A work center is a place where work activities are performed, and can include people, machines, or equipment. Work centers contain information used to determine available capacity and scheduling and costing. This document explains how to change details in a work center using transaction code CR02. The steps are to access the change work center screen, enter the plant and work center, copy the existing data, make changes on any tab, and save the changes.
A work center is a place where work activities are performed, and can include people, machines, or equipment. Work centers contain information used to determine available capacity and scheduling and costing. This document explains how to change details in a work center using transaction code CR02. The steps are to access the change work center screen, enter the plant and work center, copy the existing data, make changes on any tab, and save the changes.
A work center is a place where work activities are performed, and can include people, machines, or equipment. Work centers contain information used to determine available capacity and scheduling and costing. This document explains how to change details in a work center using transaction code CR02. The steps are to access the change work center screen, enter the plant and work center, copy the existing data, make changes on any tab, and save the changes.
A work center is a place where conversion of activity takes place.
An individual person, a group of people (craft), or other resources such as machines, and equipment can be treated as work center.
Work centers may be grouped into a work center hierarchy; every
work center in the hierarchy subordinate to another work center.
Work center contains information used to determine the available
capacity is entered. The available capacity for a work center is calculated using the number of working hours available to each work center. Work center contains Scheduling and costing information also.
Objective of this Document
This document explains how to change details in the work center.
List of prerequisites:-
Work center
What is the Menu path to log on to this Transaction code:-
Production Master Data Work Centers Work Center CR02 -
Change 1. Press Twice CR02 – Change.
Change Work Center: Initial Screen
2. Maintain the following data:
Field Name Values
Plant Enter value in Plant. Work center Enter value in Work center. 3. Press Copy Enter Button . 4. Change the required data in the work center in any tab screen.
5. Press Save .
6. The message bar displays “Work center xxxx in plant xxxx was changed”