxes, jointing of cables, sealing compounds, fixing materials, and
supports, all necessary accessories, and all other related works, all as specified,
shown on the drawings and to the satisfaction of the Engineer.

MV cables Only…….……...………………………
1 LS
……………………………………. ID
LV cables Only…….……...………………………
1 LS
……………………………………. ID
D.9.1.10 Telephone System
D.9.1.10.1 Allow for local Telephone and DATA connection fees including the supply and
installation of all necessary cables, builder's work and accessories, and all other
1 LS
related works, all as directed and to the satisfaction of the Engineer, and in full Only…….……...………………………
coordination with local relevant authority. ……………………………………. ID

6/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.10.2 Supply, install, connect, test and commission the following telecommunication
system complete including cables CAT6 (minimum 25) unless otherwise stated,
UPS, pulled-in conduits or cable trays, boxes, frames, racks, fittings, devices,
1 LS
equipment, accessories and all other related works, all as specified, shown on the
drawings and to the satisfaction of the Engineer Only…….……...………………………
……………………………………. ID
D.9.1.11 Analogue Addressable Fire Alarm System
Supply, install, connect, test and commission a complete analogue addressable fire
alarm system including Main Fire Alarm Panel, repeater Panels, Manual Call
Stations, fire alarm bells, fire detectors, boxes, fire cables, conduits, connections, 1 LS
fittings and accessories and all realted works, all as specified and to the Only…….……...………………………
satisfaction of the Engineer. ……………………………………. ID
D.9.2 Telemetry Cables for the Pumping Lines including Telemetry ducts and Only…….……...………………………
1 LS
Telemetry manholes along the pumping line profile ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS3- 0: Siteworks (ID)
Only
IRAQI DINAR

7/7
Bill D – Booster Stations
BS3 - Bill 1: Guard House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
15 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
18 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
15 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
5 m3
accordance with the drawings. ……………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 50 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 60 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
TYPE WD1 (210x100)
This item shall be measured per unit of Wood door installed in situ in accordance
2 Unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
a. TYPE W1 225x130cm
This item shall be measured per unit of windows including rolling shutter installed
1 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
b. TYPE W2 100x200cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
c. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
d. TYPE D1 210x80cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
e. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
150 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 50 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with the Only…….……...………………………
drawings, as directed and approved by the Engineer. 60 l.m.
……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
140 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
120 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
D.5.6 RED CLAY ROOFING TILES
This item shall be measured in square meters of red clay roof tiles quantity as Only…….……...………………………
50 m2
indicated on the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
55 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.7: METAL WORKS
D.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets 3 l.m. Only…….……...………………………
installation quantity as indicated on approved shop drawings. ……………………………………. ID
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
750 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Guard House Only…….……...………………………
1 set
……………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-GH, complete with Cabinet, bus bars, circuit breakers,
cable glands, power cables and all related accessories and fittings, all as specified, shown on 1 LS Only…….……...………………………
drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches, socket
outlets, power outlets, disconnecting switches,emergency lighting with autononomy 3 hrs,
1 LS
boxes wires, cover plates, chassis, with all needed accessories and fittings, all as specified, Only…….……...………………………
and to the satisfaction of the engineer. ……………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS3- 1: Guard House (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS3 - Bill 2: Staff House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 85 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
34 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
56 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
27 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
20 m3
accordance with the drawings. ……………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 105 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 160 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
a. TYPE WD1 (210x100)
This item shall be measured per unit of Wood door installed in situ in accordance
8 Unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
b. TYPE D4 (210x100)
This item shall be measured per unit of Wood door installed in situ in accordance
1 Unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
a. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
b. TYPE W7 120x70cm
This item shall be measured per unit of windows including rolling shutter installed
2 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
c. TYPE W8 200x130cm
This item shall be measured per unit of windows installed in situ in accordance
4 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
d. TYPE D1 210x80cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
e. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
305 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 145 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with the Only…….……...………………………
130 l.m.
drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
305 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
210 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
160 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.7: METAL WORKS
D.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets 4 l.m. Only…….……...………………………
installation quantity as indicated on approved shop drawings. ……………………………………. ID
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Staff House Only…….……...………………………
1 set
……………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-SH, complete with Cabinet, bus bars, circuit breakers,
cable glands, power cables and all related accessories and fittings, all as specified, shown on 1 LS Only…….……...………………………
drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches, socket
outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3 hrs,
boxes wires, cover plates, chassis, with all needed accessories and fittings, all as specified, 1 LS
Only…….……...………………………
and to the satisfaction of the engineer.
……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS3- 2: Staff House (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS3 - Bill 3: Store
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 30 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
7 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
19 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
16 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
6 m3
accordance with the drawings. ……………………………………. ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 45 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 75 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
1 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
TYPE W4 150x80cm
This item shall be measured per unit of windows including rolling shutter installed
6 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
190 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 60 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
190 m2
without including opening surfaces in accordance with the drawings, as directed Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
b. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
130 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)

2/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
75 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 5 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Store & Workshop Only…….……...………………………
1 set
……………………………………. ID
D.9.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-S/W, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside 1 LS
galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID

3/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS3- 3: Store (ID)
Only
IRAQI DINAR

4/4
Bill D – Booster Stations
BS3 - Bill 4: Generator & Transformer
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 275 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
140 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
300 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
390 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
accordance with the drawings. 55 m3
……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 400 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
1 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
TYPE SD7 (250x300)
This item shall be measured per unit of Steel door with louvers installed in situ in
3 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
TYPE W12 250x250cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
900 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 320 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
900 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
350 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
400 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 180 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 7 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
2,250 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Generator and Transformer Room Only…….……...………………………
1 set
……………………………………. ID

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Electrical Works
D.9.2.1 Power Distribution Transformers.
Supply, install, connect test and commission the following oil immersed MV/LV power
distribution transformer complete with all needed connections, joints, cable terminations,
cable glands, wiring and protection devices from MV power network to transformer's
primary input; and from transformer's secondary output to the power metering device and to
complete the connection to the main power network with all necessary LV cables,
auxiliaries, cable supports, as well as the connection to the earthing loop, all as specified,
shown on drawings, to the satisfaction of the engineer and in full coordination with local
authority.
Transformer, 2500 kVA, 33/3.3 kV. Only…….……...………………………
2 Item
……………………………………. ID
Transformer, 300 kVA, 3.3/0.4 kV. Only…….……...………………………
1 Item
……………………………………. ID
D.9.2.2 Stand-by Power Generators.
Supply, install, connect, test and commission the following standby power Generator-Sets
with synchronizing and totalizing panels , acoustic treatment for each generator and anti
vibration installation. Complete with all needed connections, wiring, protection devices,
control and monitoring digital panel board, fuel diesel tank for each generator with low level
emergency turn off controller, and a storage back-up Diesel tank, delivered full with all
needed plumbing works, fuel impuruties separator filter, emergency stop push-button,
exhaust pipes with filters, turn on and off manual and automatic system to be integrated to
the ATS system, complete the connection to the main power network, as well as the
connection to the main earthing loop, all as specified, shown on drawings and to the
satisfaction of the engineer.

Generator-Set, prime rating 750 kVA, 3.3kV, 50Hz, PF0.8. Only…….……...………………………


2 Item
……………………………………. ID
fuel Diesel Tank, Black steel, 10000L. Only…….……...………………………
2 Item
……………………………………. ID
SYNCHRONIZING Panel for the above mentioned generators. Only…….……...………………………
1 Item
……………………………………. ID
Galvanized steel exhaust pipes with filter, insulation and aluminum jacketing. Only…….……...………………………
2 Item
……………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2.3 Main Distribution Panel Boards
Supply, install, connect, test and commission the following Power Distribution Panel
Boards, complete with protection devices, monitoring devices, metering devices, control
components, ventilation fans, bus bars, ACBs, MCCBs, MCBs, Relays, Timers, Contactors,
Starters, cables, cable glands, all needed connections accessories and supports , all as
specified, shown on drawings and to the satisfaction of the engineer.

MV 33kV Switchgear, connecting the overhead MV cables to the transformers, complete


with all needed protection devices, power supply, cables, connections and fittings. 1 Item Only…….……...………………………
……………………………………. ID
MV 3.3kV Switchgear, connecting the MV cables to the transformers, complete with all Only…….……...………………………
1 Item
needed protection devices, power supply, cables, connections and fittings. ……………………………………. ID
LV Switchgear for the connection between the transformers and the MDBs complete with Only…….……...………………………
2 Item
all needed protection devices, cables, connections and fittings. ……………………………………. ID
Main Distribution Panel Board MDB: Only…….……...………………………
1 Item
……………………………………. ID
Secondary Distribution Board DB-TP-G&T Only…….……...………………………
1 Item
……………………………………. ID
D.9.2.4 Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-G&T complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside 1 LS
galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs, boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
D.9.2.5 Capacitor bank, 400 KVAR, 3phase including air circuit breaker, complete with all needed
connections, fittings, cabling, accessories, all as specified, and to the satisfaction of the 3 Item Only…….……...………………………
engineer. ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS3- 4: Generator & Transformer (ID)
Only
IRAQI DINAR

6/6
Bill D – Booster Stations
BS3 - Bill 5: Reservoir 3,000 m3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 800 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
950 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
455 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
795 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
160 m3
accordance with the drawings. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.1 WATERSTOP JOINTS
This item shall be measured in linear meter of installed Waterstop as indicated on Only…….……...………………………
420 l.m.
drawings. ……………………………………. ID

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
300 m2
……………………………………. ID
D.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
accordance to the drawings as directed and approved by the Engineer.
6,200 m2
……………………………………. ID
D.3.4 VAPOR BARRIER
This item shall be measured in square meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence of 1,580 m2 Only…….……...………………………
the Engineer and according to his approval. ……………………………………. ID
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 1,580 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)
D.5: FINISHES
D.5.5 WALL PAINT
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
1,150 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
1,580 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 15 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
2,250 kg
drawings and as requested by the Engineer. ……………………………………. ID
D.7.4 DRAINAGE PIPES FOR RESERVOIRS
This item shall be measured by linear meter of drainage pipes for each reservoir
completely installed with all necessary connections and fixing accessories to the 140 l.m.
approval of the Engineer. Draining the roof slabs of reservoirs and pumping Only…….……...………………………
station including the floor drains. ……………………………………. ID
D.7.5 DUCTILE IRON COVER AND FRAME
This item shall be measured per unit of ductile iron cover completely installed to 8 unit Only…….……...………………………
the approval of the Engineer. ……………………………………. ID
Sub-Total D.7 (ID)
D.10: MECHANICAL WORKS FOR RESERVOIRS
D.10.1.a GATE VALVE
This item shall be measured in unit of gate valve completely installed and tested.

DN150 mm - PN16 bars Only…….……...………………………


2 unit ……………………………………. ID
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.1.b NEEDLE VALVE
This item shall be measured in unit of needle valve completely installed and
tested.
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.10.2 STRAINER FOR WATER METERS
The strainer for water meter shall be measured by unit and shall be classified for
payment according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.3 WATER METER
D.10.3.1 WATER METER COUNTER
This item shall be measured in unit of water meter completely installed and tested.

DN150 mm - PN16 bars Only…….……...………………………


2 unit ……………………………………. ID
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.3.2 MECHANICAL FLOWMETER
This item shall be measured by unit and classified for payment according to
pipeline (mounted on) diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.4 BUTTERFLY VALVES
This item shall be measured in unit of butterfly valve completely installed and
tested.
DN150 mm - PN16 bars Only…….……...………………………
2 unit ……………………………………. ID
DN800 mm - PN16 bars Only…….……...………………………
6 unit ……………………………………. ID
D.10.5 TRIPLE FUNCTION (DOUBLE) AIR VALVES
This item shall be measured by unit and shall be classified for payment according
to diameter and nominal pressure.
DN50 mm - PN16 bars Only…….……...………………………
2 unit ……………………………………. ID
DN200 mm - PN16 bars Only…….……...………………………
2 unit ……………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.10.6 STRAINER
This item shall be measured in unit of strainers completely installed and tested.

DN150 mm - PN16 bars Only…….……...………………………


2 unit ……………………………………. ID
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.7 FLOAT-VALVE
Float-valves shall be measured by unit and shall be classified for payment
according to diameter and nominal pressure.
DN800 mm - PN16 bars Only…….……...………………………
1 unit ……………………………………. ID
D.10.8 GAUGE GLASS LEVEL INDICATOR
The price shall be paid by unit of glass level indicator completely installed and Only…….……...………………………
tested. 1 unit ……………………………………. ID
D.10.10 PIPES AND FITTINGS FOR RESERVOIRS
This item shall be paid as a set of a complete pipes and fittings system installed
and tested for each of the corresponding springs, reservoirs types and pumping
stations, according to the technical specifications, supplier’s recommendation and
to the satisfaction of the Engineer.
For BS3 Reservoir Only…….……...………………………
1 unit ……………………………………. ID
Sub-Total D.10 (ID)
Total Bill BS3- 5: Reservoir 2*3,000 m3 (ID)
Only
IRAQI DINAR

5/5
Bill D – Booster Stations
BS3 - Bill 6: Pumps Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 150 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
80 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
160 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
220 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
35 m3
accordance with the drawings. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 350 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
c. TYPE SD3 (210x110)
This item shall be measured per unit of Steel door with louvers installed in situ in
2 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
i. TYPE W9 90x80cm
This item shall be measured per unit of windows installed in situ in accordance
16 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
1,350 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 350 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
750 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
475 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 350 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 10 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
1,125 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
BS3 Pumps Room Only…….……...………………………
1 set
……………………………………. ID

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Pumpsets
D.9.2.1 From Booster Station 3 to Batofa Regional Tank, Horizontal Split case double suction
pump, capacity 753 m3/hr at 155 m head, 1500 rpm, suitable for 2 ppm chlorine content.
Complete with all motor and pump built in protection devices as per specifications (PTC
thermistor, overload, Oil leak detector, motor bearing temperature, pumps bearing 5 ea
temperature). Pumps shall be fitted with mechanical shaft seal type spring loaded flat faces
arranged such that replacement of wearing components can be carried out without the need Only…….……...………………………
to dismantle the pump.
……………………………………. ID
D.9.2.2 Anti Water Hammer System:
- Surge vessel at the pumping station location (Type: Bladder, Number of units: 2, Size:
7000 liters each, Connection: 300 mm, Header Size: 400 mm, PN 16, Factory Test Pressure:
23 bar, Precharge pressure: 5.2 bar).
- Open surge tank at PEG BL48 (Material: Concrete, Number of Units: 1, Base Area: 1 LS
19.6m2, Height: 5.2m, Top Elevation: 952.5, Connection In: 600mm, Connection Out:
600mm).
- Control of the pumping station (Drive: Soft starter, Drive Configuration: 8s/16s, Startup Only…….……...………………………
delay interval: Min 40 sec.). ……………………………………. ID
D.9.2.3 Suction Pipes, Valves, Instruments and Accessories
D.9.2.3.1 Main suction header, DN900, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
reservoir header to pumps suction pipes 1 set
……………………………………. ID
D.9.2.3.2 DN500 motorized double flanged gate valve Only…….……...………………………
5 ea
……………………………………. ID
D.9.2.3.3 Suction pipe, DN500, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, washers, Only…….……...………………………
Gaskets, etc. 5 set
……………………………………. ID
D.9.2.3.4 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...………………………
5 ea
……………………………………. ID
D.9.2.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.2.4 Discharge Piping, Valves, Instruments and Accessories
D.9.2.4.1 Discharge pipe, DN450, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts,
5 Set Only…….……...………………………
washers, Gaskets, etc.
……………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2.4.2 DN450 motorized double flanged gate valve, DI, PN25
5 ea Only…….……...………………………
……………………………………. ID
D.9.2.4.3 DN450 Non slam check valves, complete with lever and limit switch, DI, PN25
5 ea Only…….……...………………………
……………………………………. ID
D.9.2.4.4 Main Discharge header, DN800, Ductile Iron, including fittings and wall inserts) from Pump
1 Set Only…….……...………………………
Discharge Piping to 1 m from outer face of the pumps room wall
……………………………………. ID
D.9.2.4.5 High Pressure Switch/Transmitter
5 ea Only…….……...………………………
……………………………………. ID
D.9.2.4.6 Vibration sensor / Analyzer
5 set Only…….……...………………………
……………………………………. ID
D.9.3 Gantry Crane
D.9.3.1 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting chain,
control box, runway beams, rails, limit switches, etc. and Third Party Load Test certificate 1 ea Only…….……...………………………
……………………………………. ID
D.9.4 Electrical Works
Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-P complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories, fittings and related works
all as specified, shown on drawings and to the satisfaction of the engineer. Cables shall be 5 item
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Secondary distribution board DB-TP-BS3 complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside 1 LS
Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID
- Lighting and power installation, complete including, highbay lighting fixtures 1x250W
HPS IP65, switches, socket outlets, power outlets,disconnecting switches,emergency
lighting with autononomy 3 hrs, boxes wires, cover plates, chassis, with all needed 1 LS
Only…….……...………………………
accessories and fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer.
……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer.
……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS3- 6: Pumps Room (ID)
Only
IRAQI DINAR

6/6
Bill D – Booster Stations
BS3 - Bill 7: Chlorination Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
6 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
30 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
4 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
accordance with the drawings.
5 m3
……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 25 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
b. TYPE SD2 (210x245)
This item shall be measured per unit of Steel door with louvers (in both lower and
upper parts of the door) installed in situ in accordance with the drawings, as 1 unit
indicated in the doors schedule, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID
c. TYPE SD3 (210x110)
This item shall be measured per unit of Steel door with louvers installed in situ in
1 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
m. TYPE W13 150x140cm
This item shall be measured per unit of windows installed in situ in accordance
3 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
150 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in
25 m2
accordance with the drawings, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
without including opening surfaces in accordance with the drawings, as directed
130 m2
Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
50 m2
without including opening surfaces in accordance with the drawings, as directed Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 25 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Chlorination Building Only…….……...………………………
1 set
……………………………………. ID

