You are on page 1of 66

ABSTRACT

LOA : GAIL/BLORE/C&P/O&M/C 2014-27/5300023281


Contract Name: DBPL
Client : GAIL(India ) Limited
Contractor : NARMADA OFFSHORE CONSTRUCTION PVT LTD

Bill No:
Date:

NOCPL/GAIL-DBPL/W257/2015-16/RA 01
28.12.2015

MEASUREMENT SUMMERY SHEET - GOA BASE WORKS


S.No
SOR Ref

Item Description

WO Qty

Item Description

Units

Site Qty

Units

Total
QTY

U/Rate

Amount

Total

MECHANICAL WORKS
1
1.1
1.2
1.3
1.4
1.5
1.6

2
2.1
3

Hydrotesting
Hydrotesting of 36" OD coated pipes
(13.5mm to 19 mm)
Hydrotesting of 30" OD coated pipes
(10.3mm to 14.3 mm)
Hydrotesting of 24" OD coated pipes (8.7mm
to 14.3 mm)
Hydrotesting of 18" OD coated pipes (11.1
mm thk)
Hydrotesting of 8" OD coated pipes (6.4mm
thk)
Hydrotesting of 4" OD coated pipes (6.4 mm
thk)

11

EA

11

11

108,000.00

1,188,000.00

22

EA

22

22

90,000.00

1,980,000.00

EA

72,000.00

576,000.00

EA

54,000.00

162,000.00

EA

24,000.00

96,000.00

EA

12,000.00

36,000.00

51

EA

25

25

3,000.00

75,000.00

LETTER STENCILING ON PIPES


Letter Stenciling on pipe of all sizes
HOLIDAY TESTING

3.1

Holiday Testing of 36" OD coated pipes

650

479.02

479.02

600.00

287,412.00

3.2

Holiday Testing of 30" OD coated pipes

1260

628.38

628.38

500.00

314,190.00

3.3

Holiday Testing of 24" OD coated pipes

480

486.32

486.32

450.00

218,844.00

180

184.93

184.93

350.00

64,725.50

216

218.39

218.39

200.00

43,678.00

180

145.79

145.79

150.00

21,868.50

110
212
80
30
40
20

EA
EA
EA
EA
EA
EA

78
96
80
30
40
24

78
96
80
30
40
24

1,500.00
900.00
750.00
575.00
400.00
200.00

117,000.00
86,400.00
60,000.00
17,250.00
16,000.00
4,800.00

120

EA

74

74

3.4
3.5
3.6
4
4.1
4.2
4.3
4.4
4.5
4.6
5
5.1

5.2
5.3

Holiday Testing of 18" OD coated pipes


Holiday Testing of 8" OD coated pipes
Holiday Testing of 4" OD coated pipes

ENDCAP SUPPLY / FABRICATION &


INSTALLATION
ENDCAP 36" OD coated pipes
ENDCAP 30" OD coated pipes
ENDCAP 24" OD coated pipes
ENDCAP 18" OD coated pipes
ENDCAP 8" OD coated pipes
ENDCAP 4" OD coated pipes

TESTING & CALIBRATION OF PSV


Testing and Calibration of Pressure safety
valves of 1"X2", 600# /300#
Flanged/Threaded.
Testing and Calibration of Pressure safety
valves of 11/2"X2", 600# /300# Flanged.
Testing and Calibration of Pressure safety
valves of 2"X3", 600# /300# Flanged.

20
15

EA
EA

2500
1500
2500

185,000.00
7,500.00
-

ABSTRACT
LOA : GAIL/BLORE/C&P/O&M/C 2014-27/5300023281
Contract Name: DBPL
Client : GAIL(India ) Limited
Contractor : NARMADA OFFSHORE CONSTRUCTION PVT LTD

Bill No: NOCPL/GAIL-DBPL


Date:
28.12.2015

MEASUREMENT SUMMERY SHEET - GOA BASE WORKS


S.No
SOR Ref

Item Description
Item Description

WO Qty

Units

Site
Qty

Units

Total
QTY
Total

MECHANICAL WORKS
1
1.3

4
4.6
5

Hydrotesting
Hydrotesting of 24" OD coated pipes (8.7mm
to 14.3 mm)

EA

EA

Testing and Calibration of Pressure safety


valves of1"X1" 600# /300# Flanged.

EA

Testing and Calibration of Pressure safety


valves of 3/4"X1" 600# /300# Flanged.

EA

Testing and Calibration of Pressure safety


valves of1/2"X1/2" 600# /300# Flanged.

EA

ENDCAP SUPPLY / FABRICATION &


INSTALLATION
ENDCAP 4" OD coated pipes

TESTING & CALIBRATION OF PSV

NOCPL/GAIL-DBPL/W257/2015-16/EX 01
8.12.2015

U/Rate

Amount

72,000.00

72,000.00

200.00

800.00

2500

22,500.00

2500

15,000.00

2500

2,500.00

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Bangalore Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREMENT SHEET
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

BASE :

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : RT Zuari ,Gail
Terminal,Mormugao,Goa.

GOA

Measurement Period:
From 1st June 2015 to 28th July 2015

SOR ITEM NO : 1

Item Description :

HYDROTESTING: Hydrotesting of coated line pipes,API 5L GR X 70 of 36"/30"/24"/18" OD and AP

8"/4" OD having wall thickness ranging from19mm to 6.4 mm as per approved procedure,terms,cond
work of this tender document.Normally length ofeach coated line pipe shall be 11 to 12.5 meter.The j
receiving of pipes fom the yard GAIL,handling,loading and shifting of line pipes from the yard of Gail,h
and shifting of linepipes to designated place of hydrotesing site.Selection of testing site in an around
Store/yard including hiring/leasing of the land is in the scope of the Contractor.Site mobilization for re
pertaining to Hydrotesting job at the respective test locations along DBPL distributed in Goa, Maharas
Karnataka mobilization includes arrangng of land,manpower,materials,test equipments,consumables
materials.All Test instruments used shall have calibration done not later than three months from the d
testing.After successful hydrotesting,cutting the tested pipes into individaul pipe length ,shifting it ba
Store/Yard from where the pipes were lifted and proper stacking of hydrotested pipes on wooden slee
200mm 200mm Cross-section) before demobilization of the above said sie of GAIL including handin
materials if ant.Pipes f any sizes shall be issued from the following locatins of DBPL : i) RT Zuari
Termianl,Mormugao,Goa.ii), DBPL Project Village & Post Vathar Tauka Hatkangale,kolhapur or at Statio
Limited,Village:Devrukh,Tehsil Sangmeshwar,Distt Ratnagiri.iii) IP4 station,saundatti Taluka,Distt Belg
terminal,Bidadi/SV-1B,BychaGuppe,Hobli Taverkere.

