You are on page 1of 47

NO.

1
2
3
4
5
6
7
8
9
10
11
12

NAMA TENAGA

Mandor
Kepala tukang
Tukang batu
Pekerja
Operator
Mekanik
Pengemudi
Tukang kayu
Tukang besi
Penganyam besi
Juru ukur
Asisten operator

SAT.

Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh

HARGA SATUAN
( Rp.)

HARGA SATUAN
( Rp.)

202,400.00
189,750.00
151,800.00
107,525.00
189,750.00
189,750.00
189,750.00
151,800.00
151,800.00
107,525.00
107,525.00
107,525.00

NO.

NAMA BAHAN

1
2
3
4
5
6
8
10
13
15
16
17
18
19
21
22
23
24
NO.

Solar Industri
Bensin
Batu belah
Porland Cement (@ 50 Kg)
Pasir pasang/cor
Gebalan rumput
Batu koral beton
Kawat bronjong galvanis O 6 mm
Karung plastik/glangsing
Paku payung
Cat meni
Kayu meranti usuk
Kayu meranti papan
Kayu meranti balok
Paku
Besi tulangan polos
Kawat ikat beton
Minyak begisting
NAMA BAHAN

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Elastis joint tebal 2 cm


Ijuk
Pliwood tebal 9 mm
Kayu mangi2/gelam O 10 cm panjang 3 m
Pipa PVC O 2"
Gedek bambu 2 x 3 m
Bambu petung
Kawat
Kayu bekisting
Minyak bakar
Pelumas
Pipa galvanis medium O 3"
Kayu balau balok
Klem
Baut mur O 14 mm, panjang 20 cm
Sand grevel (sirtu)
Pasir urug
Batu pecah tangan (jalan)
Geotektil
Gorong-gorong O 100 cm panjang 50 cm
Batu dia 60 cm

46
47

Baja Profil
Multiplek 12 mm

SAT.

HARGA SATUAN
( Rp.)

Ltr
Ltr
M3
Zak
M3
M2
M3
Kg
Bh
Kg
Kg
M3
M3
M3
Kg
Kg
Kg
Liter
SAT.

12,650.00
10,925.00
695,750.00
126,500.00
822,250.00
5,750.00
759,000.00
50,600.00
5,750.00
57,730.00
31,625.00
5,060,000.00
5,060,000.00
5,060,000.00
25,300.00
16,445.00
35,420.00
4,427.50
HARGA SATUAN
( Rp.)
40,250.00
11,500.00
120,175.00
37,950.00
9,487.50
128,800.00
57,500.00
37,950.00
3,162,500.00
4,427.50
31,625.00
105,416.67
5,060,000.00
13,800.00
11,500.00
253,000.00
189,750.00
759,000.00
57,500.00
196,075.00
695,750.00

M2
Kg
Lembar
Btg
M
Lbr
Ljr
Kg
M3
Ltr
Ltr
M
M3
Set
Set
M3
M3
M3
M2
Bh
M3

12,650.00
10,925.00
695,750.00
126,500.00
822,250.00
5,750.00
759,000.00
50,600.00
5,750.00
57,730.00
31,625.00
5,060,000.00
5,060,000.00
5,060,000.00
25,300.00
16,445.00
35,420.00
4,427.50

40,250.00
11,500.00
120,175.00
37,950.00
9,487.50
128,800.00
57,500.00
37,950.00
3,162,500.00
4,427.50
31,625.00
105,416.67
5,060,000.00
13,800.00
11,500.00
253,000.00
189,750.00
759,000.00
57,500.00
196,075.00
695,750.00

M
Lbr

82,800.00
234,025.00

82,800.00
234,025.00

NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

NAMA ALAT

Stamper
Pompa Air
Pesawat ukur
Meteran 5 m
Palu / bodem
Foto copy A4
Alat pelancip / pisau besar
Keranjang
Kereta dorong
Molen
Ember
Kotak adukan
Kuas
Cetok
Kasut kayu
Tang pemotong kawat
Concrete vibrator
Gunting pemotong baja
Kunci pembengkok tulangan
Gergaji
Tusuk bambu
Excavator
Bulldozer
Dump Truck
Walls
Vibrator Roller
Chainsaw
Trailler
Water Tank Truck
Timbris
Linggis
Tandem Roller
Las Listrik
Bor Listrik
Alat penunjang

SAT.

