015 - Professional Practice - SAMPLE - BOARD QUESTIONS
015 - Professional Practice - SAMPLE - BOARD QUESTIONS
People / public
Bid Bulletin
Proposal
Proposal Bond
Special Provision
Specifications
Written Notice
Work
Install
Furnish
Provide
50 %
65 %
80 %
30 %
25
12 sq. m
50 / contractor
15 days
15 days
90 days
Contractor
True
False
10 days
15 %
15 %
Penalty clause
5,000 to first 50 hectares
R.A 6451
PD 1308
Liens
6%
150 %
200/hr
500/hr
12 %
Repetitive construction
Minimum basic fee for housing projects
Group 3 (exceptional)
P750
Construction phase service
5 days
10 days
10 %
50 %
85 %
12 %
6%
8%
Architect
3 months
General conditions
Quotation
Certificate of Payment
Performance Bond
Contract
time
reckoning
shall
commence on the ___from receipt of
___
An area of a city where municipal
buildings are grouped
No person unless the country of his
relation allows the same __
The third phase of an architects regular
services
Project financing falls under what kind
of service of the architect
Comprehensive planning falls under
what service of the architect
The fee of the architect for design-build
services on a guaranteed maximum
cost aside from his fee for regular
design services
What percentage of an architects work
is liability under the civil code
For interior design services, the
architect shall be paid what percentage
of the fee upon submission of the final
design
When the owner fails to implement the
plans and documents for construction
as prepared by the architect, the
architect is entitled to receive what
percentage of the fee upon submission
of the final design
The minimum basic fee for specialized
decorative building
The minimum basic fee for industrial
buildings with a project cost below 50
million pesos
The minimum basic fee for hospital with
a project cost below 50 million pesos
In design-build services, the single
point responsibility of project delivery
puts the legal liability for both the
design and construction on the
The release of 10% retention by the
owner shall be done after how many
months form the date of final payment
Printed documents
stipulating
the
procedural and administrative aspect of
the contract
A price given by a contractor, sub
contractor, material supplier or vendor
to furnish material, labor or both
A
statement
from
the
architect
confirming the amount of money due
the contractor for work accomplished
A bond furnished by the contractor and
his surety as a guarantee to execute the
work in accordance with the terms of
the contract
Bid
7%
Closed specification
Instruction to Bidders
2 months
12 months / 1 year
30 days
Statue of Limitation
Statutory Bond
Statue of Frauds
Lease
Leasehold
Lesse
Lessor
2-2.5
Multiple of Direct Personnel Expenses
True
Percentage of Construction