NAMA TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Operator
Mekanik
Pengemudi
Tukang kayu
Tukang besi
Penganyam besi
Juru ukur
Asisten operator
SAT.
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
HARGA SATUAN
( Rp.)
HARGA SATUAN
( Rp.)
202,400.00
189,750.00
151,800.00
107,525.00
189,750.00
189,750.00
189,750.00
151,800.00
151,800.00
107,525.00
107,525.00
107,525.00
NO.
NAMA BAHAN
1
2
3
4
5
6
8
10
13
15
16
17
18
19
21
22
23
24
NO.
Solar Industri
Bensin
Batu belah
Porland Cement (@ 50 Kg)
Pasir pasang/cor
Gebalan rumput
Batu koral beton
Kawat bronjong galvanis O 6 mm
Karung plastik/glangsing
Paku payung
Cat meni
Kayu meranti usuk
Kayu meranti papan
Kayu meranti balok
Paku
Besi tulangan polos
Kawat ikat beton
Minyak begisting
NAMA BAHAN
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Baja Profil
Multiplek 12 mm
SAT.
HARGA SATUAN
( Rp.)
Ltr
Ltr
M3
Zak
M3
M2
M3
Kg
Bh
Kg
Kg
M3
M3
M3
Kg
Kg
Kg
Liter
SAT.
12,650.00
10,925.00
695,750.00
126,500.00
822,250.00
5,750.00
759,000.00
50,600.00
5,750.00
57,730.00
31,625.00
5,060,000.00
5,060,000.00
5,060,000.00
25,300.00
16,445.00
35,420.00
4,427.50
HARGA SATUAN
( Rp.)
40,250.00
11,500.00
120,175.00
37,950.00
9,487.50
128,800.00
57,500.00
37,950.00
3,162,500.00
4,427.50
31,625.00
105,416.67
5,060,000.00
13,800.00
11,500.00
253,000.00
189,750.00
759,000.00
57,500.00
196,075.00
695,750.00
M2
Kg
Lembar
Btg
M
Lbr
Ljr
Kg
M3
Ltr
Ltr
M
M3
Set
Set
M3
M3
M3
M2
Bh
M3
12,650.00
10,925.00
695,750.00
126,500.00
822,250.00
5,750.00
759,000.00
50,600.00
5,750.00
57,730.00
31,625.00
5,060,000.00
5,060,000.00
5,060,000.00
25,300.00
16,445.00
35,420.00
4,427.50
40,250.00
11,500.00
120,175.00
37,950.00
9,487.50
128,800.00
57,500.00
37,950.00
3,162,500.00
4,427.50
31,625.00
105,416.67
5,060,000.00
13,800.00
11,500.00
253,000.00
189,750.00
759,000.00
57,500.00
196,075.00
695,750.00
M
Lbr
82,800.00
234,025.00
82,800.00
234,025.00
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
NAMA ALAT
Stamper
Pompa Air
Pesawat ukur
Meteran 5 m
Palu / bodem
Foto copy A4
Alat pelancip / pisau besar
Keranjang
Kereta dorong
Molen
Ember
Kotak adukan
Kuas
Cetok
Kasut kayu
Tang pemotong kawat
Concrete vibrator
Gunting pemotong baja
Kunci pembengkok tulangan
Gergaji
Tusuk bambu
Excavator
Bulldozer
Dump Truck
Walls
Vibrator Roller
Chainsaw
Trailler
Water Tank Truck
Timbris
Linggis
Tandem Roller
Las Listrik
Bor Listrik
Alat penunjang
SAT.
Unit/Jam
Unit/Jam
Unit/Hr
Bh
Bh
Lbr
Bh
Bh
Unit
Unit/Hr
Bh
Bh
Bh
Bh
Bh
Bh
Unit/Jam
Bh
Bh
Bh
Bh
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit
Bh
Unit/Jam
Unit/Hr
Unit/Hr
Bh
HARGA SATUAN
( Rp.)
HARGA SATUAN
( Rp.)
