Y2 – CR02_Change Work Center
Link 1
Link 2
Link 3
Link 4
Job Role
Change History
Update the following table as necessary when this document is changed.
Date Name Change Description
Trigger: Change of work center is used if you wish to change any information in the work center
in the system.
Business Process Overview
A work center is an organizational unit that defines where and when an operation should be carried out within
a plant. A work center is unique within a plant. Work centers can be machines, people or production lines.
Operations that need to be executed are defined on a task list and executed at the corresponding user
assigned work center. This transaction enables the user to change and maintain basic data, set defaults,
assignments, capacities and scheduling data pertinent to a work center. Work centers contain default values
that are copied or referenced in operations at the time of task list creation. They also contain costing,
scheduling and capacity data required for leadtime scheduling and capacity planning.
Input - Required Fields Field Value / Comments
Plant 8110
Work Center Category Z001 : Machine
Z002 : Labor
Capacity Category 001, 002
Output - Results Comments
Change / update the basic data, set defaults,
set assignments, develop capacities and
scheduling data.
Tips and Tricks
You may rename a work center ID using menu “Work center > Rename”. Change in work center
ID will apply to all routings and production orders operations using the work center.
Access Transaction:
Via Menu Path Logistics Production Master Data Create Work Center
Via Transaction Code CR02
Procedure:
Error: Reference Identifies types of task lists R Enter value in Work center.
source not foundUsag with the work center that may
e be associated with. Example: 009
Standard Value Key Key defining and giving a R Enter standard value key.
dimension (for example, time
or area) to up to six standard Example:
values. For Machine : ZMAC
For Labour Only : ZLAB
Length of Breaks Total break time per shift / R Enter break time.
availability time period.
Capacity utilization Actual capacity vs. theoretical R Enter value in Capacity utilization.
capacity expressed as a %.
No. of indiv. cap. Number of machines or R Enter value in No. of indiv. cap..
people making up work center
capacity.
Relevant to finite Identifies Work Center R Tick this indicator.
scheduling capacities to be used in
calculating available capacity
during finite scheduling.
Can be used by Allows multiple operations to R Tick this indicator.
several Operations use this capacity. If not set,
only 1 operation will access
this capacity, even if partially
consumed.
Long Term Planning Allows this work center to be R Tick this indicator.
used for capacity during long
term planning
Validity End date Identifies the end of the a R Enter the value in End date.
validity period
Cost Center Key that identifies the cost R Enter cost center where costs of
center this work center are supposed to
be charged to.
Activity Type Activity types describe the R Enter Activity Type for Setup.
activity produced by a cost
center and are measured in
units of time or quantity.
Formula Key Calculation of costs of a work R Enter Formula Key for Setup.
center's activity type
Formula Key Calculation of costs of a work R Enter Formula Key for Machine.
center's activity type
Activity Type Activity types describe the R Enter Activity Type for Labor.
activity produced by a cost
center and are measured in
units of time or quantity.
Formula Key Calculation of costs of a work R Enter Formula Key for Setup.
center's activity type