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Chlorination System
D.9.2.1 1 Ton Chlorine Drum container Only…….……...………………………
4 ea
……………………………………. ID
D.9.2.2 Chlorine container roller support (for duty containers) Only…….……...………………………
2 ea
……………………………………. ID
D.9.2.3 Weighing scale Only…….……...………………………
1 ea
……………………………………. ID
D.9.2.4 Chlorine container support rack (for Stand by containers) Only…….……...………………………
2 ea
……………………………………. ID
D.9.2.5 Chlorine gas manifold made from stainless steel SS.316, complete with isolation valves, Only…….……...………………………
2 set
fittings and all accessories ……………………………………. ID
D.9.2.6 Pressure gauge for each manifolD. Only…….……...………………………
2 ea
……………………………………. ID
D.9.2.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and all Only…….……...………………………
2 ea
accessories ……………………………………. ID
D.9.2.8 Automatic changeover device between gas manifolds Only…….……...………………………
1 ea
……………………………………. ID
D.9.2.9 Gas pressure reducing and shut off valve, electrically operated Only…….……...………………………
2 ea
……………………………………. ID
D.9.2.10 Automatic vacuum chlorination, 10 Kg/hr Only…….……...………………………
2 ea
……………………………………. ID
D.9.2.11 Automatic Duty/Standby Changeover Panel for Chlorinators Only…….……...………………………
1 ea
……………………………………. ID
D.9.2.12 Chlorine Analyzer Only…….……...………………………
1 ea
……………………………………. ID
D.9.2.13 Injection Point Only…….……...………………………
1 ea
……………………………………. ID
D.9.2.14 Booster Pump Only…….……...………………………
2 ea
……………………………………. ID
D.9.2.15 Chlorine Sampling Pumps Only…….……...………………………
2 ea
……………………………………. ID
D.9.2.16 Chlorine gas leak detector Only…….……...………………………
1 ea
……………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2.17 Warning light and alarm Only…….……...………………………
1 set
……………………………………. ID
D.9.2.18 Air Supply / Extract fans Only…….……...………………………
1 set
……………………………………. ID
D.9.2.19 Drench shower Only…….……...………………………
1 set
……………………………………. ID
D.9.2.20 Breathing apparatus Only…….……...………………………
3 ea
……………………………………. ID
D.9.2.21 Any other item to make the system complete in all respects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.3 Gantry Crane
D.9.3.1 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting chain,
control box, runway beams, rails, limit switches, etc. and Third Party Load Test certificate 1 ea Only…….……...………………………
……………………………………. ID
D.9.4 Electrical Works
Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-PCHR; complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories including connection to
PLC fittings and related works all as specified, shown on drawings and to the satisfaction of 1 LS
the engineer. Cables shall be laid inside galvanized steel cable trays and ladders installed Only…….……...………………………
inside concrete trenches. ……………………………………. ID
- Secondary distribution board DB-TP-CHR complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside 1 LS
galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets, boxes wires,disconnecting switches,emergency lighting with 1 LS Only…….……...………………………
autononomy 3 hrs cover plates, chassis, with all needed accessories and fittings, all as
……………………………………. ID
specified, and to the satisfaction of the engineer.
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Station 3
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer.
……………………………………. ID
Sub-Total D.9 (ID)
Total Bill BS3- 7: Chlorination Room (ID)
Only
IRAQI DINAR

6/6
Bill D – Booster Stations
Summary - Booster Station 3
Munistry of Municipalities and TourismGeneral Directorate of Water and Sewerage Mangesh, Batofa and Zawita Water Supply Project
Dohuk Water Directorate Summary Bill

Bill Of Quantities: Mangesh, Batofa and Zawita Water Supply Project


Summary Bill D - Booster Station 3

Description Amount (ID)

Bill 0: Siteworks

Bill 1: Guard House

Bill 2: Staff House

Bill 3: Store

Bill 4: Generator & Transformer

Bill 5: Reservoir 2*3,000 m3

Bill 6: Pumps Room

Bill 7: Chlorination Room

Total Carried to General Summary

1/1
Bill D – Booster Stations
Booster Station 4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and shall
be the net projected horizontal area in accordance to the drawings & survey plan 50 m2 Only…….……...………………………
submitted and approved by the Engineer. ……………………………………. ID
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
5 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
22 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
13 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
5 m3
accordance with the drawings. ……………………………………. ID

1/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 10 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
15 m2
……………………………………. ID
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 50 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
a. TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
3 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
b. TYPE SD2 (210x245)
This item shall be measured per unit of Steel door with louvers (in both lower and
upper parts of the door) installed in situ in accordance with the drawings, as 3 unit
indicated in the doors schedule, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID

2/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4.2 ALUMINUM DOORS AND WINDOWS
i. TYPE W9 90x80cm
This item shall be measured per unit of windows installed in situ in accordance
9 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
j. TYPE W10 140x110cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
l. TYPE W12 250x250cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
25 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
a. COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 5 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 40 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
25 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

3/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
175 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
100 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
50 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings and 1 unit Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
BS4 Building including all chambers Only…….……...………………………
1 set
……………………………………. ID

4/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.3 Local Electricity Connection
D.9.1.3.1 Overhead Transmission lines (11 kV) shall be 120/20 ACSR"Lark".
OHL routing shall start from the nearest Substation and will be connected to
Booster Station 4. The towers will be designed according to local standards.
Routing will take into consideration the master plans in the region, the existing 1 LS
OHL and the necessary clearance distance from buildings, as per applicable
standards. The OHL shall be of the ACSR "Lark" type and 2 cables (single-core) Only…….……...………………………
shall be used per phase. ……………………………………. ID
D.9.1.4 PLC and SCADA system
Supply, install, and connect a complete PLC and SCADA system as described in
specifications documents and drawings with full control of the Booster Station,
including remote terminal units (RTU) with 20% additional spare capacity for
each computer system complete with PCs, printers, LCD screens displays, Mimic
Panels, Communications interfaces, SCADA software, and all cabling and 1 LS
necessary accessories for the connection between RTUs and all equipment, and
their interfaces including all necessary interfacing elements, cabling and
accessories in order to ensure the communication between all RTUs and the
control room etc... as specified and shown on drawings and approved by Only…….……...………………………
Engineers. ……………………………………. ID
D.9.1.5 Earthing
Supply, install, connect, test and commission the following earthing system to
provide low connecting earth resistance less than 3 ohms complete including earth
rods, earth stranded bare copper conductor for earthing network, earth pits,
1 Item
connectors, inspection boxes, clamps, test links, earth bar, excavation, backfilling,
earthing busbars and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer. ……………………………………. ID

5/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.6 Lightning Protection
Supply, install, connect, test and commission the following lightning protection
system, complete including air terminator, bare copper tape down conductors, test
points, surge arrestors for power systems as well as for low current systems as
2 Item
many as needed, earthing pits, all necessary accessories, and all other related
works, all as specified, shown on the drawings and to the satisfaction of the Only…….……...………………………
Engineer. ……………………………………. ID
D.9.1.10 Telephone System
D.9.1.10.1 Allow for local Telephone and DATA connection fees including the supply and
installation of all necessary cables, builder's work and accessories, and all other
1 LS
related works, all as directed and to the satisfaction of the Engineer, and in full Only…….……...………………………
coordination with local relevant authority. ……………………………………. ID
D.9.1.10.2 Supply, install, connect, test and commission the following telecommunication
system complete including cables CAT6 (minimum 25) unless otherwise stated,
UPS, pulled-in conduits or cable trays, boxes, frames, racks, fittings, devices, 1 LS
equipment, accessories and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer ……………………………………. ID
D.9.1.11 Analogue Addressable Fire Alarm System
Supply, install, connect, test and commission a complete analogue addressable fire
alarm system including Main Fire Alarm Panel, repeater Panels, Manual Call
Stations, fire alarm bells, fire detectors, boxes, fire cables, conduits, connections, 1 LS
fittings and accessories and all realted works, all as specified and to the Only…….……...………………………
satisfaction of the Engineer. ……………………………………. ID

6/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Pumpsets
D.9.2.1 From Booster Station 4 to Lumana and Siyaratika Existing Tanks Horizontal Split case
double suction pump, capacity 45 m3/hr at 320 m head, 1500 rpm, suitable for 2 ppm
chlorine content. Complete with all motor and pump built in protection devices as per
specifications (PTC thermistor, overload, Oil leak detector, motor bearing temperature, 2 ea
pumps bearing temperature). Pumps shall be fitted with mechanical shaft seal type spring
loaded flat faces arranged such that replacement of wearing components can be carried out Only…….……...………………………
without the need to dismantle the pump. ……………………………………. ID
D.9.2.2 Anti Water Hammer System:
- Surge vessel at the pumping station location (Type: Bladder, Number of units: 1, Size: 100
liters each, Connection: 80 mm, Header Size: 80 mm, PN 40, Factory Test Pressure: 58 bar,
1 LS
Precharge pressure: 8.6 bar).
- Pressure Relief Valve (Type: Spring loaded, Units: 1, Size: 100 mm, PN 40). Only…….……...………………………
- Control of the pumping station (Drive: Soft starter, Drive Configuration: 8s/16s). ……………………………………. ID
D.9.3 Suction Pipes, Valves, Instruments and Accessories
D.9.3.1 Main suction header, DN150, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 set
reservoir header to pumps suction pipes ……………………………………. ID
D.9.3.2 DN150 motorized double flanged gate valve Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.3 Suction pipe, DN150, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, washers, Only…….……...………………………
2 set
Gaskets, etc. ……………………………………. ID
D.9.3.4 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.4 Discharge Piping, Valves, Instruments and Accessories
D.9.4.1 Discharge pipe, DN150, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
2 Set
washers, Gaskets, etc. ……………………………………. ID
D.9.4.2 DN150 motorized double flanged gate valve, DI, PN40 Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.3 DN150 Non slam check valves Nozzle type, complete with lever and limit switch, DI, PN40 Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.4 Main Discharge header, DN150, Ductile Iron, including fittings and wall inserts) from Pump Only…….……...………………………
1 Set
Discharge Piping to 1 m from outer face of the pumps room wall ……………………………………. ID

7/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.4.5 High Pressure Switch/Transmitter Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.6 Vibration sensor / Analyzer Only…….……...………………………
2 set
……………………………………. ID
D.9.5 Chlorination System
D.9.5.1 1 Ton Chlorine Drum container Only…….……...………………………
2 ea
……………………………………. ID
D.9.5.2 Chlorine container roller support (for duty containers) Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.3 Weighing scale Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.4 Chlorine container support rack (for Stand by containers) Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.5 Chlorine gas manifold made from seamless carbon steel, complete with isolation valves, Only…….……...………………………
1 set
fittings and all accessories ……………………………………. ID
D.9.5.6 Pressure gauge for each manifolD. Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and all Only…….……...………………………
1 ea
accessories ……………………………………. ID
D.9.5.8 Automatic changeover device between gas manifolds Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.9 Gas pressure reducing and shut off valve, electrically operated Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.10 Automatic vacuum chlorination, 10 Kg/hr Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.11 Automatic Duty/Standby Changeover Panel for Chlorinators Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.12 Chlorine Analyzer Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.13 Injection Point Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.14 Booster Pump Only…….……...………………………
1 ea
……………………………………. ID

8/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.5.15 Chlorine Sampling Pumps Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.16 Chlorine gas leak detector Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.17 Warning light and alarm Only…….……...………………………
1 set
……………………………………. ID
D.9.5.18 Air Supply / Extract fans Only…….……...………………………
1 set
……………………………………. ID
D.9.5.19 Drench shower Only…….……...………………………
1 set
……………………………………. ID
D.9.5.20 Breathing apparatus Only…….……...………………………
2 ea
……………………………………. ID
D.9.5.21 Any other item to make the system complete in all respects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.6 Electrical Works
D.9.6.1 Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-P complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories, fittings and related works
1 LS
all as specified, shown on drawings and to the satisfaction of the engineer. Cables shall be
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Secondary distribution board DB-TP-BS4 complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
1 LS
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs, boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, cables and wires, cover plates, chassis, with all needed accessories and fittings, all as 1 LS Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID

9/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
D.9.6.2 Power Distribution Transformers.
Supply, install, connect test and commission the following oil immersed MV/LV power
distribution transformer complete with all needed connections, joints, cable terminations,
cable glands, wiring and protection devices from MV power network to transformer's
primary input; and from transformer's secondary output to the power metering device and to
complete the connection to the main power network with all necessary LV cables,
auxiliaries, cable supports, as well as the connection to the earthing loop, all as specified,
shown on drawings, to the satisfaction of the engineer and in full coordination with local
authority.
Transformer, 300 kVA, 11/0.4 kV. Only…….……...………………………
1 Item
……………………………………. ID
D.9.6.3 Stand-by Power Generators.
Supply, install, connect, test and commission the following standby power Generator-Sets
with synchronizing and totalizing panels , acoustic treatment for each generator and anti
vibration installation. Complete with all needed connections, wiring, protection devices,
control and monitoring digital panel board, fuel diesel tank for each generator with low level
emergency turn off controller, and a storage back-up Diesel tank, delivered full with all
needed plumbing works, fuel impuruties separator filter, emergency stop push-button,
exhaust pipes with filters, turn on and off manual and automatic system to be integrated to
the ATS system, complete the connection to the main power network, as well as the
connection to the main earthing loop, all as specified, shown on drawings and to the
satisfaction of the engineer.
Generator-Set, prime rating 200 kVA, 0.4kV, 50Hz, PF0.8. Only…….……...………………………
1 Item
……………………………………. ID
Fuel Diesel Tank, Black steel, 5000L. Only…….……...………………………
1 Item
……………………………………. ID
Totalizing panel Only…….……...………………………
1 Item
……………………………………. ID
Galvanized steel exhaust pipes with filter, insulation and aluminum jacketing. Only…….……...………………………
1 Item
……………………………………. ID

10/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 4
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.6.4 Main Distribution Panel Boards
Supply, install, connect, test and commission the following Power Distribution Panel
Boards, complete with protection devices, monitoring devices, metering devices, control
components, ventilation fans, bus bars, ACBs, MCCBs, MCBs, Relays, Timers, Contactors,
Starters, cables, cable glands, all needed connections accessories and supports , all as
specified, shown on drawings and to the satisfaction of the engineer.

MV Switchgear, connecting the overhead MV cables to the transformers, complete with all Only…….……...………………………
1 Item
needed protection devices, power supply, cables, connections and fittings. ……………………………………. ID
LV Switchgear for the connection between the transformers and the MDBs complete with Only…….……...………………………
1 Item
all needed protection devices, cables, connections and fittings. ……………………………………. ID
Main Distribution Panel Board MDB Only…….……...………………………
1 Item
……………………………………. ID
D.9.7 Telemetry Cables for the Pumping Lines including Telemetry ducts and Only…….……...………………………
1 LS
Telemetry manholes along the pumping line profile ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill D - Booster Stations 4 (ID)
Only
IRAQI DINAR

11/11
Bill D – Booster Stations
Booster Station 5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and shall
be the net projected horizontal area in accordance to the drawings & survey plan 50 m2 Only…….……...………………………
submitted and approved by the Engineer. ……………………………………. ID
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Only…….……...………………………
Contract Drawings, the limits shall be 50cm away of blinding edges.
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
5 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
22 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
13 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
accordance with the drawings.
5 m3
……………………………………. ID

1/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 10 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
15 m2
……………………………………. ID
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 50 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
a. TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
3 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
b. TYPE SD2 (210x245)
This item shall be measured per unit of Steel door with louvers (in both lower and
upper parts of the door) installed in situ in accordance with the drawings, as 3 unit
Only…….……...………………………
indicated in the doors schedule, as directed and approved by the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
i. TYPE W9 90x80cm
This item shall be measured per unit of windows installed in situ in accordance
9 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID

2/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
j. TYPE W10 140x110cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
l. TYPE W12 250x250cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
25 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
a. COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 5 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in
40 m2
accordance with the drawings, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
25 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
175 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

3/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
100 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
50 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings and 1 unit Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
BS5 Building including all chambers Only…….……...………………………
1 set
……………………………………. ID

4/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.2 Local Electricity Connection
D.9.1.2.1 Overhead Transmission lines (11 KV) shall be 120/20 ACSR"Lark".
OHL routing shall start from the nearest Substation and will be connected to
Booster Station 5. The towers will be designed according to local standards.
Routing will take into consideration the master plans in the region, the existing 1 LS
OHL and the necessary clearance distance from buildings, as per applicable
standards. The OHL shall be of the ACSR "Lark" type and 2 cables (single-core)
Only…….……...………………………
shall be used per phase.
……………………………………. ID
D.9.1.3 PLC and SCADA system
Supply, install, and connect a complete PLC and SCADA system as described in
specifications documents and drawings with full control of the Booster Station,
including remote terminal units (RTU) with 20% additional spare capacity for
each computer system complete with PCs, printers, LCD screens displays, Mimic
Panels, Communications interfaces, SCADA software, and all cabling and
1 LS
necessary accessories for the connection between RTUs and all equipment, and
their interfaces including all necessary interfacing elements, cabling and
accessories in order to ensure the communication between all RTUs and the
control room etc... as specified and shown on drawings and approved by Only…….……...………………………
Engineers. ……………………………………. ID
D.9.1.4 Earthing
Supply, install, connect, test and commission the following earthing system to
provide low connecting earth resistance less than 3 ohms complete including earth
rods, earth stranded bare copper conductor for earthing network, earth pits,
connectors, inspection boxes, clamps, test links, earth bar, excavation, backfilling, 1 Item
earthing busbars and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer. ……………………………………. ID

5/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.5 Lightning Protection
Supply, install, connect, test and commission the following lightning protection
system, complete including air terminator, bare copper tape down conductors, test
points, surge arrestors for power systems as well as for low current systems as
2 Item
many as needed, earthing pits, all necessary accessories, and all other related
works, all as specified, shown on the drawings and to the satisfaction of the Only…….……...………………………
Engineer. ……………………………………. ID
D.9.1.6 Telephone System
D.9.1.6.1 Allow for local Telephone and DATA connection fees including the supply and
installation of all necessary cables, builder's work and accessories, and all other
1 LS
related works, all as directed and to the satisfaction of the Engineer, and in full Only…….……...………………………
coordination with local relevant authority. ……………………………………. ID
D.9.1.6.2 Supply, install, connect, test and commission the following telecommunication
system complete including cables CAT6 (minimum 25) unless otherwise stated,
pulled-in conduits or cable trays, boxes, frames, racks, fittings, devices,
1 LS
equipment, accessories and all other related works, all as specified, shown on the
drawings and to the satisfaction of the Engineer Only…….……...………………………
……………………………………. ID
D.9.1.7 Analogue Addressable Fire Alarm System
Supply, install, connect, test and commission a complete analogue addressable fire
alarm system including Main Fire Alarm Panel, repeater Panels, Manual Call
Stations, fire alarm bells, fire detectors, boxes, fire cables, conduits, connections, 1 LS
fittings and accessories and all realted works, all as specified and to the
Only…….……...………………………
satisfaction of the Engineer.
……………………………………. ID

6/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.2 Pumpsets
D.9.2.1 From Booster Station 5 to Barash Existing Tank Horizontal Split case double suction pump,
capacity 25 m3/hr at 195 m head, 1500 rpm, suitable for 2 ppm chlorine content. Complete
with all motor and pump built in protection devices as per specifications (PTC thermistor,
overload, Oil leak detector, motor bearing temperature, pumps bearing temperature). Pumps 2 ea
shall be fitted with mechanical shaft seal type spring loaded flat faces arranged such that
replacement of wearing components can be carried out without the need to dismantle the Only…….……...………………………
pump. ……………………………………. ID
D.9.3 Suction Pipes, Valves, Instruments and Accessories
D.9.3.1 Main suction header, DN100, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 set
reservoir header to pumps suction pipes ……………………………………. ID
D.9.3.2 DN100 motorized double flanged gate valve Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.3 Suction pipe, DN100, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, washers, Only…….……...………………………
2 set
Gaskets, etc. ……………………………………. ID
D.9.3.4 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.4 Discharge Piping, Valves, Instruments and Accessories
D.9.4.1 Discharge pipe, DN100, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
2 Set
washers, Gaskets, etc. ……………………………………. ID
D.9.4.2 DN100 motorized double flanged gate valve, DI, PN25 Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.3 DN100 Non slam check valves Nozzle Type, complete with lever and limit switch, DI, Only…….……...………………………
2 ea
PN25 ……………………………………. ID
D.9.4.4 Main Discharge header, DN150, Ductile Iron, including fittings and wall inserts) from Pump Only…….……...………………………
1 Set
Discharge Piping to 1 m from outer face of the pumps room wall ……………………………………. ID
D.9.4.5 High Pressure Switch/Transmitter Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.6 Vibration sensor / Analyzer Only…….……...………………………
2 set
……………………………………. ID

7/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.5 Chlorination System
D.9.5.1 1 Ton Chlorine Drum container Only…….……...………………………
2 ea
……………………………………. ID
D.9.5.2 Chlorine container roller support (for duty containers) Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.3 Weighing scale Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.4 Chlorine container support rack (for Stand by containers) Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.5 Chlorine gas manifold made from stainless steel SS.316, complete with isolation valves, Only…….……...………………………
1 set
fittings and all accessories ……………………………………. ID
D.9.5.6 Pressure gauge for each manifolD. Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and all Only…….……...………………………
1 ea
accessories ……………………………………. ID
D.9.5.8 Automatic changeover device between gas manifolds Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.9 Gas pressure reducing and shut off valve, electrically operated Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.10 Automatic vacuum chlorination, 10 Kg/hr Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.11 Automatic Duty/Standby Changeover Panel for Chlorinators Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.12 Chlorine Analyzer Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.13 Injection Point Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.14 Booster Pump Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.15 Chlorine Sampling Pumps Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.16 Chlorine gas leak detector Only…….……...………………………
1 ea
……………………………………. ID

8/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.5.17 Warning light and alarm Only…….……...………………………
1 set
……………………………………. ID
D.9.5.18 Air Supply / Extract fans Only…….……...………………………
1 set
……………………………………. ID
D.9.5.19 Drench shower Only…….……...………………………
1 set
……………………………………. ID
D.9.5.20 Breathing apparatus Only…….……...………………………
2 ea
……………………………………. ID
D.9.5.21 Any other item to make the system complete in all respects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.6 Electrical Works
D.9.6.1 Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-P complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories, fittings and related works
1 LS
all as specified, shown on drawings and to the satisfaction of the engineer. Cables shall be
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Secondary distribution board DB-TP-BS4 complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
1 LS
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets, disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs, boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID

9/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.6.2 Power Distribution Transformers.
Supply, install, connect test and commission the following oil immersed MV/LV power
distribution transformer complete with all needed connections, joints, cable terminations,
cable glands, wiring and protection devices from MV power network to transformer's
primary input; and from transformer's secondary output to the power metering device and to
complete the connection to the main power network with all necessary LV cables,
auxiliaries, cable supports, as well as the connection to the earthing loop, all as specified,
shown on drawings, to the satisfaction of the engineer and in full coordination with local
authority.
Transformer, 300 kVA, 11/0.4 kV. Only…….……...………………………
1 Item
……………………………………. ID
D.9.6.3 Stand-by Power Generators.
Supply, install, connect, test and commission the following standby power Generator-Sets
with synchronizing and totalizing panels , acoustic treatment for each generator and anti
vibration installation. Complete with all needed connections, wiring, protection devices,
control and monitoring digital panel board, fuel diesel tank for each generator with low level
emergency turn off controller, and a storage back-up Diesel tank, delivered full with all
needed plumbing works, fuel impuruties separator filter, emergency stop push-button,
exhaust pipes with filters, turn on and off manual and automatic system to be integrated to
the ATS system, complete the connection to the main power network, as well as the
connection to the main earthing loop, all as specified, shown on drawings and to the
satisfaction of the engineer.