S N.

1.3

Location

Description

GOA

Hydrotesting of 24" OD
coated pipes (8.7mm to
14.3 mm)

Pipe
Size

Unit

Nos

24"

EA

24"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

NAME :

NAME :

SIGNATURE:

SIGNATURE :

DATE:

DATE :

& Emergency Works for Dabhol

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257
1

GOA

asurement Period:

m 1st June 2015 to 28th July 2015

R ITEM NO : 1

I 5L GR X 70 of 36"/30"/24"/18" OD and API 5L GR X 65/42 of


mm as per approved procedure,terms,conditions & scope of
ed line pipe shall be 11 to 12.5 meter.The job includes
shifting of line pipes from the yard of Gail,handling,loading
site.Selection of testing site in an around the pipe
e of the Contractor.Site mobilization for requisite jobs
ns along DBPL distributed in Goa, Maharashtra ans
r,materials,test equipments,consumables and requisite
one not later than three months from the date of
es into individaul pipe length ,shifting it back to GAIL to the
king of hydrotested pipes on wooden sleepers (minimum
he above said sie of GAIL including handing over of scrap
llowing locatins of DBPL : i) RT Zuari
har Tauka Hatkangale,kolhapur or at Station-1,Gail India
i.iii) IP4 station,saundatti Taluka,Distt Belgaum.iv)RT

fication & Approved deviation,

Remarks

Additional Line pipe


Hydrotested

M/s GAIL
NAME :
SIGNATURE :
DATE :

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for DabholB
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREME
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

BASE : Bych
Taverkere

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : SV-1B,BychaGuppe,Hobli
Taverkere

Measurement Period:
From 1 July 2015 to 11 July 2015

SOR ITEM NO : 1

Item Description :

HYDROTESTING: Hydrotesting of coated line pipes,API 5L GR X 70 of 36"/30"/24"/18" OD a

OD having wall thickness ranging from19mm to 6.4 mm as per approved procedure,terms,condit


tender document.Normally length ofeach coated line pipe shall be 11 to 12.5 meter.The job inclu
the yard GAIL,handling,loading and shifting of line pipes from the yard of Gail,handling,loading a
designated place of hydrotesing site.Selection of testing site in an around the pipe Store/yard inc
land is in the scope of the Contractor.Site mobilization for requisite jobs pertaining to Hydrotestin
locations along DBPL distributed in Goa, Maharashtra ans Karnataka mobilization includes arrang
land,manpower,materials,test equipments,consumables and requisite materials.All Test instrume
calibration done not later than three months from the date of testing.After successful hydrotestin
into individaul pipe length ,shifting it back to GAIL to the Store/Yard from where the pipes were li
hydrotested pipes on wooden sleepers (minimum 200mm 200mm Cross-section) before demo
sie of GAIL including handing over of scrap materials if ant.Pipes f any sizes shall be issued from
DBPL : i) RT Zuari Termianl,Mormugao,Goa.ii), DBPL Project Village & Post Vathar Tauka Hatkanga
1,Gail India Limited,Village:Devrukh,Tehsil Sangmeshwar,Distt Ratnagiri.iii) IP4 station,saundatti
terminal,Bidadi/SV-1B,BychaGuppe,Hobli Taverkere.

S N.

Location

Description

Pipe
Size

Unit

1.4

SV 1B

Hydrotesting of 18" OD coated


pipes (11.1 mm thk)

18"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

NAME :

NAME :

SIGNATURE:

SIGNATURE :

DATE:

DATE :

MEASUREMENT SHEET

n, & Emergency Works for DabholBangalore

A Bill :

WO NO. : 257

MEASUREMENT SHEET
NO.

BASE : BychaGuppe, Hobli


Taverkere
1

easurement Period:

om 1 July 2015 to 11 July 2015

OR ITEM NO : 1

API 5L GR X 70 of 36"/30"/24"/18" OD and API 5L GR X 65/42 of 8"/4"


as per approved procedure,terms,conditions & scope of work of this
e shall be 11 to 12.5 meter.The job includes receiving of pipes fom
rom the yard of Gail,handling,loading and shifting of linepipes to
site in an around the pipe Store/yard including hiring/leasing of the
requisite jobs pertaining to Hydrotesting job at the respective test
s Karnataka mobilization includes arrangng of
and requisite materials.All Test instruments used shall have
te of testing.After successful hydrotesting,cutting the tested pipes
Store/Yard from where the pipes were lifted and proper stacking of
m 200mm Cross-section) before demobilization of the above said
nt.Pipes f any sizes shall be issued from the following locatins of
ct Village & Post Vathar Tauka Hatkangale,kolhapur or at StationDistt Ratnagiri.iii) IP4 station,saundatti Taluka,Distt Belgaum.iv)RT

Nos
3

cification & Approved deviation,

M/s GAIL

Remarks

NAME :
SIGNATURE :
DATE :

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : CWC-GADAG

BASE :

CW

Measurement Period:
From 11Aug 2015 to 7 Sep 2015

SOR ITEM NO : 1

Item Description :

HYDROTESTING: Hydrotesting of coated line pipes,API 5L GR X 70 of 36"/30"/24"/18" OD