34,500.00
34,500.00
172,500.00
20,700.00
41,400.00
276.00
48,300.00
17,250.00
345,000.00
276,000.00
13,800.00
49,404.00
15,180.00
34,500.00
10,350.00
28,290.00
21,114.00
81,420.00
24,150.00
38,364.00
10,350.00
349,002.00
396,819.00
163,944.00
101,085.00
239,085.00
49,680.00
345,000.00
133,860.00
53,337.00
62,514.00
195,339.00
345,000.00
172,500.00
3,450.00
34,500.00
34,500.00
172,500.00
20,700.00
41,400.00
276.00
48,300.00
17,250.00
345,000.00
276,000.00
13,800.00
49,404.00
15,180.00
34,500.00
10,350.00
28,290.00
21,114.00
81,420.00
24,150.00
38,364.00
10,350.00
349,002.00
396,819.00
163,944.00
101,085.00
239,085.00
49,680.00
345,000.00
133,860.00
53,337.00
62,514.00
195,339.00
345,000.00
172,500.00
3,450.00
I PEKERJAAN PERSIAPAN
1. Pembersihan dan Striping / Kosrekan
NO.
2.
URAIAN
A.
1
2
3
TENAGA
Pekerja
Tukang Tebas
Mandor
B.
BAHAN
C.
1
PERALATAN
Chainsaw
D.
E.
F.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
B.
1
2
3
BAHAN
Kayu Klas III 5/7 (ikat)
Paku Biasa 2" - 5"
Kayu Papan Klas III (2 x 20 x 400)
C.
PERALATAN
D.
E.
F.
II PEKERJAAN TANAH
1. Galian Tanah Menggunakan Excavator (Alat)
NO.
2.
URAIAN
A.
1
2
3
TENAGA
Operator
Mekanik
Penjaga Malam
B.
1
BAHAN
Solar Industri
C.
1
PERALATAN
Sewa/Alat berat Excavator
D.
E.
F.
Galian Tanah Tanah Biasa Sedalam <1 m dan jarak angkut 3 m (Ma
NO.
3.
URAIAN
A.
1
2
TENAGA
Tukang Gali
Mandor
B.
BAHAN
C.
PERALATAN
D.
E.
F.
Galian Tanah Tanah Biasa Sedalam <1 m d <2 m dan jarak angkut 3
NO.
URAIAN
A.
1
2
TENAGA
Tukang Gali
Mandor
B.
BAHAN
4.
C.
PERALATAN
D.
E.
F.
5.
URAIAN
A.
1
2
TENAGA
Tukang Gali
Mandor
B.
BAHAN
C.
PERALATAN
D.
E.
F.
URAIAN
A.
1
2
3
TENAGA
Operator
Mekanik
Penjaga Malam
B.
1
BAHAN
Solar Industri
C.
1
2
PERALATAN
Sewa/Alat berat Excavator rock breaker
Sewa/Alat berat Excavator
D.
E.
F.
6.
7.
URAIAN
A.
1
2
TENAGA
Pekerja
Mandor
B.
BAHAN
C.
PERALATAN
D.
E.
F.
8.
URAIAN
A.
1
2
TENAGA
Operator
Mekanik
B.
BAHAN
C.
1
PERALATAN
Sewa/Alat berat Buldozer
D.
E.
F.
URAIAN
A.
1
2
TENAGA
Operator
Mekanik
B.
1
BAHAN
Tanah Urug
9.
C.
1
PERALATAN
Sewa/Alat berat Buldozer
D.
E.
F.
URAIAN
A.
1
2
TENAGA
Tukang Gali
Mandor
B.
1
BAHAN
Pasir Urug
C.
PERALATAN
D.
E.
F.
III
PEKERJAAN BETON
2.
1 m3 Beton Cyclop
NO.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B.
1
BAHAN
pc
pb
3
4
Batu Belah
air
C.
PERALATAN
Molen 0.35 m3
D.
E.
F.
5.
1 m3 Beton Mutu, f'c = 19.3 Mpa (K225), Slump (122) cm, w/c = 0.5
NO.
6.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B.
1
BAHAN
pc
pb
3
4
kr
air
C.
PERALATAN
Molen 0.35 m3
D.
E.
F.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
B.
1
2
3
4
BAHAN
*Multiflex 12 mm atau 18 mm
*Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak Bekisting
C.
PERALATAN
D.
E.
F.
Catatan :
7.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
B.
1
BAHAN
Besi Beton (polos/ulir)
Kawat Beton
C.
1
PERALATAN
Mesin Potong Besi
D.