Generator-Set, prime rating 105 kVA, 0.4kV, 50Hz, PF0.8. Only…….……...………………………


1 Item
……………………………………. ID
Fuel Diesel Tank, Black steel, 5000L. Only…….……...………………………
1 Item
……………………………………. ID
Totalizing panel Only…….……...………………………
1 Item
……………………………………. ID
Galvanized steel exhaust pipes with filter, insulation and aluminum jacketing. Only…….……...………………………
1 Item
……………………………………. ID

10/11
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 5
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.6.4 Main Distribution Panel Boards
Supply, install, connect, test and commission the following Power Distribution Panel
Boards, complete with protection devices, monitoring devices, metering devices, control
components, ventilation fans, bus bars, ACBs, MCCBs, MCBs, Relays, Timers, Contactors,
Starters, cables, cable glands, all needed connections accessories and supports , all as
specified, shown on drawings and to the satisfaction of the engineer.

MV Switchgear, connecting the overhead MV cables to the transformers, complete with all Only…….……...………………………
1 Item
needed protection devices, power supply, cables, connections and fittings. ……………………………………. ID
LV Switchgear for the connection between the transformers and the MDBs complete with Only…….……...………………………
1 Item
all needed protection devices, cables, connections and fittings. ……………………………………. ID
Main Distribution Panel Board MDB Only…….……...………………………
1 Item
……………………………………. ID
D.9.7 Telemetry Cables for the Pumping Lines including Telemetry ducts and Only…….……...………………………
1 LS
Telemetry manholes along the pumping line profile ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill D - Booster Stations 5 (ID)
Only
IRAQI DINAR

11/11
Bill D – Booster Stations
Booster Station 6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and shall
be the net projected horizontal area in accordance to the drawings & survey plan 50 m2 Only…….……...………………………
submitted and approved by the Engineer. ……………………………………. ID
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
5 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
22 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
13 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
5 m3
accordance with the drawings. ……………………………………. ID

1/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 10 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
15 m2
……………………………………. ID
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 50 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
a. TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
3 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
b. TYPE SD2 (210x245)
This item shall be measured per unit of Steel door with louvers (in both lower and
upper parts of the door) installed in situ in accordance with the drawings, as 3 unit
indicated in the doors schedule, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID

2/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.4.2 ALUMINUM DOORS AND WINDOWS
i. TYPE W9 90x80cm
This item shall be measured per unit of windows installed in situ in accordance
9 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
j. TYPE W10 140x110cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
l. TYPE W12 250x250cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
25 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
a. COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 5 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 40 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
25 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

3/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
175 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
100 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
50 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings and 1 unit Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
BS6 Building including all chambers Only…….……...………………………
1 set
……………………………………. ID

4/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.2 Local Electricity Connection
D.9.1.2.1 Allow for local electricity connection fees including the supply and installation of
all necessary cables, builder's work and accessories, and all other related works,
1 LS
all as directed and to the satisfaction of the Engineer, and in full coordination with Only…….……...………………………
local relevant authority. ……………………………………. ID
D.9.1.3 PLC and SCADA system
Supply, install, and connect a complete PLC and SCADA system as described in
specifications documents and drawings with full control of the Booster Station,
including remote terminal units (RTU) with 20% additional spare capacity for
each computer system complete with PCs, printers, LCD screens displays, Mimic
Panels, Communications interfaces, SCADA software, and all cabling and 1 LS
necessary accessories for the connection between RTUs and all equipment, and
their interfaces including all necessary interfacing elements, cabling and
accessories in order to ensure the communication between all RTUs and the
control room etc... as specified and shown on drawings and approved by Only…….……...………………………
Engineers. ……………………………………. ID
D.9.1.4 Earthing
Supply, install, connect, test and commission the following earthing system to
provide low connecting earth resistance less than 3 ohms complete including earth
rods, earth stranded bare copper conductor for earthing network, earth pits,
1 Item
connectors, inspection boxes, clamps, test links, earth bar, excavation, backfilling,
earthing busbars and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.5 Lightning Protection
Supply, install, connect, test and commission the following lightning protection
system, complete including air terminator, bare copper tape down conductors, test
points, surge arrestors for power systems as well as for low current systems as
2 Item
many as needed, earthing pits, all necessary accessories, and all other related
works, all as specified, shown on the drawings and to the satisfaction of the Only…….……...………………………
Engineer. ……………………………………. ID

5/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.6 Telephone System
D.9.1.6.1 Allow for local Telephone and DATA connection fees including the supply and
installation of all necessary cables, builder's work and accessories, and all other
1 LS
related works, all as directed and to the satisfaction of the Engineer, and in full Only…….……...………………………
coordination with local relevant authority. ……………………………………. ID
D.9.1.6.2 Only…….……...………………………
1 LS
……………………………………. ID
D.9.1.7 Analogue Addressable Fire Alarm System
Supply, install, connect, test and commission a complete analogue addressable fire
alarm system including Main Fire Alarm Panel, repeater Panels, Manual Call
Stations, fire alarm bells, fire detectors, boxes, fire cables, conduits, connections, 1 LS
fittings and accessories and all realted works, all as specified and to the Only…….……...………………………
satisfaction of the Engineer. ……………………………………. ID
D.9.2 Pumpsets
D.9.2.1 From Booster Station 6 to Zaiwa Existing Tank, Horizontal Split case double suction pump,
capacity 14 m3/hr at 100 m head, 1500 rpm, suitable for 2 ppm chlorine content. Complete
with all motor and pump built in protection devices as per specifications (PTC thermistor,
overload, Oil leak detector, motor bearing temperature, pumps bearing temperature). Pumps 2 ea
shall be fitted with mechanical shaft seal type spring loaded flat faces arranged such that
replacement of wearing components can be carried out without the need to dismantle the Only…….……...………………………
pump. ……………………………………. ID
D.9.3 Suction Pipes, Valves, Instruments and Accessories
D.9.3.1 Main suction header, DN100, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 set
reservoir header to pumps suction pipes ……………………………………. ID
D.9.3.2 DN100 motorized double flanged gate valve Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.3 Suction pipe, DN100, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, washers, Only…….……...………………………
2 set
Gaskets, etc. ……………………………………. ID
D.9.3.4 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID

6/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.4 Discharge Piping, Valves, Instruments and Accessories
D.9.4.1 Discharge pipe, DN100, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
2 Set
washers, Gaskets, etc. ……………………………………. ID
D.9.4.2 DN100 motorized double flanged gate valve, DI, PN16 Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.3 DN100 Non slam check valves Nozzle Type, complete with lever and limit switch, DI, Only…….……...………………………
2 ea
PN16 ……………………………………. ID
D.9.4.4 Main Discharge header, DN100, Ductile Iron, including fittings and wall inserts) from Pump Only…….……...………………………
1 Set
Discharge Piping to 1 m from outer face of the pumps room wall ……………………………………. ID
D.9.4.5 High Pressure Switch/Transmitter Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.6 Vibration sensor / Analyzer Only…….……...………………………
2 set
……………………………………. ID
D.9.5 Chlorination System
D.9.5.1 1 Ton Chlorine Drum container Only…….……...………………………
2 ea
……………………………………. ID
D.9.5.2 Chlorine container roller support (for duty containers) Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.3 Weighing scale Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.4 Chlorine container support rack (for Stand by containers) Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.5 Chlorine gas manifold made from seamless carbon steel, complete with isolation valves, Only…….……...………………………
1 set
fittings and all accessories ……………………………………. ID
D.9.5.6 Pressure gauge for each manifolD. Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and all Only…….……...………………………
1 ea
accessories ……………………………………. ID

7/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.5.8 Automatic changeover device between gas manifolds Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.9 Gas pressure reducing and shut off valve, electrically operated Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.10 Automatic vacuum chlorination, 10 Kg/hr Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.11 Automatic Duty/Standby Changeover Panel for Chlorinators Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.12 Chlorine Analyzer Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.13 Injection Point Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.14 Booster Pump Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.15 Chlorine Sampling Pumps Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.16 Chlorine gas leak detector Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.17 Warning light and alarm Only…….……...………………………
1 set
……………………………………. ID
D.9.5.18 Air Supply / Extract fans Only…….……...………………………
1 set
……………………………………. ID
D.9.5.19 Drench shower Only…….……...………………………
1 set
……………………………………. ID
D.9.5.20 Breathing apparatus Only…….……...………………………
2 ea
……………………………………. ID
D.9.5.21 Any other item to make the system complete in all respects (List details) Only…….……...………………………
1 LS
……………………………………. ID

8/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.6 Electrical Works
D.9.6.1 Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-P complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories, fittings and related works
1 LS
all as specified, shown on drawings and to the satisfaction of the engineer. Cables shall be
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Secondary distribution board DB-TP-BS4 complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
1 LS
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets, boxes wires, cover plates, chassis, with all needed accessories
1 LS
and fittings, all as specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
D.9.6.2 Connection to nearest Electrical Post Only…….……...………………………
1 Item
……………………………………. ID

9/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 6
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.6.3 Stand-by Power Generators.
Supply, install, connect, test and commission the following standby power Generator-Sets
with synchronizing and totalizing panels , acoustic treatment for each generator and anti
vibration installation. Complete with all needed connections, wiring, protection devices,
control and monitoring digital panel board, fuel diesel tank for each generator with low level
emergency turn off controller, and a storage back-up Diesel tank, delivered full with all
needed plumbing works, fuel impuruties separator filter, emergency stop push-button,
exhaust pipes with filters, turn on and off manual and automatic system to be integrated to
the ATS system, complete the connection to the main power network, as well as the
connection to the main earthing loop, all as specified, shown on drawings and to the
satisfaction of the engineer.
Generator-Set, prime rating 75 kVA, 0.4kV, 50Hz, PF0.8. Only…….……...………………………
1 Item
……………………………………. ID
Fuel Diesel Tank, Black steel, 5000L. Only…….……...………………………
1 Item
……………………………………. ID
Totalizing panel Only…….……...………………………
1 Item
……………………………………. ID
Galvanized steel exhaust pipes with filter, insulation and aluminum jacketing. Only…….……...………………………
1 Item
……………………………………. ID
D.9.6.4 Main Distribution Panel Boards
Supply, install, connect, test and commission the following Power Distribution Panel
Boards, complete with protection devices, monitoring devices, metering devices, control
components, ventilation fans, bus bars, ACBs, MCCBs, MCBs, Relays, Timers, Contactors,
Starters, cables, cable glands, all needed connections accessories and supports , all as
specified, shown on drawings and to the satisfaction of the engineer.

Main Distribution Panel Board MDB Only…….……...………………………


1 Item
……………………………………. ID
D.9.7 Telemetry Cables for the Pumping Lines including Telemetry ducts and Only…….……...………………………
1 LS
Telemetry manholes along the pumping line profile ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill D - Booster Stations 6 (ID)
Only
IRAQI DINAR

10/10
Bill D – Booster Stations
Booster Station 7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.1: EARTHWORK
D.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and shall
be the net projected horizontal area in accordance to the drawings & survey plan 50 m2 Only…….……...………………………
submitted and approved by the Engineer. ……………………………………. ID
D.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total D.1 (ID)
D.2: CONCRETE & MASONRY
D.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
5 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
22 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
13 m3
……………………………………. ID
D.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
5 m3
accordance with the drawings. ……………………………………. ID

1/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 10 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total D.2 (ID)
D.3: WATERPROOFING
D.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
15 m2
……………………………………. ID
D.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 50 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total D.3 (ID)
D.4: DOORS AND WINDOWS
D.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
D.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
a. TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
3 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
b. TYPE SD2 (210x245)
This item shall be measured per unit of Steel door with louvers (in both lower and
3 unit
upper parts of the door) installed in situ in accordance with the drawings, as Only…….……...………………………
indicated in the doors schedule, as directed and approved by the Engineer. ……………………………………. ID
D.4.2 ALUMINUM DOORS AND WINDOWS
i. TYPE W9 90x80cm
This item shall be measured per unit of windows installed in situ in accordance
9 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID

2/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
j. TYPE W10 140x110cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
l. TYPE W12 250x250cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total D.4 (ID)
D.5: FINISHES
D.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
25 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
D.5.2 FLOOR TILES
a. COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 5 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 40 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
25 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
175 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

3/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
100 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total D.5 (ID)
D.6: EXTERNAL WORKS
D.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
50 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
D.6.5 GATE
a. TYPE G1 500x240
This item shall be measured per unit of gate installed as indicated on drawings and 1 unit Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
Sub-Total D.6 (ID)
D.7: METAL WORKS
D.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total D.7 (ID)
D.9: ELECTROMECHANICAL WORKS
D.9.1 GENERAL
D.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
BS7 Building including all chambers Only…….……...………………………
1 set
……………………………………. ID

4/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.2 Local Electricity Connection
D.9.1.2.1 Allow for local electricity connection fees including the supply and installation of
all necessary cables, builder's work and accessories, and all other related works,
1 LS
all as directed and to the satisfaction of the Engineer, and in full coordination with Only…….……...………………………
local relevant authority. ……………………………………. ID
D.9.1.3 PLC and SCADA system
Supply, install, and connect a complete PLC and SCADA system as described in
specifications documents and drawings with full control of the Booster Station,
including remote terminal units (RTU) with 20% additional spare capacity for
each computer system complete with PCs, printers, LCD screens displays, Mimic
Panels, Communications interfaces, SCADA software, and all cabling and 1 LS
necessary accessories for the connection between RTUs and all equipment, and
their interfaces including all necessary interfacing elements, cabling and
accessories in order to ensure the communication between all RTUs and the
control room etc... as specified and shown on drawings and approved by Only…….……...………………………
Engineers. ……………………………………. ID
D.9.1.4 Earthing
Supply, install, connect, test and commission the following earthing system to
provide low connecting earth resistance less than 3 ohms complete including earth
rods, earth stranded bare copper conductor for earthing network, earth pits,
1 Item
connectors, inspection boxes, clamps, test links, earth bar, excavation, backfilling,
earthing busbars and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer. ……………………………………. ID
D.9.1.5 Lightning Protection
Supply, install, connect, test and commission the following lightning protection
system, complete including air terminator, bare copper tape down conductors, test
points, surge arrestors for power systems as well as for low current systems as
2 Item
many as needed, earthing pits, all necessary accessories, and all other related
works, all as specified, shown on the drawings and to the satisfaction of the Only…….……...………………………
Engineer. ……………………………………. ID

5/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.1.6 Telephone System
D.9.1.6.1 Allow for local Telephone and DATA connection fees including the supply and
installation of all necessary cables, builder's work and accessories, and all other
1 LS
related works, all as directed and to the satisfaction of the Engineer, and in full Only…….……...………………………
coordination with local relevant authority. ……………………………………. ID
D.9.1.6.2 Supply, install, connect, test and commission the following telecommunication
system complete including cables CAT6 (minimum 25) unless otherwise stated,
UPS, pulled-in conduits or cable trays, boxes, frames, racks, fittings, devices, 1 LS
equipment, accessories and all other related works, all as specified, shown on the Only…….……...………………………
drawings and to the satisfaction of the Engineer ……………………………………. ID
D.9.1.7 Analogue Addressable Fire Alarm System
Supply, install, connect, test and commission a complete analogue addressable fire
alarm system including Main Fire Alarm Panel, repeater Panels, Manual Call
Stations, fire alarm bells, fire detectors, boxes, fire cables, conduits, connections, 1 LS
fittings and accessories and all realted works, all as specified and to the Only…….……...………………………
satisfaction of the Engineer. ……………………………………. ID
D.9.2 Pumpsets
D.9.2.1 From Booster Station 7 to Kurime Existing Tank, Horizontal Split case double suction
pump, capacity 10 m3/hr at 43 m head, 1500 rpm, suitable for 2 ppm chlorine content.
Complete with all motor and pump built in protection devices as per specifications (PTC
thermistor, overload, Oil leak detector, motor bearing temperature, pumps bearing 2 ea
temperature). Pumps shall be fitted with mechanical shaft seal type spring loaded flat faces
arranged such that replacement of wearing components can be carried out without the need Only…….……...………………………
to dismantle the pump. ……………………………………. ID
D.9.3 Suction Pipes, Valves, Instruments and Accessories
D.9.3.1 Main suction header, DN100, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 set
reservoir header to pumps suction pipes ……………………………………. ID
D.9.3.2 DN100 motorized double flanged gate valve Only…….……...………………………
2 ea
……………………………………. ID
D.9.3.3 Suction pipe, DN100, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, washers, Only…….……...………………………
2 set
Gaskets, etc. ……………………………………. ID
D.9.3.4 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...………………………
2 ea
……………………………………. ID

