You are on page 1of 19

Increment Plan

Incr.
1
2

Start
13.6.2006
25.7.2006

Days
42
42

End
24.7.2006
4.9.2006

Size
19
0

Status

Release Date

Template note: Increment plan is intended to collect individual sprints into larger releases. In smaller projects, this is not ne

Sprint Plan
Sprint
1
2
3
4
5
6

Start
6/13/2006
6/27/2006
7/11/2006
7/25/2006
8/8/2006
8/22/2006

Days
14
14
14
14
14
14

End
6/26/2006
7/10/2006
7/24/2006
8/7/2006
8/21/2006
9/4/2006

Unallocated stories

Size
8
3
8
0
0
0

-5

Status
Release Date
Planned
Planned
Planned
Planned
Planned
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned

Goal

er releases. In smaller projects, this is not needed.

Goal
Planning
Specification and prototype development
Specification and prototype development
Specification and prototype development
Specification and prototype development, documentation
Usability test, documentation, prototype corrections

Increment
1
1
1
2
2
2

Product Backlog
Story ID Story name
1
This is a sample story
2
This is another sample story

3
4
5
6

This is a third sample story


This is a fourth sample story
This is an unallocated sample story
This is a removed story

Status
Done
Ongoing

Size
3
5

Sprint
1
1

Planned
Planned
Planned
Removed

3
8
13
5

2
3

Priority Comments
You can add comments here to add key detail or
explanation to the story. For larger definitions,
use external tools and materials.

Product Backlog Burndown Chart


Original planned size
Count trend from last

137
3 sprints

Velocity (points per sprint)


Original estimate
Last 3 sprints
Realized total average
Average last 8
Avg. worst 3 in last 8
Trend

30
25.0
25.0
25.0
25.0
25.0

12

Velocity and Remaini

10

Predictions - Completion at the end of sprint


Original estimate - Min
3
Original estimate - Avg
5
Original estimate - Max
8
Last 3 sprints
6
Realized average
6
Average last 8
6
Avg. worst 3 in last 8
6
Trend
6
Realized + St. Dev
6
Realized - St. Dev
6

Development Ve
12

10

Sprint
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Remain.
Work
137
114
87
56
28

Planned
Work
23
29
31
28
28

Realized
Work
23
27

Current Total
Size
137
137
137
137
137

Planned Speed
Average Realized

Velocity and Remaining Work

Note:
In this chart, the tops of the bars show the amount of actual
(or planned) implemented functionality at the beginning of each sp
The bottoms of the bars show the changes in project scope
(i.e. if the amount of story points
in the project increases, the bottoms move lower). The length
of the bars indicate the estimated size of the project at the
beginning of each sprint.
The red line indicates the current planned scope.

Development Velocity

Planned Speed

Realized Speed

Average Realized

Avg. Last 8

show the amount of actual


onality at the beginning of each sprint.
e changes in project scope

oms move lower). The length


d size of the project at the

t planned scope.

Daily Progress
Ideal Progress
Current Trend

35

Work Remaining (h)

Sprint 1 Backlog

30
25
20
15
10
5
0

Sprint implementation days


Trend calculated based on last
Task name
Example task
Example task 2
Example task 3
<Delete these example lines>

5
5
Story ID
1
1
2
2

Days
Responsible
Danny Dev
Tina Tester
Danny Dev

Totals
Status
Done
Ongoing
Ongoing
Planned

Effort Remaining on im
33
33
Est.
1
5
5
7
7
12
12
9
9

Work Remaining (h)

35
30
25
20
15
10
5
0

Remaining on implementation day


30 23 21
2
3
4
5
2
0
7
2
2
12 12 10
9
9
9

Sprint 1 Backlog
Ideal Progress
Current Trend

Work Remaining (h)

Daily Progress

0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0

Sprint implementation days


Trend calculated based on last
Task name

5
5
Days
Story ID Responsible

Totals
Status

Effort Remaining on impleme


0
0
Est.
1
2

.9

.8

.7

.6

.5

.4

.3

.2

.1
0

Remaining on implementation day


3

Story ID:
Task:

1
Story:
Example task

This is a sample story

Responsible Person: Danny Dev


Initial
Work
5
Estimate
Done

Story ID:
Task:

1
Story:
Example task 2

Work
Left

This is a sample story

Responsible Person: Tina Tester


Initial
Work
7
Estimate
Done

Story ID:
Task:

2
Story:
Example task 3

Work
Left

This is another sample story

Responsible Person: Danny Dev


Initial
12 Work
Estimate
Done

Story ID:
Task:

Work
Left

2
Story:
This is another sample story
<Delete these example lines>

Responsible Person:
Initial
Work
9
Estimate
Done

Work
Left

You might also like