E.
F.
IV PEKERJAAN PASANGAN
1. Plesteran Tebal 1 cm, dengan Mortar Jenis PC-PP Tipe N (untuk Mutu
NO.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B.
1
2
BAHAN
Pasir Pasang
Portland Cement
C.
PERALATAN
D.
E.
F.
2.
3.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B.
1
2
BAHAN
Pasir Pasang
Portland Cement
C.
PERALATAN
D.
E.
F.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B.
1
2
3
BAHAN
Batu
Pasir Pasang
Portland Cement
C.
1
PERALATAN
Molen
D.
E.
F.
4.
5.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B.
1
2
3
BAHAN
Batu
Pasir Pasang
Portland Cement
C.
1
PERALATAN
Molen
D.
E.
F.
5.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Mandor
B.
1
2
3
BAHAN
Batu / Batu Belah
Kawat Bronjong dia. 6 mm
Besi Beton dia. 10 mm
C.
PERALATAN
D.
E.
F.
URAIAN
NO.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B.
1
2
3
BAHAN
Batu
Pasir Pasang
Portland Cement
C.
1
PERALATAN
Molen
D.
E.
F.
VI PEKERJAAN LAIN-LAIN
1. Pengeringan atau Pemompaan Air
NO.
2.
URAIAN
A.
1
2
TENAGA
Operator
Mekanik
B.
1
BAHAN
Solar
C.
1
PERALATAN
Pompa Air
D.
E.
F.
Pipa Drain
NO.
A.
1
2
URAIAN
TENAGA
Pekerja
Tukang
3.
B.
1
2
3
BAHAN
Pipa PVC dia. 100 mm/6
Ijuk
Kerikil
C.
PERALATAN
D.
E.
F.
Gebalan Rumput
NO.
4.
URAIAN
A.
1
2
3
TENAGA
Pekerja
Tukang
Mandor
B.
1
2
BAHAN
Gebalan Rumput
Pasak Bambu
C.
PERALATAN
D.
E.
F.
URAIAN
A.
1
2
3
4
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
B.
1
2
BAHAN
Besi Beton dia 12 mm
Baja Profil L40.40.4
C.
PERALATAN
5.
1
2
D.
E.
F.
URAIAN
A.
1
2
TENAGA
Pekerja
Mandor
B.
1
2
BAHAN
Karung Plasrik
Gedek
C.
PERALATAN
D.
E.
F.
SATUAN
KOEF.
OH
OH
OH
0.009
0.003
0.001
HARGA SATUAN
RP.
107,525.00
151,800.00
202,400.00
JUMLAH TENAGA KERJA
0.020
49,680.00
JUMLAH HARGA PERALATAN
ralatan ( A + B + C )
JUMLAH HARGA
RP.
967.73
455.40
202.40
1,625.53
993.60
993.60
2,619.13
392.87
3,100.00
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
OH
OH
0.100
0.100
0.010
0.005
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
10,752.50
15,180.00
1,897.50
1,012.00
28,842.00
m
kg
m
0.012
0.020
0.007
5,060,000.00
25,300.00
5,060,000.00
JUMLAH HARGA BAHAN
60,720.00
506.00
35,420.00
96,646.00
ralatan ( A + B + C )
125,488.00
18,823.20
144,400.00
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OJ
OJ
OJ
1.000
0.500
2.000
27,107.14
27,107.14
15,360.71
JUMLAH TENAGA KERJA
27,107.14
13,553.57
30,721.43
71,382.14
Ltr
0.012
12,650.00
JUMLAH HARGA BAHAN
151.80
151.80
Jam
0.032
349,002.00
JUMLAH HARGA PERALATAN
11,168.06
11,168.06
ralatan ( A + B + C )
82,702.01
12,405.30
95,200.00
KOEF.
OH
OH
0.563
0.019
HARGA SATUAN
RP.
151,800.00
202,400.00
JUMLAH TENAGA KERJA
JUMLAH HARGA
RP.
85,463.40
3,845.60
89,309.00
ralatan ( A + B + C )
89,309.00
13,396.35
102,800.00
KOEF.
OH
OH
0.675
0.023
HARGA SATUAN
RP.
151,800.00
202,400.00
JUMLAH TENAGA KERJA
JUMLAH HARGA
RP.