6/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID
D.9.4 Discharge Piping, Valves, Instruments and Accessories
D.9.4.1 Discharge pipe, DN100, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
2 Set
washers, Gaskets, etc. ……………………………………. ID
D.9.4.2 DN100 motorized double flanged gate valve, DI, PN16 Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.3 DN100 Non slam check valves Nozzle Type, complete with lever and limit switch, DI, Only…….……...………………………
2 ea
PN16 ……………………………………. ID
D.9.4.4 Main Discharge header, DN100, Ductile Iron, including fittings and wall inserts) from Pump Only…….……...………………………
1 Set
Discharge Piping to 1 m from outer face of the pumps room wall ……………………………………. ID
D.9.4.5 High Pressure Switch/Transmitter Only…….……...………………………
2 ea
……………………………………. ID
D.9.4.6 Vibration sensor / Analyzer Only…….……...………………………
2 set
……………………………………. ID
D.9.5 Chlorination System
D.9.5.1 1 Ton Chlorine Drum container Only…….……...………………………
2 ea
……………………………………. ID
D.9.5.2 Chlorine container roller support (for duty containers) Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.3 Weighing scale Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.4 Chlorine container support rack (for Stand by containers) Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.5 Chlorine gas manifold made from stainless steel SS.316, complete with isolation valves, Only…….……...………………………
1 set
fittings and all accessories ……………………………………. ID
D.9.5.6 Pressure gauge for each manifolD. Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and all Only…….……...………………………
1 ea
accessories ……………………………………. ID
D.9.5.8 Automatic changeover device between gas manifolds Only…….……...………………………
1 ea
……………………………………. ID

7/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.5.9 Gas pressure reducing and shut off valve, electrically operated Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.10 Automatic vacuum chlorination, 10 Kg/hr Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.11 Automatic Duty/Standby Changeover Panel for Chlorinators Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.12 Chlorine Analyzer Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.13 Injection Point Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.14 Booster Pump Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.15 Chlorine Sampling Pumps Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.16 Chlorine gas leak detector Only…….……...………………………
1 ea
……………………………………. ID
D.9.5.17 Warning light and alarm Only…….……...………………………
1 set
……………………………………. ID
D.9.5.18 Air Supply / Extract fans Only…….……...………………………
1 set
……………………………………. ID
D.9.5.19 Drench shower Only…….……...………………………
1 set
……………………………………. ID
D.9.5.20 Breathing apparatus Only…….……...………………………
2 ea
……………………………………. ID
D.9.5.21 Any other item to make the system complete in all respects (List details) Only…….……...………………………
1 LS
……………………………………. ID

8/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.6 Electrical Works
D.9.6.1 Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-P complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories, fittings and related works
1 LS
all as specified, shown on drawings and to the satisfaction of the engineer. Cables shall be
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Secondary distribution board DB-TP-BS4 complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
1 LS
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets, boxes wires, cover plates, chassis, with all needed accessories
1 LS
and fittings, all as specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, cables and wires, cover plates, chassis, with all needed accessories and fittings, all as 1 LS Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
D.9.6.2 Connection to nearest Electrical Post Only…….……...………………………
1 Item
……………………………………. ID

9/10
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill D - Booster Stations


Bill D - Booster Stations 7
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.6.3 Stand-by Power Generators.
Supply, install, connect, test and commission the following standby power Generator-Sets
with synchronizing and totalizing panels , acoustic treatment for each generator and anti
vibration installation. Complete with all needed connections, wiring, protection devices,
control and monitoring digital panel board, fuel diesel tank for each generator with low level
emergency turn off controller, and a storage back-up Diesel tank, delivered full with all
needed plumbing works, fuel impuruties separator filter, emergency stop push-button,
exhaust pipes with filters, turn on and off manual and automatic system to be integrated to
the ATS system, complete the connection to the main power network, as well as the
connection to the main earthing loop, all as specified, shown on drawings and to the
satisfaction of the engineer.
Generator-Set, prime rating 50 kVA, 0.4kV, 50Hz, PF0.8. Only…….……...………………………
1 Item
……………………………………. ID
Fuel Diesel Tank, Black steel, 5000L. Only…….……...………………………
1 Item
……………………………………. ID
Totalizing panel Only…….……...………………………
1 Item
……………………………………. ID
Galvanized steel exhaust pipes with filter, insulation and aluminum jacketing. Only…….……...………………………
1 Item
……………………………………. ID
D.9.6.4 Main Distribution Panel Boards
Supply, install, connect, test and commission the following Power Distribution Panel
Boards, complete with protection devices, monitoring devices, metering devices, control
components, ventilation fans, bus bars, ACBs, MCCBs, MCBs, Relays, Timers, Contactors,
Starters, cables, cable glands, all needed connections accessories and supports , all as
specified, shown on drawings and to the satisfaction of the engineer.

Main Distribution Panel Board MDB Only…….……...………………………


1 Item
……………………………………. ID
D.9.7 Telemetry Cables for the Pumping Lines including Telemetry ducts and Only…….……...………………………
1 LS
Telemetry manholes along the pumping line profile ……………………………………. ID
Sub-Total D.9 (ID)
Total Bill D - Booster Stations 7 (ID)
Only
IRAQI DINAR

10/10
Bill D – Booster Stations
Summary Bill D - Booster Stations
Munistry of Municipalities and TourismGeneral Directorate of Water and Sewerage Mangesh, Batofa and Zawita Water Supply Project
Dohuk Water Directorate Summary Bill

Bill Of Quantities: Mangesh, Batofa and Zawita Water Supply Project


Summary Bill D - Booster Stations

Description Amount (ID)

Bill D - Booster Station 1


Bill D - Booster Station 2

Bill D - Booster Station 3

Bill D - Booster Station 4

Bill D - Booster Station 5

Bill D - Booster Station 6

Bill D - Booster Station 7

Total Carried to General Summary

1/1
Bill E – Water Treatment Plant
Siteworks
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.1 CLEARING AND GRUBBING
This item shall be measured in square meter of cleared and grubbed area and shall Only…….……...……………………
be the net projected horizontal area in accordance to the drawings & survey plan 46,000 m2 ……………………………………….
submitted and approved by the Engineer. ID
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 80,000 m3 Only…….……...……………………
Contract Drawings, the limits shall be 50cm away of blinding edges. ……………………………………….
ID
E.1.3 SELECTED FILL & BACKFILL
This item shall be measured in cubic meter and shall be the net volume according
to the Contract Drawings and as directed & approved by the Engineer. Wherever Only…….……...……………………
8,000 m3 ……………………………………….
backfilling limits are not indicated on Contract Drawings, the limits shall be 50cm
away of blinding edges. ID
E.1.4 ROCKFILL AND STRUCTURAL BACKFILL
This item shall be measured in cubic meter and shall be the net volume according Only…….……...……………………
to the Contract Drawings and as directed & approved by the Engineer. 1,600 m3 ……………………………………….
ID
E.1.5 QUARRY RUN AGGREGATE BASE COURSE
This item shall be measured in cubic meter and shall be the net volume according Only…….……...……………………
to the Contract Drawings and as directed & approved by the Engineer. 5,000 m3 ……………………………………….
ID
E.1.6 MANHOLES AND STRUCTURES
This item shall be measured in cubic meter and shall be the net volume according Only…….……...……………………
to the Contract Drawings or/and as directed & approved by the Engineer. 100 m3 ……………………………………….
ID
E.1.7 WATER DISTRIBUTION SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...……………………
Engineer. 1 L.S. ……………………………………….
ID

1/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1.8 SANITARY SEWER SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...……………………
Engineer. 1 L.S. ……………………………………….
ID
E.1.9 STORMWATER DRAINAGE SYSTEM
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...……………………
Engineer. 1 L.S. ……………………………………….
ID
E.1.10 AUTOMATIC IRRIGATION SYSTEM FOR LANDSCAPED AREAS
This item shall be measured as Lumps Sum as directed & approved by the Only…….……...……………………
Engineer. 1 L.S. ……………………………………….
ID
E.1.11 DIVERSION OF ZAB RIVER FOR THE CONSTRUCTION OF THE
INTAKE STRUCTURE
This item shall be measured as Lump Sum as directed & approved by the Only…….……...……………………
Engineer. 1 L.S. ……………………………………….
ID
E.1.12 COAGULANT STORAGE
This item shall be measured as Lump Sum as directed & approved by the Only…….……...……………………
Engineer. 1 L.S. ……………………………………….
ID
E.1.13 CHLORINE STORE
This item shall be measured as Lump Sum as directed & approved by the Only…….……...……………………
Engineer. 1 L.S. ……………………………………….
ID
Sub-Total E.1 (ID)

2/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.6: EXTERNAL WORKS
E.6.1 CONCRETE CURBS
Only…….……...……………………
This item shall be measured in linear meter of concrete curbs installed as indicated
1,400 l.m. ……………………………………….
on approved shop drawings.
ID
E.6.4 FENCE Only…….……...……………………
This item shall be measured in linear meter of fence installed as indicated on
750 l.m. ……………………………………….
drawings and as directed and approved by the Engineer.
ID
E.6.5 GATE
a. TYPE G1 500x240 Only…….……...……………………
This item shall be measured per unit of gate installed as indicated on drawings and 1 unit ……………………………………….
as directed and approved by the Engineer. ID
E.6.6 AGGREGATE BASE COURSE
This item shall be measured in cubic meter of aggregate base course materials Only…….……...……………………
3
compacted in accordance with the drawings and as directed and approved by the 1,800 m ……………………………………….
Engineer. ID
E.6.7 BITUMINOUS BASE COURSE
a. TWO LAYERS THICKNESS = 2x6cm
This item shall be measured in square meter and shall be the net value as indicated Only…….……...……………………
6,000 m2 ……………………………………….
on the drawings and as measured in the presence of the Engineer and according to
his approval. ID
E.6.8 AGRICULTURAL TOP SOIL
This item shall be measured in cubic meter of materials in accordance with the Only…….……...……………………
drawings and as directed and approved by the Engineer. 1,750 m3 ……………………………………….
ID
E.6.9 TREES AND SHRUBS, GROUND COVERS AND GRASS COVERS
This item shall be measured in cubic meter of materials in accordance with the Only…….……...……………………
drawings and as directed and approved by the Engineer. 3,000 m2 ……………………………………….
ID
Sub-Total E.6 (ID)

3/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.8: GEOTECHNICAL INVESTIGATION
Note: The geotechnical investigation shall be performed in order to evaluate the
bearing capacities, material characteristics and any potential geotechnical
problems of the foundation soil for sites where structures will be executed and
where requested by the Engineer.
E.8.1 PRELIMINARY REPORT
This item shall be paid by unit of report, for each site to be investigated, upon Only…….……...……………………
1 unit
approval and acceptance of the aforesaid report after revision and modification of ……………………………………….
Engineer instructions and comments. ID
E.8.2 RELOCATION OF DRILLING RIG
This item shall be paid by unit of relocation from completed borehole to the Only…….……...……………………
4 unit
Engineer satisfaction to another borehole (in the same site or in another far site). ……………………………………….
ID
E.8.3 VERTICAL CORING IN OVERBURDEN
This item shall be in linear meter of borehole accepted by the Engineer, quantity
of which shall be the distance between the natural ground level and the top of rock 100 l.m. Only…….……...……………………
formation as measured in situ and determined by the Engineer. ……………………………………….
ID
E.8.4 VERTICAL CORING IN ROCK
This item shall be in linear meter of borehole accepted by the Engineer, quantity
of which shall be the distance between the level and the bottom of overburden and 50 l.m. Only…….……...……………………
the lower cored rock formation as measured in situ and determined by the ……………………………………….
Engineer. ID
E.8.5 LABORATORY AND SITE TESTS ON SOIL AND ROCK SAMPLES
This item shall be in unit of set of tests for each borehole, necessary to conclude
the soil bearing capacity in function of the depth in each borehole or to identify
20 unit
geotechnical problems, conducted as directed, & accepted by the Engineer, Only…….……...……………………
payable 60% upon test completion and the remaining at the submittal of the final ……………………………………….
revised report ID
E.8.6 FINAL REPORT Only…….……...……………………
This item shall be paid by unit upon report submittal subject to Engineer consent 1 unit ……………………………………….
approval & revision thereto if modification prevails. ID
Sub-Total E.8 (ID)

4/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.3 Local Electricity Connection
E.9.1.3.1 Overhead Transmission lines (33 kV OHL Double circuit Lark conductor) shall be
248mm2 Aluminum ACSR"Lark" type.
OHL routing shall start from Batofa Power Substation and will be connected to the
Water Treatment Plant, Booster Station 1, Booster Station 2 and Booster Station 3.
The towers will be designed according to local standards. Routing will take into 1 LS
consideration the master plans in the region, the existing OHL and the necessary
clearance distance from buildings, as per applicable standards. The OHL shall be Only…….……...……………………
of the ACSR "Lark" type and 2 cables (single-core) shall be used per phase. ……………………………………….
ID
E.9.1.4 PLC and SCADA system
Supply, install, and connect a complete PLC and SCADA system as described in
specifications documents and drawings with full control and monitoring of each
process of the treatment plant, BS1, BS2 and BS3 including remote terminal units
(RTU) with 20% additional spare capacity for each computer system complete
with PCs, printers, LCD screens displays, Mimic Panels, Communications
interfaces, SCADA software, and all cabling and necessary accessories for the 1 LS
connection between RTUs and all equipment, and their interfaces including all
necessary interfacing elements, cabling and accessories in order to ensure the
communication between all RTUs and the control room etc... as specified and Only…….……...……………………
shown on drawings and approved by Engineers. ……………………………………….
ID
Design, Supply, install and Test RTU/SCADA System to provide monitoring and Only…….……...……………………
control for the entire plant. The SCADA system shall be able to monitor the 1 LS ……………………………………….
operation of the remote booster pumping station. ID

5/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.1.5 Earthing
Supply, install, connect, test and commission the following earthing system to
provide low connecting earth resistance less than 3 ohms complete including earth
rods, earth stranded bare copper conductor for earthing network, earth pits,
1 Item
connectors, inspection boxes, clamps, test links, earth bar, excavation, backfilling, Only…….……...……………………
earthing busbars and all other related works, all as specified, shown on the ……………………………………….
drawings and to the satisfaction of the Engineer. ID
E.9.1.6 Lightning Protection
Supply, install, connect, test and commission the following lightning protection
system, complete including air terminator, bare copper tape down conductors, test
points, surge arrestors for power systems as well as for low current systems as
19 Item
many as needed, earthing pits, all necessary accessories, and all other related Only…….……...……………………
works, all as specified, shown on the drawings and to the satisfaction of the ……………………………………….
Engineer. ID
E.9.1.7 Site Lighting
E.9.1.7.1 Feeder pillar
Supply, install, connect, test and commission the following feeder pillar complete
including reinforced concrete foundation, 60cmx60cm manhole for cables access,
galvanized steel plate for cable protection, ventilation louver with screen,
galvanized steel protection barrier, PVC sleeves, cabling and connections, all 1 LS
necessary accessories and other related works, all as specified, shown on the Only…….……...……………………
drawings, to the satisfaction of the Engineer, and with full coordination with ……………………………………….
electrical local authority. ID
E.9.1.7.2 Lighting Poles.
Supply, install, connect, test and commission the following lighting poles,
complete with die cast aluminum lighting fixture including starters, lamp holder,
reflector and lamp, including concrete base with all required civil and installation
works with all necessary accessories, and all other related works, all as specified,
shown on the drawings and to the satisfaction of the Engineer.

E.9.1.7.2.1 12m high, single bracket galvanized steel, street lighting pole, with one luminaire Only…….……...……………………
housing 1x250W HPS lamp IP65. 12 Item ……………………………………….
ID

6/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.1.7.2.2 12m high, double brackets galvanized steel, street lighting pole, with two Only…….……...……………………
luminaire housing 1x250W HPS lamp IP65. 21 Item ……………………………………….
ID
E.9.1.7.2.3 12m high, four brackets galvanized steel, street lighting pole, with four luminaire Only…….……...……………………
housing 1x250W HPS lamp IP65. 7 Item ……………………………………….
ID
E.9.1.7.3 Concrete encased duct for road crossings and cable draw pit.
E.9.1.7.3.1 40cm x 40cm cable draw pit Only…….……...……………………
13 Item ……………………………………….
ID
E.9.1.7.3.2 Concrete encased 1 x 100mm UPVC duct for road crossings Only…….……...……………………
50 lm ……………………………………….
ID

7/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.1.7.4 External lighting cables
Supply, install, connect, test and commission the following directly burried steel
wire armoured cables for external lighting installation, complete with all required
civil and installation works with all necessary accessories, and all other related 1 LS Only…….……...……………………
works, all as specified, shown on the drawings and to the satisfaction of the ……………………………………….
Engineer. ID
E.9.1.7.7 Earthing for Feeder pillar and lighting poles.
Supply, install, connect, test and commission earthing system to provide low
connecting earth resistance less than 3 ohms complete including earth rods, earth
stranded bare copper conductor for feeder pillar and lighting poles earthing, earth
11 Item
pits, connectors, inspection boxes, clamps, excavation, backfilling and all other Only…….……...……………………
related works, all as specified, shown on the drawings and to the satisfaction of the ……………………………………….
Engineer. ID
E.9.1.8 Trenching and Ducting
E.9.1.8.1 Supply, install, and commission the following trenches and 6" duct banks for main
power network cabling system, complete with all needed excavation works, Only…….……...……………………
1 LS
backfilling and other related civil works, all as specified, shown on the drawings ……………………………………….
and to the satisfaction of the Engineer. ID
E.9.1.8.2 Supply, install, and commission the following manholes for main power network
cabling system, complete with all needed concrete casting, iron cast covers,
sleeves, excavation works, backfilling and other related civil works, all as 1 LS Only…….……...……………………
specified, shown on the drawings and to the satisfaction of the Engineer. ……………………………………….
ID

8/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.1.9 Cabling
Supply, install, connect, test and commission the following steel wire armoured
cables for the main power network, pumps and all equipments inside WTP
complete including conduits or cable trays where neccesary, terminal and junction
boxes, jointing of cables, sealing compounds, fixing materials, and supports, all
necessary accessories, and all other related works, all as specified, shown on the
drawings and to the satisfaction of the Engineer.
MV cables Only…….……...……………………
1 LS ……………………………………….
ID
LV cables Only…….……...……………………
1 LS ……………………………………….
ID
E.9.1.10 Telephone System
E.9.1.10.1 Allow for local Telephone and DATA connection fees including the supply and
installation of all necessary cables, builder's work and accessories, and all other Only…….……...……………………
1 LS
related works, all as directed and to the satisfaction of the Engineer, and in full ……………………………………….
coordination with local relevant authority. ID
E.9.1.10.2 Supply, install, connect, test and commission the following telecommunication
system complete including cables CAT6 (minimum 25) unless otherwise stated,
UPS, pulled-in conduits or cable trays, boxes, frames, racks, fittings, devices, 1 LS Only…….……...……………………
equipment, accessories and all other related works, all as specified, shown on the ……………………………………….
drawings and to the satisfaction of the Engineer ID
E.9.1.11 Analogue Addressable Fire Alarm System
Supply, install, connect, test and commission a complete analogue addressable fire
alarm system including Main Fire Alarm Panel, repeater Panels, Manual Call
Stations, fire alarm bells, fire detectors, boxes, fire cables, conduits, connections, 1 LS Only…….……...……………………
fittings and accessories and all realted works, all as specified and to the ……………………………………….
satisfaction of the Engineer. ID
E.9.2 Interconnecting Piping
E.9.2.1 Ductile Iron, DN 800 pipes (approx 60m), PN 16 , including fittings, support from Low Lift Only…….……...……………………
Pumping Station to Flowmeter Chamber, as per BS EN 545 1 LS ……………………………………….
ID