OD having wall thickness ranging from19mm to 6.4 mm as per approved procedure,terms,cond


tender document.Normally length ofeach coated line pipe shall be 11 to 12.5 meter.The job inc
the yard GAIL,handling,loading and shifting of line pipes from the yard of Gail,handling,loading
designated place of hydrotesing site.Selection of testing site in an around the pipe Store/yard i
land is in the scope of the Contractor.Site mobilization for requisite jobs pertaining to Hydrotest
locations along DBPL distributed in Goa, Maharashtra ans Karnataka mobilization includes arran
land,manpower,materials,test equipments,consumables and requisite materials.All Test instrum
calibration done not later than three months from the date of testing.After successful hydrotest
into individaul pipe length ,shifting it back to GAIL to the Store/Yard from where the pipes were
hydrotested pipes on wooden sleepers (minimum 200mm 200mm Cross-section) before dem
sie of GAIL including handing over of scrap materials if ant.Pipes f any sizes shall be issued fro
DBPL : i) RT Zuari Termianl,Mormugao,Goa.ii), DBPL Project Village & Post Vathar Tauka Hatkang
1,Gail India Limited,Village:Devrukh,Tehsil Sangmeshwar,Distt Ratnagiri.iii) IP4 station,saundatt
terminal,Bidadi/SV-1B,BychaGuppe,Hobli Taverkere.

S N.

Location

Description

Pipe
Size

Unit

1.2

CWC- GADAG

Hydrotesting of 30" OD coated


pipes (14.3-11.9 mm thk)

30"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

NAME :

NAME :

DATE:

DATE :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

CWC-GADAG

asurement Period:

m 11Aug 2015 to 7 Sep 2015

R ITEM NO : 1

PI 5L GR X 70 of 36"/30"/24"/18" OD and API 5L GR X 65/42 of 8"/4"


s per approved procedure,terms,conditions & scope of work of this
shall be 11 to 12.5 meter.The job includes receiving of pipes fom
om the yard of Gail,handling,loading and shifting of linepipes to
te in an around the pipe Store/yard including hiring/leasing of the
requisite jobs pertaining to Hydrotesting job at the respective test
Karnataka mobilization includes arrangng of
nd requisite materials.All Test instruments used shall have
of testing.After successful hydrotesting,cutting the tested pipes
tore/Yard from where the pipes were lifted and proper stacking of
200mm Cross-section) before demobilization of the above said
t.Pipes f any sizes shall be issued from the following locatins of
t Village & Post Vathar Tauka Hatkangale,kolhapur or at StationDistt Ratnagiri.iii) IP4 station,saundatti Taluka,Distt Belgaum.iv)RT

Nos
22

22

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :

Remarks

DATE :

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for DabholBa
Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

BASE :

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : SV 21, Madagondanhalvi

Ma

Measurement Period:
From 11 July 2015 to 15 July 2015

SOR ITEM NO : 1

Item Description :

HYDROTESTING: Hydrotesting of coated line pipes,API 5L GR X 70 of 36"/30"/24"/18" OD and

having wall thickness ranging from19mm to 6.4 mm as per approved procedure,terms,conditions &
document.Normally length ofeach coated line pipe shall be 11 to 12.5 meter.The job includes rece
GAIL,handling,loading and shifting of line pipes from the yard of Gail,handling,loading and shifting
place of hydrotesing site.Selection of testing site in an around the pipe Store/yard including hiring/
scope of the Contractor.Site mobilization for requisite jobs pertaining to Hydrotesting job at the res
DBPL distributed in Goa, Maharashtra ans Karnataka mobilization includes arrangng of land,manpo
equipments,consumables and requisite materials.All Test instruments used shall have calibration d
months from the date of testing.After successful hydrotesting,cutting the tested pipes into individa
to GAIL to the Store/Yard from where the pipes were lifted and proper stacking of hydrotested pipe
(minimum 200mm 200mm Cross-section) before demobilization of the above said sie of GAIL inc
materials if ant.Pipes f any sizes shall be issued from the following locatins of DBPL : i) RT Zuari Te
Project Village & Post Vathar Tauka Hatkangale,kolhapur or at Station-1,Gail India Limited,Village:D
Sangmeshwar,Distt Ratnagiri.iii) IP4 station,saundatti Taluka,Distt Belgaum.iv)RT terminal,Bidadi/S
Taverkere.

S N.

Location

Description

Pipe
Size

Unit

1.6

SV 21

Hydrotesting of 4" OD coated pipes


(6.4mm thk)

4"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

NAME :

NAME :

SIGNATURE:

SIGNATURE :

DATE:

DATE :

EASUREMENT SHEET

& Emergency Works for DabholBangalore Gas

WO NO. : 257

MEASUREMENT SHEET
NO.
BASE :
RA Bill :

Madagondanhalvi

Measurement Period:
From 11 July 2015 to 15 July 2015

SOR ITEM NO : 1

5L GR X 70 of 36"/30"/24"/18" OD and API 5L GR X 65/42 of 8"/4" OD


pproved procedure,terms,conditions & scope of work of this tender
1 to 12.5 meter.The job includes receiving of pipes fom the yard
d of Gail,handling,loading and shifting of linepipes to designated
d the pipe Store/yard including hiring/leasing of the land is in the
rtaining to Hydrotesting job at the respective test locations along
ation includes arrangng of land,manpower,materials,test
truments used shall have calibration done not later than three
g,cutting the tested pipes into individaul pipe length ,shifting it back
d proper stacking of hydrotested pipes on wooden sleepers
zation of the above said sie of GAIL including handing over of scrap
owing locatins of DBPL : i) RT Zuari Termianl,Mormugao,Goa.ii), DBPL
t Station-1,Gail India Limited,Village:Devrukh,Tehsil
Distt Belgaum.iv)RT terminal,Bidadi/SV-1B,BychaGuppe,Hobli

Nos
3

ation & Approved deviation,

M/s GAIL

Remarks

NAME :
SIGNATURE :
DATE :

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : IP-4, ACHMETTI

BASE :

IP-

Measurement Period:
From 4 Sep 2015 to 12 Sep 2015

SOR ITEM NO : 1

Item Description :