102,465.00
4,655.20
107,120.20
ralatan ( A + B + C )
107,120.20
16,068.03
123,200.00
SATUAN
KOEF.
OH
OH
1.351
0.045
HARGA SATUAN
RP.
151,800.00
202,400.00
JUMLAH TENAGA KERJA
JUMLAH HARGA
RP.
205,081.80
9,108.00
214,189.80
ralatan ( A + B + C )
214,189.80
32,128.47
246,400.00
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OJ
OJ
OJ
1.000
0.500
2.000
27,107.14
27,107.14
15,360.71
JUMLAH TENAGA KERJA
27,107.14
13,553.57
30,721.43
71,382.14
Ltr
0.012
12,650.00
JUMLAH HARGA BAHAN
151.80
151.80
Jam
Jam
0.096
0.064
436,252.50
349,002.00
JUMLAH HARGA PERALATAN
41,792.99
22,266.33
41,792.99
ralatan ( A + B + C )
113,326.93
16,999.04
130,400.00
SATUAN
KOEF.
OH
OH
0.330
0.012
HARGA SATUAN
RP.
107,525.00
202,400.00
JUMLAH TENAGA KERJA
0.050
241,500.00
JUMLAH HARGA PERALATAN
ralatan ( A + B + C )
35,483.25
2,428.80
37,912.05
12,075.00
12,075.00
49,987.05
7,498.06
57,500.00
SATUAN
KOEF.
OJ
OJ
1.000
0.500
HARGA SATUAN
RP.
27,107.14
27,107.14
JUMLAH TENAGA KERJA
JUMLAH HARGA
RP.
0.035
396,819.00
JUMLAH HARGA PERALATAN
ralatan ( A + B + C )
JUMLAH HARGA
RP.
27,107.14
13,553.57
40,660.71
13,888.67
13,888.67
54,549.38
8,182.41
62,800.00
SATUAN
KOEF.
OJ
OJ
1.000
0.500
m3
1.200
HARGA SATUAN
RP.
27,107.14
27,107.14
JUMLAH TENAGA KERJA
189,750.00
JUMLAH HARGA
RP.
27,107.14
13,553.57
40,660.71
227,700.00
Jam
0.050
227,700.00
396,819.00
JUMLAH HARGA PERALATAN
19,840.95
19,840.95
ralatan ( A + B + C )
288,201.66
43,230.25
331,500.00
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
0.400
0.040
151,800.00
202,400.00
JUMLAH TENAGA KERJA
60,720.00
8,096.00
68,816.00
m3
1.200
189,750.00
JUMLAH HARGA BAHAN
227,700.00
227,700.00
ralatan ( A + B + C )
SATUAN
OH
OH
OH
OH
296,516.00
44,477.40
341,000.00
Manual
KOEF.
Molen
1.650
0.275
0.028
0.083
kg
1.320
0.205
0.020
0.060
HARGA SATUAN
RP.
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
247
kg
869
0.621
m3*)
kg
L
999
0.740
215
m3*)
Hari
JUMLAH HARGA
RP.
141,933.00
31,119.00
3,795.00
12,144.00
188,991.00
2,530.00
624,910.00
822,250.00
510,382.32
695,750.00
300.00
JUMLAH HARGA BAHAN
0.200
JUMLAH HARGA PERALATAN
514,855.00
64,500.00
1,714,647.32
-
ralatan ( A + B + C )
1,903,638.32
285,545.75
2,189,200.00
Manual
KOEF.
Molen
1.650
0.275
0.028
0.083
1.320
0.205
0.020
0.060
OH
OH
OH
OH
kg
R+P
1.000
107,525.00
0.138
151,800.00
0.018
189,750.00
0.050
202,400.00
JUMLAH TENAGA KERJA
371
kg
698
0.499
m *)
kg
L
1047
0.776
215
m *)
Hari
HARGA SATUAN
RP.
938,630.00
822,250.00
409,950.36
759,000.00
300.00
JUMLAH HARGA BAHAN
276,000.00
ralatan ( A + B + C )
588,646.67
64,500.00
2,001,727.02
55,200.00
55,200.00
2,245,918.02
336,887.70
2,582,900.00
Lbr
M3
kg
L
141,933.00
31,119.00
3,795.00
12,144.00
188,991.00
2,530.00
3
0.200
JUMLAH HARGA
RP.