9/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2.2 Ductile Iron, DN 800/900 (approx 95 m) pipes, PN 16 , fittings, support from Flowmeter Only…….……...……………………
Chamber to Cascade Aerator, as per BS EN 545 1 LS ……………………………………….
ID
E.9.2.3 Ductile Iron, DN 900 pipes (approx 110 m), PN 16 , fittings, support from Cascade Aertors Only…….……...……………………
to Flash Mixer, as per BS EN 545 1 LS ……………………………………….
ID
E.9.2.4 Ductile Iron, DN 600 pipes (approx 85 m), PN 16 , fittings, support from Flash Mixer Only…….……...……………………
Distribution Chamber to Clariflocculator, as per BS EN 545 1 LS ……………………………………….
ID
E.9.2.5 Ductile Iron, DN 600 pipes, PN 16 , fittings, support from Clariflocculators to Collection Only…….……...……………………
Chamber, as per BS EN 545 1 LS ……………………………………….
ID
E.9.2.6 Ductile Iron, DN 900 pipes (approx 130 m), PN 16 , fittings, support from Collection Only…….……...……………………
Chamber to Gravity Filters, as per BS EN 545 1 LS ……………………………………….
ID
E.9.2.7 Ductile Iron, DN 900 pipes (approx 70 m), PN 16 , fittings, support from Effluent Outlet of Only…….……...……………………
Gravity Filters to Storage Tank, as per BS EN 545 1 LS ……………………………………….
ID
E.9.2.8 Ductile Iron pipes, PN 16 , fittings, support from Drain Outlets of Gravity Filters to nearest Only…….……...……………………
sludge drainage manholD. 1 LS ……………………………………….
ID
E.9.2.9 Ductile Iron, DN 500 pipes, PN 16 , fittings, support from Backwash pupmps to Gravity Only…….……...……………………
Filters to Break Tank, as per BS EN 545 1 LS ……………………………………….
ID
E.9.2.10 SS316, DN 250 pipes, SCH. 20 , fittings, support from Air scouring blowers to Gravity Only…….……...……………………
Filters 1 LS ……………………………………….
ID
E.9.2.12 Sludge drainage network including piping, manhole and accessories to make the system Only…….……...……………………
complete 1 LS ……………………………………….
ID
E.9.2.13 Any other items to make the piping complete in all respect Only…….……...……………………
1 LS ……………………………………….
ID

10/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.3 Telemetry Cables for Pumping Lines from HLP including Telemetry ducts Only…….……...……………………
and Telemetry manholes along the pumping lines profiles 1 LS ……………………………………….
ID
E.9.4 Spare Parts
E.9.4.1 Grit Pump
E.9.4.1.1 Set of bearings
1 LS Only…….……...…………………………
…………………………………. ID
E.9.4.1.2 Set of motor seals
1 LS Only…….……...…………………………
…………………………………. ID
E.9.4.1.3 Mechanical seals
2 LS Only…….……...…………………………
…………………………………. ID
E.9.4.2 Submersible pumps
E.9.4.2.1 Set of bearings
4 LS Only…….……...…………………………
…………………………………. ID
E.9.4.2.2 Set of motor seals
4 LS Only…….……...…………………………
…………………………………. ID
E.9.4.2.3 Mechanical seals
4 LS Only…….……...…………………………
…………………………………. ID
E.9.4.2.4 Impeller (one of each size)
2 LS Only…….……...…………………………
…………………………………. ID
E.9.4.3 Dosing pumps
E.9.4.3.1 PE tubing for each size and type installed
50 m Only…….……...…………………………
…………………………………. ID
E.9.4.3.2 Repair kit for each model installed
1 set Only…….……...…………………………
…………………………………. ID

11/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.4.4 Gas chlorination system
E.9.4.4.1 Injector
1 No Only…….……...…………………………
…………………………………. ID
E.9.4.4.2 Spare kit for the complete chlorination system as per manufacturer's standard
2 set Only…….……...…………………………
…………………………………. ID
E.9.4.4.3 Sampling pump
1 No Only…….……...…………………………
…………………………………. ID
E.9.4.4.4 Gas detector spare kit
2 set Only…….……...…………………………
…………………………………. ID
E.9.4.5 High Lift pumps
E.9.4.5.1 Set of bearings for each type of pumps installed
4 set Only…….……...…………………………
…………………………………. ID
E.9.4.5.2 Set of motor seals for each type of pumps installed
4 set Only…….……...…………………………
…………………………………. ID
E.9.4.5.3 Set of pumps seals for each type of pumps installed
4 set Only…….……...…………………………
…………………………………. ID
E.9.4.5.4 Impeller (one of each size)
2 No Only…….……...…………………………
…………………………………. ID
E.9.4.6 Instruments
E.9.4.6.1 Ultrasonic level sensor for each type installed
1 ea Only…….……...…………………………
…………………………………. ID
E.9.4.6.2 Flowmeter for each type installed
1 set Only…….……...…………………………
…………………………………. ID

12/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.4.6.3 Float switch for each type installed
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.6.4 Turbidity sensor for each type installed
2 ea Only…….……...…………………………
…………………………………. ID
E.9.4.6.5 Pressure switch for each type installed
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.6.6 Limit switch for each type installed
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.6.7 Pressure gauge for each type installed
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.6.8 level switch for each type installed
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7 Electrical spares
E.9.4.7.1 Contactors for each size of contactor installed
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.2 Control relays for each size of control relay installed
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.3 Elements for each size of thermal overloads fitted
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.4 Fixed and moving contacts and springs for each type of contactor fitted
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.5 20% spare indicating bulbs of all types
1 Set Only…….……...…………………………
…………………………………. ID

13/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.4.7.6 For every fuse size, 6 No. spare fuses
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.7 Time delay relay of each size
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.8 Each colour of pilot light glasses
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.9 Voltmeter (each size)
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.10 MCCB (each type and size)
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.11 Each type of pushbutton and selector switch fitted
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.12 PLC power supply for each capacity
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.13 PLC CPU for each model
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.14 Digital input module for each size installed
2 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.15 Digital output module for each size installed
2 Set Only…….……...…………………………
…………………………………. ID

14/15
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Siteworks
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.4.7.16 Analog input module for each size installed
1 Set Only…….……...…………………………
…………………………………. ID
E.9.4.7.17 Analog output module for each size installed
1 Set Only…….……...…………………………
…………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Siteworks (ID)
Only
IRAQI DINAR

15/15
Bill E – Water Treatment Plant
Low Lift Pumpimg Station
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Intake Structure and Low Lift Pumpimg Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 350 m3 Only…….……...……………………
indicated on Contract Drawings, the limits shall be 50cm away of blinding ……………………………………….
edges. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...……………………
260 m3
……………………………………….
b. For Slabs and Beams Only…….……...……………………
860 m3
……………………………………….
c. For Walls and Columns Only…….……...……………………
1,600 m3
……………………………………….
d. For Manhole Only…….……...……………………
90 m3
……………………………………….
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...……………………
70 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Intake Structure and Low Lift Pumpimg Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.3: WATERPROOFING
E.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...……………………
500 m2
……………………………………….
E.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...……………………
1,650 m2
accordance to the drawings as directed and approved by the Engineer. ……………………………………….
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, Only…….……...……………………
thermal isolator and concrete screed quantity as indicated on the drawings and 260 m2 ……………………………………….
as directed and approved by the Engineer. ID
Sub-Total E.3 (ID)
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings
and as directed and approved by the Engineer.
a. TYPE SD1 (240x90)
This item shall be measured per unit of Steel door with louvers installed in situ Only…….……...……………………
2 unit
in accordance with the drawings, as indicated in the doors schedule, as directed ……………………………………….
and approved by the Engineer. ID
g. TYPE SD7 (240x300)
This item shall be measured per unit of Steel door with louvers installed in situ Only…….……...……………………
1 unit
in accordance with the drawings, as indicated in the doors schedule, as directed ……………………………………….
and approved by the Engineer. ID
Sub-Total E.4 (ID)

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Intake Structure and Low Lift Pumpimg Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...……………………
800 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………….
E.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in Only…….……...……………………
650 m2 ……………………………………….
accordance with the drawings, as directed and approved by the Engineer.
ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area Only…….……...……………………
800 m2 ……………………………………….
without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ID
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area Only…….……...……………………
680 m2 ……………………………………….
without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...……………………
2
accordance with the drawings, as directed and approved by the Engineer. 260 m ……………………………………….
ID
Sub-Total E.6 (ID)

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Intake Structure and Low Lift Pumpimg Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Low Lift Pumping Station Only…….……...……………………
1 set
……………………………………….
E.9.2 Intake structure
E.9.2.1 Concrete stopper panels Only…….……...……………………
2 Set
……………………………………….
E.9.2.2 Automatic Trash screen, SS316, 50 mm opening Only…….……...……………………
1 ea
……………………………………….
E.9.2.3 Stop Log, SS316L Only…….……...……………………
2 ea
……………………………………….
E.9.2.4 Monorail 7.5 tons, complete with structure and electrical hoist and trolley Only…….……...……………………
1 set
……………………………………….
E.9.2.5 DN 1400 wall inserts and pipe spools Only…….……...……………………
4 set
……………………………………….
E.9.2.6 DN 1400 automatic butterfly valves, DI, complete with local control and limit Only…….……...……………………
1 LS
switches ……………………………………….
E.9.2.7 SS316 Access ladder and platform Only…….……...……………………
1 LS
……………………………………….
E.9.2.8 SS316 Access cover Only…….……...……………………
1 LS
……………………………………….
E.9.2.9 Grit pump, 75 m3/hr, 12 m head complete with SS316 guide rails and lifting Only…….……...……………………
1 ea
chain ……………………………………….
E.9.2.10 Discharge pipes and valve for the grit pump (from inlet channel to sludge tank) Only…….……...……………………
1 Set
……………………………………….
E.9.2.11 Float switches (Low Low Level and Low Alarm Level) Only…….……...……………………
1 ea
……………………………………….
E.9.2.12 Any other item to make the works complete (supports, bolts, etc.) Only…….……...……………………
1 LS
……………………………………….

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Intake Structure and Low Lift Pumpimg Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.3 Low Lift Pumping Station (LLPS)
E.9.3.1 Mechanical Works
E.9.3.1.1.a Main Pumps: Submersible pump 734 m3/hr, 30 m head, solids passage 100 mm, suitable Only…….……...……………………
8 ea
for Soft Starter control, complete with SS316 guide rails and lifting chain. ……………………………………….
E.9.3.1.1.b Jockey Pumps: Submersible pump 367 m3/hr, 30 m head, solids passage 100 mm,
suitable for Soft Starter control, complete with SS316 guide rails and lifting chain. This Only…….……...……………………
2 ea
pump shall have same motor and pump casing as the previous item (only impeller will be ……………………………………….
different) ID
E.9.3.1.2 Ductile Iron, PN16, DN 400 Discharge pipe from pump to main header including air
release valve, automatic gate valve, non slam check valve with counter and limit switch, Only…….……...……………………
10 Set
SS316 Bolts, Nuts, Washers, bosses for instruments. Gate valve actuator shall be with ……………………………………….
limit switches. DI Pipes shall be as per BS EN 545 ID
E.9.3.1.3 Ductile Iron, PN16, DN 800 Discharge main from LLPS to FLowmeter chamber Only…….……...……………………
1 Set
complete with all supports, accessories, SS316 Bolts/Nuts/Washers. ……………………………………….
E.9.3.1.4 DN800 electric butterfly valve Only…….……...……………………
1 ea
……………………………………….
E.9.3.1.5 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting Only…….……...……………………
chain, control box, runway beams, rails, limit switches, etc. and Third Party Load Test 1 ea ……………………………………….
certificate ID
E.9.3.1.6 Anti Water Hammer System Only…….……...……………………
1 LS
……………………………………….
E.9.3.2 Instrumentation
E.9.3.2.1 Ultrasonic level sensor / transmitter, panel mounted, 110 V, complete with supports Only…….……...……………………
2 ea
……………………………………….
D.9.3.2.2 Float Switch, complete with SS316L chain, support and weight Only…….……...……………………
12 ea
……………………………………….
D.9.3.2.3 Pressure gauge, 1/2" connection, SS316L construction, glycerine filled, 150mm dial, Only…….……...……………………
reading 0 - 40 m, complete with snubber and SS316 isolation valve, air release valve. 10 ea ……………………………………….
ID
D.9.3.2.4 Turbidity sensor / transmitter 0 - 2500 mg/l complete with supports Only…….……...……………………
2 ea
……………………………………….
D.9.3.2.5 High Pressure switch Only…….……...……………………
10 ea
……………………………………….

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Intake Structure and Low Lift Pumpimg Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
D.9.3.2.6 Low Pressure Switch Only…….……...……………………
10 ea
……………………………………….
D.9.3.2.7 Vibration sensors, analyzer and monitor Only…….……...……………………
10 set
……………………………………….
E.9.3.3 Electrical Works
Electrical installation, complete including but not limited to the following:
E.9.3.3.1 - Main Control Center Panel MCCP-LLP complete including protection devices,
starters, monitoring devices, ventilation, power and control cables, connections, cable
glands, control equipments, disconnecting switches with all needed accessories, fittings
10 item Only…….……...……………………
and related works all as specified, shown on drawings and to the satisfaction of the
engineer. Cables shall be laid inside galvanized steel cable trays and ladders installed ……………………………………….
inside concrete trenches. ID
E.9.3.3.2 - Secondary distribution board DB-TP-LLPS complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be laid 1 LS Only…….……...……………………
inside galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………….
ID
E.9.3.3.3 - Lighting and power installation, complete including, high bay lighting fixtures
1x250W HPS IP65, switches, socket outlets, power outlets,disconnecting
switches,emergency lighting with autononomy 3 hrs, boxes wires, cover plates, chassis, 1 LS Only…….……...……………………
with all needed accessories and fittings, all as specified, and to the satisfaction of the ……………………………………….
engineer. ID
E.9.3.3.4 - Telephone and Data installation, complete including, telephone outlets, Data outlets, Only…….……...……………………
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS ……………………………………….
fittings, all as specified, and to the satisfaction of the engineer. ID
E.9.3.3.5 - Fire Alarm installation, complete including, manual call station, fire alarms, fire Only…….……...……………………
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS ……………………………………….
and fittings, all as specified, and to the satisfaction of the engineer. ID
Sub-Total E.9 (ID)
Total Bill E - Low Lift Pumpimg Station (ID)
Only
IRAQI DINAR

6/6
Bill E – Water Treatment Plant
Flow Meter
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Flow Meter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 50 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
30 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
20 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
40 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
accordance with the drawings. 10 m3
……………………………………. ID
Sub-Total E.2 (ID)

1/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Flow Meter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.3: WATERPROOFING
E.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
170 m2
……………………………………. ID
Sub-Total E.3 (ID)
E.5: FINISHES
E.5.5 WALL PAINT
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
220 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 3 l.m. Only…….……...………………………
Engineer. ……………………………………. ID
E.7.5 DUCTILE IRON COVER AND FRAME
This item shall be measured per unit of ductile iron cover completely installed 2 unit Only…….……...………………………
to the approval of the Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 Flowmeter Chamber
E.9.1.1 Mechanical Works
E.9.1.1.1 DN800 Ultrasonic flowmeter Only…….……...………………………
2 ea
……………………………………. ID
E.9.1.1.2 Fittings, automatic valves and accessories in Flowmeter Chamber (as per drawing) Only…….……...………………………
2 Set
……………………………………. ID
E.9.1.1.3 Drain Pump, 5 L/s, 10m head, with built in float switch complete piping to outside the Only…….……...………………………
2 Set
chamber ……………………………………. ID

2/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Flow Meter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.1.2 Electrical, control and instrumentation Works
E.9.1.2.1 Power cables to flowmeter and drain pump Only…….……...………………………
1 LS
……………………………………. ID
E.9.1.2.2 Instruments and Control Cables to flowmeter Only…….……...………………………
1 LS
……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Flow Meter (ID)
Only
IRAQI DINAR

3/3
Bill E – Water Treatment Plant
Cascade Aerator
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Cascade Aerator
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 75 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
50 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
20 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
100 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
15 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
30 m2
……………………………………. ID
E.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
215 m2
accordance to the drawings as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/2
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Cascade Aerator
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5: FINISHES
E.5.5 WALL PAINT
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
700 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 3 l.m. Only…….……...………………………
Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
Total Bill E - Cascade Aerator (ID)
Only
IRAQI DINAR

2/2
Bill E – Water Treatment Plant
Flash Mixer
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Flash Mixer
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 25 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
18 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
0 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
62 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
5 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
200 m2
……………………………………. ID
E.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
200 m2
accordance to the drawings as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Flash Mixer
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5: FINISHES
E.5.5 WALL PAINT
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface
130 m2 Only…….……...………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 12 l.m. Only…….……...………………………
Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 Flash Mixer
E.9.1.1 Mechanical Works
E.9.1.1.1 Flash Mixer, paddle type, VFD controlled complete with support Only…….……...………………………
2 ea
……………………………………. ID
E.9.1.2 Electrical, control and instrumentation Works Only…….……...………………………
1 ea
……………………………………. ID
E.9.1.2.1 Emergency stop complete with stand Only…….……...………………………
2 ea
……………………………………. ID
E.9.1.2.2 Power Cables to mixers motor Only…….……...………………………
1 Set
……………………………………. ID
E.9.1.2.3 Instruments and control cables to mixer motor Only…….……...………………………
1 LS
……………………………………. ID

2/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Flash Mixer
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2 Distribution Chamber (integrated with Flash Mixer)
E.9.2.1 Mechanical Works
E.9.2.1.1 SS316 Effluent Weirs, automatic Only…….……...………………………
4 ea
……………………………………. ID
E.9.2.1.2 Ductile Iron, PN16 fittings Only…….……...………………………
1 LS
……………………………………. ID
E.9.2.2 Electrical, control and instrumentation Works
E.9.2.2.1 Power Cables to Weirs Only…….……...………………………
1 Set
……………………………………. ID
E.9.2.2.2 Instruments and control cables to Weirs Only…….……...………………………
1 LS
……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Flash Mixer (ID)
Only
IRAQI DINAR

3/3
Bill E – Water Treatment Plant
Clarifloculator
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Clarifloculator
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 2,000 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
2,120 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
80 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
3,600 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
400 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
1,500 m2
……………………………………. ID
E.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
10,000 m2
accordance to the drawings as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Clarifloculator
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5: FINISHES
E.5.5 WALL PAINT
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface
750 m2 Only…….……...………………………
area without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.7: METAL WORKS
E.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated Only…….……...………………………
2,000 kg
on drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 Clariflocculator
Internally and externally ladders should be made from galvanized steel, the spacing of
the steps shall not exceed 30cm. Ladders shall Cat type with safety cage for height above 4 ea Only…….……...………………………
2.2 m. ……………………………………. ID
E.9.1.1 Sludge scraper (made at least from stainless steel S316) to remove the sludge and
floating sediment in circular settling basins (Diameter 34 m), the scraper, which is
normally in continuous operation, is exclusively controlled from the switch board
mounted on the bridge. Further connections for signals to a central control room
(operation, alarm lamps etc.)are provided. An emergency push button is located at the
basin rim within the ladder area. All electrical equipment must be designed in
4 Set
accordance with VDE_ regulations. Above and below water the scraper construction
must suitable corrosion protection with complete (2) No. flocculator motors of speed (2 -
4) R.P.M. with shaft conected to four paddles maked from stainless steel materials to be
protected from chemical reactions in heavy solution with complete electrical control
instruments and protection devices and cable needed. Only…….……...………………………
……………………………………. ID

