Square

:
W = Weight of hammer (Ton.)
2
e = (W +Wp*n ) / (W+Wp)
A = Area of pile
L2 = Height of base at top pile
L = Height of pile (m.)
H = Height of drop (cm.)
Z = Equipment loss fator
Qa = Allowable bearing capacity
FS = Factor of safety
Qu = Ultimate bearing capacity
C = C1+C2+C3
C1 = (1.8*Qu*L2)/A
C2 = (0.72*Qu*L)/A
C3 = (3.6*Qu)/A
Wp = Weight of Pile (Ton.)
n = Coefficient of restitution

Type of pile

HILEY'S FORMULA
0.30 x 0.30 x 7.00
= 3.50

4.50

= 0.7172

0.7642

= 900.00

cm2

= 0.10

m.

= 7.00

m.

cm.

m.
Ton.

= 0.80
=

40

Ton.

= 2.50
= 100.00

Ton.

= 0.98

cm.

= 0.02

cm.

= 0.56

cm.

= 0.40

cm.

= 1.51

Ton.

Wp

#$% Settlement )%%+#,%-./ blow count


S

= 0.25

Weight of hammer
=
Height of drop H = 40.00
50.00
Last 10 blows
S = 3.13
5.14
Blows per foot N = 96
59
Weight of hammer
=
Height of drop H = 40.00
50.00
Last 10 blows
S = 6.10
8.86
Blows per foot N = 50
34

3.50
60.00
7.15
42

70.00
9.16
33

80.00
11.16
27

Ton.
cm.
cm.
blows.

80.00
17.11
18

Ton.
cm.
cm.
blows.

4.50
60.00
11.61
26

70.00
14.36
21

REFERENCE Blowles , Joseph E. , Foundation analysis and design , 1988

7.216

= 40.00

e =

0.717

3.50

RECHECK FROM LAST 10 BLOWS


S
C
+
)
10
2

= 66.00

Ton.

S
C
+
)
10
2
F .S

= 26.40

Ton.

Qu =

eWHZ /(

Qa =

eWHZ

/(