0.350
0.020
JUMLAH HARGA
RP.
0.200
0.500
0.050
0.010
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
21,505.00
75,900.00
9,487.50
2,024.00
108,916.50
0.200
0.015
0.250
0.200
234,025.00
5,060,000.00
25,300.00
4,427.50
JUMLAH HARGA BAHAN
46,805.00
75,900.00
6,325.00
885.50
129,915.50
ralatan ( A + B + C )
238,832.00
35,824.80
274,700.00
misal 2 kali maka koefisien menjadi 0.20 (Multiflek) dan 0.015 (Kaso)
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
OH
OH
0.700
0.700
0.070
0.040
Kg
105
Kg
1.500
35,420.00
JUMLAH HARGA BAHAN
53,130.00
1,779,855.00
Hari
0.050
169,050.00
JUMLAH HARGA PERALATAN
8,452.50
8,452.50
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
16,445.00
ralatan ( A + B + C )
75,267.50
106,260.00
13,282.50
8,096.00
202,906.00
1,726,725.00
1,991,213.50
298,682.03
22,899.00
0.300
0.150
0.015
0.015
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
32,257.50
22,770.00
2,846.25
3,036.00
60,909.75
M3
kg
0.018
4.450
822,250.00
2,530.00
JUMLAH HARGA BAHAN
14,800.50
11,258.50
26,059.00
ralatan ( A + B + C )
86,968.75
13,045.31
100,100.00
JUMLAH HARGA
RP.
OH
OH
OH
OH
0.300
0.150
0.015
0.015
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
32,257.50
22,770.00
2,846.25
3,036.00
60,909.75
M3
kg
0.012
6.340
822,250.00
2,530.00
JUMLAH HARGA BAHAN
9,867.00
16,040.20
25,907.20
ralatan ( A + B + C )
86,816.95
13,022.54
99,900.00
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
OH
OH
2.703
0.900
0.090
0.135
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
290,640.08
136,620.00
17,077.50
27,324.00
471,661.58
M3
M3
kg
1.200
0.520
163
695,750.00
822,250.00
2,530.00
JUMLAH HARGA BAHAN
834,900.00
427,570.00
412,390.00
1,674,860.00
unit/hari
0.167
44,400.00
JUMLAH HARGA PERALATAN
7,414.80
7,414.80
ralatan ( A + B + C )
2,153,936.38
323,090.46
2,477,100.00
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
OH
OH
2.703
0.900
0.090
0.135
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
290,640.08
136,620.00
17,077.50
27,324.00
471,661.58
M3
M3
kg
1.200
0.440
252
695,750.00
822,250.00
2,530.00
JUMLAH HARGA BAHAN
834,900.00
361,790.00
637,560.00
1,834,250.00
unit/hari
0.167
44,400.00
JUMLAH HARGA PERALATAN
7,414.80
7,414.80
ralatan ( A + B + C )
2,313,326.38
346,998.96
2,660,400.00
JUMLAH HARGA
RP.
OH
OH
OH
OH
0.750
0.300
0.060
0.015
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
80,643.75
45,540.00
11,385.00
3,036.00
140,604.75
M3
kg
kg
1.800
4.000
24.500
695,750.00
50,600.00
16,445.00
JUMLAH HARGA BAHAN
1,252,350.00
202,400.00
402,902.50
1,857,652.50
ralatan ( A + B + C )
SATUAN
1,998,257.25
299,738.59
2,298,000.00
KOEF.
HARGA SATUAN
JUMLAH HARGA
SATUAN
KOEF.
OH
OH
OH
OH
2.703
0.900
0.090
0.135
M3
M3
kg
1.200
RP.
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
695,750.00
ralatan ( A + B + C )
RP.
290,640.08
136,620.00
17,077.50
27,324.00
471,661.58
834,900.00
834,900.00
1,306,561.58
195,984.24
1,502,600.00
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
0.042
0.042
189,750.00
189,750.00
JUMLAH TENAGA KERJA
7,969.50
7,969.50
15,939.00
Ltr
0.500
12,650.00
JUMLAH HARGA BAHAN
6,325.00
6,325.00
Unit
0.042
241,500.00
JUMLAH HARGA PERALATAN
10,143.00
10,143.00
ralatan ( A + B + C )
32,407.00
4,861.05
37,300.00
SATUAN
KOEF.
