Professional Documents
Culture Documents
Tenderno
LineItemNo
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
Pageno
Srno
ItemId
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
ConfigId
SubDivisionCode
BOQDesc
Construction of cement concrete Excavation in
soil (by Mechanical Means.) Excavation for
roadway in soil using mechanical meanse
including loading in tipper for carrying of cut
earth to embankment site and unloading with
all lifts and lead upto 1000 meters as per
relevant clauses of section 300.
Compacting Original Ground
Compacting Original Ground supporting sub
grade Loosening of the ground upto a level of
500 mm below the subgrade level watered,
graded and compacted in layers to meet
requirement of table 300-2 for sub grade
Construction of sub-grade with Material
construction
Obtained from Borrow Pits/Borrow Area
(Construction of sub-grade with approved
material/selected soil having C.B.R.>8 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site, spreading, grading to
required slope and compacting to meet
requirement of table 300-2).
Scarifying existing bituminous surface to a
depth of 50 mm (Scarifying the existing
bituminous road surface to a depth of 50 mm
and disposal of scarified material with in all
lifts and lead up to 1000 meters.) as per clause
305.4.3.
Granular Sub-base as per Table 400-1
Construction of granular sub-base by providing
graded Material carriage of mixed Material to
work site spreading in uniform layers with
motor grader on prepared surface watering
rolling and compacting with vibratory power
roller at OMC to achieve the desired density
complete as per clause 401
Plant mix method (with Mechanically crushed
stone only) For Lower Sub-base with
Grading-III Material
Quantity
UOM
51158.25
Cum
32175
Cum
32175
Cum
33750
Sqm
14051
Cum
12585
Cum
10125
Cum
20270
Cum
30694.95
Cum
7560
Cum
9000
Meter
200
Cum
2700
Sqm
450
Each
48161.85
Sqm
33419.56
Cum
15631.26
Cum
12962.34
Cum
10175.5
Cum
49125.09
Sqm
49125.09
Sqm
Dense
Graded
Bituminous
Macadam
(Providing and laying dense bituminous
macadam with 40-60 TPH HMP using crushed
aggregates of specified grading, premixed with
bituminous binder @ 4.0 to 4.5 percent by
weight of total mix of mix and filler,
transporting the hot mix to work site, laying
with a hydrostatic paver finisher with sensor
control to the required grade, level and
alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the
desired compaction as per MORTH
specification clause No. 505 complete in all
respects.)
With mechanical paver finisher
for Grading II (26.5 mm nominal size bitumen
content 4.50percent)
3929.95
Cum
1964.77
Cum
675
Sqm
14400
Meter
7300.8
Cum
2730
Cum
14601.6
Cum
1238.4
Cum
619.6
Cum
2580
RM
Each
Each
20
Each
Each
Each
Each
40
Each
40
Each
20
Each
0.4
Cum
2.048
Cum
10.24
Sqm
3.04
Sqm
0.4
Cum
40
Kg
0.072
Cum
618.8
Cum
Rate
Amount
95
4860033.75
50
1608750
250
8043750
23
776250
1423
19994573
AmountInWor
ds
1372
17266620
2332
23611500
4926
99850020
120
3683394
291
2199960
207
1863000
2413
482600
707
1908900
2617
1177650
23
1107722.55
1423
47556033.88
1372
21446088.72
1434
18587995.56
291
2961070.5
64
3144005.76
17
835126.53
7916
31109484.2
9812
19278323.24
707
477225
4905
70632000
236
1722988.8
371
1012830
120
1752192
144
178329.6
620
384152
1040
2683200
787
3148
1074
6444
702
14040
4494
17976
3434
10302
655
3930
1459
58360
79
3160
30
600
3267
1306.8
2953
6047.74
99
1013.76
139
422.56
4742
1896.8
55
2200
4031
290.23
45
27846