You are on page 1of 2

Sl.

No

Approvals/Clearances/consents
Required

1
2

Incorporation of Company
Registration/IEM/Industrial
license

Consent for
Establishment (CFE)from
UPPCB
(NOC and consent under Water

and Air Pollution Control Acts)


Approval of construction
activity
and building plan/ Factory
License.

Sanction of Power

Use and storage of


explosive substances/
Solvent storage license
Ground water approval

8
9

Fire Department NOC.

Environmental
Clearance

10

Registration under States Sales


Tax Act, and Central and State
Excise Act

11

Weights and Measures

12

NOC for storage of


Diesel
Electrical Safety, under
Indian Electricity Rules
1956
Consent from Pollution
Control Board
Clearance from Fire
Department

13
.
14
15

Department to be
Approached and
Consulted
Registrar of Companies
DIC for SSI/SIA for large
and medium industries

State Pollution
Control Board

Municipal and local


authorities/Gram
Panchayat
Chief Inspector of
Factories
Pollution Control
Board
State Electricity
Board
Chief Controller of
Explosives
The State Ground
Water Authority
(SGWA)
U.P Fire services
Screening/Scoping
EIA Study (by
Accredited
consultant)
Public consultation
EIA update
Appraisal
SEIAA Environmental
Clearance
Other activities
i. Sales Tax
Department
ii. Central and State
Excise Depts.

Time Required
1 month
1 month
1 month*

1 month*

2 months *

3 months*
2 months*

2 months*
60 days
30 days
45 days
15days
60days
45 days
60 days

2 months**

Inspector of
Weights and
Measures
District Magistrate

1 month**

Director, Electrical
Safety

1 month**

SPCB

1 month**

CFO

Total Time required for clearances


(before commencing Construction)
* Pre construction Simultaneous process

11
month
s

1 month*

1 yr 1 month
** Post

Approvals/Clearances Required

Department to be Approached and Consulted

Incorporation of Company

Registrar of Companies

Registration/IEM/Industrial
license

DIC for SSI/SIA for large and medium


industries

Allotment of land

State DI/SIDC/Infrastructure Corporation


/SSIDC

Permission for land use


a. State DI
(in case industry is located
outside an industrial area)

b. Dept. of Town and Country


Planning
Local authority/Distt. Collector

NOC and consent under Water


and Air Pollution Control Acts

Approval of construction activity


and building plan

State Pollution Control Board

a. Town and country planning


b. Municipal and local authorities
c. Chief Inspector of Factories
d. Pollution Control Board
Electricity Board

Sanction of Power

State Electricity Board

Use and storage of explosives

Chief Controller of Explosives

Use and storage of explosives

Chief Controller of Explosives

Boiler Inspection Certificate

Chief Inspector of Boilers