OH
OH
0.025
0.050
HARGA SATUAN
RP.
107,525.00
202,400.00
JUMLAH TENAGA KERJA
JUMLAH HARGA
RP.
2,688.13
10,120.00
12,808.13
M
Kg
M3
1.000
0.300
0.045
9,487.50
11,500.00
253,000.00
JUMLAH HARGA BAHAN
ralatan ( A + B + C )
9,487.50
3,450.00
11,385.00
24,322.50
37,130.63
5,569.59
42,800.00
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
OH
0.150
0.050
0.015
107,525.00
151,800.00
202,400.00
JUMLAH TENAGA KERJA
16,128.75
7,590.00
3,036.00
26,754.75
M2
Bh
1.200
2.000
5,750.00
3,500.00
JUMLAH HARGA BAHAN
6,900.00
7,000.00
13,900.00
ralatan ( A + B + C )
40,654.75
6,098.21
46,800.00
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
OH
OH
0.750
0.300
0.060
0.015
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
80,643.75
45,540.00
11,385.00
3,036.00
140,604.75
m
m
30.000
6.000
14,592.20
82,800.00
JUMLAH HARGA BAHAN
437,765.90
496,800.00
934,565.90
hr
hr
0.020
0.020
345,000.00
172,500.00
JUMLAH HARGA PERALATAN
ralatan ( A + B + C )
6,900.00
3,450.00
3,450.00
1,078,620.65
161,793.10
1,240,500.00
HARGA SATUAN
RP.
JUMLAH HARGA
RP.
SATUAN
KOEF.
OH
OH
0.750
0.015
107,525.00
202,400.00
JUMLAH TENAGA KERJA
80,643.75
3,036.00
83,679.75
bh
Lbr
23.000
1.000
5,750.00
128,800.00
JUMLAH HARGA BAHAN
132,250.00
128,800.00
261,050.00
ralatan ( A + B + C )
344,729.75
51,709.46
396,500.00
26.62 kg
437765.9
14592.2
NO.
URAIAN PEKERJAAN
1
2
PEKERJAAN PERSIAPAN
Pembersihan dan Striping / Kosrekan
Pengukuran dan pemasangan bouwplank
PEKERJAAN TANAH
Galian Tanah Menggunakan Excavator (Alat)
Galian Tanah Tanah Biasa Sedalam <1 m dan jarak angkut 3 m (Manual)
Galian Tanah Tanah Biasa Sedalam <1 m d <2 m dan jarak angkut 3 m (Manual)
PEKERJAAN BETON
1 m3 Beton Cyclop
1 m3 Beton Mutu, f'c = 19.3 Mpa (K225), Slump (122) cm, w/c = 0.58
3
4
PEKERJAAN PASANGAN
Plesteran Tebal 1 cm, dengan Mortar Jenis PC-PP
Pasangan Batu Mortar Tipe N (untuk Mutu PP Tertentu Setara dengan Campuran 1 PC : 4 PP
Pasangan Batu Mortar Tipe M (untuk Mutu PP Tertentu Setara dengan Campuran 1 PC : 2 PP
1
2
3
4
5
II
III
IV
IV
URAIAN PEKERJAAN
PERSIAPAN
n Striping / Kosrekan
n pemasangan bouwplank
anah Berbatu
tu, f'c = 19.3 Mpa (K225), Slump (122) cm, w/c = 0.58
PASANGAN
1 cm, dengan Mortar Jenis PC-PP
LAIN LAIN
au Pemompaan Air
h Tinggi 1 m
SAT.
HARGA SATUAN
( Rp.)
M2
M
3,100.00
144,400.00
M3
95,200.00
102,800.00
M3
123,200.00
M3
246,400.00
130,400.00
M3
57,500.00
M3
62,800.00
331,500.00
M3
341,000.00
M3
2,189,200.00
2,582,900.00
M2
Kg
274,700.00
22,899.00
M2
100,100.00
99,900.00
M3
2,477,100.00
M3
2,660,400.00
2,298,000.00
M3
1,502,600.00
Jam
Bh
M2
Bh
M3
37,300.00
42,800.00
46,800.00
1,240,500.00
396,500.00