HYDROTESTING: Hydrotesting of coated line pipes,API 5L GR X 70 of 36"/30"/24"/18" OD

OD having wall thickness ranging from19mm to 6.4 mm as per approved procedure,terms,cond


tender document.Normally length ofeach coated line pipe shall be 11 to 12.5 meter.The job inc
the yard GAIL,handling,loading and shifting of line pipes from the yard of Gail,handling,loading
designated place of hydrotesing site.Selection of testing site in an around the pipe Store/yard i
land is in the scope of the Contractor.Site mobilization for requisite jobs pertaining to Hydrotest
locations along DBPL distributed in Goa, Maharashtra ans Karnataka mobilization includes arran
land,manpower,materials,test equipments,consumables and requisite materials.All Test instrum
calibration done not later than three months from the date of testing.After successful hydrotest
into individaul pipe length ,shifting it back to GAIL to the Store/Yard from where the pipes were
hydrotested pipes on wooden sleepers (minimum 200mm 200mm Cross-section) before dem
sie of GAIL including handing over of scrap materials if ant.Pipes f any sizes shall be issued fro
DBPL : i) RT Zuari Termianl,Mormugao,Goa.ii), DBPL Project Village & Post Vathar Tauka Hatkang
1,Gail India Limited,Village:Devrukh,Tehsil Sangmeshwar,Distt Ratnagiri.iii) IP4 station,saundatt
terminal,Bidadi/SV-1B,BychaGuppe,Hobli Taverkere.

S N.

Location

Description

Pipe
Size

Unit

1.5

IP-4 ACHMETTI

Hydrotesting of 8" OD coated


pipes (6.4 mm thk)

8"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

NAME :

NAME :

DATE:

DATE :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

IP-4, ACHMETTI

asurement Period:

m 4 Sep 2015 to 12 Sep 2015

R ITEM NO : 1

PI 5L GR X 70 of 36"/30"/24"/18" OD and API 5L GR X 65/42 of 8"/4"


s per approved procedure,terms,conditions & scope of work of this
shall be 11 to 12.5 meter.The job includes receiving of pipes fom
om the yard of Gail,handling,loading and shifting of linepipes to
te in an around the pipe Store/yard including hiring/leasing of the
requisite jobs pertaining to Hydrotesting job at the respective test
Karnataka mobilization includes arrangng of
nd requisite materials.All Test instruments used shall have
of testing.After successful hydrotesting,cutting the tested pipes
tore/Yard from where the pipes were lifted and proper stacking of
200mm Cross-section) before demobilization of the above said
t.Pipes f any sizes shall be issued from the following locatins of
t Village & Post Vathar Tauka Hatkangale,kolhapur or at StationDistt Ratnagiri.iii) IP4 station,saundatti Taluka,Distt Belgaum.iv)RT

Nos
4

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :

Remarks

DATE :

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for DabholB
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREME
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : IP-1, Devrukh

BASE :

IP-1

Measurement Period:
From 18 OCT 2015 to 8 Nov 2015

SOR ITEM NO : 1

Item Description :

HYDROTESTING: Hydrotesting of coated line pipes,API 5L GR X 70 of 36"/30"/24"/18" OD a

OD having wall thickness ranging from19mm to 6.4 mm as per approved procedure,terms,condit


tender document.Normally length ofeach coated line pipe shall be 11 to 12.5 meter.The job inclu
the yard GAIL,handling,loading and shifting of line pipes from the yard of Gail,handling,loading a
designated place of hydrotesing site.Selection of testing site in an around the pipe Store/yard inc
land is in the scope of the Contractor.Site mobilization for requisite jobs pertaining to Hydrotestin
locations along DBPL distributed in Goa, Maharashtra ans Karnataka mobilization includes arrang
land,manpower,materials,test equipments,consumables and requisite materials.All Test instrume
calibration done not later than three months from the date of testing.After successful hydrotestin
into individaul pipe length ,shifting it back to GAIL to the Store/Yard from where the pipes were li
hydrotested pipes on wooden sleepers (minimum 200mm 200mm Cross-section) before demo
sie of GAIL including handing over of scrap materials if ant.Pipes f any sizes shall be issued from
DBPL : i) RT Zuari Termianl,Mormugao,Goa.ii), DBPL Project Village & Post Vathar Tauka Hatkanga
1,Gail India Limited,Village:Devrukh,Tehsil Sangmeshwar,Distt Ratnagiri.iii) IP4 station,saundatti
terminal,Bidadi/SV-1B,BychaGuppe,Hobli Taverkere.

S N.

Location

Description

Pipe
Size

Unit

1.1

IP-1 DEVRUKH

Hydrotesting of 36" OD coated


pipes (13.5 to 19 mm thk)

36"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

NAME :

NAME :

SIGNATURE:

SIGNATURE :

DATE:

DATE :

MEASUREMENT SHEET

n, & Emergency Works for DabholBangalore

A Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

IP-1, DEVRUKH

easurement Period:

om 18 OCT 2015 to 8 Nov 2015

OR ITEM NO : 1

API 5L GR X 70 of 36"/30"/24"/18" OD and API 5L GR X 65/42 of 8"/4"


as per approved procedure,terms,conditions & scope of work of this
e shall be 11 to 12.5 meter.The job includes receiving of pipes fom
rom the yard of Gail,handling,loading and shifting of linepipes to
site in an around the pipe Store/yard including hiring/leasing of the
requisite jobs pertaining to Hydrotesting job at the respective test
s Karnataka mobilization includes arrangng of
and requisite materials.All Test instruments used shall have
te of testing.After successful hydrotesting,cutting the tested pipes
Store/Yard from where the pipes were lifted and proper stacking of
m 200mm Cross-section) before demobilization of the above said
nt.Pipes f any sizes shall be issued from the following locatins of
ct Village & Post Vathar Tauka Hatkangale,kolhapur or at StationDistt Ratnagiri.iii) IP4 station,saundatti Taluka,Distt Belgaum.iv)RT