2/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Clarifloculator
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
Piece of pipe 600 mm. dia. its length will be about 1m.,NP10, will be fixed in the bottom
in center to discharge water to sludge manhole with a paddle flange wellded with the 4 ea
pipe and will be fixed in the concrete base to work as water proof.
Steel elbow 90º of 600 mm. dia. of standard length 10 NP.must be fixed and welded on
4 3
the site.
E.9.1.2 Water level indicator must be installed in each clariflucculator tank to defined high water
level, and give alarm to control room panel, completely with all accessories and 4 ea Only…….……...………………………
instruments. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Clarifloculator (ID)
Only
IRAQI DINAR

3/3
Bill E – Water Treatment Plant
Gravity Filter
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Gravity Filter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 875 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
1,600 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
480 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
1,620 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
175 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Gravity Filter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.3: WATERPROOFING
E.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...………………………
550 m2
……………………………………. ID
E.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
3,300 m2
accordance to the drawings as directed and approved by the Engineer. ……………………………………. ID
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 1,750 m2 Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings
and as directed and approved by the Engineer.
b. TYPE SD2 (245x210)
This item shall be measured per unit of Steel door with louvers (in both lower
and upper parts of the door) installed in situ in accordance with the drawings, 1 unit
as indicated in the doors schedule, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID
g. TYPE SD7 (240x300)
This item shall be measured per unit of Steel door with louvers installed in situ
2 unit
in accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
n. TYPE W14 430x160cm
This item shall be measured per unit of windows installed in situ in accordance
25 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Gravity Filter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
2,600 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in
700 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer.
……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
2,600 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
2,000 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 1,750 m2 Only…….……...………………………
……………………………………. ID
E.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 1,200 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.6 (ID)

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Gravity Filter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 20 l.m. Only…….……...………………………
Engineer. ……………………………………. ID
E.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
1,000 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Gravity Filter Building Only…….……...………………………
1 set
……………………………………. ID
E.9.2 Gravity Filter
E.9.2.1 Filter underdrain system (concrete blocks, nozzle, etc) Only…….……...………………………
10 Set
……………………………………. ID
Filter nozzle, PP, 0.25mm opening. Head loss should not exceed 0.1 m at 0.5 m3/hr Only…….……...………………………
27300 ea
……………………………………. ID
Underdrain blocks Only…….……...………………………
10 set
……………………………………. ID
E.9.2.2 Filter Subfill, 60 cm depth (Gravel) Only…….……...………………………
500 m3
……………………………………. ID
E.9.2.3 Filter media consisting of Anthracite / Sand / Garnet, depth 90 cm Only…….……...………………………
10 Set
……………………………………. ID
Sand Only…….……...………………………
224 m3
……………………………………. ID
Anthracite Only…….……...………………………
409 m3
……………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Gravity Filter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
Garnet Only…….……...………………………
112 m3
……………………………………. ID
Garnet support Only…….……...………………………
42 m3
……………………………………. ID
E.9.2.4 Washwater Trough, GRP, Properly supported Only…….……...………………………
10 Set
……………………………………. ID
E.9.2.5 Influent Water valves (Motorized Penstock, diameter 400,, SS316) complete Only…….……...………………………
20 Set
……………………………………. ID
E.9.2.6 Washwater outlet valves (Motorized Penstock, 400 x 400mm, SS316, complete) Only…….……...………………………
20 Set
……………………………………. ID
E.9.2.7 Backwash pumps set consisting of 2 pumps each 1239 m3/hr at 15m head, piping,
valves, supports, etc..., motor 90 kw, 3 pH/50 Hz/400 V, 1450 rpm, TEFC. Pumps shall
be fitted with mechanical shaft seal type spring loaded flat faces arranged such that 1 Set
replacement of wearing components can be carried out without the need to dismantle the Only…….……...………………………
pump. ……………………………………. ID
E.9.2.8 Air Scouring blower 1333 CFM at 7 psi, complete with soundproof enclosure, intake
filter/silencer, discharge silencer, non return valve, flexible coupling, header, temperature
2 Set
gauge, clogged filter indicator and all accessories to make a complete system. Motor 55 Only…….……...………………………
kW, 3ph/50Hz/400V, 2900 rpm, TEFC. ……………………………………. ID
E.9.2.9 DN250 piping from Blowers to Filters, SS316, including valves, fittings and accessories Only…….……...………………………
1 Set
……………………………………. ID
E.9.2.10 DN500 piping, from Backwash pumps to filters, DI, including valves, fittings and Only…….……...………………………
1 Set
accessories ……………………………………. ID
E.9.2.11 Filter instruments Only…….……...………………………
1 Set
……………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Gravity Filter
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2.12 Electrical Works
Electrical installation, complete including but not limited to the following:
- 0.4 kV Low Voltage Console Panels to operate blowers, backwash pumps, valves and Only…….……...………………………
10 set
every electrical item of the filter ……………………………………. ID
- Secondary distribution board DB-TP-GF complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables, soft starter panel for air scouring and backwash
pumps complete with all protection and all related accessories and fittings, all as
1 LS
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be laid
inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2x40W,
switches, socket outlets, power outlets, boxes wires, cover plates, chassis, with all
1 LS
needed accessories and fittings, all as specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...………………………
fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...………………………
and fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Gravity Filter (ID)
Only
IRAQI DINAR

6/6
Bill E – Water Treatment Plant
High Lift Pumping Station
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - High Lift Pumping Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 250 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
113 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
418 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
29 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
50 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 460 m2 Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - High Lift Pumping Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings
and as directed and approved by the Engineer.
c. TYPE SD3 (210x110)
This item shall be measured per unit of Steel door with louvers installed in situ
3 unit
in accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
i. TYPE W9 90x80cm
This item shall be measured per unit of windows installed in situ in accordance
12 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
630 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in
460 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer.
……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
630 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ……………………………………. ID

2/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - High Lift Pumping Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
800 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
580 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as
directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 460 m2 Only…….……...………………………
……………………………………. ID
Sub-Total E.6 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 6 l.m. Only…….……...………………………
Engineer. ……………………………………. ID
E.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
1,000 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
High Lift Pumping Station Only…….……...………………………
1 set
……………………………………. ID

3/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - High Lift Pumping Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2 High Lift Pumping Stations
E.9.2.1 Batufa Pumpset
E.9.2.1.1 Horizontal Split case double suction pump, capacity 777 m3/hr at 210 m head, 1500 rpm,
suitable for 2 ppm chlorine content. Complete with all motor and pump built in
protection devices as per specifications (PTC thermistor, overload, Oil leak detector,
motor bearing temperature, pumps bearing temperature). Pumps shall be fitted with 5 ea
mechanical shaft seal type spring loaded flat faces arranged such that replacement of
wearing components can be carried out without the need to dismantle the pump. Only…….……...………………………
……………………………………. ID
E.9.2.1.2 Anti Water Hammer System:
- Surge vessel at the pumping station location (Type: Bladder, Number of units: 3, Size:
7000 liters each, Connection: 250 mm, Header Size: 400 mm, PN 25, Factory Test
1 LS
Pressure: 40 bar, Precharge pressure: 7 bar).
- Control of the pumping station (Drive: Soft starter, Drive Configuration: 8s/16s, Only…….……...………………………
Startup delay interval: Min 50 sec.) ……………………………………. ID
E.9.2.1.3 Suction Pipe, Valves, Instruments and Accessories
E.9.2.1.3.1 Main suction header, DN800, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 set
Storage /Strategic reservoir header to pumps suction pipes ……………………………………. ID
E.9.2.1.3.2 DN450 motorized double flanged gate valve Only…….……...………………………
5 ea
……………………………………. ID
E.9.2.1.3.3 Suction pipe, DN450, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
5 set
washers, Gaskets, etc. ……………………………………. ID
E.9.2.1.3.4 Low pressure switch (or Vacuum switch) / Transmitter Only…….……...………………………
5 ea
……………………………………. ID
E.9.2.1.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID
E.9.2.1.4 Discharge Piping, Valves, Instruments and Accessories
E.9.2.1.4.1 Discharge pipe, DN400, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
5 Set
washers, Gaskets, etc. ……………………………………. ID
E.9.2.1.4.2 DN400 motorized double flanged gate valve, DI, PN25 Only…….……...………………………
5 ea
……………………………………. ID
E.9.2.1.4.3 DN400 Non slam check valves, Nozzle Type, complete with lever and limit switch, DI, Only…….……...………………………
5 ea
PN25 ……………………………………. ID

4/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - High Lift Pumping Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2.1.4.4 Main Discharge header, DN700, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 Set
Pump Discharge Piping to 1 m from outer face of the pumps room wall ……………………………………. ID
E.9.2.1.4.5 High Pressure Switch/Transmitter Only…….……...………………………
5 ea
……………………………………. ID
E.9.2.1.4.6 Vibration sensor / Analyzer Only…….……...………………………
5 set
……………………………………. ID
E.9.2.2 Mangesh and Zawita Pumpset
E.9.2.2.1 Horizontal Split case, multi-stage pump, capacity 560 m3/hr at 120 m head, 1500 rpm,
suitable for 2 ppm chlorine content. Complete with all motor and pump built in
protection devices as per specifications (PTC thermistor, overload, Oil leak detector,
motor bearing temperature, pumps bearing temperature). Pumps shall be fitted with 5 ea
mechanical shaft seal type spring loaded flat faces arranged such that replacement of
wearing components can be carried out without the need to dismantle the pump. Only…….……...………………………
……………………………………. ID
E.9.2.2.2 Anti Water Hammer System:
- Surge vessel at the pumping station location (Type: Bladder, Number of units: 2, Size:
7000 liters each, Connection: 300 mm, Header Size: 400 mm, PN 25, Factory Test
Pressure: 36 bar, Precharge pressure: 3.7 bar).
- One way discharge tank at PEG E446 (Material: Concrete, Number of Units: 1, Base
Area: 4.9m2, Height: 4m, Water Capacity: 14.7m3, Connection In: 100mm, Connection
1 LS
Out: 600mm).
- Standpipe U end at PEG E462 (Material: Flanged DI, Number of Units: 1, Base Area:
DN800, Height: 1m above HWL in downstream reservoir, Connection: 800mm).
- Control of the pumping station (Drive: Soft starter, Drive Configuration: 8s/16s,
Startup delay interval: Min 30 sec.). Only…….……...………………………
……………………………………. ID
E.9.2.3 Suction Pipe, Valves, Instruments and Accessories
E.9.2.3.1 Main suction header, DN700, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 set
Storage /Strategic reservoir to pumps suction pipes ……………………………………. ID
E.9.2.3.2 DN400 motorized double flanged gate valve Only…….……...………………………
5 ea
……………………………………. ID
E.9.2.3.3 Suction pipe, DN400, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
5 set
washers, Gaskets, etc. ……………………………………. ID

5/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - High Lift Pumping Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2.3.4 Low pressure switch (or Vacuum switch) Only…….……...………………………
5 ea
……………………………………. ID
E.9.2.3.5 Any other item to make the suction piping complete in all aspects (List details) Only…….……...………………………
1 LS
……………………………………. ID
E.9.2.4 Discharge Piping, Valves, Instruments and Accessories
E.9.2.4.1 Discharge pipe, DN350, Ductile Iron, including fittings, supports, SS316 Bolts, Nuts, Only…….……...………………………
5 Set
washers, Gaskets, etc. ……………………………………. ID
E.9.2.2.3.2 DN350 motorized double flanged gate valve, DI, PN25 Only…….……...………………………
5 ea
……………………………………. ID
E.9.2.2.3.3 DN350 Non slam check valves Nozzle Type, complete with lever and limit switch, DI, Only…….……...………………………
5 ea
PN25 ……………………………………. ID
E.9.2.2.3.4 Main Discharge header, DN700, Ductile Iron, including fittings and wall inserts) from Only…….……...………………………
1 Set
Pump Discharge Piping to 1 m from outer face of the pumps room wall ……………………………………. ID
E.9.2.2.3.5 High Pressure Switch/Transmitter Only…….……...………………………
5 ea
……………………………………. ID
E.9.2.2.3.6 Vibration sensor / Analyzer Only…….……...………………………
5 set
……………………………………. ID
E.9.2.5 Electrical Works
Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-HLP; complete including protection devices,
starters, monitoring devices, ventilation, power and control cables, connections, cable
glands, control equipments, disconnecting switches with all needed accessories including
10 item
connection to PLC fittings and related works all as specified, shown on drawings and to
the satisfaction of the engineer. Cables shall be laid inside galvanized steel cable trays Only…….……...………………………
and ladders installed inside concrete trenches. ……………………………………. ID
- Secondary distribution board SDB-HLP complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be laid 1 LS
Only…….……...………………………
inside galvanized steel cable trays and ladders installed inside concrete trenches.
……………………………………. ID

6/7
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - High Lift Pumping Station
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Lighting and power installation, complete including, highbay lighting fixtures 1x250W
HPS IP65, switches, socket outlets, power outlets,disconnecting switches,emergency
lighting with autononomy 3 hrs, boxes wires, cover plates, chassis, with all needed 1 LS
accessories and fittings, all as specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...………………………
fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...………………………
and fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - High Lift Pumping Station (ID)
Only
IRAQI DINAR

7/7
Bill E – Water Treatment Plant
Post & Pre Chlorination Rooms
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Post & Pre Chlorination Rooms
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS
No. IN FIGURES ID AMOUNT
ID ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 70 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
12 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
60 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
8 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
14 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 120 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Post & Pre Chlorination Rooms
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS
No. IN FIGURES ID AMOUNT
ID ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
b. TYPE SD2 (210x200)
This item shall be measured per unit of Steel door with louvers (in both lower and
upper parts of the door) installed in situ in accordance with the drawings, as 2 unit
Only…….……...………………………
indicated in the doors schedule, as directed and approved by the Engineer. ……………………………………. ID
c. TYPE SD3 (210x110)
This item shall be measured per unit of Steel door with louvers installed in situ in
2 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
m. TYPE W13 150x140cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer
210 m2
……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
210 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

2/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Post & Pre Chlorination Rooms
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS
No. IN FIGURES ID AMOUNT
ID ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
125 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
120 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
E.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 120 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.6 (ID)
E.7: METAL WORKS
E.7.2 HOT DIP GALVANISED CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 8 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Pre-Chlorination Building Only…….……...………………………
1 set
……………………………………. ID
Post-Chlorination Building Only…….……...………………………
1 set
……………………………………. ID
E.9.2 Pre-Chlorination System
E.9.2.1 1 Ton Chlorine Drum container Only…….……...………………………
6 ea
……………………………………. ID

3/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Post & Pre Chlorination Rooms
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS
No. IN FIGURES ID AMOUNT
ID ID
E.9.2.2 Chlorine container roller support (for duty containers) Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.3 Weighing scale Only…….……...………………………
1 ea
……………………………………. ID
E.9.2.4 Chlorine container support rack (for Stand by containers) Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.5 Chlorine gas manifold made from stainless steel SS.316, complete with isolation valves, Only…….……...………………………
2 set
fittings and all accessories ……………………………………. ID
E.9.2.6 Pressure gauge for each manifold. Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and all Only…….……...………………………
2 ea
accessories ……………………………………. ID
E.9.2.8 Automatic changeover device between gas manifolds Only…….……...………………………
1 ea
……………………………………. ID
E.9.2.9 Gas pressure reducing and shut off valve, electrically operated Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.10 Automatic vacuum chlorination, 12 Kg/hr Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.11 Automatic Duty/Standby Changeover Panel for Chlorinators Only…….……...………………………
1 ea
……………………………………. ID
E.9.2.12 Chlorine Analyzer Only…….……...………………………
1 ea
……………………………………. ID
E.9.2.13 Injection Point Only…….……...………………………
1 ea
……………………………………. ID
E.9.2.14 Booster Pump Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.15 Chlorine Sampling Pumps Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.16 Chlorine gas leak detector Only…….……...………………………
1 ea
……………………………………. ID
E.9.2.17 Warning light and alarm Only…….……...………………………
1 set
……………………………………. ID

4/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Post & Pre Chlorination Rooms
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS
No. IN FIGURES ID AMOUNT
ID ID
E.9.2.18 Air Supply / Extract fans Only…….……...………………………
1 set
……………………………………. ID
E.9.2.19 Drench shower Only…….……...………………………
1 set
……………………………………. ID
E.9.2.20 Breathing apparatus Only…….……...………………………
3 ea
……………………………………. ID
E.9.2.21 Any other item to make the system complete in all respects (List details) Only…….……...………………………
1 LS
……………………………………. ID
E.9.2.22 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-CMR complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables, conduits and all related accessories and fittings, all as 1 LS Only…….……...………………………
specified, shown on drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2x40W, switches,
socket outlets, power outlets, boxes wires, cover plates, chassis, with all needed accessories
1 LS
and fittings, all as specified, and to the satisfaction of the engineer. Only…….……...………………………
……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
E.9.2.23 Chlorine gas scubbing system, Sodium Hydroxide based, complete with vessel (constructed
of anti-corrosion material), piping, fans, dampener, sensors, differential pressure gauge, and 1 LS Only…….……...………………………
all related accessories ……………………………………. ID
E.9.3 Post Chlorination System
E.9.3.1 1 Ton Chlorine Drum container Only…….……...………………………
4 ea
……………………………………. ID
E.9.3.2 Chlorine container roller support (for duty containers) Only…….……...………………………
2 ea
……………………………………. ID
E.9.3.3 Weighing scale Only…….……...………………………
1 ea
……………………………………. ID
E.9.3.4 Chlorine container support rack (for Stand by containers) Only…….……...………………………
2 ea
……………………………………. ID
E.9.3.5 Chlorine gas manifold made from stainless steel SS.316, complete with isolation valves, Only…….……...………………………
2 set
fittings and all accessories ……………………………………. ID

5/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Post & Pre Chlorination Rooms
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS
No. IN FIGURES ID AMOUNT
ID ID
E.9.3.6 Pressure gauge for each manifold. Only…….……...………………………
2 ea
……………………………………. ID
E.9.3.7 Wall mounted vacuum regulator complete with check valve/ pressure relief valve and all Only…….……...………………………
2 ea
accessories ……………………………………. ID
E.9.3.8 Automatic changeover device between gas manifolds Only…….……...………………………
1 ea
……………………………………. ID
E.9.3.9 Gas pressure reducing and shut off valve, electrically operated Only…….……...………………………
2 ea
……………………………………. ID
E.9.3.10 Automatic vacuum chlorination, 10 Kg/hr Only…….……...………………………
2 ea
……………………………………. ID
E.9.3.11 Automatic Duty/Standby Changeover Panel for Chlorinators Only…….……...………………………
1 ea
……………………………………. ID
E.9.3.12 Chlorine Analyzer Only…….……...………………………
1 ea
……………………………………. ID
E.9.3.13 Injection Point Only…….……...………………………
1 ea
……………………………………. ID
E.9.3.14 Booster Pump Only…….……...………………………
2 ea
……………………………………. ID
E.9.3.15 Chlorine Sampling Pumps Only…….……...………………………
2 ea
……………………………………. ID
E.9.3.16 Chlorine gas leak detector Only…….……...………………………
1 ea
……………………………………. ID
E.9.3.17 Warning light and alarm Only…….……...………………………
1 set
……………………………………. ID
E.9.3.18 Air Supply / Extract fans Only…….……...………………………
1 set
……………………………………. ID
E.9.3.19 Drench shower Only…….……...………………………
1 set
……………………………………. ID
E.9.3.20 Breathing apparatus Only…….……...………………………
3 ea
……………………………………. ID
E.9.3.21 Any other item to make the system complete in all respects (List details) Only…….……...………………………
1 LS
……………………………………. ID

