You are on page 1of 8

Title: Y2 - MC8D_Create Batch Job for Mass

Processing
Functional Area: Production Planning
Sub Area:

Last Update: 09/06/20

Y2 - MC8D_Create Batch Job for Mass MC8D


Processing

Publisher Information

File Name
Y2 - MC8D_Create Batch Job for Mass Processing
Link 1

Link 2

Link 3

Link 4

Job Role

Insert Job Role rows as necessary.

Transaction User Data Description


MC8D Create Batch Job for Mass Processing
Client Language Doc Type Job Role
EN BPP

File Name: 489762008.doc Page: 1 of 8


Title: Y2 - MC8D_Create Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

Change History
Update the following table as necessary when this document is changed.
 
Date Name Change Description
     

Trigger:
 
 
Business Process Overview
 To create a job to transfer over the forecast version over to demand management.  Each forecast version will
have to have a job created.
 
 
 
 
 
 
 
Input - Required Fields Field Value / Comments
   
   
   
 
 
Output - Results Comments
   
   
   
 
 
Tips and Tricks
 
          NA
 
 

Access Transaction:
 
Via Menu Path Logistics  Planning and MRP Execution  Sale Operation
Planning (SOP)  Transactions  MC8D - Create Batch Job for
Mass Processing
Via Transaction Code MC8D
 

File Name: 489762008.doc Page: 2 of 8


Title: Y2 - MC8D_Create Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

Procedure:

Create Planning Job

1. Update the following required and optional fields:

Field Name Description R/O/C Values


Job number Description of the Job R Enter value in Job number.
number.
Example: ZSOP-8110
Job name Job name for batch job R Enter value in Job name.
processing in background
Example: Mass Transfer Active
SOP to Active D Mgt

2. Click button.

Create Planning Job

3. Update the following required and optional fields:

Field Name Description R/O/C Values


Info structure Description of the Info R Enter value in Info structure.
structure.
Example: S076

File Name: 489762008.doc Page: 3 of 8


Title: Y2 - MC8D_Create Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

Version Three-digit number which R Enter value in Version.


represents the version of the
forecast parameters as Example: A00 for active version
defined in the forecast profile of SOP.

4. Click button.

Planning type (1) 6 Entries Found

5. Double-click on SOPKAPAM in the list box.

ABAP: Variant Directory of Program RMCA0766

1. Click on .

File Name: 489762008.doc Page: 4 of 8


Title: Y2 - MC8D_Create Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

ABAP: Variants

6. Update the following required and optional fields:

Field Name Description R/O/C Values


Create variant Code identifying an alternate R Enter value in Create variant.
view of data in a report
Example: Mtransfer1

7. Click button.

Variants: Change Screen Assignment

8. Tick on the created column.

9. Click button.

File Name: 489762008.doc Page: 5 of 8


Title: Y2 - MC8D_Create Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

Maintain Variant: Report RMCA0766, Variant ZSOP-8110

10. Update the following required and optional fields:

Field Name Description R/O/C Values


Plant Number that uniquely R Enter value in Plant.
identifies the plant
Example: 8110
Control parameters for background planning
Planning activity Description of the Planning R Enter value in Planning activity.
activity.
Example: 20
Aggregation Level
Plant Number that uniquely R Keep as default.
identifies the plant

File Name: 489762008.doc Page: 6 of 8


Title: Y2 - MC8D_Create Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

11. Click button.

Information

12. Click button.

Variant Attributes

13. Update the following required and optional fields:

Field Name Description R/O/C Values


Meaning Description of the Meaning. R Enter value in Meaning.
Example: Transfer SOP to D Mgt

File Name: 489762008.doc Page: 7 of 8


Title: Y2 - MC8D_Create Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

14. Click button.

15. Message will


be displayed at the bottom left of the screen.

16. The Create batch job for mass processing (mass transfer of SOP to demand management) task is
completed.

File Name: 489762008.doc Page: 8 of 8

You might also like