Unit/Jam
Unit/Jam
Unit/Hr
Bh
Bh
Lbr
Bh
Bh
Unit
Unit/Hr
Bh
Bh
Bh
Bh
Bh
Bh
Unit/Jam
Bh
Bh
Bh
Bh
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
Unit
Bh
Unit/Jam
Unit/Hr
Unit/Hr
Bh

HARGA SATUAN
( Rp.)

HARGA SATUAN
( Rp.)

34,500.00
34,500.00
172,500.00
20,700.00
41,400.00
276.00
48,300.00
17,250.00
345,000.00
276,000.00
13,800.00
49,404.00
15,180.00
34,500.00
10,350.00
28,290.00
21,114.00
81,420.00
24,150.00
38,364.00
10,350.00
349,002.00
396,819.00
163,944.00
101,085.00
239,085.00
49,680.00
345,000.00
133,860.00
53,337.00
62,514.00
195,339.00
345,000.00
172,500.00
3,450.00

34,500.00
34,500.00
172,500.00
20,700.00
41,400.00
276.00
48,300.00
17,250.00
345,000.00
276,000.00
13,800.00
49,404.00
15,180.00
34,500.00
10,350.00
28,290.00
21,114.00
81,420.00
24,150.00
38,364.00
10,350.00
349,002.00
396,819.00
163,944.00
101,085.00
239,085.00
49,680.00
345,000.00
133,860.00
53,337.00
62,514.00
195,339.00
345,000.00
172,500.00
3,450.00

I PEKERJAAN PERSIAPAN
1. Pembersihan dan Striping / Kosrekan
NO.

2.

URAIAN

A.
1
2
3

TENAGA
Pekerja
Tukang Tebas
Mandor

B.

BAHAN

C.
1

PERALATAN
Chainsaw

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Pengukuran dan pemasangan bouwplank


NO.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

B.
1
2
3

BAHAN
Kayu Klas III 5/7 (ikat)
Paku Biasa 2" - 5"
Kayu Papan Klas III (2 x 20 x 400)

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

II PEKERJAAN TANAH
1. Galian Tanah Menggunakan Excavator (Alat)

NO.

2.

URAIAN

A.
1
2
3

TENAGA
Operator
Mekanik
Penjaga Malam

B.
1

BAHAN
Solar Industri

C.
1

PERALATAN
Sewa/Alat berat Excavator

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Galian Tanah Tanah Biasa Sedalam <1 m dan jarak angkut 3 m (Ma
NO.

3.

URAIAN

A.
1
2

TENAGA
Tukang Gali
Mandor

B.

BAHAN

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Galian Tanah Tanah Biasa Sedalam <1 m d <2 m dan jarak angkut 3
NO.

URAIAN

A.
1
2

TENAGA
Tukang Gali
Mandor

B.

BAHAN

4.

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Galian Tanah Tanah Berbatu


NO.

5.

URAIAN

A.
1
2

TENAGA
Tukang Gali
Mandor

B.

BAHAN

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Galian Tanah berbatu Menggunakan Excavator (Alat)


NO.

URAIAN

A.
1
2
3

TENAGA
Operator
Mekanik
Penjaga Malam

B.
1

BAHAN
Solar Industri

C.
1
2

PERALATAN
Sewa/Alat berat Excavator rock breaker
Sewa/Alat berat Excavator

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

6.

1 m3 Timbunan Tanah (Manual)


NO.

7.

URAIAN

A.
1
2

TENAGA
Pekerja
Mandor

B.

BAHAN

C.

PERALATAN

Pemadatan Timbunan (Stamper)

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Timbunan Tanah Menggunakan Buldozer (Alat)


NO.

8.

URAIAN

A.
1
2

TENAGA
Operator
Mekanik

B.

BAHAN

C.
1

PERALATAN
Sewa/Alat berat Buldozer

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Timbunan Tanah Dari Luar Menggunakan Buldozer


NO.

URAIAN

A.
1
2

TENAGA
Operator
Mekanik

B.
1

BAHAN
Tanah Urug

9.

C.
1

PERALATAN
Sewa/Alat berat Buldozer

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

1 m3 Timbunan Pasir Sebagai Bahan Pengisi


NO.

URAIAN

A.
1
2

TENAGA
Tukang Gali
Mandor

B.
1

BAHAN
Pasir Urug

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

III

PEKERJAAN BETON

2.

