You are on page 1of 3

Ares of Concern

1. Vegetables
Production

a. Ampalaya
Production

Greenhouse Nursery Development Plan and Program of Works


SY 2011-2015
Vegetables Production
Objectives
Proposed Job
Personel Involved
Time Frame

To raise 3 kinds of Constructing and


vegetables in the
maintaining the
Nursery containing
cleaning of
an area of 500
drainage canal
square meter.
around the area.
Under brushing the
whole area.
a) Ampalaya
b) Eggplant
Providing beds 1
c) Pechay
meter wide
according to its
To produce good
desired length.
quality vegetables Preparing the land by
for market.
hoeing the area to
loosen the soil.
To engage in
Preparing the seed
Ampalaya
beds for planting so
production to the
as not to become
Faculty
water logged.
Contruction trellis for
consumtion.
To encourage the
climbing these
faculty and
crops.
Sowing of seeds
students to plant
directly in beds or
ampalaya for their
in the plastic
home produntion.
container.
Cultivation and
weeding by hoeing
to give more
favorable medium
for the growing
roots.
Fertilization of crops
with complete

In-Charge of the
Nursery Project.
Hiring 2 laborers.

In-Charge of the
project.
Students for my
laboratory in crop
science.

Expected
Output/Remarks
The preparation of The Whole area
the whole area will
must be well
be start on March
prepared.
to April 2011.

The planting will be Be able to sells the


from March 2011.
produce and better
quality fruits.

b. Eggpalnt
Production

c. Pechay Production

fertilizer (14-14-14)
per hill with an
additional
application of
compost per hill
before planting.
To plant 200 hills of
Raising of seeding in
eggplant within the
seed boxes or in
500 square meter
the seed tray.
Proving farm manure
area.
To encourage
for every hole to be
students in
planted with
agricultuter to
seeding.

Applying
fertilizer for
plants this
newly establish
vegetables in their
seedings.
background.
To show the students Controling any insects
for spraying
and outsiders that
chemicals
growing eggpalnts
necessary.
is a lucrative
Cultivating the soils
business.
for every hill by
hilling-up to
enhance growth.
Weeding the area if
weeds become
nuisance.
To grows pechay
Land preparation by
palnts in the
thorough
nursery for students
pulverizing the soil.
Seeds bedding and
and faculty
sowing of
comsumtion.
To let students learn
seeds/planting the
the nactual
seedlings.
Fertilizing and
technology in
spraying of plants
growing pechay
for growth and
palants.
To enhance students
proper

Project In-Charge.
Students laboratory
in crop science
subject.

Instructor In-Charge.
Laboratory students
in crop science.

The planting of
To become production
seedings will start
and sells the
on April 2011.
production for
Cultural
income generating
management will
projects.
follow from April to
May.

From May to June


2011.
The planting
started from the
middle of May
2011.

To produce better
leafy vegetables.

in engaging pechay
production.

development.

Prepared By:

Approved:

EDNA C. LEYSON
Greenhouse In-Charge

ROBERTO L. SALADAR PhD


Executive Director

You might also like