Nos
11

11

cification & Approved deviation,

M/s GAIL

Remarks

NAME :
SIGNATURE :
DATE :

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for DabholBangalore
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREMENT SHEET
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : GOA

BASE :

WO NO. : 257

GOA

Measurement Period:
From 1st June 2015

To 28th July 2015

SOR ITEM NO : 3

Item Description :

HOLIDAYTESTING: Holiday testing of 36/30/24/18 inch OD API 5L GR X 70 and 8IN/4IN API 5L GR X 65/42 coated line
pipe having wall thickness ranging from 19MM to 6.4MM as per approved procedure, terms, conditions and scope of work
mentioned elsewhere in the tender document. Normally length of each coated line pipe shall be 11 to 12 meter. Unit of
measurement (UOM) is meter. Handling of line pipes for carrying out Holiday testing, and the testing of entire length of
pipes , repair for any coating damage i.e scratches and pin holes etc also be ensured. Supply of manpower, repair material ,
consumable, tools , etc. Shall be in scope of contractor.
HOLIDAY TEST INSTRUMENT SHALL BE

SUPPLIED BY GAIL.
S N.

Location

Description

Pipe
Size

Unit

Length
(MTR)

3.3

GOA

Holiday of 30" OD coated pipes


(14.3-11.1mm thk)

30"

MTR

46.210

TOTAL QUANTITY

46.210

NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech


Date of Measurement: NOV 2015
LOCATION : GOA

BASE :

RA Bill :

GO

Measurement Period:
From 1st June 2015

To 28th July 201

SOR ITEM NO : 3

Item Description :

HOLIDAYTESTING: Holiday testing of 36/30/24/18 inch OD API 5L GR X 70 and 8IN/4IN API

pipe having wall thickness ranging from 19MM to 6.4MM as per approved procedure, terms, con
mentioned elsewhere in the tender document. Normally length of each coated line pipe shall b
measurement (UOM) is meter. Handling of line pipes for carrying out Holiday testing, and the te
pipes , repair for any coating damage i.e scratches and pin holes etc also be ensured. Supply o
consumable, tools , etc. Shall be in scope of contractor.
HOLIDAY TEST I

SUPPLIED BY GAIL.
S N.

Location

Description

Pipe
Size

Unit

3.3

GOA

Holiday testing of 24" OD


coated pipes (11.1 mm thk)

24"

MTR

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

Bill :

WO NO. : 257

GOA

asurement Period:

m 1st June 2015

To 28th July 2015

R ITEM NO : 3

h OD API 5L GR X 70 and 8IN/4IN API 5L GR X 65/42 coated line


s per approved procedure, terms, conditions and scope of work
ngth of each coated line pipe shall be 11 to 12 meter. Unit of
rrying out Holiday testing, and the testing of entire length of
n holes etc also be ensured. Supply of manpower, repair material ,

HOLIDAY TEST INSTRUMENT SHALL BE


Length
(MTR)
486.320

486.320

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

BASE : SV
Taverkere

Name of work : Mech

RA Bill :

Measurement Period:

Date of Measurement: NOV 2015

From 1July 2015 to 11 July 2015

LOCATION : SV-1B,BychaGuppe,Hobli
Taverkere

SOR ITEM NO : 3

Item Description :

HOLIDAYTESTING: Holiday testing of 36/30/24/18 inch OD API 5L GR X 70 and 8IN/4IN API

pipe having wall thickness ranging from 19MM to 6.4MM as per approved procedure, terms, con
mentioned elsewhere in the tender document. Normally length of each coated line pipe shall b
measurement (UOM) is meter. Handling of line pipes for carrying out Holiday testing, and the te
pipes , repair for any coating damage i.e scratches and pin holes etc also be ensured. Supply o
consumable, tools , etc. Shall be in scope of contractor.
HOLIDAY TEST I

SUPPLIED BY GAIL.
S N.

Location

Description

Pipe
Size

Unit

3.4

SV 1B

Holiday testing of 18" OD


coated pipes (11.1 mm thk)

18"

MTR

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.

WO NO. : 257

BASE : SV-1B,BychaGuppe,Hobli
Taverkere
1

asurement Period:

m 1July 2015 to 11 July 2015

R ITEM NO : 3

h OD API 5L GR X 70 and 8IN/4IN API 5L GR X 65/42 coated line


s per approved procedure, terms, conditions and scope of work
ngth of each coated line pipe shall be 11 to 12 meter. Unit of
rrying out Holiday testing, and the testing of entire length of
n holes etc also be ensured. Supply of manpower, repair material ,

HOLIDAY TEST INSTRUMENT SHALL BE


Length
(MTR)
184.930

184.930

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEE

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dab
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED
CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : SV 21, Madagondanhalvi

Measurement Period:
From 11 July 2015 to 15 July 2015

SOR ITEM NO : 3

Item Description :

HOLIDAYTESTING: Holiday testing of 36/30/24/18 inch OD API 5L GR X 70 and 8IN/4IN

pipe having wall thickness ranging from 19MM to 6.4MM as per approved procedure, terms
mentioned elsewhere in the tender document. Normally length of each coated line pipe sh
measurement (UOM) is meter. Handling of line pipes for carrying out Holiday testing, and t
pipes , repair for any coating damage i.e scratches and pin holes etc also be ensured. Supp
consumable, tools , etc. Shall be in scope of contractor.
HOLIDAY TE

SUPPLIED BY GAIL.
S N.

