Give a name to
Work Centre
Work Centre
Category, like
Machine or Labour
Etc..
Press Enter
Basic Data Tab:
Parameters UOM
Control Key = PM01Plant Maintenance Internal
Different control keys have different settings which can be seen
from F4
Other fields will depend on your particular situation as needed.
The units of Measurement of Standard Values is in time like Hrs, the parameters
are as selected in Standard Value Key in Basic Data Tab.
Change the unit of times as needed, normally these should be in Hr.
Capacities Tab:
Formula
Under capacities there is option to give capacity for Setup, Machine and Labour
If a particular option is not needed, then it can be removed.
Under Machine Capacity, there are some formulas in Setup and Processing
fields;
Place cursor on the field and click the FORM button below to show the detail of
the formula.
Click on Capacity Header Data to fill up the values as need.
Costing Tab:
Cost Centre
Cost Centre: 4230 (you might have a cost centre given to you from FICO, The
cost centre will be setup by FICO)
Activity Type = Setup / machine / Labour assigned to the cost centre
There are various activity types assigned to activities like Setup Time, Machine
Time, Labour Time
Basically the rate or cost per hour for Setup Time, Machine running time and
labour time, these will be setup by product costing.
Whenever the work centre is used some cost is incurred, so we need a cost
centre to collect this cost, which is why a cost centre is assigned to the Work
Centre. While the cost centre acts as a cost collector.
Once complete Press the Save Button to save the Work Centre.
3 - Create Functional Location
Functional location represents an eqp, a building or a part there of. It can be a
condenser, a packing area etc. Functional location is created based on technical
or functional criteria or a combination of both.
Transaction code = IL01
Functional Location Name: example = 1000-TST-PM-01, based on mask of XXXX-
XXX-AA-NN
Based on the mask setting (the format in which functional location is names,
custom mask can be created in SPRO). The mask defines the hierarchy of the
functional location
XXXX-XXX-AA-NN
Function
Plant
Area Sub Area
Different masks can be selected from the filed “STRINDICATOR”, this will depend
if in your particular installation you have more than one mask setup.
Press Enter for Next Screen in General Tab
Description
Object Type
Maintenance Plant
Location etc as
needed
Work Centre
Organization Tab:
Planning Plant
The company code and planning plant values have automatically been picked up
based on the maintenance plant selected
Structure Tab:
In the structure we can assign the equipment that is in this functional location.
This called Equipment Installation Allowed.
Press Save to Save the functional location
4- Create Equipment
Equipment is a single object for which maintenance task needs to be
performed, this can be a pump / motor / boiler, and equipment can be installed
at a functional location and linked to a material. Equipment master record
needs to be created and maintained to keep a record of the maintenance, and
cost of maintenance.
Transaction code = IE01
Name of Eqp
Object Type
Where again we have a number of fields which can be filled if required as per
your installation.
Location Tab:
Maint Plant
Work Centre
Organization Tab:
The company code and planning plant values have automatically been picked up
based on the maint plant selected
Structure Tab:
We need to place this eqp into a structure, so create all the equipment needed
and then they can be placed into appropriate functional locations.
This will complete the equipment creation, save the equipment.
Status = Released
Activity to be done
Work Centre
Select the operation line where the values have been input, and click on the
Button = Internal
In the standard values, input the values for following fields:
Work duration
Percentage = 100%
Calculation Key =1
Normal duration
of work
Then go back to main screen
So now if during this operation any components like spare part, or oil, bearing
or cotton waste etc is needed, for this, select the line of Operation and click the
Button = Component – this will take you to component overview screen
Where any material which is in the Plant 1000 can be used, so as many
materials / qty needed can be assigned to the operation. And any material
without which this operation cannot be done are marked with a checkmark in
Backflush column.
Back Flush
Indicator