1 m3 Beton Cyclop
NO.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.
1

BAHAN
pc

pb

3
4

Batu Belah
air

C.

PERALATAN

Molen 0.35 m3

D.
E.
F.

5.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

1 m3 Beton Mutu, f'c = 19.3 Mpa (K225), Slump (122) cm, w/c = 0.5
NO.

6.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.
1

BAHAN
pc

pb

3
4

kr
air

C.

PERALATAN

Molen 0.35 m3

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

1 m2 Bekisting untuk Permukaan Beton Biasa dengan Multiflex 12 mm


NO.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

B.
1
2
3
4

BAHAN
*Multiflex 12 mm atau 18 mm
*Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak Bekisting

C.

PERALATAN

D.
E.
F.
Catatan :

7.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )
* Dapat digunakan lebih dari 1 (satu) kali misal 2 kali maka koefisie

Pembesian 1 kg dengan Besi Polos atau Ulir


NO.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

B.
1

BAHAN
Besi Beton (polos/ulir)

Kawat Beton

C.
1

PERALATAN
Mesin Potong Besi

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

IV PEKERJAAN PASANGAN
1. Plesteran Tebal 1 cm, dengan Mortar Jenis PC-PP Tipe N (untuk Mutu
NO.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.
1
2

BAHAN
Pasir Pasang
Portland Cement

C.

PERALATAN

D.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )

E.
F.

2.

Overhead & Profit 15% X D


Harga Satuan Pekerjaan ( D + E )

Siaran dengan Mortar Jenis PC-PP Tipe M (untuk Mutu PP Tertentu Se


NO.

3.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.
1
2

BAHAN
Pasir Pasang
Portland Cement

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Pasangan Batu Mortar Tipe N (untuk Mutu PP Tertentu Setara denga


NO.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.
1
2
3

BAHAN
Batu
Pasir Pasang
Portland Cement

C.
1

PERALATAN
Molen

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

4.

Pasangan Batu Mortar Tipe M (untuk Mutu PP Tertentu Setara denga


NO.

5.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.
1
2
3

BAHAN
Batu
Pasir Pasang
Portland Cement

C.
1

PERALATAN
Molen

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Bronjong Kawat Ukuran 1 x 2 x 0.5 m Berberntuk Persegi Menggunak


NO.

5.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja Penganyam
Tukang Penganyam
Kepala Tukang Penganyam
Mandor

B.
1
2
3

BAHAN
Batu / Batu Belah
Kawat Bronjong dia. 6 mm
Besi Beton dia. 10 mm

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Pasangan Batu Kosong (Rip Rap dia 60 cm), M3


NO.

URAIAN

NO.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.
1
2
3

BAHAN
Batu
Pasir Pasang
Portland Cement

C.
1

PERALATAN
Molen

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

VI PEKERJAAN LAIN-LAIN
1. Pengeringan atau Pemompaan Air
NO.

2.

URAIAN

A.
1
2

TENAGA
Operator
Mekanik

B.
1

BAHAN
Solar

C.
1

PERALATAN
Pompa Air

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Pipa Drain
NO.
A.
1
2

URAIAN
TENAGA
Pekerja
Tukang

3.

B.
1
2
3

BAHAN
Pipa PVC dia. 100 mm/6
Ijuk
Kerikil

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Gebalan Rumput
NO.

4.

URAIAN

A.
1
2
3

TENAGA
Pekerja
Tukang
Mandor

B.
1
2

BAHAN
Gebalan Rumput
Pasak Bambu

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Bar Screen (Trash Rack)


NO.

URAIAN

A.
1
2
3
4

TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

B.
1
2

BAHAN
Besi Beton dia 12 mm
Baja Profil L40.40.4

C.

PERALATAN

5.

1
2

Alat Las Listrik


Bor Listrik

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

Kist Dam Lebih Tinggi 1 m


NO.

URAIAN

A.
1
2

TENAGA
Pekerja
Mandor

B.
1
2

BAHAN
Karung Plasrik
Gedek

C.

PERALATAN

D.
E.
F.

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead & Profit 15% X D
Harga Satuan Pekerjaan ( D + E )

SATUAN

KOEF.