6/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Post & Pre Chlorination Rooms
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS
No. IN FIGURES ID AMOUNT
ID ID
E.9.3.22 Electrical Works
Electrical installation, complete including but not limited to the following:
- Main Control Center Panel MCCP-CLR, complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories Including connection to
1 LS
PLC, fittings and related works all as specified, shown on drawings and to the satisfaction
of the engineer. Cables shall be laid inside galvanized steel cable trays and ladders installed Only…….……...………………………
inside concrete trenches. ……………………………………. ID
- Main Control Center Panel MCCP-BL, complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories Including connection to
1 LS
PLC, fittings and related works all as specified, shown on drawings and to the satisfaction
of the engineer. Cables shall be laid inside galvanized steel cable trays and ladders installed Only…….……...………………………
inside concrete trenches. ……………………………………. ID
- Main Control Center Panel MCCP-FC, complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches with all needed accessories Including connection to
1 LS
PLC, fittings and related works all as specified, shown on drawings and to the satisfaction
of the engineer. Cables shall be laid inside galvanized steel cable trays and ladders installed Only…….……...………………………
inside concrete trenches. ……………………………………. ID
- Main Control Center Panel MCCP-INLET, complete including protection devices,
starters, monitoring devices, ventilation, power and control cables, connections, cable
glands, control equipments, disconnecting switches to the mechanical equipments, with all
1 LS
needed accessoriesI ncluding connection to PLC, fittings and related works all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID
- Main Control Center Panel MCCP-PRCHR, complete including protection devices,
starters, monitoring devices, ventilation, power and control cables, connections, cable
glands, control equipments, disconnecting switches to the mechanical equipments, with all
needed accessories Including connection to PLC, fittings and related works all as specified, 1 LS
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID

7/8
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Post & Pre Chlorination Rooms
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS
No. IN FIGURES ID AMOUNT
ID ID
- Main Control Center Panel MCCP-PCHR, complete including protection devices, starters,
monitoring devices, ventilation, power and control cables, connections, cable glands, control
equipments, disconnecting switches conduits or cable tray where neccesary to the
mechanical equipments, with all needed accessoriesI ncluding connection to PLC, fittings 1 LS
and related works all as specified, shown on drawings and to the satisfaction of the engineer.
Cables shall be laid inside galvanized steel cable trays and ladders installed inside concrete Only…….……...………………………
trenches. ……………………………………. ID
- Secondary distribution board DB-TP-CHR complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside
1 LS
galvanized steel cable trays and ladders installed inside concrete trenches. Cables shall be
laid inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2X40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs, boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
E.9.3.23 Chlorine gas scubbing system, Sodium Hydroxide based, complete with vessel (constructed
of anti-corrosion material), piping, fans, dampener, sensors, differential pressure gauge, and 1 LS Only…….……...………………………
all related accessories ……………………………………. ID
E.9.4 Gantry Crane
E.9.4.1 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting chain,
control box, runway beams, rails, limit switches, etc. and Third Party Load Test certificate 1 ea Only…….……...………………………
……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Post & Pre Chlorination Rooms (ID)
Only
IRAQI DINAR

8/8
Bill E – Water Treatment Plant
Chemicals Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Chemicals Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 35 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
9 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
33 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
4 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
7 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 65 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Chemicals Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
b. TYPE SD2 (210x245)
This item shall be measured per unit of Steel door with louvers (in both lower and
2 unit
upper parts of the door) installed in situ in accordance with the drawings, as Only…….……...………………………
indicated in the doors schedule, as directed and approved by the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
m. TYPE W13 150x140cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
225 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
225 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
110 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)

2/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Chemicals Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
65 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
E.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 65 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.6 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Chemical Room Only…….……...………………………
1 set
……………………………………. ID
E.9.2 Alum Feed System
E.9.2.1 Alum Dosing Pump, 1500 L/hr, 3 bars Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.2 Alum Dosing Tank capacity 10,000 Liter Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.3 Mixer suitable for the 10,000 Liters tank Only…….……...………………………
2 ea
……………………………………. ID
E.9.2.4 Interconnectiong, piping, tubing, valves Only…….……...………………………
1 set
……………………………………. ID

3/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Chemicals Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.3 Polymer Dosing System
E.9.3.1 Fully automatic three-chamber preparation system for dry and liquid polyelectrolytes,
complete with dry powder feeder, agitators, water control station with water meter, level
1 set
controls and control panel incorporating a PLC unit; preparation capacities: 1500 L/hr Only…….……...………………………
……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Chemicals Room (ID)
Only
IRAQI DINAR

4/4
Bill E – Water Treatment Plant
Blowers Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Blowers Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 75 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
10 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
48 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
76 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
15 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 130 m2 Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Blowers Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings
and as directed and approved by the Engineer.
b. TYPE SD7 (240x300)
This item shall be measured per unit of Steel door with louvers (in both lower
and upper parts of the door) installed in situ in accordance with the drawings, as 1 unit
indicated in the doors schedule, as directed and approved by the Engineer. Only…….……...………………………
……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
h. TYPE W9 70x80cm
This item shall be measured per unit of windows installed in situ in accordance
7 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
380 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 130 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
380 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID

2/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Blowers Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
250 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 130 m2 Only…….……...………………………
……………………………………. ID
Sub-Total E.6 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 6 l.m. Only…….……...………………………
Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Blower Room Only…….……...………………………
1 set
……………………………………. ID
E.9.2 Blower Room
E.9.2.1 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-BR, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be laid 1 LS
inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID

3/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Blowers Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Lighting and power installation, complete including, lighting fixtures 2x40W, switches,
socket outlets, power outlets, disconnecting switches,emergency lighting with autononomy
1 LS
3 hrs,boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...………………………
fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...………………………
and fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Blowers Room (ID)
Only
IRAQI DINAR

4/4
Bill E – Water Treatment Plant
Clear Water Tank
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Clear Water Tank
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 1,875 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...…………………………
…………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...…………………………
1,950 m3
…………………………………. ID
b. For Slabs and Beams Only…….……...…………………………
930 m3
…………………………………. ID
c. For Walls and Columns Only…….……...…………………………
870 m3
…………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...…………………………
380 m3
accordance with the drawings. …………………………………. ID
Sub-Total E.2 (ID)

1/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Clear Water Tank
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.3: WATERPROOFING
E.3.1 WATERSTOP JOINTS
This item shall be measured in linear meter of installed Waterstop as indicated on Only…….……...…………………………
420 l.m.
drawings. …………………………………. ID
E.3.2 BITUMINOUS COATING FOR BURIED SURFACES
This item shall be measured in square meter of bituminous coating application. Only…….……...…………………………
530 m2
…………………………………. ID
E.3.3 WATERPROOF PROTECTIVE COATING INSIDE WATER TANKS
This item shall be measured in square meter and shall be the net area in Only…….……...…………………………
10,200 m2
accordance to the drawings as directed and approved by the Engineer. …………………………………. ID
E.3.4 VAPOR BARRIER
This item shall be measured in square meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence of 3,680 m2 Only…….……...…………………………
the Engineer and according to his approval. …………………………………. ID
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 3,680 m2 Only…….……...…………………………
and approved by the Engineer. …………………………………. ID
Sub-Total E.3 (ID)
E.5: FINISHES
E.5.5 WALL PAINT
b. EPOXY (FOR FAIR FACED CONCRETE PROTECTION)
This item shall be measured in square meter and shall be the actual surface area
1,650 m2 Only…….……...…………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. …………………………………. ID
Sub-Total E.5 (ID)

2/3
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Clear Water Tank
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 18 l.m. Only…….……...…………………………
…………………………………. ID
E.7.4 DRAINAGE PIPES FOR RESERVOIRS
This item shall be measured by linear meter of drainage pipes for each reservoir
completely installed with all necessary connections and fixing accessories to the 180 l.m.
approval of the Engineer. Draining the roof slabs of reservoirs and pumping Only…….……...…………………………
station including the floor drains. …………………………………. ID
E.7.5 DUCTILE IRON COVER AND FRAME
This item shall be measured per unit of ductile iron cover completely installed to 12 unit Only…….……...…………………………
the approval of the Engineer. …………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 Storage / Strategic Tank
E.9.1.1 Ultrasonic Level sensor/tranmitter complete with supports Only…….……...…………………………
3 ea
…………………………………. ID
E.9.1.2 Float switch complete with SS316 lifting chain, weight and support Only…….……...…………………………
6 ea
…………………………………. ID
E.9.1.3 DN1000 Automatic butterfly valve, complete with local control and limit switches Only…….……...…………………………
4 ea
…………………………………. ID
E.9.1.4 DN1000 wall inserts and piping, DI Only…….……...…………………………
1 Set
…………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Clear Water Tank (ID)
Only
IRAQI DINAR

3/3
Bill E – Water Treatment Plant
Generator & Transformer Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Generator & Transformer Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according to
the excavation limits indicated on Contract Drawings and as directed & approved by
the Engineer. Wherever excavation limits are not indicated on Contract Drawings, 350 m3
Only…….……...………………………
the limits shall be 50cm away of blinding edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
180 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
427 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
493 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
70 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)

1/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Generator & Transformer Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
f. TYPE SD6 (110x112)
This item shall be measured per unit of Steel door with louvers installed in situ in
2 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
g. TYPE SD7 (250x300)
This item shall be measured per unit of Steel door with louvers installed in situ in
2 unit
accordance with the drawings, as indicated in the doors schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
l. TYPE W12 250x250cm
This item shall be measured per unit of windows installed in situ in accordance with
3 Unit
the drawings, as indicated in the windows schedule, as directed and approved by the Only…….……...………………………
Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in accordance Only…….……...………………………
1,800 m2
with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in accordance 750 m2 Only…….……...………………………
with the drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
1,100 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed and
approved by the Engineer. ……………………………………. ID

2/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Generator & Transformer Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
700 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed and
approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 300 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.6 (ID)
E.7: METAL WORKS
E.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
2,000 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Generator and Transformer Room Only…….……...………………………
1 set
……………………………………. ID

3/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Generator & Transformer Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2 Transformers and Generators Building
E.9.2.1 Electrical Works
E.9.2.1.1 Power Distribution Transformers.
Supply, install, connect test and commission the following oil immersed MV/LV power
distribution transformer complete with all needed connections, joints, cable terminations, cable
glands, wiring and protection devices from MV power network to transformer's primary input;
and from transformer's secondary output to the power metering device and to complete the
connection to the main power network with all necessary LV cables, auxiliaries, cable
supports, as well as the connection to the earthing loop, all as specified, shown on drawings, to
the satisfaction of the engineer and in full coordination with local authority.

Transformer, 2000 kVA, 33/0.4 kV. Only…….……...………………………


2 Item
……………………………………. ID
Transformer, 7500 kVA, 33/3.3 kV. Only…….……...………………………
2 Item
……………………………………. ID
E.9.2.1.2 Stand-by Power Generators.
Supply, install, connect, test and commission the following standby power Generator-Sets with
synchronizing and totalizing panels , acoustic treatment for each generator and anti vibration
installation. Complete with all needed connections, wiring, protection devices, control and
monitoring digital panel board, Fuel diesel tank for each generator with low level emergency
turn off controller, and a storage back-up Diesel tank, delivered full with all needed plumbing
works, fuel impuruties separator filter, emergency stop push-button, exhaust pipes with filters,
turn on and off manual and automatic system to be integrated to the ATS system, complete the
connection to the main power network, as well as the connection to the main earthing loop, all
as specified, shown on drawings and to the satisfaction of the engineer.

Generator-Set, prime rating 1400 kVA, 3.3kV, 50Hz, PF0.8. Only…….……...………………………


4 Item
……………………………………. ID
Fuel Diesel Tank, Black steel, 10000L. Only…….……...………………………
4 Item
……………………………………. ID
SYNCHRONIZING Panel for the above mentioned generators. Only…….……...………………………
1 Item
……………………………………. ID
Galvanized steel exhaust pipes with filter, insulation and aluminum jacketing. Only…….……...………………………
4 Item
……………………………………. ID

4/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Generator & Transformer Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2.1.3 Main Distribution Panel Boards
Supply, install, connect, test and commission the following Power Distribution Panel Boards,
complete with protection devices, monitoring devices, metering devices, control components,
ventilation fans, bus bars, ACBs, MCCBs, MCBs, Relays, Timers, Contactors, Starters, cables,
cable glands, all needed connections accessories and supports , all as specified, shown on
drawings and to the satisfaction of the engineer. Cables shall be laid inside galvanized steel
cable trays and ladders installed inside concrete trenches.

MV 33kV Switchgear, connecting the overhead MV cables to the transformers, complete with
all needed protection devices, power supply, cables, connections and fittings. 1 Item Only…….……...………………………
……………………………………. ID
MV 3.3kV Switchgear, connecting the overhead MV cables to the transformers, complete with
all needed protection devices, power supply, cables, connections and fittings. 1 Item Only…….……...………………………
……………………………………. ID
LV Switchgear for the connection between the transformers and the MDBs complete with all Only…….……...………………………
4 Item
needed protection devices, cables, connections and fittings. ……………………………………. ID
Main Distribution Panel Board MDB: MDB1, MDB2. Only…….……...………………………
2 Item
……………………………………. ID
Secondary Distribution Board DB-TP-G&T Only…….……...………………………
1 Item
……………………………………. ID
E.9.2.1.4 Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-G&T complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
1 LS
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2x40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs, boxes wires, cover plates, chassis, with all needed accessories and fittings, all as specified, Only…….……...………………………
and to the satisfaction of the engineer. ……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets, boxes,
UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, all as 1 LS Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, all 1 LS Only…….……...………………………
as specified, and to the satisfaction of the engineer. ……………………………………. ID

5/6
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Generator & Transformer Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2.1.5 Capacitor bank, 400 KVAR, 3phase including air circuit breaker, complete with all needed
connections, fittings, cabling, accessories, all as specified, and to the satisfaction of the 3
engineer.
E.9.2.1.6 Capacitor bank, 500 KVAR, 3phase including air circuit breaker, complete with all needed
connections, fittings, cabling, accessories, all as specified, and to the satisfaction of the 1 Item Only…….……...………………………
engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Generator & Transformer Room (ID)
Only
IRAQI DINAR

6/6
Bill E – Water Treatment Plant
Laboratory
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Laboratory
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
3 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
33 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
6 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
5 m3
accordance with the drawings. ……………………………………. ID
E.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 40 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total E.2 (ID)

1/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Laboratory
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 60 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)
E.4: DOORS AND WINDOWS
E.4.2 ALUMINUM DOORS AND WINDOWS
a. TYPE D2 210x90cm
This item shall be measured per unit of doors installed in situ in accordance with
1 Unit
the drawings, as indicated in the windows schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
b. TYPE W2 100x200cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
c. TYPE W4 150x80cm
This item shall be measured per unit of windows including rolling shutter installed
1 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
160 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
a. COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 45 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID

2/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Laboratory
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
160 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
120 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
45 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.6 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Laboratory Only…….……...………………………
1 set
……………………………………. ID
E.9.1.2 LABORATORY EQUIPMENTS
This item shall be paid as lump sum for laboratory equipment completed and LS Only…….……...………………………
1
tested. ……………………………………. ID

3/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Laboratory
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2 Laboratory
E.9.2.1 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-LAB, complete with Cabinet, bus bars, circuit breakers,
cable glands, power cables and all related accessories and fittings, all as specified, shown on 1 LS Only…….……...………………………
drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches, socket
outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs,boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Laboratory (ID)
Only
IRAQI DINAR

4/4
Bill E – Water Treatment Plant
Central Control Room
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Central Control Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 15 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
20 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
10 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
23 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
3 m3
accordance with the drawings. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and as 35 m2 Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Central Control Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.2 ALUMINUM DOORS AND WINDOWS
m. TYPE W13 150x140cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
s. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
110 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
c. WOODEN FLOOR FINISH
This item shall be measured in square meter and shall be the net area in 36 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
110 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
75 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)

2/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Central Control Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 36 m2 Only…….……...………………………
……………………………………. ID
E.6.3 CONCRETE FLOOR FINISHING
This item shall be measured in square meter of concrete floor finishing surface
which shall be the net area in accordance with the drawings, as directed and 36 m2 Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.6 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Control Room Only…….……...………………………
1 set
……………………………………. ID

3/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Central Control Room
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2 Control Room
E.9.2.1 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-CR/3, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as
specified, shown on drawings and to the satisfaction of the engineer. Cables shall be laid 1 LS
inside galvanized steel cable trays and ladders installed inside concrete trenches. Only…….……...………………………
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches, socket
outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3 hrs,
1 LS
boxes wires, cover plates, chassis, with all needed accessories and fittings, all as specified, Only…….……...………………………
and to the satisfaction of the engineer. ……………………………………. ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...………………………
fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...………………………
and fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Central Control Room (ID)
Only
IRAQI DINAR

4/4
Bill E – Water Treatment Plant
Store & Workshop
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Store & Workshop
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 30 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
7 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
19 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
16 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
6 m3
accordance with the drawings. ……………………………………. ID
E.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 45 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 75 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Store & Workshop
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.2 STEEL DOORS
This item shall be measured in unit of steel doors as indicated on the drawings and
as directed and approved by the Engineer.
a. TYPE SD1 (140x240)
This item shall be measured per unit of Steel door installed in situ in accordance
1 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
b. TYPE SD2 (300x370)
This item shall be measured per unit of Steel door installed in situ in accordance
1 unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
E. TYPE W4 150x80cm
This item shall be measured per unit of windows including rolling shutter installed
6 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
190 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
b. INTERNAL FLOOR FINISHING SCREED WITH HARDENER
This item shall be measured in square meter and shall be the net area in 60 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID

2/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Store & Workshop
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
190 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
130 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
75 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.6 (ID)
E.7: METAL WORKS
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 5 l.m. Only…….……...………………………
……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Store Only…….……...………………………
1 set
……………………………………. ID
E.9.2 Store
E.9.2.1 Gantry crane, SWL 7.5 tons complete with electrical hoist, electrical trolleys, lifting chain,
control box, runway beams, rails, limit switches, etc. and Third Party Load Test certificate 1 ea Only…….……...………………………
……………………………………. ID

3/4
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Store & Workshop
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.9.2.2 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-S/W, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as specified,
shown on drawings and to the satisfaction of the engineer. Cables shall be laid inside 1 LS
Only…….……...………………………
galvanized steel cable trays and ladders installed inside concrete trenches.
……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2x40W, switches,
socket outlets, power outlets, disconnecting switches,emergency lighting with autononomy 3 1 LS Only…….……...………………………
hrs,boxes wires, cover plates, chassis, with all needed accessories and fittings, all as
……………………………………. ID
specified, and to the satisfaction of the engineer.
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Store & Workshop (ID)
Only
IRAQI DINAR

