1.
2.
3.
Values
Enter value in Work
center hierarchy.
Enter value in Start.
Enter value in End.
4.
5.
.
.
7.
Note: The top part of the table shows the work centers.
The bottom part of the screen shows the products that can be
manufactured at the work centers and the present production
schedule.
8.
Press in the required row and column where you want to create
your planned order, for example, row PE-1 RX-1 and column 05.11.02
9.
10. Press
16. The message bar displays Changes were made to the master
plan