OH
OH
OH

0.009
0.003
0.001

HARGA SATUAN
RP.
107,525.00
151,800.00
202,400.00
JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN


Jam

0.020

49,680.00
JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

JUMLAH HARGA
RP.
967.73
455.40
202.40
1,625.53

993.60
993.60
2,619.13
392.87
3,100.00

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH
OH
OH

0.100
0.100
0.010
0.005

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

10,752.50
15,180.00
1,897.50
1,012.00
28,842.00

m
kg
m

0.012
0.020
0.007

5,060,000.00
25,300.00
5,060,000.00
JUMLAH HARGA BAHAN

60,720.00
506.00
35,420.00
96,646.00

ralatan ( A + B + C )

JUMLAH HARGA PERALATAN

125,488.00
18,823.20
144,400.00

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OJ
OJ
OJ

1.000
0.500
2.000

27,107.14
27,107.14
15,360.71
JUMLAH TENAGA KERJA

27,107.14
13,553.57
30,721.43
71,382.14

Ltr

0.012

12,650.00
JUMLAH HARGA BAHAN

151.80
151.80

Jam

0.032

349,002.00
JUMLAH HARGA PERALATAN

11,168.06
11,168.06

ralatan ( A + B + C )

82,702.01
12,405.30
95,200.00

arak angkut 3 m (Manual)


SATUAN

KOEF.

OH
OH

0.563
0.019

HARGA SATUAN
RP.
151,800.00
202,400.00
JUMLAH TENAGA KERJA

JUMLAH HARGA
RP.
85,463.40
3,845.60
89,309.00

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

89,309.00
13,396.35
102,800.00

m dan jarak angkut 3 m (Manual)


SATUAN

KOEF.

OH
OH

0.675
0.023

HARGA SATUAN
RP.
151,800.00
202,400.00
JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA
RP.
102,465.00
4,655.20
107,120.20

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

107,120.20
16,068.03
123,200.00

SATUAN

KOEF.

OH
OH

1.351
0.045

HARGA SATUAN
RP.
151,800.00
202,400.00
JUMLAH TENAGA KERJA

JUMLAH HARGA
RP.
205,081.80
9,108.00
214,189.80

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

214,189.80
32,128.47
246,400.00

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OJ
OJ
OJ

1.000
0.500
2.000

27,107.14
27,107.14
15,360.71
JUMLAH TENAGA KERJA

27,107.14
13,553.57
30,721.43
71,382.14

Ltr

0.012

12,650.00
JUMLAH HARGA BAHAN

151.80
151.80

Jam
Jam

0.096
0.064

436,252.50
349,002.00
JUMLAH HARGA PERALATAN

41,792.99
22,266.33
41,792.99

ralatan ( A + B + C )

113,326.93
16,999.04
130,400.00

SATUAN

KOEF.

OH
OH

0.330
0.012

HARGA SATUAN
RP.
107,525.00
202,400.00
JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN


unit/m3

0.050

241,500.00
JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

35,483.25
2,428.80
37,912.05

12,075.00
12,075.00
49,987.05
7,498.06
57,500.00

SATUAN

KOEF.

OJ
OJ

1.000
0.500

HARGA SATUAN
RP.
27,107.14
27,107.14
JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN


Jam

JUMLAH HARGA
RP.

0.035

396,819.00
JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

JUMLAH HARGA
RP.
27,107.14
13,553.57
40,660.71

13,888.67
13,888.67
54,549.38
8,182.41
62,800.00

SATUAN

KOEF.

OJ
OJ

1.000
0.500

m3

1.200

HARGA SATUAN
RP.
27,107.14
27,107.14
JUMLAH TENAGA KERJA
189,750.00

JUMLAH HARGA
RP.
27,107.14
13,553.57
40,660.71
227,700.00

Jam

0.050

JUMLAH HARGA BAHAN

227,700.00

396,819.00
JUMLAH HARGA PERALATAN

19,840.95
19,840.95

ralatan ( A + B + C )

288,201.66
43,230.25
331,500.00

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH

0.400
0.040

151,800.00
202,400.00
JUMLAH TENAGA KERJA

60,720.00
8,096.00
68,816.00

m3

1.200

189,750.00
JUMLAH HARGA BAHAN

227,700.00
227,700.00

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

SATUAN
OH
OH
OH
OH

296,516.00
44,477.40
341,000.00

Manual

KOEF.
Molen

1.650
0.275
0.028
0.083

kg

1.320
0.205
0.020
0.060

HARGA SATUAN
RP.
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

247

kg

869

0.621

m3*)

kg
L

999

0.740
215

m3*)

