Professional Documents
Culture Documents
1
References
Abdinnour-Helm, S., Lengnick-Hall, M. L., & Lengnick-Hall, C. A. (2003). Preimplementation attitudes and organizational readiness for implementing an enterprise
resource planning system. European journal of operational research, 146(2), 258-273.
Adner, R., & Kapoor, R. (2010). Value creation in innovation ecosystems: How the structure
of technological interdependence affects firm performance in new technology
generations. Strategic management journal, 31(3), 306-333.
Cankurtaran, P., Langerak, F., & Griffin, A. (2013). Consequences of New Product
Development Speed: A MetaAnalysis. Journal of Product Innovation
Management, 30(3), 465-486.
Cole, R. E. (2011, June 22). What Really Happened to Toyota? MITSloan Management
Review. Retrieved from: http://sloanreview.mit.edu/article/what-really-happened-totoyota/
Cooper, R. G. (2008). Perspective: The StageGate IdeatoLaunch ProcessUpdate,
What's New, and NexGen Systems*. Journal of Product Innovation
Management, 25(3), 213-232.
Courtney, H., Kirkland, J., & Viguerie, P. (1997). Strategy under uncertainty. Harvard
business review, 75(6), 67-79.
Crown, J. , & Matlack, C. (2008, April 9). Boeing delays Dreamlineragain. Business Week.
Retrieved from: http://www.businessweek.com/stories/2008-04-09/boeing-delaysdreamliner-againbusinessweek-business-news-stock-market-and-financial-advice
DuBrin, A. (2011). Essentials of management (9th ed.). Mason: Cengage Learning.
Dunlop, M. (2007, May 22). 787 line up and running. The Herald. Retrieved from:
http://search.proquest.com/docview/334332742?accountid=6143
Federal Aviation Administration (2013, January 11). Press Release FAA Will Review Boeing
787 Design and Production. Retrieved from: http://www.faa.gov/news/
press_releases/news_story.cfm?newsId=14213
Ford, D. N., & Sterman, J. D. (2003). The Liar's Club: concealing rework in concurrent
development. Concurrent Engineering, 11(3), 211-219.
Frost, L. (2006, Jul 17). Boeing: Problems with 787 won't rattle
schedule. Columbian. Retrieved from: http://search.proquest.com/docview/
253328422?accountid=6143
Gates, D. (2008, November 1). Boeing strike ends; Machinists back on the job Sunday. The
Seattle Times. Retrieved from: http://seattletimes.com/html/localnews/2008340022
_webmachinists02m.html
Gates, D. (2008, November 20). Boeing 787 fastener problems caused by Boeing engineers.
The Seattle Times. Retrieved from: http://seattletimes.com/html/businesstechnology/
2008413389_dreamliner20.html
Gates, D. (2012, February 5). Boeing finds another 787 manufacturing problem. The Seattle
Times. Retrieved from: http://seattletimes.com/html/businesstechnology/2017434319
_boeing06.html
Gates, D. (2014, June 23). 787 still having problems with unfinished work from S.C. The
Seattle Times. Retrieved from: http://seattletimes.com/html/businesstechnology/
2023913654_boeing 787productionxml.html
Gertler, J. (2014). F-35 Joint Strike Fighter (JSF) Program. Congressional Research Service.
Retrieved from: http://fas.org/sgp/crs/weapons/RL30563.pdf
Gevers, J. M., & Demerouti, E. (2013). How supervisors' reminders relate to subordinates'
absorption and creativity. Journal of Managerial Psychology, 28(6), 677-698.
Mueni, C. (2010). Case Study: Boeing Supply Chain Challenges during the Manufacture of
Boeing 787 Aircraft. Retrieved from: http://www.grin.com/en/e-book/265533/casestudy-boeing-supply-chain-challenges-during-the-manufacture-of-boeing
Pappalardo, J. (2007, July). Alenias Gamble. AIR & SPACE MAGAZINE. Retrieved from:
http://www.airspacemag.com/flight-today/alenias-gamble-18611587/?all&no-ist
Pich, M. T., Loch, C. H., & Meyer, A. D. (2002). On uncertainty, ambiguity, and complexity
in project management. Management science, 48(8), 1008-1023.
Piercy, N. F. (2009). Strategic relationships between boundary-spanning functions: Aligning
customer relationship management with supplier relationship management. Industrial
Marketing Management, 38(8), 857-864.
Pritchard, D., & MacPherson, A. (2004). Outsourcing US commercial aircraft technology and
innovation: implications for the industrys long term design and build
capability. United States Trade Center, Department of Geography, Buffalo, NY.
Saunders, A. G. (1994). Supplier audits as part of a supplier partnership. The TQM
Magazine, 6(2), 41-42.
Sethi, R., & Iqbal, Z. (2008). Stage-gate controls, learning failure, and adverse effect on
novel new products. Journal of Marketing, 72(1), 118-134.
Shore, B. (2008). Systematic biases and culture in project failures. Project Management
Journal, 39(4), 5-16.
Smock, D. (2009, Augustus 24). What's Causing Huge Delays for the Boeing 787
Dreamliner? Retrieved from: http://www.designnews.com/document.asp?doc_id=
228554&dfpPParams=ind_183,aid_228554&dfpLayout=article
Sosa, M. E., Eppinger, S. D., Pich, M., McKendrick, D. G., & Stout, S. K. (2002). Factors
that influence technical communication in distributed product development: an