Min Dhama Co., Ltd.

Daily Report
Project Name:

Myanmar Aquarium Project

Project Code:

4YG 04700

Project Start Date


Estimate Completion Date

Report Date :

20-Jun-2016

2014

Contract Period

1 Year

Calendar Day

31-Dec-2016

Remain Period

195

Calendar Day

Monday

No. of Day

Report No.
AM

DPR-0322
PM

Weather

Fine

6~8

8~10

10 ~12

12~2

2~4

4~6

Rain

Retaining Wall

Mason

Carpenter

Smith

Pile Hacker

29

12

18

Work Force
Trades

PM

PE

Today

Trades

Power Plus

Water
proof

Today

SSE

Site Engr

QA/QC

M&E

Admin

Safety

Security

Site Store

Surveyor

Operator

Driver

Helper

STRUTS

Deck Sheet

Painter

D&W Installer

Ceiling worker

ACP

Steel Erector

7
Total
95

11

Machine & Equipments on site


Description

Previous

Today

Remarks

Cum.

Description

Previous

Today

Remarks

Cum.

Description

Excavator

60 Ton Crane

Dozer

50 Ton Crane

Truck

Water Boxer

25 Ton Crane

Stud Welding Machine

Boom Lift

Generator

Previous

Today

Cum.

Remarks

Backhoe ( CAT )

Material Delivery On Site


Quantity
Description

Quantity

Unit

Description
Today

Cement ( Elephant )

Bags

100

Sand (Rough)

Suds

2.22

Shringle

Suds

1.11

Roof Stub Column

Nos

36

Quantity

Unit

Description

Total

Today

Unit

Total

Remarks
Today

Total

QC - Test Sampling
Item

Remarks

Test Sample
Taken

LTI Free hours

UA,UC

Near Miss

FAI

MTC

LTA

347513 hrs

HSE

Daily TBT Conducted By Safety


Officer

How to write Job Safety Analysis ( JSA )

HSE
Trades Of Work
1

Ground Beam work

Floor Slab

Location

Remark

F & B Building

90%

2.1

Concrete Casting for Ground Floor Slab

F & B Building

80%

2.2

Concrete Casting for 1st Floor Slab

F & B Building

93%

2.3

Rebar Installation for 2nd Floor Slab

F & B Building

37%

Wall

F & B Building

3.1

Brickwork for Wall ( Include Stiffener Column & Lintel )

On Ground Floor

80%

3.2

Brickwork for Wall ( Include Stiffener Column & Lintel )

On First Floor

30%

Door

F & B Building

4.1

Rebar Installation for Parameter Door

On Ground Floor

83%

4.2

Fixing Formwork for Parameter Door

On Ground Floor

78%

4.3

Casting Concrete for Parameter Door

On Ground Floor

78%

Earth Work

F & B Building

5
5.1

Earth Filling & Dressing for Ground Floor Slab

5.2

Earth Dressing for Landscape around F & B

6
6.1

7
7.1

8
8.1

95%

F & B Building

Steel Erection
Steel Erection for Roof Column

Second Floor

82%

F & B Building ; Between Grid line A3 & A4

COMPLETE

Staircase
Casting Concrete for ST - 2

F & B Building

M&E WORK

First Floor ; Bet: Grid Line A7 & A8

Pipe Installation(150mm PVC) KWP

In Progress

F & B Building

Septic Tank Area

9.1

Pulling out Sheet Pile

At Septic Tank Area

60%

10

Pile Cap work

Aquarium Building

96%

10.1

Earthwork Excavation

10.2

Casting Lean Concrete

10.3

Brickwork

10.4

Pile Hacking

10.5

Rebar Installation

10.6

Casting Concrete

11
11.2

12
12.1

13
13.1

14

Aquarium Building

Column
Casting Concrete for Column ( 2.2 m ht from +30.45 level )

Pile Cap work

1 No ; Main Fish Tank

COMPLETE

Service Building

34%

Excavation , Casting Lean Concrete , Pile Hacking & Brick Formwork

Service Building

Beam work

At +29.10 Level

Excavation , Casting Lean Concrete & Brick Formwork

38%

Service Building

Wall

14.1

Fixing Formwork for Wall ( 800mm ht from +27.30 Level )

COMPLETE

14.2

Casting Concrete for Wall ( 800mm ht from +27.30 Level )

COMPLETE

15
15.1

16

Aquarium Project

Drain
Earthwork Excavation, Lean Concrete & Brick Formwork ( Include Column & Beam )

Retaining Wall

16.1

Shoring with Myaw , Bamboo Mat & Sand Bags

16.2

Excavation

16.3

9" thk; Hardcore

16.4

3" thk; (1:3:6) Lean Concrete

16.5

Footing & Short Column

16.6

Beam

16.7

Stone Pitching, Plastering & Pointing

Inner Parameter Drain

8%

Aquarium Project

90%

Special Event
Visitors on
site

Purpose

Site Inspection

Project Manager

Name

Site Instruction

Project Engineer

Sign

Name: Sai Thaung Nyunt

Prepare By: Site Engineer

Sign

Name:

Chu Pwint May

Sign