DewaComments
0.Substationinternalwall&ceilingtobesandcementplasterwithwhiteemulsionpaint.Floortobesandcementnetfinishingonly.
1.Emergencylighttobefoxedabovethealuminumlouvereddoor.
2.Substationfloor,cabletrenches&walltobesmoothfinishes.Floorcracksoranydamagetoberepairedproperly.
3.Insidethesubstationtobecleaned&clearedallconstructionmaterials.
4.Frontsideofthesubstationtobecleaned&clearedallconstructionmaterialsuptoDMroad.
5.Cabletraystobeprovidedatthesamesize&locationshowninthedrawing.
6.Cabletraysdepthtobe95cm.fromfinishedfloorlevel&45cm.minimumclearancetobeprovidedbetweenceiling&cabletrays.
7.NoservicestobeprovidedbelowtheHV&LVcabletrays.Minimum45cm.clearancetobeprovidedbetweencabletrays&anyservicespassedabovethecabletrays.
8.Leveldifferencetobemaintainedbetweensubstationfinishedfloor&outsideDMpavementasshowninthedrawing.
9.AccessroadtobeprovidedfromnearbyDM/RTAroaduptoSubstationroom.
10.Minimum10wide&9heightclearaccesstobeprovidedfromDM/RTAroaduptosubstationroom.Noadditionalservices/obstructiontobeprovidedinfrontofthesubstation
room.