Hari

JUMLAH HARGA
RP.
141,933.00
31,119.00
3,795.00
12,144.00
188,991.00

2,530.00

624,910.00

822,250.00

510,382.32

695,750.00
300.00
JUMLAH HARGA BAHAN

0.200
JUMLAH HARGA PERALATAN

514,855.00
64,500.00
1,714,647.32
-

ralatan ( A + B + C )

1,903,638.32
285,545.75
2,189,200.00

p (122) cm, w/c = 0.58


SATUAN

Manual

KOEF.
Molen

1.650
0.275
0.028
0.083

1.320
0.205
0.020
0.060

OH
OH
OH
OH

kg

R+P

1.000
107,525.00
0.138
151,800.00
0.018
189,750.00
0.050
202,400.00
JUMLAH TENAGA KERJA

371

kg

698

0.499

m *)

kg
L

1047

0.776
215

m *)

Hari

HARGA SATUAN
RP.

938,630.00

822,250.00

409,950.36

759,000.00
300.00
JUMLAH HARGA BAHAN
276,000.00

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

588,646.67
64,500.00
2,001,727.02
55,200.00
55,200.00
2,245,918.02
336,887.70
2,582,900.00

dengan Multiflex 12 mm atau 18 mm (Tanpa Perancah)


HARGA SATUAN
SATUAN
KOEF.
RP.
OH
OH
OH
OH

Lbr
M3
kg
L

141,933.00
31,119.00
3,795.00
12,144.00
188,991.00

2,530.00
3

0.200

JUMLAH HARGA
RP.

0.350
0.020

JUMLAH HARGA
RP.

0.200
0.500
0.050
0.010

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

21,505.00
75,900.00
9,487.50
2,024.00
108,916.50

0.200
0.015
0.250
0.200

234,025.00
5,060,000.00
25,300.00
4,427.50
JUMLAH HARGA BAHAN

46,805.00
75,900.00
6,325.00
885.50
129,915.50

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

238,832.00
35,824.80
274,700.00

misal 2 kali maka koefisien menjadi 0.20 (Multiflek) dan 0.015 (Kaso)

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH
OH
OH

0.700
0.700
0.070
0.040

Kg

105

Kg

1.500

35,420.00
JUMLAH HARGA BAHAN

53,130.00
1,779,855.00

Hari

0.050

169,050.00
JUMLAH HARGA PERALATAN

8,452.50
8,452.50

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
16,445.00

ralatan ( A + B + C )

75,267.50
106,260.00
13,282.50
8,096.00
202,906.00
1,726,725.00

1,991,213.50
298,682.03
22,899.00

PP Tipe N (untuk Mutu PP Tertentu Setara dengan Campuran 1 PC : 4 PP)


HARGA SATUAN JUMLAH HARGA
SATUAN
KOEF.
RP.
RP.
OH
OH
OH
OH

0.300
0.150
0.015
0.015

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

32,257.50
22,770.00
2,846.25
3,036.00
60,909.75

M3
kg

0.018
4.450

822,250.00
2,530.00
JUMLAH HARGA BAHAN

14,800.50
11,258.50
26,059.00

ralatan ( A + B + C )

JUMLAH HARGA PERALATAN

86,968.75

13,045.31
100,100.00

uk Mutu PP Tertentu Setara dengan Campuran 1 PC : 2 PP)


HARGA SATUAN
SATUAN
KOEF.
RP.

JUMLAH HARGA
RP.

OH
OH
OH
OH

0.300
0.150
0.015
0.015

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

32,257.50
22,770.00
2,846.25
3,036.00
60,909.75

M3
kg

0.012
6.340

822,250.00
2,530.00
JUMLAH HARGA BAHAN

9,867.00
16,040.20
25,907.20

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

86,816.95
13,022.54
99,900.00

Tertentu Setara dengan Campuran 1 PC : 4 PP)


HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH
OH
OH

2.703
0.900
0.090
0.135

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

290,640.08
136,620.00
17,077.50
27,324.00
471,661.58

M3
M3
kg

1.200
0.520
163

695,750.00
822,250.00
2,530.00
JUMLAH HARGA BAHAN

834,900.00
427,570.00
412,390.00
1,674,860.00

unit/hari

0.167

44,400.00
JUMLAH HARGA PERALATAN

7,414.80
7,414.80

ralatan ( A + B + C )