Location

Description

Pipe
Size

3.6

SV 21

Holiday of 4" OD coated pipes


(6.4mm thk)

4"

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

MENT SHEET

cy Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

SV-21, Madagondanhalvi

Period:

o 15 July 2015

: 3

R X 70 and 8IN/4IN API 5L GR X 65/42 coated line


procedure, terms, conditions and scope of work
oated line pipe shall be 11 to 12 meter. Unit of
day testing, and the testing of entire length of
be ensured. Supply of manpower, repair material ,

HOLIDAY TEST INSTRUMENT SHALL BE

Unit

Length
(MTR)

MTR

145.79

roved deviation,

M/s GAIL

AME :

IGNATURE :

ATE :

145.79

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : CWC-GADAG

BASE :

CW

Measurement Period:
From 11Aug 2015 to 7 Sep 2015

SOR ITEM NO : 3

Item Description :

HOLIDAYTESTING: Holiday testing of 36/30/24/18 inch OD API 5L GR X 70 and 8IN/4IN API

pipe having wall thickness ranging from 19MM to 6.4MM as per approved procedure, terms, con
mentioned elsewhere in the tender document. Normally length of each coated line pipe shall b
measurement (UOM) is meter. Handling of line pipes for carrying out Holiday testing, and the te
pipes , repair for any coating damage i.e scratches and pin holes etc also be ensured. Supply o
consumable, tools , etc. Shall be in scope of contractor.
HOLIDAY TEST I

SUPPLIED BY GAIL.
S N.

Location

Description

Pipe
Size

Unit

3.2

CWC- GADAG

Holiday of 30" OD coated pipes


(14.3-11.1mm thk)

30"

MTR

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

CWC-GADAG

asurement Period:

m 11Aug 2015 to 7 Sep 2015

R ITEM NO : 3

h OD API 5L GR X 70 and 8IN/4IN API 5L GR X 65/42 coated line


s per approved procedure, terms, conditions and scope of work
ngth of each coated line pipe shall be 11 to 12 meter. Unit of
rrying out Holiday testing, and the testing of entire length of
n holes etc also be ensured. Supply of manpower, repair material ,

HOLIDAY TEST INSTRUMENT SHALL BE


Length
(MTR)
582.17

582.17

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : IP-4,ACHMETTI

BASE :

IP-

Measurement Period:
From Sep 2015

SOR ITEM NO : 3

Item Description :

HOLIDAYTESTING: Holiday testing of 36/30/24/18 inch OD API 5L GR X 70 and 8IN/4IN API

pipe having wall thickness ranging from 19MM to 6.4MM as per approved procedure, terms, con
mentioned elsewhere in the tender document. Normally length of each coated line pipe shall b
measurement (UOM) is meter. Handling of line pipes for carrying out Holiday testing, and the te
pipes , repair for any coating damage i.e scratches and pin holes etc also be ensured. Supply o
consumable, tools , etc. Shall be in scope of contractor.
HOLIDAY TEST I

SUPPLIED BY GAIL.
S N.

Location

Description

Pipe
Size

Unit

3.5

IP-4 ACHMETTI

Holiday of 8" OD coated pipes


(6.4mm thk)

8"

MTR

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

IP-4,ACHMETTI

asurement Period:

m Sep 2015

R ITEM NO : 3

h OD API 5L GR X 70 and 8IN/4IN API 5L GR X 65/42 coated line


s per approved procedure, terms, conditions and scope of work
ngth of each coated line pipe shall be 11 to 12 meter. Unit of
rrying out Holiday testing, and the testing of entire length of
n holes etc also be ensured. Supply of manpower, repair material ,

HOLIDAY TEST INSTRUMENT SHALL BE


Length
(MTR)
218.39

218.39

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : IP-1, DEVRUKH

BASE :

IP-

Measurement Period:
From OCT 2015

SOR ITEM NO : 3

Item Description :

HOLIDAYTESTING: Holiday testing of 36/30/24/18 inch OD API 5L GR X 70 and 8IN/4IN API

pipe having wall thickness ranging from 19MM to 6.4MM as per approved procedure, terms, con
mentioned elsewhere in the tender document. Normally length of each coated line pipe shall b
measurement (UOM) is meter. Handling of line pipes for carrying out Holiday testing, and the te
pipes , repair for any coating damage i.e scratches and pin holes etc also be ensured. Supply o
consumable, tools , etc. Shall be in scope of contractor.
HOLIDAY TEST I

SUPPLIED BY GAIL.
S N.

Location

Description

Pipe
Size

Unit

3.1

IP-1,DEVRUKH

Holiday of 36" OD coated pipes


(13.5 to 19mm thk)

36"

MTR

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

IP-1, DEVRUKH

asurement Period:

m OCT 2015

R ITEM NO : 3

h OD API 5L GR X 70 and 8IN/4IN API 5L GR X 65/42 coated line


s per approved procedure, terms, conditions and scope of work
ngth of each coated line pipe shall be 11 to 12 meter. Unit of
rrying out Holiday testing, and the testing of entire length of
n holes etc also be ensured. Supply of manpower, repair material ,

HOLIDAY TEST INSTRUMENT SHALL BE


Length
(MTR)
479.02

479.02

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : GOA

BASE :

GO

Measurement Period:
From 1st June 2015

To 28th July 201

SOR ITEM NO : 2

Item Description :

LETTER STENCILING ON PIPES: Letter stenciling of pipe details on outer s

pipes as per approved procedure, terms , conditions & scope of work mentioned e
document. Normally length of each coated line pipe shall be 10 to 12 meter. Unit
EA per pipe.

S N.

Location

Description

Pipe
Size

Unit

2.1

GOA

LETTER STENCILING ON PIPES

24"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

Bill :

WO NO. : 257

GOA

asurement Period:

m 1st June 2015

To 28th July 2015

R ITEM NO : 2

nciling of pipe details on outer surface of coated line


ns & scope of work mentioned elsewhere in the tender
pe shall be 10 to 12 meter. Unit of measurement (UOM) is

Qty
9

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

BASE : SV
Taverkere

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : SV-1B,BychaGuppe,Hobli
Taverkere

Measurement Period:
From 1July 2015 to 11 July 2015

SOR ITEM NO : 2

Item Description :

LETTER STENCILING ON PIPES: Letter stenciling of pipe details on outer s

pipes as per approved procedure, terms , conditions & scope of work mentioned e
document. Normally length of each coated line pipe shall be 10 to 12 meter. Unit
EA per pipe.
S N.

Location

Description

Pipe
Size

Unit

2.1

SV 1B

LETTER STENCILING ON PIPES

18"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.

