Professional Documents
Culture Documents
DATE :
PROJECT: Upgrading 132kV Single Circuit
JOB ACTIVITY : FOUNDATION
Overhead Line To Double Circuit From PMU
Rantau To PMU Chembong.
PREPARED BY :OM PRAKASH ( SSS)
CHECKED BY :RAJASHEKARAN ( SHO)
APPROVED BY :HGPT SITE COMMITTEE
No
HAZARD
ACTIVITIES
HAZARD
1.
Excavation
2.
Fixing of
Reinforcement
bar
3.
4.
-Machine
overturn/topple.
- Slope failure
- Flooding
CONSEQUANC
ES
- Fatality
- Crushing in
between
- Hit by bar
- Minor Injury
Installation of
form work.
- Fall
- Crush in
Between
- Hit by objects.
-Minor Injury
Concreting
- Loss of load
- Fall
- Major Injury
- Fracture
PROBABILI
TY
SEVERI
TY
RISK
SCOR
E
12
HIGH
MEDIUM
LOW
MEDIUM
LEVEL
TYPE OF CONTROL
5.
6.
Form work
stripping
House Keeping
- Crushing in
between.
- Pierce by sharp
object
- Material drop
- Fall
- Crushing in
between
- Hot by bar
- Slippery
- Sickness
- Major Injury
-Negligible
Injury
- Proper arrangement of
materials.
- Bend all protruding nails.
- Close supervision
- Proper PPE
4 VERY LIKELY
are excessive.
LOW
LOW
- Proper Stacking
- proper signage
- Toolbox
briefing/induction/training/N
OP
- Proper PPE
* PROBABILITY
X
Probability Index
** SEVERITY
=
Description
: Could happen frequently, Exposures
3 LIKELY
: Could happen occasionally, Exposures
are not adequately control
2 UNLIKELY
: Could happen, but only rarely,
Exposures are controlled and likely
To remain so.
1 HIGHLY UNLIKELY
: Could happen but probably never will.
Exposures are negligible.
SEVERITY INDEX
4 FATALITY
damage more than
DESCRIPTION
SCORE
LEVEL
: Death / Property
RM 100K
: Normal irreversible.
7 16
HIGH
36
MEDIUM
12
LOW
DATE :
PROJECT: Upgrading 132kV Single Circuit
Overhead Line To Double
Circuit From PMU
Rantau To PMU Chembong.