2,153,936.38
323,090.46
2,477,100.00

Tertentu Setara dengan Campuran 1 PC : 2 PP)


HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH
OH
OH

2.703
0.900
0.090
0.135

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

290,640.08
136,620.00
17,077.50
27,324.00
471,661.58

M3
M3
kg

1.200
0.440
252

695,750.00
822,250.00
2,530.00
JUMLAH HARGA BAHAN

834,900.00
361,790.00
637,560.00
1,834,250.00

unit/hari

0.167

44,400.00
JUMLAH HARGA PERALATAN

7,414.80
7,414.80

ralatan ( A + B + C )

2,313,326.38
346,998.96
2,660,400.00

uk Persegi Menggunakan Kawat Diameter 8 mm


HARGA SATUAN
SATUAN
KOEF.
RP.

JUMLAH HARGA
RP.

OH
OH
OH
OH

0.750
0.300
0.060
0.015

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

80,643.75
45,540.00
11,385.00
3,036.00
140,604.75

M3
kg
kg

1.800
4.000
24.500

695,750.00
50,600.00
16,445.00
JUMLAH HARGA BAHAN

1,252,350.00
202,400.00
402,902.50
1,857,652.50

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

SATUAN

1,998,257.25
299,738.59
2,298,000.00

KOEF.

HARGA SATUAN

JUMLAH HARGA

SATUAN

KOEF.

OH
OH
OH
OH

2.703
0.900
0.090
0.135

M3
M3
kg

1.200

RP.
107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA
695,750.00

JUMLAH HARGA BAHAN


unit/hari
JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

RP.
290,640.08
136,620.00
17,077.50
27,324.00
471,661.58
834,900.00
834,900.00
1,306,561.58
195,984.24
1,502,600.00

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH

0.042
0.042

189,750.00
189,750.00
JUMLAH TENAGA KERJA

7,969.50
7,969.50
15,939.00

Ltr

0.500

12,650.00
JUMLAH HARGA BAHAN

6,325.00
6,325.00

Unit

0.042

241,500.00
JUMLAH HARGA PERALATAN

10,143.00
10,143.00

ralatan ( A + B + C )

32,407.00
4,861.05
37,300.00

SATUAN

KOEF.

OH
OH

0.025
0.050

HARGA SATUAN
RP.
107,525.00
202,400.00
JUMLAH TENAGA KERJA

JUMLAH HARGA
RP.
2,688.13
10,120.00
12,808.13

M
Kg
M3

1.000
0.300
0.045

9,487.50
11,500.00
253,000.00
JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

9,487.50
3,450.00
11,385.00
24,322.50

37,130.63
5,569.59
42,800.00

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH
OH

0.150
0.050
0.015

107,525.00
151,800.00
202,400.00
JUMLAH TENAGA KERJA

16,128.75
7,590.00
3,036.00
26,754.75

M2
Bh

1.200
2.000

5,750.00
3,500.00
JUMLAH HARGA BAHAN

6,900.00
7,000.00
13,900.00

JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

40,654.75
6,098.21
46,800.00

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH
OH
OH

0.750
0.300
0.060
0.015

107,525.00
151,800.00
189,750.00
202,400.00
JUMLAH TENAGA KERJA

80,643.75
45,540.00
11,385.00
3,036.00
140,604.75

m
m

30.000
6.000

14,592.20
82,800.00
JUMLAH HARGA BAHAN

437,765.90
496,800.00
934,565.90

hr
hr

0.020
0.020

345,000.00
172,500.00
JUMLAH HARGA PERALATAN

ralatan ( A + B + C )

6,900.00
3,450.00
3,450.00
1,078,620.65
161,793.10
1,240,500.00

HARGA SATUAN
RP.

JUMLAH HARGA
RP.

SATUAN

KOEF.

OH
OH

0.750
0.015

107,525.00
202,400.00
JUMLAH TENAGA KERJA

80,643.75
3,036.00
83,679.75

bh
Lbr

23.000
1.000

5,750.00
128,800.00
JUMLAH HARGA BAHAN

132,250.00
128,800.00
261,050.00

ralatan ( A + B + C )

JUMLAH HARGA PERALATAN

344,729.75
51,709.46
396,500.00

26.62 kg

437765.9
14592.2

NO.

