You are on page 1of 3
JARVIS INVESTMENTS LIMITED To, Dubai Electricity & Water Authority PO. Box # 564 Dubai, U AE Date: 06.04.2016 Attn: SENIOR MANAGER CONNECTION SERVCES DEPT. Application : E-971253. Project, HOTEL STAFF ACCOMMODATION Owner:. JARVIS INVESTEMENT LIMITED. Plot, Area OAS.003, DUBAI- IMPZ. Subject :CONFIRMATION LETTER/FLOW CHART Dear Sir, With reference to the above project this is to confirm that the Electrical DB's , All the Light fittings and equipments (if any) will be installed later by the Tenant in future as per DEWA rules and regulations, according to the attached chart. | request you to arrange for release of power supply for my project. This is for your information and records, (Ws Yours Fafthfully, | ‘Offshore Company with limited (GEA a JARVIS INVESTMENTS LIMITED ‘Approval and inspection of L.V. wiring installation in tenant areas for proposed On Plot No. OAS.003 International media production zone for JARVIS INVESTEMENT LIMITED. 1 ‘We have already obtained provisional approval on the LV installation drawings which show proposed loads and location of point of supply (DB) within each tenant’s premises. Distribution Boards are located near tothe entrance of the tenant premises. 2. ‘The Tenant's area clectrical works shall be caried out by DEWA registered electrical contractor(s). 3. ‘The shop drawings shall be submitted to DEWA prior to commencement of works. 44. The shop drawings shall be prepared by the electrical contractor and submitted to the Cheat ond Client Shall review the drawings in line with provisional approval and forward to DEWA along with the following 8) No Objection letter as per the attached specimen. b) Updated status on summary of MDB and SMDB indicating status of power supply to tenant areas (to identify the power released and pending areas) 5. Electrical MDB’s and Metering Arrangements are provided to connect tenant areas in the Lv room. 6. Application for inspection shall be submitted by the Electrical Contractor as per attached format at least 1 week in advance, routed through dewa approved contractor. 7. Co-ordination shall be done by electrical contractor for Inspection at site by DEWA. 8. ‘The electrical contractor shall produce original approved drawings at site. 9, Submission of test certificate, payment of security deposit and release of supply shall be coordinated by electrical contractor. 10. Any non-compliance of DEWA approved drawings at site shall be resolved by electrical ‘contractor (Tenants shall not be permitted to approach DEWA to resolve the issue). 11. The Landlord will identify the authorized Electrical Engineer (well qualified and experienced) to coordinate with DEWA for technical discussion, inspections eto [GES in nt’ ‘Shops — Fit outs: “Ofthore Company with rtd Unblty under Reqisu won F1SST22 Correspondence Address -.0, Box 50127, Dube UAE. * Tel #O4~333 1658 * FexO4~3331027 JARVIS INVESTMENTS LIMITED Tenant Contactors Prequalification Landlord Approval Decision Not Approved a Selected Tenant Contractor ‘Shop Drawings by Tenant Contractor Landlord - Approval / Decision DEWA Submission Application for DEWA’s inspection along with contractor's test certificate {Tenant's Elect. Contractor] DEWA Inspection —— Security Deposit Payment at DEWA ‘ ‘Supply release to the premise - Shop 3932027

You might also like