4/4
Bill E – Water Treatment Plant
Guard House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Guard House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 25 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
15 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
18 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
15 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
5 m3
accordance with the drawings. ……………………………………. ID
E.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in accordance
with the drawings or as executed in situ, measured in the presence of the Engineer 50 m3 Only…….……...………………………
and according to his approval. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 60 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Guard House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
a. TYPE WD1 (210x100)
This item shall be measured per unit of Wood door installed in situ in accordance
2 Unit
with the drawings, as indicated in the doors schedule, as directed and approved by Only…….……...………………………
the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
a. TYPE W1 225x130cm
This item shall be measured per unit of windows including rolling shutter installed
1 Unit
in situ in accordance with the drawings, as indicated in the windows schedule, as Only…….……...………………………
directed and approved by the Engineer. ……………………………………. ID
b. TYPE W2 100x200cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
c. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
r. TYPE D1 210x80cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
s. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in accordance
2 Unit
with the drawings, as indicated in the windows schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Guard House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
150 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
a. COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 50 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with the Only…….……...………………………
60 l.m.
drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
140 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
120 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
E.5.6 RED CLAY ROOFING TILES
This item shall be measured in square meters of red clay roof tiles quantity as Only…….……...………………………
50 m2
indicated on the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
55 m2
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.6 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Guard House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.7: METAL WORKS
E.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets 3 l.m. Only…….……...………………………
installation quantity as indicated on approved shop drawings. ……………………………………. ID
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
D.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
750 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Guard House Only…….……...………………………
1 set
……………………………………. ID
E.9.2 Guard Building
E.9.2.1 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-GH, complete with Cabinet, bus bars, circuit breakers,
cable glands, power cables and all related accessories and fittings, all as specified, shown on 1 LS Only…….……...………………………
drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches, socket
outlets, power outlets, disconnecting switches,emergency lighting with autononomy 3
1 LS
hrs,boxes wires, cover plates, chassis, with all needed accessories and fittings, all as Only…….……...………………………
specified, and to the satisfaction of the engineer. ……………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Guard House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire detectors,
boxes, fire cables and wires, cover plates, chassis, with all needed accessories and fittings, 1 LS Only…….……...………………………
all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Guard House (ID)
Only
IRAQI DINAR

5/5
Bill E – Water Treatment Plant
Staff House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Staff House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume
according to the excavation limits indicated on Contract Drawings and as
directed & approved by the Engineer. Wherever excavation limits are not 200 m3
indicated on Contract Drawings, the limits shall be 50cm away of blinding Only…….……...………………………
edges. ……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
170 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
285 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
135 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
100 m3
accordance with the drawings. ……………………………………. ID
E.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence of 530 m3 Only…….……...………………………
the Engineer and according to his approval. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane,
thermal isolator and concrete screed quantity as indicated on the drawings and 795 m2 Only…….……...………………………
as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Staff House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
a. TYPE WD1 (210x100)
This item shall be measured per unit of Wood door installed in situ in
40 Unit
accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
b. TYPE D4 (210x100)
This item shall be measured per unit of Wood door installed in situ in
5 Unit
accordance with the drawings, as indicated in the doors schedule, as directed Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
c. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in accordance
10 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
g. TYPE W7 120x70cm
This item shall be measured per unit of windows including rolling shutter
10 Unit
installed in situ in accordance with the drawings, as indicated in the windows Only…….……...………………………
schedule, as directed and approved by the Engineer. ……………………………………. ID
h. TYPE W8 200x130cm
This item shall be measured per unit of windows installed in situ in accordance
20 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
r. TYPE D1 210x80cm
This item shall be measured per unit of windows installed in situ in accordance
10 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Staff House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
s. TYPE D2 210x90cm
This item shall be measured per unit of windows installed in situ in accordance
5 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
1,530 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
a. COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 735 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with the Only…….……...………………………
650 l.m.
drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
1,530 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
1,050 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer.
795 m2
……………………………………. ID
Sub-Total E.6 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Staff House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.7: METAL WORKS
E.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets 20 l.m. Only…….……...………………………
installation quantity as indicated on approved shop drawings. ……………………………………. ID
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder
installed as indicated on drawings and as directed and approved by the 20 l.m. Only…….……...………………………
Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and testeD.
Staff House Only…….……...………………………
5 set
……………………………………. ID
E.9.2 Staff House
E.9.2.1 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board PP-SH, complete with Cabinet, bus bars, circuit breakers,
cable glands, power cables and all related accessories and fittings, all as specified, shown 5 LS Only…….……...………………………
on drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures, switches, socket
outlets, power outlets,disconnecting switches,emergency lighting with autononomy 3 hrs, 1 LS Only…….……...………………………
boxes wires, cover plates, chassis, with all needed accessories and fittings, all as ……………………………………. ID
specified, and to the satisfaction of the engineer.

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Staff House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...………………………
fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...………………………
and fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Staff House (ID)
Only
IRAQI DINAR

5/5
Bill E – Water Treatment Plant
Office House
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Office House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.1: EARTHWORK
E.1.2 UNCLASSIFIED EXCAVATION
This item shall be measured in cubic meter and shall be the net volume according
to the excavation limits indicated on Contract Drawings and as directed &
approved by the Engineer. Wherever excavation limits are not indicated on 100 m3
Contract Drawings, the limits shall be 50cm away of blinding edges. Only…….……...………………………
……………………………………. ID
Sub-Total E.1 (ID)
E.2: CONCRETE & MASONRY
E.2.1 REINFORCED CONCRETE CLASS A
This item shall be measured in cubic meter and shall be the net volume in
accordance with the drawings.
a. For Foundation Works Only…….……...………………………
11 m3
……………………………………. ID
b. For Slabs and Beams Only…….……...………………………
61 m3
……………………………………. ID
c. For Walls and Columns Only…….……...………………………
78 m3
……………………………………. ID
E.2.2 BLINDING CONCRETE
This item shall be measured in cubic meter and shall be the net volume in Only…….……...………………………
20 m3
accordance with the drawings. ……………………………………. ID
E.2.3 HOLLOW CONCRETE BLOCKS
This item shall be measured in cubic meter and shall be the net area in
accordance with the drawings or as executed in situ, measured in the presence of 90 m3 Only…….……...………………………
the Engineer and according to his approval. ……………………………………. ID
Sub-Total E.2 (ID)
E.3: WATERPROOFING
E.3.5 WATERPROOFING WITH THERMAL ISOLATORS
This item shall be measured in square meter of waterproofing membrane, thermal
isolator and concrete screed quantity as indicated on the drawings and as directed 210 m2 Only…….……...………………………
and approved by the Engineer. ……………………………………. ID
Sub-Total E.3 (ID)

1/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Office House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.4: DOORS AND WINDOWS
E.4.1 STEEL & WOOD DOORS & STEEL PROTECTION
E.4.1.1 WOOD DOORS
This item shall be measured in square meter of wood doors as indicated on the
drawings and as directed and approved by the Engineer.
a. TYPE WD3 (210x100)
This item shall be measured per unit of Wood door installed in situ in accordance
11 Unit
with the drawings, as indicated in the doors schedule, as directed and approved Only…….……...………………………
by the Engineer. ……………………………………. ID
E.4.2 ALUMINUM DOORS AND WINDOWS
c. TYPE W3 80x40cm
This item shall be measured per unit of windows installed in situ in accordance
4 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
g. TYPE W7 120x65cm
This item shall be measured per unit of windows including rolling shutter
8 Unit
installed in situ in accordance with the drawings, as indicated in the windows Only…….……...………………………
schedule, as directed and approved by the Engineer. ……………………………………. ID
h. TYPE W8 200x130cm
This item shall be measured per unit of windows installed in situ in accordance
5 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
t. TYPE D3 280x260cm
This item shall be measured per unit of windows installed in situ in accordance
1 Unit
with the drawings, as indicated in the windows schedule, as directed and Only…….……...………………………
approved by the Engineer. ……………………………………. ID
Sub-Total E.4 (ID)

2/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Office House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.5: FINISHES
E.5.1 CEMENT PLASTER WORK
This item shall be measured in square meter and shall be the net area in Only…….……...………………………
775 m2
accordance with the drawings, as directed and approved by the Engineer ……………………………………. ID
E.5.2 FLOOR TILES
a. COLORED CERAMIC TILES
This item shall be measured in square meter and shall be the net area in 210 m2 Only…….……...………………………
accordance with the drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.4 SKIRTING
This item shall be measured per linear meter and shall be in accordance with the Only…….……...………………………
125 l.m.
drawings, as directed and approved by the Engineer. ……………………………………. ID
E.5.5 WALL PAINT
a. WASHABLE EMULSION PAINT OR ENAMEL PAINT
This item shall be measured in square meter and shall be the actual surface area
775 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
c. COARSE SCRATCHED PAINT
This item shall be measured in square meter and shall be the actual surface area
250 m2 Only…….……...………………………
without including opening surfaces in accordance with the drawings, as directed
and approved by the Engineer. ……………………………………. ID
E.5.6 RED CLAY ROOFING TILES
This item shall be measured in square meters of red clay roof tiles quantity as Only…….……...………………………
18 m2
indicated on the drawings, as directed and approved by the Engineer. ……………………………………. ID
Sub-Total E.5 (ID)
E.6: EXTERNAL WORKS
E.6.2 COLORED CEMENT TILES 40x40x4cm THICK
This item shall be measured in square meter of colored cement tiles net area in
accordance with the drawings, as directed and approved by the Engineer. 190 m2 Only…….……...………………………
……………………………………. ID
Sub-Total E.6 (ID)

3/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Office House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
E.7: METAL WORKS
E.7.1 KITCHEN CABINETS
This item shall be measured in linear meter of floor and wall kitchen cabinets Only…….……...………………………
4 l.m.
installation quantity as indicated on approved shop drawings. ……………………………………. ID
E.7.2 STAINLESS STEEL CAT LADDER
This item shall be measured per linear meter of stainless steel cat ladder installed
as indicated on drawings and as directed and approved by the Engineer. 4 l.m. Only…….……...………………………
……………………………………. ID
E.7.3 STEEL WORKS
This item shall be measured in kilogram of steel works installed as indicated on Only…….……...………………………
750 kg
drawings and as requested by the Engineer. ……………………………………. ID
Sub-Total E.7 (ID)
E.9: ELECTROMECHANICAL WORKS
E.9.1 GENERAL
E.9.1.1 MECHANICAL INSTALLATION FOR BUILDINGS
This item shall be paid as lump sum for mechanical installation for building
completed and tested.
Office House Only…….……...………………………
1 set
……………………………………. ID
E.9.2 Office House
E.9.2.1 Electrical Works
Electrical installation, complete including but not limited to the following:
- Secondary distribution board DB-TP-OH, complete with Cabinet, bus bars, circuit
breakers, cable glands, power cables and all related accessories and fittings, all as 1 LS Only…….……...………………………
specified, shown on drawings and to the satisfaction of the engineer. ……………………………………. ID
- Lighting and power installation, complete including, lighting fixtures 2x40W, switches,
socket outlets, power outlets,disconnecting switches,emergency lighting with autononomy 1 LS Only…….……...………………………
3 hrs, boxes wires, cover plates, chassis, with all needed accessories and fittings, all as ……………………………………. ID

4/5
Ministry of Municipality and Tourism General Directorate of Water Sewerage Dohuk Water Directorate Mangesh, Batofa and Zawita Water Supply ProjectBill Of QuantitiesPart II: Bills

Bill E - Water Treatment Plant


Bill E - Office House
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
- Telephone and Data installation, complete including, telephone outlets, Data outlets,
boxes, UPS, cables and wires, cover plates, chassis, with all needed accessories and 1 LS Only…….……...………………………
fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
- Fire Alarm installation, complete including, manual call station, fire alarms, fire
detectors, boxes, fire cables and wires, cover plates, chassis, with all needed accessories 1 LS Only…….……...………………………
and fittings, all as specified, and to the satisfaction of the engineer. ……………………………………. ID
Sub-Total E.9 (ID)
Total Bill E - Office House (ID)
Only
IRAQI DINAR

5/5
Bill E – Water Treatment Plant
Summary Bill E - Water Treatment Plant
Munistry of Municipalities and TourismGeneral Directorate of Water and Sewerage Mangesh, Batofa and Zawita Water Supply Project
Dohuk Water Directorate Summary Bill

Bill Of Quantities: Mangesh, Batofa and Zawita Water Supply Project


Summary Bill E - Water Treatment Plant

Description Amount (ID)

Bill E - Siteworks
Bill E - Low Lift Pumpimg Station
Bill E - Flow Meter
Bill E - Cascade Aerator
Bill E - Flash Mixer
Bill E - Clarifloculator
Bill E - Gravity Filter
Bill E - High Lift Pumping Station
Bill E - Post & Pre Chlorination Rooms
Bill E - Chemicals Room
Bill E - Blowers Room
Bill E - Clear Water Tank
Bill E - Generator & Transformer Room
Bill E - Laboratory
Bill E - Central Control Room
Bill E - Store & Workshop
Bill E - Guard House
Bill E - Staff House
Bill E - Office House

Total Carried to General Summary

1/1
Bill F – Dayworks
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water Sewerage Bill Of Quantities
Dohuk Water Directorate Part II: Bills

Bill F -DAYWORKS

ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
F.1 LABOUR
This item shall be measured by working day
F.1.1 Skilled craftsmen Only…….……...………………………
360 day
……………………………………. ID
F.1.2 Skilled electrical and mechanical engineering craftsmen Only…….……...………………………
200 day
……………………………………. ID
F.1.3 Skilled archaeologist Only…….……...………………………
120 day
……………………………………. ID
F.1.4 Semi skilled craftsmen Only…….……...………………………
600 day
……………………………………. ID
F.1.5 Labourers Only…….……...………………………
1000 day
……………………………………. ID
F.1.6 Bar benders Only…….……...………………………
120 day
……………………………………. ID
F.1.7 Concreters Only…….……...………………………
120 day
……………………………………. ID
F.1.8 Carpenters Only…….……...………………………
120 day
……………………………………. ID
F.1.9 Masons Only…….……...………………………
120 day
……………………………………. ID
F.1.10 Transport drivers Only…….……...………………………
120 day
……………………………………. ID
F.1.11 Fitter/mechanics Only…….……...………………………
120 day
……………………………………. ID
F.1.12 Gangers (in charge of labourers) Only…….……...………………………
120 day
……………………………………. ID
F.1.13 Formen Only…….……...………………………
120 day
……………………………………. ID
F.1.14 Watchmen Only…….……...………………………
120 day
……………………………………. ID
F.1.15 Welders Only…….……...………………………
120 day
……………………………………. ID

1/4
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water Sewerage Bill Of Quantities
Dohuk Water Directorate Part II: Bills

Bill F -DAYWORKS

ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
F.1.16 Plant operators Only…….……...………………………
120 day
……………………………………. ID
F.1.17 Drivers (heavy equipment, such as dozers,graders) Only…….……...………………………
120 day
……………………………………. ID
F.2 EQUIPMENT
This item shall be measured by working day
F.2.1 Compressor (working pressure 7Kg/cm.sq.) Only…….……...………………………
80 day
……………………………………. ID
F.2.2 Compressor (working pressure 3.5Kg/cm.sq.) Only…….……...………………………
100 day
……………………………………. ID
F.2.3 Tilting drum concrete mixer up to 200 litres wet capacity Only…….……...………………………
80 day
……………………………………. ID
F.2.4 Lorry mounted concrete pump (including boom, piping and pipe cleaning Only…….……...………………………
60 day
equipment) up to 50 m3/hr capacity ……………………………………. ID
F.2.5 Concrete vibrator poker
F.2.5.1 Petrol driven Only…….……...………………………
60 day
……………………………………. ID
F.2.5.2 Diesel driven Only…….……...………………………
60 day
……………………………………. ID
F.2.5.3 Electric driven Only…….……...………………………
60 day
……………………………………. ID
F.2.6 Mobile rubber tyred full circle slew crane, including all crane equipment
F.2.6.1 Up to 50 tonne capacity Only…….……...………………………
20 day
……………………………………. ID
F.2.6.2 Up to 25 tonne capacity Only…….……...………………………
80 day
……………………………………. ID
F.2.7 Dumper trucks
F.2.7.1 Up to 1000 Kg Only…….……...………………………
120 day
……………………………………. ID

2/4
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water Sewerage Bill Of Quantities
Dohuk Water Directorate Part II: Bills

Bill F -DAYWORKS

ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
F.2.8 Asphalt/coated macadam spreader
F.2.8.1 Up to 56 kw Only…….……...………………………
20 day
……………………………………. ID
F.2.8.2 Asphalt cutter Only…….……...………………………
60 day
……………………………………. ID
F.2.9 Trucks
F.2.9.1 Ordinary up to 16.0 tons Only…….……...………………………
20 day
……………………………………. ID
F.2.9.2 Ordinary up to 8 tons Only…….……...………………………
40 day
……………………………………. ID
F.2.10 Roller
F.2.10.1 Steel 3-wheeled up to 10.5 tonnes Only…….……...………………………
20 day
……………………………………. ID
F.2.10.2 Rubber tyred up to 1.0 tonne/wheel Only…….……...………………………
20 day
……………………………………. ID
F.2.10.3 Rubber tyred up to 3.0 tonnes/wheel Only…….……...………………………
20 day
……………………………………. ID
F.2.11 Tractors (Crawler) with bull or angle dozer, maker's rated flywheel
F.2.11.1 Up to 100.0 kw Only…….……...………………………
80 day
……………………………………. ID
F.2.12 Motor grader, variable blade/flywheel
F.2.12.1 Up to 110 kw Only…….……...………………………
20 day
……………………………………. ID
F.2.13 Dozers
F.2.13.1 Dozer D8 Only…….……...………………………
12 day
……………………………………. ID
F.2.13.2 Dozer D9 Only…….……...………………………
12 day
……………………………………. ID
F.2.14 Mobile water tank
F.2.14.1 Up to 4450 litres Only…….……...………………………
100 day
……………………………………. ID

3/4
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water Sewerage Bill Of Quantities
Dohuk Water Directorate Part II: Bills

Bill F -DAYWORKS

ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE UNIT RATE IN LETTERS AMOUNT
No. IN FIGURES ID ID
ID
F.2.15 Excavators
F.2.15.1 Excavator (max. power 38 hp; max. digging depth 3.5 m) Only…….……...………………………
100 day
……………………………………. ID
F.2.16 Wheel loader
F.2.16.1 Wheel loader (max. power 90 hp; toothless shovel) Only…….……...………………………
100 day
……………………………………. ID
F.2.17 Backhoe loader
F.2.17.1 Backhoe loader (max. power 90 hp; toothless bucket) Only…….……...………………………
100 day
……………………………………. ID
F.2.18 Skid steer loader
F.2.18.1 Skid steer loader (similar to Bobcat), max. power 70 hp Only…….……...………………………
100 day
……………………………………. ID
Total Bill F - Dayworkws (ID)
Only
IRAQI DINAR

4/4
Collection Sheet
Ministry of Municipality and Tourism Mangesh, Batofa and Zawita Water Supply Project
General Directorate of Water Sewerage Bill Of Quantities
Dohuk Water Directorate Part II: Bills

COLLECTION SHEET

SECTION AMOUNT IN FIGURES AMOUNT IN LETTERS


ID ID
Only…….……...……………………………………..………………….
TOTAL BILL A
.…...…………………….…………………………. ID
Only…….……...……………………………………..………………….
TOTAL BILL B
.…...…………………….…………………………. ID
Only…….……...……………………………………..………………….
TOTAL BILL C
.…...…………………….…………………………. ID
Only…….……...……………………………………..………………….
TOTAL BILL D
.…...…………………….…………………………. ID
Only…….……...……………………………………..………………….
TOTAL BILL E
.…...…………………….…………………………. ID
Only…….……...……………………………………..………………….
TOTAL BILL F
.…...…………………….…………………………. ID
Only…….……...……………………………………..………………….
TOTAL
.…...…………………….…………………………. ID

Only
IRAQI DINAR