URAIAN PEKERJAAN

1
2

PEKERJAAN PERSIAPAN
Pembersihan dan Striping / Kosrekan
Pengukuran dan pemasangan bouwplank

PEKERJAAN TANAH
Galian Tanah Menggunakan Excavator (Alat)

Galian Tanah Tanah Biasa Sedalam <1 m dan jarak angkut 3 m (Manual)

Galian Tanah Tanah Biasa Sedalam <1 m d <2 m dan jarak angkut 3 m (Manual)

Galian Tanah Tanah Berbatu

Galian Tanah berbatu Menggunakan Excavator (Alat)

1 m3 Timbunan Tanah (Manual)

Timbunan Tanah Menggunakan Buldozer (Alat)

Timbunan Tanah Dari Luar Menggunakan Buldozer

1 m3 Timbunan Pasir Sebagai Bahan Pengisi

PEKERJAAN BETON
1 m3 Beton Cyclop

1 m3 Beton Mutu, f'c = 19.3 Mpa (K225), Slump (122) cm, w/c = 0.58

3
4

1 m2 Bekisting untuk Permukaan Beton Biasa dengan Multiflex 12 mm atau 18 mm (Tanpa P


Pembesian 1 kg dengan Besi Polos atau Ulir

PEKERJAAN PASANGAN
Plesteran Tebal 1 cm, dengan Mortar Jenis PC-PP

Siaran dengan Mortar Jenis PC-PP

Pasangan Batu Mortar Tipe N (untuk Mutu PP Tertentu Setara dengan Campuran 1 PC : 4 PP

Pasangan Batu Mortar Tipe M (untuk Mutu PP Tertentu Setara dengan Campuran 1 PC : 2 PP

Bronjong Kawat Ukuran 1 x 2 x 0.5 m Berberntuk Persegi Menggunakan Kawat Diameter 8

Pasangan Batu Kosong (Rip Rap dia 60 cm), M3

1
2
3
4
5

PEKERJAAN LAIN LAIN


Pengeringan atau Pemompaan Air
Pipa Drain
Gebalan Rumput
Bar Screen (Trash Rack)
Kist Dam Lebih Tinggi 1 m

II

III

IV

IV

URAIAN PEKERJAAN

PERSIAPAN
n Striping / Kosrekan
n pemasangan bouwplank

Menggunakan Excavator (Alat)

anah Biasa Sedalam <1 m dan jarak angkut 3 m (Manual)

anah Biasa Sedalam <1 m d <2 m dan jarak angkut 3 m (Manual)

anah Berbatu

erbatu Menggunakan Excavator (Alat)


Tanah (Manual)

h Menggunakan Buldozer (Alat)

h Dari Luar Menggunakan Buldozer


Pasir Sebagai Bahan Pengisi

tu, f'c = 19.3 Mpa (K225), Slump (122) cm, w/c = 0.58

untuk Permukaan Beton Biasa dengan Multiflex 12 mm atau 18 mm (Tanpa Perancah)


dengan Besi Polos atau Ulir

PASANGAN
1 cm, dengan Mortar Jenis PC-PP

Mortar Jenis PC-PP

Mortar Tipe N (untuk Mutu PP Tertentu Setara dengan Campuran 1 PC : 4 PP)

Mortar Tipe M (untuk Mutu PP Tertentu Setara dengan Campuran 1 PC : 2 PP)

t Ukuran 1 x 2 x 0.5 m Berberntuk Persegi Menggunakan Kawat Diameter 8 mm

Kosong (Rip Rap dia 60 cm), M3

LAIN LAIN
au Pemompaan Air

h Tinggi 1 m

SAT.

HARGA SATUAN
( Rp.)

M2
M

3,100.00
144,400.00

M3

95,200.00

102,800.00

M3

123,200.00

M3

246,400.00

130,400.00

M3

57,500.00

M3

62,800.00

331,500.00

M3

341,000.00

M3

2,189,200.00

2,582,900.00

M2
Kg

274,700.00
22,899.00

M2

100,100.00

99,900.00

M3

2,477,100.00

M3

2,660,400.00

2,298,000.00

M3

1,502,600.00

Jam
Bh
M2
Bh
M3

37,300.00
42,800.00
46,800.00
1,240,500.00
396,500.00

You might also like