WO NO. : 257

BASE : SV-1B,BychaGuppe,Hobli
Taverkere
1

asurement Period:

m 1July 2015 to 11 July 2015

R ITEM NO : 2

nciling of pipe details on outer surface of coated line


ns & scope of work mentioned elsewhere in the tender
pe shall be 10 to 12 meter. Unit of measurement (UOM) is

Qty
3

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : CWC-GADAG

BASE :

CW

Measurement Period:
From 7th Sep 2015

SOR ITEM NO : 2

Item Description :

LETTER STENCILING ON PIPES: Letter stenciling of pipe details on outer s

pipes as per approved procedure, terms , conditions & scope of work mentioned e
document. Normally length of each coated line pipe shall be 10 to 12 meter. Unit
EA per pipe.
S N.

Location

Description

Pipe
Size

Unit

2.1

CWC-GADAG

LETTER STENCILING ON PIPES

30"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

Bill :

WO NO. : 257

CWC-GADAG

asurement Period:

m 7th Sep 2015

R ITEM NO : 2

nciling of pipe details on outer surface of coated line


ns & scope of work mentioned elsewhere in the tender
pe shall be 10 to 12 meter. Unit of measurement (UOM) is

Qty
22

22

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : CWC-GADAG

BASE :

CW

Measurement Period:
From 8th Sep 2015

SOR ITEM NO : 2

Item Description :

LETTER STENCILING ON PIPES: Letter stenciling of pipe details on outer s

pipes as per approved procedure, terms , conditions & scope of work mentioned e
document. Normally length of each coated line pipe shall be 10 to 12 meter. Unit
EA per pipe.
S N.

Location

Description

Pipe
Size

Unit

2.1

IP-4,ACHMETTI

LETTER STENCILING ON PIPES

8"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

Bill :

WO NO. : 257

CWC-GADAG

asurement Period:

m 8th Sep 2015

R ITEM NO : 2

nciling of pipe details on outer surface of coated line


ns & scope of work mentioned elsewhere in the tender
pe shall be 10 to 12 meter. Unit of measurement (UOM) is

Qty
4

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : SV 21, Madagondanhalvi

BASE :

SV

Measurement Period:
From 11 July 2015 to 15 July 2015

SOR ITEM NO : 2

Item Description :

LETTER STENCILING ON PIPES: Letter stenciling of pipe details on outer s

pipes as per approved procedure, terms , conditions & scope of work mentioned e
document. Normally length of each coated line pipe shall be 10 to 12 meter. Unit
EA per pipe.
S N.

Location

Description

Pipe
Size

Unit

2.1

SV 21

LETTER STENCILING ON PIPES

4"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

SV-21, Madagondanhalvi

asurement Period:

m 11 July 2015 to 15 July 2015

R ITEM NO : 2

nciling of pipe details on outer surface of coated line


ns & scope of work mentioned elsewhere in the tender
pe shall be 10 to 12 meter. Unit of measurement (UOM) is

Qty
3

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

RA Bill :

Date of Measurement: NOV 2015


LOCATION : IP-1, DEVRUKH

BASE :

IP-

Measurement Period:
From 18 Oct 2015 to 8 Nov 2015

SOR ITEM NO : 2

Item Description :

LETTER STENCILING ON PIPES: Letter stenciling of pipe details on outer s

pipes as per approved procedure, terms , conditions & scope of work mentioned e
document. Normally length of each coated line pipe shall be 10 to 12 meter. Unit
EA per pipe.
S N.

Location

Description

Pipe
Size

Unit

2.1

IP-1 DEVRUKH

LETTER STENCILING ON PIPES

36"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

IP-1, DEVRUKH

asurement Period:

m 18 Oct 2015 to 8 Nov 2015

R ITEM NO : 2

nciling of pipe details on outer surface of coated line


ns & scope of work mentioned elsewhere in the tender
pe shall be 10 to 12 meter. Unit of measurement (UOM) is

Qty
11

11

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada
narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech


Date of Measurement: NOV 2015
LOCATION : GOA

RA Bill :

BASE :

GO

Measurement Period:
From 1st June 2015 To 28th July 2015

SOR ITEM NO : 4

Item Description :

END CAP/FABRICATION & INSTALLATION: Fabrication and Installation o

pipe greasing upto 20cm both Internal & External at both ends of pipe to be carri
of the End caps. The Caps should be cirumscribing the pipe with sufficient grip to
mentioned in scope of work. All materials and labour shall be in the scope of cont

S N.

Location

Description

Pipe
Size

Unit

4.3

GOA

END CAP/ FABRICATION &


INSTALLATION

24"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

GOA

asurement Period:

m 1st June 2015 To 28th July 2015

R ITEM NO : 4

N: Fabrication and Installation of MS end Cap and Line

at both ends of pipe to be carried out before installation


g the pipe with sufficient grip to hold the pipe as
our shall be in the scope of contractor.

Qty
80

80

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

BASE : SV
Taverkere

Name of work : Mech

RA Bill :

Measurement Period:

Date of Measurement: NOV 2015

From 9th Sep 2015

LOCATION : SV-1B,BychaGuppe,Hobli
Taverkere

SOR ITEM NO : 4

Item Description :

END CAP/FABRICATION & INSTALLATION:

Fabrication and Installation of MS end


20cm both Internal & External at both ends of pipe to be carried out before installation of the End caps. The
pipe with sufficient grip to hold the pipe as mentioned in scope of work. All materials and labour shall be in th

S N.

Location

Description

Pipe
Size

Unit

4.4

SV 1B

END CAP/ FABRICATION &


INSTALLATION

18"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.

WO NO. : 257

BASE : SV-1B,BychaGuppe,Hobli
Taverkere

Bill :

asurement Period:

m 9th Sep 2015

R ITEM NO : 4

N:

Fabrication and Installation of MS end Cap and Line pipe greasing upto
t before installation of the End caps. The Caps should be cirumscribing the
work. All materials and labour shall be in the scope of contractor.

