Scrum is an agile way to manage a project, usually software development.

Agile software
development with Scrum is often perceived as a methodology; but rather than viewing Scrum as
methodology, think of it as a framework for managing a process.
In the agile Scrum world, instead of providing complete, detailed descriptions of how everything
is to be done on a project, much of it is left up to the Scrum software development team. This is
because the team will know best how to solve the problem they are presented.
This is why in Scrum development, for example, a sprint planning meeting is described in terms
of the desired outcome (a commitment to a set of features to be developed in the next sprint)
instead of a set of Entry criteria, Task definitions, Validation criteria, Exit criteria (ETVX) and so
on, as would be provided in most methodologies.
Scrum relies on a self-organizing, cross-functional team. The scrum team is self-organizing in
that there is no overall team leader who decides which person will do which task or how a
problem will be solved. Those are issues that are decided by the team as a whole.
And in Scrum, a team is cross functional, meaning everyone is needed to take a feature from idea
to implementation.
Within agile development, Scrum teams are supported by two specific roles. The first is a Scrum
Master, who can be thought of as a coach for the team, helping team members use the Scrum
process to perform at the highest level.
The product owner (PO) is the other role, and in Scrum software development, represents the
business, customers or users, and guides the team toward building the right product.
Scrum Life Cycle:
The sprint cycle is an iterative cycle of about 3-4 weeks, in which the actual development of the
product is done. It starts out with a Sprint Planning Meeting to decide what will be done in the
current sprint. Then the development is done. A sprint is closed with a Sprint Review Meeting

where the progress made in the last sprint is demonstrated, the sprint is reviewed, and
adjustments are made to the project as necessary.

Stakeholders come up with a list of requirements


This list of requirements (called the product backlog) is prioritised
A cross functional team is established to work together on the backlog
A product owner is introduced to ensure the prioritisation of the backlog and is

responsible for the return on investment


A scrum master is introduced to facilitate this entire process and ensure the team is
delivering value
The team, product owner and scrum master are referred to as thecommitted team while
the stake holders are referred to as the involvedteam
The scrum team works in fixed time boxes known as sprints
Each sprint is the same length and is made up of as many backlog requirements which
can be completed in the given sprint time frame
The team has a daily scrum meeting which is 15 minutes long where they ask themselves

3 questions:
What did I complete yesterday?
What am I working on today?
What is slowing me down?
11. A sprint review is carried out at the end of each sprint. Here members show what they

have completed
12. After the sprint review is the sprint retrospective where the team discusses what went
well and what needs to improve

Conclusion:
Scrum is one of the most popular agile frame works, helping teams deliver software in small
iterations (known as sprints) which last 1-4 weeks. As it is a frame work rather than a
methodology it must be tailored to suit the needs of the individual. The simplest definition of
scrum which I have been able to find is reflected in the sport from which it got its name. Within
a rugby scrum there is a team working together as one unit and aggressively trying to advance

the ball. This approach is demonstrated in Scrum where we have a cross functional team which is
focused on advancing the common goal. The team approach carried out in Scrum can be
compared and contrasted with the more sequential approach seen in more traditional methods of
software development e.g Waterfall.