Qty
30

30

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

BASE :

RA Bill :

SV

Measurement Period:

Date of Measurement: NOV 2015

From 9th Sep 2015

LOCATION : SV 21, Madagondanhalvi

SOR ITEM NO : 4

Item Description :

END CAP/FABRICATION & INSTALLATION:

Fabrication and Installation of MS end


20cm both Internal & External at both ends of pipe to be carried out before installation of the End caps. The
pipe with sufficient grip to hold the pipe as mentioned in scope of work. All materials and labour shall be in th

S N.

Location

Description

Pipe
Size

Unit

4.6

SV 21

END CAP/ FABRICATION &


INSTALLATION

4"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

Bill :

WO NO. : 257

SV-21, Madagondanhalvi

asurement Period:

m 9th Sep 2015

R ITEM NO : 4

N:

Fabrication and Installation of MS end Cap and Line pipe greasing upto
t before installation of the End caps. The Caps should be cirumscribing the
work. All materials and labour shall be in the scope of contractor.

Qty
24

24

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech


Date of Measurement: NOV 2015
LOCATION : CWC-GADAG

BASE :

RA Bill :

CW

Measurement Period:
From 7th Sep 2015

SOR ITEM NO : 4

Item Description :

END CAP/FABRICATION & INSTALLATION:

Fabrication and Installation of MS end


20cm both Internal & External at both ends of pipe to be carried out before installation of the End caps. The
pipe with sufficient grip to hold the pipe as mentioned in scope of work. All materials and labour shall be in th

S N.

Location

Description

Pipe
Size

Unit

4.2

CWC-GADAG

END CAP/ FABRICATION &


INSTALLATION

30"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

Bill :

WO NO. : 257

CWC-GADAG

asurement Period:

m 7th Sep 2015

R ITEM NO : 4

N:

Fabrication and Installation of MS end Cap and Line pipe greasing upto
t before installation of the End caps. The Caps should be cirumscribing the
work. All materials and labour shall be in the scope of contractor.

Qty
96

96

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech


Date of Measurement: NOV 2015
LOCATION : IP-4,ACHMETTI

BASE :

RA Bill :

IP-

Measurement Period:
From 12th Sep 2015

SOR ITEM NO : 4

Item Description :

END CAP/FABRICATION & INSTALLATION:

Fabrication and Installation of MS end


20cm both Internal & External at both ends of pipe to be carried out before installation of the End caps. The
pipe with sufficient grip to hold the pipe as mentioned in scope of work. All materials and labour shall be in th

S N.

Location

Description

Pipe
Size

Unit

4.5

IP-4,ACHMETTI

END CAP/ FABRICATION &


INSTALLATION

8"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

Bill :

WO NO. : 257

IP-4,ACHMETTI

asurement Period:

m 12th Sep 2015

R ITEM NO : 4

N:

Fabrication and Installation of MS end Cap and Line pipe greasing upto
t before installation of the End caps. The Caps should be cirumscribing the
work. All materials and labour shall be in the scope of contractor.

Qty
40

40

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech


Date of Measurement: NOV 2015
LOCATION : IP-1, DEVRUKH

RA Bill :

BASE :

IP-

Measurement Period:
From NOV 2015

SOR ITEM NO : 4

Item Description :

END CAP/FABRICATION & INSTALLATION:

Fabrication and Installation of MS end


20cm both Internal & External at both ends of pipe to be carried out before installation of the End caps. The
pipe with sufficient grip to hold the pipe as mentioned in scope of work. All materials and labour shall be in th

S N.

Location

Description

Pipe
Size

Unit

4.1

IP-1, DEVRUKH

END CAP/ FABRICATION &


INSTALLATION

36"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore

Bill :

MEASUREMENT SHEET
NO.
BASE :

WO NO. : 257

IP-1, DEVRUKH

asurement Period:

m NOV 2015

R ITEM NO : 4

N:

Fabrication and Installation of MS end Cap and Line pipe greasing upto
t before installation of the End caps. The Caps should be cirumscribing the
work. All materials and labour shall be in the scope of contractor.

Qty
78

78

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

Remarks

narmada

MEASUREMENT SHEET

PROJECT : Rate Contract Hydrotest, PSV calibration, & Emergency Works for Dabhol
Gas Pipeline
CLIENT : M/s GAIL (INDIA) LIMITED

MEASUREM
NO.

CONTRACTOR : M/s Narmada Offshore constructions pvt Ltd.

Name of work : Mech

BASE :

RA Bill :

IP-

Measurement Period:

Date of Measurement: NOV 2015

From 12th Sep 2015

LOCATION : IP-STATION

SOR ITEM NO : 5

Item Description :

TESTING AND CALIBRATION OF PSV:

Testing and Calibration Pressure Safety


at IP Stations, Despatch/Receiving terminals,Metering Skids with operating pressure ranging be
92kg/cm2 as per approved procedure and scope of work mentioned elsewhere in Tender Docum

S N.

Location

Description

5.1
5.2
5.3

IP-STATION

TESTING & CALIBRATION OF


PSV

Pipe
Size

Unit

1'X2"

EA

11/2"X2"

EA

2"X3"

EA

1"X1"

EA

3/4"X1"

EA

1/2"X1/2"

EA

TOTAL QUANTITY
NOTE: Certified that the work done as per Drawing, Specification & Approved deviation,
Quantities mentioned above are checked & certified.

M/s NOCPL

M/s GAIL

SIGNATURE:

SIGNATURE :

DATE:

DATE :

NAME :

NAME :

EASUREMENT SHEET

, & Emergency Works for DabholBangalore


MEASUREMENT SHEET
NO.
BASE :

Bill :

WO NO. : 257

IP-STATION

asurement Period:

m 12th Sep 2015

R ITEM NO : 5

ting and Calibration Pressure Safety Valves various sizes installed


s with operating pressure ranging between 10 kg/cm2 to
mentioned elsewhere in Tender Document.

Qty

Remarks

74
5
0
9
6
1

95

fication & Approved deviation,

M/s GAIL
NAME :

SIGNATURE :
DATE :

ExtraWork (Out Of
Scope)

You might also like